This document is an Advertisement for Bids issued by AVB Construction, LLC for Mattawan Consolidated School's new Maintenance & Transportation Building project. The project involves constructing a Pre-Engineered Metal Building with multiple bid packages covering site concrete, masonry, metals, general trades, doors, glazing, drywall, flooring, painting, signage, fire protection, plumbing, mechanical, electrical, technology, sitework, paving, fencing, and landscaping. Construction is scheduled to commence in October 2025 with completion expected in October 2026. Sealed bids are due by 11:00 AM on Friday, September 12, 2025, with a public bid opening immediately following, and there will be no pre-bid walk for this project.
Bidders must submit sealed bids to the Mattawan Consolidated School Central Office with accompanying bid security of at least 5% of the bid amount. Additionally, bidders are required to provide three sworn and notarized affidavits: disclosing any familial relationships with school district leadership, certifying no public contracting bars due to bid rigging, and confirming the bidder is not an "Iran-Linked Business" as defined by Michigan law. Questions and inquiries should be directed to AVB via email at apeters@avbinc.com. The project will be designed by TowerPinkster, with AVB Construction, LLC serving as the Construction Manager.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: MCS Maintenance & Transportation Building
Owner: Mattawan Consolidated School Design Professional: TowerPinkster Architect’s Project Number: 23-106.020
Bid Package 2B Construction Manager: AVB Construction, LLC AVB Project Number: AVB 25-032
To potential bidders:
The owner is soliciting bids to erect a new Pre-Engineered Metal Building for a new Mattawan Consolidated Schools Maintenance & Transportation Facility. AVB Construction, LLC is the Construction Manager for the project and is seeking bids for the following:
03.100 Site Concrete, Flatwork; 04.200 Masonry; 05.100 Miscellaneous Metals; 06.800 General Trades; 08.340 OH Doors;
08.400 Aluminum, Glass Glazing; 09.250 Studs, Drywall, Ceilings; 09.600 General Flooring; 09.910 Paint; 10.400 Signage,
21.100 Fire Protection; 22.100 Plumbing; 23.100 Mechanical; 26.100 Electrical; 27.100 Technology; 31.100 Sitework;
32.120 Asphalt/Paving; 32.310 Fences & Gates; 32.900 Landscaping
Pre-Bid Walk:
• There will be no pre-bid walk for this project.
Construction commencement will be in October 2025 and completion is set for October 2026.
Bids are due at 11:00 AM Friday, September 12, 2025 - Public Bid Opening immediately following.
Bid requirements include:
1. Submit clearly labeled sealed bids by Friday, September 12, 2025, by the 11:00AM deadline, to Mattawan Consolidated School, Central Office, 56720 Murray St., Mattawan, MI 49071. (Bids received after the due date and time listed above shall not be considered or accepted.)
2. Bids submitted shall be accompanied by bid security in the amount of not less than 5% of the amount of the bid.
3. Each bid submitted shall be accompanied by the following sworn and notarized affidavits located in the Bidder’s Instructions:
a. Disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board or the superintendent of the school district.
b. Certifying that contractor is not barred from public contracting due to bid rigging or bid rotating convictions; and
c. Certifying that it is not an “Iran-Linked Business” as defined in Act 517, Public Acts of Michigan, 2001, MCL 129.311, et seq.
Please direct any questions or inquiries pertaining to this bid to AVB at apeters@avbinc.com.
• There will be no pre-bid walk for this project.
File details come from the government source that posted it. Updated .