broward Specification Package.pdf

PDF 21 MB Posted

Attached to
Separated Shared Use Path - Phase 1
Solicitation number
PNC2132220C1
Issued by
Broward County, Fort Lauderdale City, Florida

About this file

This is a Specification Package for the Separated Shared Use Path - Phase 1 project, a fixed-price construction contract administered by the Broward County Aviation Department for North Perry Airport (HWO) in Florida. The project involves the development and construction of a separated shared use path in accordance with detailed specifications and requirements. The scope includes construction of temporary work structures designed solely to support construction equipment, such as work bridges, elevated platforms, floating platforms, and rail systems. Contractors must adhere to all limitations contained in the plans and permits, and embankment placement is restricted to areas shown in the project plans. Any temporary structure types that deviate from those specified in the plans require the contractor to obtain necessary permit revisions and engineer approval.

The cost of embankment materials, placement, compaction, and removal is included in the lump sum price for temporary work structures. The specification package establishes the technical and performance requirements that bidders must address in their proposals. Contractors are responsible for compliance with all applicable permits and regulatory requirements associated with the project, including any modifications necessitated by alternative construction methods or structural choices.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .