Brookwood Ave Roadway Improvements.pdf

PDF 5 MB Posted

Attached to
Roadway Improvements - Brookwood Avenue
Solicitation number
2731
Issued by
Cabarrus County, North Carolina

About this file

Brookwood Avenue Roadway Improvements Project Summary

This is a Bid Documents package for the City of Concord Engineering Department in North Carolina for the Brookwood Avenue Roadway Improvements project (Project No. 2006-067, Bid No. 2731). The project encompasses approximately 5,220 linear feet of roadway overlay along Brookwood Avenue, installation of 5,220 feet of curb and gutter and sidewalk, storm drainage pipe and structures, additional left turn lanes at the Branchview Drive and Brookwood Avenue intersection, and traffic signals at three intersections (Church Street, Camrose Circle, and Branchview Drive/Brookwood Avenue). The bid scope includes grading, storm sewer installation, retaining walls, roadway construction, pavement markings, erosion control, water and sewer relocation, and traffic signal installation. Sealed bids are due November 17, 2026, at 11:30 a.m., submitted to Enrique A. Blat, PE, Deputy City Engineer, at the Alfred M. Brown Operations Center, 635 Alfred Brown Jr Court SW, Concord, NC 28026. Technical questions should be directed to Carolina Garcia Zaragoza, PE, at gzaragozac@concordnc.gov or 704.920.5425. Contractors must register to bid by providing company name, physical address, email address, and telephone number. The contract completion timeline is 365 days from the Notice to Proceed, with liquidated damages of $1,000 per day assessed for delays beyond the contract completion date.

Bids must be submitted on a unit price basis with a 5% bid bond or equivalent security. The successful bidder must execute a Performance Bond and Payment Bond prior to contract award. North Carolina-licensed contractors are required, with all subcontractors holding utility contractor licenses in the state. The bid includes a 10% contingency line item designated for minor change orders at the City's discretion. Bidders must acknowledge receipt of all addenda, represent that they have examined contract documents and visited the site, and certify that no collusive bidding has occurred. Bid documents are available free of charge from the City of Concord website at https://concordnc.gov/Departments/Finance/Purchasing/RFPs-RFQs-and-Bids. The successful bidder will be determined based on lowest responsible bid considering quality, performance, and time specifications. All work must comply with 2024 NCDOT Standard Specifications, City of Concord Technical Standards, and Water and Sewer Authority of Cabarrus County specifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID DOCUMENTS FOR

BROOKWOOD AVE. ROADWAY

IMPROVEMENTS

PROJECT NO. 2006-067

BID NO. 2731

SET # ___

ENGINEERING DEPARTMENT

635 ALFRED BROWN JR. COURT SW,

POST OFFICE BOX 308

CONCORD, NORTH CAROLINA 28026-0308

TABLE OF CONTENTS

SECTION I – BIDS, AGREEMENTS, AND NOTICES

BID ADVERTISEMENT/INVITATION TO BID

INSTRUCTION TO BIDDERS

DEBARRED FIRMS CERTIFICATION FORM

EXHIBIT A – BID FORM

EXHIBIT B – STANDARD FORM OF PERFORMANCE BOND

EXHIBIT C – SPECIAL PROVISIONS

NOTICE OF AWARD

NOTICE TO PROCEED

STANDARD FORM OF CONSTRUCTION CONTRACT

EXHIBIT D – E-VERIFY

EXHIBIT E – TAX FORMS

EXHIBIT F – CERTIFICATE OF INSURANCE

PAY REQUEST FORM

ENGINEERING’S APPLICATION FOR PAYMENT FORM

CONTRACT CHANGE ORDER

CERTIFICATE OF INFRASTRUCTURE COMPLETION

FIELD ORDER

NC SALES TAX REPORT

NORTH CAROLINA ONE CALL

SECTION II – GENERAL CONDITIONS

SEE City Webpage https://concordnc.gov/Portals/0/Concord/Departments/Engineering/Documents/Old%20Site%20St andards/10%2001%2005%20General%20Conditions%20Horizontal.pdf?ver=D9zcv1hzhy5VHaH l1P4Ntg%3d%3d

APPENDIX A – NCDOT ENCROACHMENT AGREEMENT........................................ A-1

APPENDIX B – NCDEQ E&SC CERTIFICATE OF PLAN APPROVAL .................... A-2

APPENDIX C – ABATEMENT OF ASBESTOS-CEMENT PIPING GUIDELINES AND

PROCEDURES .......................................................................................................................... A-3

APPENDIX D – SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS

PROJECT SPECIAL PROVISIONS ..................................................................................... A-4

SECTION I

BIDS, AGREEMENTS, AND NOTICES

BID ADVERTISEMENT/INVITATION TO BID

October 9, 2026 Project Title: Brookwood Ave. Roadway Improvements Project No. 2006-067

Project Description: The Brookwood Ave. Roadway Improvements project consists of approx. 5,220' of overlay along Brookwood Ave., the installation of 5,220 +/- feet of curb and gutter and sidewalk, storm drainage pipe and structures, additional left turn lanes at the intersection of Branchview Dr. and Brookwood Ave., and traffic signals at the intersections of Church St, Camrose Cir., and Branchview Dr. and Brookwood Ave. for the purpose of roadway improvements along Brookwood Ave.

Sealed Bids will be received by the City of Concord (Owner) at the address below. Please submit notarized bids in a sealed envelope by the bid opening time and date. All Bids must be in accordance with the Bidding Documents on file with the City of Concord Engineering Department. Bidders must be licensed contractors in the State of North Carolina. Bids will be received on a unit price basis. A Bid Bond must accompany each bid. The Successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Contractor and all Subcontractors will be required to conform to the labor standards set forth in the Contract Documents. Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids, and will award to lowest responsible Bidder taking into consideration quality, performance, and time specified in Bid Form for performance of Work. Owner also reserves the right to waive informalities.

Enrique A. Blat, PE Deputy City Engineer

Engineer: City of Concord Engineering Department Alfred M. Brown Operations Center 635 Alfred Brown Jr Court SW P O Box 308, Concord, NC 28026-0308

Contractors wishing to bid on this project must register to bid by sending an email to Carolina Garcia- Zaragoza, P.E. at gzaragozac@concordnc.gov. Registration for bidding requires the name of the company, physical address, email address, and telephone number. All communication regarding this bid will be done through email.

Bid documents are available free of charge from the City of Concord website at:

https://concordnc.gov/Departments/Finance/Purchasing/RFPs-RFQs-and-Bids

Technical questions: Contact Carolina Garcia Zaragoza Villa, P.E., (gzaragozac@concordnc.gov) 704.920.5425

Bid Due Date: November 17, 2026 at 11:30 am https://concordnc.gov/Departments/Finance/Purchasing/RFPs-RFQs-and-Bids mailto:gzaragozac@concordnc.gov

Location: City of Concord, Alfred M. Brown Operations Center 635 Alfred Brown Jr Court SW, Concord, NC 28026

Ready Room (See attached map/directions)

MAP AND DIRECTIONS TO CITY OF CONCORD

ALFRED M BROWN OPERATIONS CENTER

Directions from Charlotte

• Take I-77 north to I-85 north from Charlotte to Concord.

• From I-85 north, take exit 49 to the right towards Lowe’s Motor Speedway.

• At the Lowe’s Motor Speedway, turn left onto Highway 29 (Concord Pkwy) north.

• Keep going north while you pass the Wal-Mart shopping center on your right.

• Turn right at the light at the Chevrolet dealership onto Cabarrus Avenue.

• Turn right at the next traffic light at the Walgreens onto Hwy 601 South (bypass). (Hwy 601 S is also Warren C. Coleman Boulevard).

• Go straight through two traffic lights at Old Charlotte Road and Wilshire Avenue.

• Pass the Bi-Lo shopping center on your left.

• Turn right at the next traffic light at Alfred Brown Jr Court SW (green & white sign on right for the City of Concord Alfred M. Brown Operations Center).

• You will be on the entrance road into our complex.

• Follow signs to the left to Visitor Parking.

• Proceed to the front desk at the Administration Building and sign in with the receptionist.

City of Concord Alfred M Brown

Operations Center

Hwy 29 To Charlotte

INSTRUCTIONS TO BIDDERS

1. DEFINED TERMS. Terms used in these Instructions to Bidders are meanings assigned to them in the General Conditions and the Supplementary Conditions. An additional term is defined as follows:

Successful Bidder - The lowest, qualified, responsible, and responsive Bidder to whom

Owner (on the basis of Owner's evaluation as herein provided) makes an award.

2. COPIES OF BID DOCUMENTS. Bid Documents may be obtained from the Owner via the link below for the City of Concord’s website.

Charge Complete set of Bid Documents Free download https://concordnc.gov/Departments/Finance/Purchasing/RFPs-RFQs-and-Bids

Partial sets of Bid Documents will not be issued in response to requests by subject matter.

Complete sets of Bid Documents must be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misrepresentations resulting from the use of incomplete sets of Quoting Documents.

Owner and Engineer, in making copies of Quoting Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

3. QUALIFICATIONS OF BIDDERS. To demonstrate qualifications to perform the Work, Bidder may be required to submit written evidence on financial data, previous experience, present commitments, and other such data as may be requested by Owner or Engineer. Each Bid must contain evidence of Bidder’s qualification to do business in the state where the Project is located, or Bidder must agree to obtain such qualification prior to award of the Contract.

4. EXAMINATION OF CONTRACT DOCUMENTS AND SITE. It is the responsibility of each Bidder, before submitting a Bid, to (a) thoroughly examine the Contract Documents, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the Work, (c) consider federal, state, and local laws and regulations that may affect cost, progress, performance, or furnishing of the Work, (d) study and carefully correlate Bidder’s observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors, or discrepancies discovered by Bidder in the Contract Documents.

4.02. Underground Facilities. Information and data reflected in the Contract Documents with respect to underground facilities at or contiguous to the site are based upon information and data furnished to Owner and Engineer by owners of such underground facilities or others, and Owner and Engineer disclaim responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions.

4.03. Additional Information. Before submitting a Bid, each Bidder will, at Bidder’s own expense, make or obtain any additional examinations, investigations, explorations, tests, and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface, and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price, and other terms and conditions of the Contract Documents.

https://concordnc.gov/Departments/Finance/Purchasing/RFPs-RFQs-and-Bids

On request 24 hours in advance, Owner will provide each Bidder access to the site to conduct such explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the site to its former condition upon completion of such explorations.

Arrangements for site visits shall be made by calling the office of the Director of Engineering for the City of Concord at 704.920.5425.

4.04. Easements. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by Owner unless otherwise specified in the Contract Documents.

4.05. Unit Price Contracts. Bidders must satisfy themselves of the accuracy of the estimated quantities in the Bid schedule by examination of the site and a review of the drawings and the specifications, including the addenda. After Bids have been submitted, the Bidder shall not assert that there was a misunderstanding concerning the quantities of work or the nature of the work to be done.

4.06. Bidder’s Representation. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement concerning examination of the Contract Documents and the site, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

5. INTERPRETATIONS AND ADDENDA. All questions about the meaning or intent of the Quoting Documents and the Contract Documents shall be submitted to Owner in writing. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Quoting Documents.

Questions received less than 10 days prior to the date for opening of Bids may not be answered. Only answers issued by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

6. BID SECURITY. Each Proposal must be accompanied by a deposit equal to 5% of the net price bid. This deposit may consist of cash, or a Cashier's Check issued by, or a Certified Check drawn on a Bank or Trust Company authorized to do business in North Carolina, or on a Bank insured by the Federal Deposit Insurance Corporation, or a U.S. Money Order, payable to the City of Concord or 5% Bid Bond in the form required by G.S. 143-129 as amended, issued by an Insurance Company authorized to do business in North Carolina, said deposit to be retained in the event of failure of the successful bidder to execute a formal contract within ten (10) days after award or to give satisfactory surety required.

The Bid security of the Successful Bidder (if so required) will be retained until such Bidder has executed the Agreement, furnished the required contract security (if so required), and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within the number of days set forth in the Bid Form, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited.

The Bid security (if so required) of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Agreement or the day after the last day the Bid remain subject to acceptance as set forth in the Bid Form, whereupon Bid security furnished by such Bidders will be returned. Bid security accompanying Bid which are deemed by Owner to be noncompetitive will be returned within 7 days after the designated Bid opening.

7. CONTRACT TIMES. The numbers of calendar days within which, or the dates by which, the Work is to be substantially completed and also completed and ready for final payment (the Contract Times) are set forth in the Bid Form.

8. LIQUIDATED DAMAGES. Provisions for liquidated damages, if any, are set forth in the Agreement.

9. SUBSTITUTES OR "OR-EQUAL ITEMS. Bidder’s attention is directed to Article 6.5 of the General Conditions concerning substitutes and "or-equal" items. Where an item or material is specified by a proprietary name, it is done for the purpose of establishing a basis of quality and not for the purpose of limiting competition. The Engineer's intent is to consider alternative products which have the desired essential characteristics. The Engineer will consider any such products offered. Requests for acceptance of alternative products shall be made through Bidders quoting as prime Contractors. Acceptances for substitutions will not be granted directly to suppliers, distributors, or subcontractors. Pursuant to Section 133-3, General Statutes of North Carolina, the following procedures shall be used:

Bidders desiring to submit alternative product proposals for prior acceptance of the Engineers shall submit, in writing, such proposals from __n/a__, until _n/a__. Applications received after this time will not be reviewed. Each such request shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute, including drawings, cuts, performance and test data, and other information necessary for an evaluation. A statement setting forth any changes in other materials, equipment, or other work that incorporation of the substitute would require shall be included. The Engineer shall consider and either accept or reject all alternative product proposals submitted.

If, by the close of the fifth day prior to the deadline for receiving Bid, the Engineer has accepted any alternative product proposals, the Quoting Documents shall be modified to include the alternative products.

The Engineer shall publish the modification in an Addenda at least 5 days prior to the deadline for receiving Bids. The Engineer's decision of acceptance or rejection of a proposed substitute shall be final.

10. SUBCONTRACTORS, SUPPLIERS, AND OTHERS. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, and other persons and organizations (including those who are to furnish the principal items of material and equipment) to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within 3 days after the opening submit to Owner the List of Subcontractors completed with all such Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work for which such identification is required. The list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, person, or organization, if requested by Owner. If Owner or Engineer after due investigation has reasonable objection to any proposed Subcontractor, Supplier, or other person or organization, Owner may, before the Notice of Award is given, request the apparent Successful Bidder to submit an acceptable substitute without an increase in the Bid.

All Subcontractors shall be a licensed utility contractor in the State of North Carolina.

11. BID FORM. The Bid Form is bound in the Quoting Documents and shall not be removed therefrom.

Bid Forms must be completed in ink.

Bids by corporations must be executed in the corporate name by the president or vice-president (or other corporate officer accompanied by evidence of authority to sign for the corporation). Bids by partnerships must be executed in the partnership name and signed by a partner. Bids by joint ventures shall be signed by each participant in the joint venture or by a representative of the joint venture accompanied by evidence of authority to sign for the joint venture.

The names of all persons signing shall be legibly printed below the signature. A Bid by a person who affixes to his signature the word "president", "secretary", "agent", or other designation without disclosing his principal may be held to be the Bid of the individual signing. When requested by Owner, evidence of the authority of the person signing shall be furnished.

All blanks in the Bid Form shall be filled. A Bid price shall be indicated for each unit price item listed therein, or the words "No Bid", "No Charge", "No Change", or other appropriate phrase shall be entered.

The Bid shall contain an acknowledgment of receipt of all Addenda; the numbers and dates of which shall be filled in on the Bid Form.

No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, Owner may require the Bidder to identify any alteration so initialed.

11.01. Bid Pricing. The Bidder shall complete the schedule of unit prices included in the Bid Form and shall accept all fixed unit prices listed therein.

The total Bid will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid. The final Contract Price will be subject to adjustment according to final measured, used, or delivered quantities as provided in Article 9.7 of the General Conditions, and the unit prices in the Bid will apply to such final quantities except that unit prices will be subject to change by Change Order as stipulated in the Supplementary Conditions.

11.02. Contingency. The Contingency is to be added to the Bid price and is to be used for minor change order items. If the Contingency is to be used, a scope of work and price would be negotiated. The Contingency is for the sole use of Owner. A change order will be issued to delete any unauthorized portion of the Contingency.

12. SUBMISSION OF BIDS. Bids shall be submitted at the time and place indicated in the Invitation to

Bid, or the modified time and place indicated by Addendum. Bids shall be enclosed in a sealed envelope or wrapping, addressed to:

The City of Concord

Enrique Blat, PE, Deputy City Engineer P.O. Box 308

635 Alfred Brown Jr Court SW Concord, North Carolina 28026-0308

Bids shall be marked with the name, license number, and address of the Bidder and shall be accompanied by the Bid security (if required) and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it.

Each Bid envelope shall be identified on the outside with the words:

“BID FOR BROOKWOOD AVE. ROADWAY IMPROVEMENTS – PROJECT 2006-067”

Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

Bids received after the time and date for receipt of Bids will be returned unopened.

One copy of all pages of the BID FORM must be submitted with the Bid, as well as a Bid Bond and Debarred Firms Certification Form.

Oral, telephone, facsimile, or telegraph Bids are invalid and will not receive consideration.

No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association.

A conditional or qualified Bid will not be accepted.

13. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.

If, within 24 hours after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid and the Bid security (if any) will be returned. Thereafter, that Bidder will be disqualified from further quoting on the Work to be provided under the Contract Documents.

14. OPENING OF BIDS. Bids will be opened at the office and at the discretion of the Director of Engineering and read aloud.

The procedure for opening Bids will follow guidelines issued by the State Building Commission dated December 10, 1990, and endorsed by the Consulting Engineers Council of North Carolina.

15. BIDS TO REMAIN SUBJECT TO ACCEPTANCE. All Bids will remain subject to acceptance for the number of days set forth in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the security (if any) prior to that date.

16. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids, and will award to lowest responsible Bidder taking into consideration quality, performance, and time specified in Bid Form for performance of Work. Owner also reserves the right to waive informalities.

In evaluating Bids, Owner will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternatives, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Supplementary Conditions.

Owner also may consider the operating costs, maintenance requirements, performance data, and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.

Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.

If the Contract is to be awarded, it will be awarded to the lowest Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests of Owner. If the Contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within the number of days set forth in the Bid

Form. The evaluation of Suppliers' or manufacturers' data submitted with the Bid, or submitted upon request prior to the Notice of Award, will include consideration of the following:

• Owner-required inventory of spare parts.

• Building design changes which would be required to accommodate the proposed materials and equipment.

• Installation requirements and related engineering, training, and operating costs.

• Experience and performance record of the Supplier or the manufacturer.

• Maintenance and frequency of inspections required to assure reliable performance of the equipment.

• Suppliers' or manufacturers' service facilities and availability of qualified field service personnel.

• Efficiency and related operating expense during the anticipated useful life of the equipment.

17. CONTRACT SECURITY. The General Conditions set forth Owner's requirements as to Performance and Payment Bonds (required). These Bonds shall be delivered to Owner with the executed Agreement.

18. SIGNING OF AGREEMENT. When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by two unsigned counterparts of the Agreement with all other written Contract Documents attached. Within the number of days set forth in the Bid Form, the Successful Bidder shall sign, leaving the dates blank, and deliver the required number of counterparts of the Agreement and attached documents to Owner with the required Bonds and power of attorney. Within 30 days thereafter, Owner shall execute all copies of the Agreement and other Contract Documents submitted by Contractor (Successful Bidder);

shall insert the date of contract on the Agreement, Bonds, and power of attorney; and shall distribute signed copies as stipulated in the Agreement.

Should the Owner not execute the Contract within the period specified, the Successful Bidder may, by written notice, withdraw his signed Contract. Such notice or withdrawal shall be effective upon receipt of the notice by the Owner.

19. SALES AND USE TAXES. Provisions for sales and use taxes, if any, are set forth in the Supplementary Conditions.

20. RETAINAGE. Provisions concerning retainage are set forth in the Agreement.

21. LAWS AND REGULATIONS. Modifications, if any, to the General Conditions concerning Laws and Regulations are set forth in the Supplementary Conditions. Additional provisions, if any, concerning Laws and Regulations are set forth in the Agreement.

21.01. Collusive Bidding. In accordance with Section 112(c) of Title 23 USC, and G.S. 75-5(b)(7) of the State of North Carolina, the Contractor (Bidder), by submission and execution of this bid or Bid, certifies that he has not entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding or quoting in connection with his Bid on this project.

End of Section

DEBARRED FIRMS CERTIFICATION FORM

Brookwood Ave. Roadway Improvements Project No. 2006-067

The undersigned hereby certifies that the firm of ________________________________ has not been suspended by the State of North Carolina or any agency or department thereof for conviction or indictment or any of the offenses enumerated in G.S. 133-27 nor will award subcontracts of any tier to firms that have been suspended for conviction or indictment of any of the offenses enumerated in G.S. 133-27.

Name of Firm

ATTEST ____________________________ (SEAL)

Signature of Authorized Official

Title

Sworn and subscribed before me this

______ day of , 20__

Notary Public

EXHIBIT A – BID FORM

PROJECT IDENTIFICATION:

THIS BID IS SUBMITTED TO:

Enrique Blat, PE, Deputy City Engineer

635 Alfred Brown Jr Court SW P.O. Box 308

Concord, North Carolina 28026-0308

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with

Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents within the specified time and for the amount indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. Bidder accepts all of the terms and conditions of the Invitation to Bid and the Instructions to Bid, including without limitation those dealing with the disposition of the Bid security (if security is required by the City Manager). This Bid will remain subject to acceptance for 60 days after the day designated for reception of Bids. Bidder will sign and submit the Agreement with the Bonds and other documents required by the Quoting Documents within 10 days after the date of Owner's Notice of Award.

3. In submitting this Bid, Bidder represents that:

a. Bidder has examined copies of all the Quoting Documents and of the following Addenda (receipt of all which is hereby acknowledged):

No. Dated

b. Bidder has visited the site and become familiar with and satisfied itself as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work.

c. Bidder is familiar with and has satisfied itself as to all Federal, State, and Local Laws and Regulations that may affect cost, progress, performance, and furnishing of Work.

d. Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have provided by the owner and under the conditions normally used and identified in the Supplementary Conditions and Special Conditions as provided in Paragraph 4.2.1 of the General Conditions. Bidder accepts the determination set forth in the Supplementary Conditions and Special Conditions of the extent of the "technical data" contained in such reports and drawings upon which Bidder is entitled to rely as provided in Paragraph 4.2 of the General Conditions. Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder’s purposes. Bidder acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Quoting Documents with respect to underground facilities at or contiguous to the site. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the time, price, and other terms and conditions of the Contract Documents.

e. Bidder is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.

f. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

g. Bidder has given Engineer written and verbal notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid Bidder has not solicited or induced any person, firm, or corporation to refrain from quoting; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

4. Bidder will complete the Work for the following unit prices. Quantities indicated are estimated and not guaranteed; they are solely for comparing Bids and establishing the initial Contract Price. Final payment will be based on actual quantities.

EXHIBIT A – BID FORM

Brookwood Ave. Roadway Improvements - Project No. 2006-067

No. Item Description Qty. Units Unit Price ($) Item Total ($)

1 800 Mobilization 1 LS

2 801 Construction Surveying 1 LS

3 SP-01 Traffic Control 1 LS

GRADING

4 SP-02 Comprehensive Grading 1 LS

5 SP-03 Select Material 6500 TN

6 SP-04 Borrow Excavation 1000 CY

7 SP-05 Rock Removal 500 CY

8 226 Undercut Excavation 200 CY

9 270 Geotextile for Soil Stabilization 600 SY

STORM SEWER

10 300 Foundation Conditioning Material, Minor Structures 250 TN

11 300 Foundation Conditioning Geotextile 1700 SY

12 310 15" RC Pipe Culverts, Class III 1150 LF

13 310 15" RC Pipe Culverts, Class IV 420 LF

14 310 18" RC Pipe Culverts, Class III 610 LF

15 310 24" RC Pipe Culverts, Class III 460 LF

16 310 30" RC Pipe Culverts, Class III 310 LF

17 310 30" DIP Pipe Culverts 180 LF

18 310 36" RC Pipe Culverts, Class III 25 LF

19 310 48" RC Pipe Culverts, Class III 82 LF

20 310 15" Pipe End Section 1 EA

21 838 Endwalls (Std. 838.11) 12 CY

22 840 Masonry Drainage Structures, 840.01 23 EA

23 840 Masonry Drainage Structures, 840.01 - Additional Length 16 LF

24 840 Masonry Drainage Structures, 840.05 3 EA

25 840 Masonry Drainage Structures, 840.15 1 EA

26 840 Masonry Drainage Structures, 840.27 w/Concrete Apron 5 EA

27 840 Masonry Drainage Structures, 840.31 (Precast 840.45) 1 EA

28 840 Masonry Drainage Structures, 840.31 (Precast 840.45) - Additional Length 10 LF

29 840 Masonry Drainage Structures, 840.32 5 EA

30 840 Masonry Drainage Structures, 840.32 - Additional Length 13 LF

31 SP-07 Masonry Drainage Structures, Offset CB with MH on Sidewalk 3 EA

32 SP-07 Masonry Drainage Structures, Offset CB with MH on Sidewalk - Additional Length 5 LF

33 SP-07 Masonry Drainage Structures, Offset CB with MH on Roadway 1 EA

34 840 Frame with Grate and Hood, Std. 840.03, Type G 15 EA

35 840 Frame with Grate and Hood, Std. 840.03, Type E 2 EA

36 840 Frame with Grate and Hood, Std. 840.03, Type F 10 EA

37 840 Drop Inlet Frame and Grate, Std. 840.16 1 EA

38 840 Drop Inlet Frame and Grate, Std. 840.22 2 EA

39 840 Drop Inlet Frame and Grate, Std. 840.29 3 EA

40 840 Manhole Frame and Cover, Std 840.54 11 EA

41 840 Manhole Frame and Cover, Std 840.55 3 EA

42 840 Pipe Collars 0.6 CY

43 859 Convert Ex. Hidden Box to Junction Box 1 EA

44 876 Rip Rap, Class A 15 TN

45 876 Rip Rap, Class B 20 TN

46 876 Rip Rap, Class I 25 TN

47 876 Rip Rap, Class II 200 TN

48 876 Geotextile for Drainage 250 SY

49 SP-08 Flowable Fill for Storm Pipe Abandonment 17 CY

RETAINING WALL

50 454 Non-engineered Segmental Gravity Retaining Wall, Std. 454.02 (Wall A) 800 SF

51 453 CIP Gravity Retaining Wall (Wall B) 100 SF

52 454 Non-engineered Segmental Gravity Retaining Wall, Std. 454.02 (Wall C) 1000 SF

53 454 Segmental Gravity Retaining Wall (Wall

D) 1500 SF

ROADWAY

54 520 Aggregate Base Course 850 TN

55 607 Incidental Milling 2600 SY

56 610 Asphalt Concrete Base Course, Type

B25.0C 1650 TN

57 610 Asphalt Concrete Intermediate Course, Type I19.0C 700 TN

58 610 Asphalt Concrete Surface Course, Type

S9.5B 2200 TN

59 620 Asphalt Binder for Plant Mix 235 TN

60 846 2'-6" Concrete Curb and Gutter 6000 LF

61 846 Valley Curb 165 LF

62 848 6" Concrete Driveway 1250 SY

63 848 4" Concrete Sidewalk 3250 SY

64 848 Concrete Curb Ramps, Std. 848.06 Sh 1 6 EA

65 848 Concrete Curb Ramps, Type 1C, Std.

848.06 Sh 7 1 EA

66 848 Concrete Curb Ramps, Type 1D, Std.

848.06 Sh 7 1 EA

67 848 Concrete Curb Ramps, Type 2A, Std.

848.06 Sh 8 1 EA

68 848 Concrete Curb Ramps, Type 2B, Std.

848.06 Sh 8 2 EA

69 848 Concrete Curb Ramps, Std. MI-113 2 EA

70 862 Steel Beam Guardrail 850 LF

71 862 Steel Beam Guardrail, shop curved 50 LF

72 862 Extra length Guardrail Post (8' Steel) 25 EA

73 862 Guardrail End Units, Type CAT-1 1 EA

74 862 Guardrail End Units, Type GREU TL-2 4 EA

75 SP-09 Pedestrian Safety Rail 720 LF

PAVEMENT MARKINGS

76 1205 Paint Paint Marking Lines, 4", 15 mil 16000 LF

77 1205 Paint Pavement Marking Lines, 8", 15 mils 800 LF

78 1205 Paint Pavement Marking Lines, 24", 15 mils 1150 LF

79 1205 Paint Pavement Marking Symbols, 15 mils 11 EA

80 1205 Paint Pavement Marking Characters, 15 mils 6 EA

81 1205 Thermoplastic Pavement Marking Lines, 4", 90 mils 16000 LF

82 1205 Thermoplastic Pavement Marking Lines, 6", 90 mils 50 LF

83 1205 Thermoplastic Pavement Marking Lines, 8", 90 mils 800 LF

84 1205 Thermoplastic Pavement Marking Lines, 24", 90 mils 1150 LF

85 1205 Thermoplastic Pavement Marking Symbols, 90 mils 11 EA

86 1205 Thermoplastic Pavement Marking Characters, 90 mils 6 EA

87 1205 Removal of Pavement Marking Lines, 8" 80 LF

88 1251 Temporary Raised Pavement Marking 10 EA

89 1251 Permanent Raised Pavement Marking 10 EA

EROSION CONTROL

90 SP-10 Inlet Sediment Control Device 40 EA

91 1605 Temporary Silt Fence 2700 LF

92 1610 Sediment Control Stone 10 TN

93 1631 Matting for Erosion Control (Biodegradable Netting) 3000 SY

94 1631 Matting for Erosion Control (North American Green S75BN, or eq.) 25 SY

95 1631 Matting for Erosion Control (North American Green S150BN, or eq.) 25 SY

96 1631 Matting for Erosion Control (North American Green C125BN, or eq.) 200 SY

97 SP-11 Coir Fiber Matting 4000 SY

98 1632 1/4" Hardware Cloth 150 LF

99 1642 12" Wattle Check 600 LF

100 1642 18" Wattle Barrier 150 LF

101 1660 Seeding and Mulching 4 AC

WATER / SEWER RELOCATION

102 WSACC 6" Restrained DIP WL 180 LF

103 WSACC 6" 45-degree DIP Bends 25 EA

104 WSACC 6" x 6" DIP Tee 1 EA

105 WSACC 8" Restrained DIP WL 60 LF

106 WSACC 8" 45-degree DIP Bends 8 EA

107 WSACC 8" x 6" DIP Reducer 1 EA

108 WSACC 18" Restrained DIP WL 30 LF

109 WSACC 18" 45-degree DIP Bends 4 EA

110 SP-13 6" Connection To Existing 6" Water Main

- Transition Fittings 6 EA

111 SP-13 8" Connection To Existing 8" Water Main

- Transition Fittings 2 EA

112 SP-13 18" Connection To Existing 18" Water Main - Transition Fittings 1 EA

113 1515 Relocate Fire Hydrant (inc. Gate Valve) 2 EA

114 WSACC 6" Gate Valve, inc. Valve Box 2 EA

115 1515 Relocate Water Meter Box (Water Meter Box supplied by COC) 17 EA

116 WSACC 3/4" Water Service Line (Water Meter Box supplied by COC) 2 EA

117 WSACC 1" Water Service Line (Water Meter Box supplied by COC) 2 EA

118 SP-14 Removal and Disposal of 6" Asbestos- Cement Pipe 30 LF

119 SP-15 Plumbing Permit and Requirements for Reconnecting Water Services 21 EA

120 WSACC 8" 401 Lined Restrained DIP Sewer 140 LF

121 WSACC 8" PVC Sewer 73.1 LF

122 WSACC 4-ft Diameter Standard Manhole 1 EA

123 WSACC 4-ft Diameter Standard Manhole - Additional Depth 3.22 LF

124 WSACC Tie to Existing Sewer System 8 EA

125 SP-16 Sanitary Sewer Bypass Pumping 8 EA

126 WSACC 4" PVC Lateral 235 LF

127 WSACC 4" Cleanout w/ Standard Mini-Manhole 9 EA

128 WSACC 4" Cleanout w/ H-20 Mini-Manhole 3 EA

129 SP-15 Plumbing Permit and Requirements for Reconnecting Sewer Services 10 EA

OTHER

130 SP-18 New Mailbox Post 5 EA

131 858 Adjustment of Valve Boxes 19 EA

132 858 Adjustment of Manholes 9 EA

133 858 Adjustment of Catch Basins 6 EA

134 SP-19 Adjustment of Fiber Junction Box 1 EA

135 SP-20 Soft Dig for Utility Line (MCNC) 1 EA

TRAFFIC SIGNALS

136 SITS SP

Install Various Size Traffic Signal Embedded Roadway Loops (Includes Saw Cut, Loop Wire, & Sealant)

1260 LF

137 SITS SP Unpaved Trenching w/ 2" PVC Conduit 705 LF

138 SITS SP Furnish and Install Standard Pull Box and lid to NCDOT Spec. 13 EA

139 SITS SP Furnish and Install One 40' Class 3 Pole, Properly Grounded 3 EA

140 SITS SP Remove Old or Damaged Pole 3 EA

141 SITS SP

Furnish and Install 3/8" Aerial Span Wire with All Necessary Hardware, Including Strandvises and Clamps. All Hardware and Span Wire Shall be Properly Grounded.

400 LF

142 SITS SP Reattach All Existing Spans to a New Pole, Furnishing Hardware 11 Per

Pole

143 SITS SP Furnish and Install #14-7 Conductor Signal Cable 2150 LF

144 SITS SP Furnish and Install #14-2 Shielded Loop Lead-In cable. 3560 LF

145 SITS SP

Furnish and Install 1" Rigid Metal Conduit, Complete with Weatherheads, LB's, Condulette's, Bushings, etc as required.

25 LF

146 SITS SP Assemble and Install Vehicular Signal Heads, City Supplied 12 EA

147 SITS SP

Install One, Pedestrian Pedestal Signal Assembly including Pedestal, base, anchor bolts, heads, buttons, signs, and foundation, City Supplied.

9 EA

148 SITS SP

Install One, Pole Mounted Video Detection Camera and All Necessary Hardware. City Supplied Hardware

5 EA

TOTAL BASE COST $______________________

10% CONTINGENCY $ _____________________

TOTAL COST $ _____________________

5. Bidder agrees that all work will be completed and ready for final payment in accordance with Paragraph

14.13 of the General Conditions within 365 days from the date of notice to proceed.

6. Liquidated damages are $1,000.00 per each day past the contract completion date.

7. Communications concerning this Bid shall be sent to Bid at the following address:

NAME: _______________________________________

ADDRESS: _______________________________________

P.O. BOX: _______________________________________

CITY: _______________________________________

STATE: _______________________________________

ZIP: _______________________________________

8. The terms used in this BID, which are defined in the General Conditions (Section II), have the meanings assigned to them in the General Conditions.

SIGNATURE OF BIDDER: __________________________________________________

Contractor's License Number ________________________________

License Expiration Date __________________________________________________

If an Individual

By (signature of individual) doing business as

Business address

Phone No.

Date , 20

ATTEST TITLE

If a Partnership

(firm name)

(signature of general partner)

If a Corporation

(corporation name)

(signature of authorized person) (title)_______________________

(Seal)

If a Joint Venture (Other party must sign below.)

By (name)_______________________________________________

Contractor's License Number

License Expiration Date

If an Individual

(signature of individual) doing business as

If a Partnership

(firm name)

(signature of general partner)

If a Corporation

(corporation name)

(signature of authorized person) (title)_______________________

(Seal)

EXHIBIT B – STANDARD FORM OF PERFORMANCE BOND

Date of Execution of this Bond

Name and Address of Principal (Contractor)

Name and Address of Surety

Name and Address of Contracting Body

Amount of Bond

Contract That certain contract by and between the Principal and the Contracting Body above named dated for

KNOW ALL MEN BY THESE PRESENTS, that we, the PRINCIPAL and SURETY above named, are held and firmly bound unto the above-named Contracting Body, hereinafter called the Contracting Body, in the penal sum of the amount stated above for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGAITON IS SUCH, that whereas the Principal entered into a certain contract with the Contracting Body, identified as shown above and hereto attached;

NOW THEREFORE, if the Principal shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term of said contract and any extensions thereof that may be granted by the Contracting Body, with or without notice to the Surety, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of the contract that may hereafter be made, notice of which modifications to the Surety being hereby waived, then, this obligation to be void; otherwise, to remain in full force and virtue.

STANDARD FORM OF PERFORMANCE BOND: (Continued)

THIS PERFORMANCE BOND is made and given pursuant to the requirements and provisions of Section 129 of Chapter 143 of the General Statutes of North Carolina and pursuant to Article 3 of Chapter 44-A of the General Statutes of North Carolina, and each and every provision set forth and contained in Section 129 of Chapter 143 and in Article 3 of Chapter 44-A of the General Statutes of North Carolina is incorporated herein, made a part hereof, and deemed to be conclusively written into this Bond.

IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under their several seals as of the date indicated above, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned and representative, pursuant to authority of its governing body.

WITNESS:

Principal (Name of individual and trade name, partnership, corporation, or joint venture)

(Proprietorship or Partnership) Printed Name_______________________ BY (SEAL) Printed Name_________________________

TITLE

(Owner, Partner, Office held in corporation, joint venture)

ATTEST: (Corporation) (Corporate Seal of Principal)

BY

Printed Name_______________________

TITLE

(Corporation Secretary or Assistant Secretary Only) Surety (Name of Surety Company)

WITNESS:

BY

Printed Name_________________________

TITLE Attorney in Fact

(Corporate Seal of Surety)

(Address of Attorney in Fact)

EXHIBIT C – PROJECT SPECIAL PROVISIONS

1) Contractor shall utilize the 2024 edition of NCDOT Standard Specifications & Standard

Drawings for Roads and Structures, the City of Concord Technical Standards, and Water & Sewer Authority of Cabarrus County Technical Standard specifications, the most restrictive requirement shall apply unless otherwise noted. NCDOT Article Numbers in the Bid Form and these Project Special Provisions reference the NCDOT Standard Specifications for Roadways and Structures.

2) The project is subject to an NCDOT Encroachment Agreement, see Appendix A. The Contractor shall comply with the terms of this Encroachment Agreement.

3) Traffic control and work within NCDOT’s ROW will be done at nighttime, or as required by the Encroachment Agreement.

4) Hours of work outside NCDOT’s ROW are 7:00 am – 6:00 pm Monday through Friday.

5) Ingress and egress shall be maintained to all business and dwellings affected by the project.

Contractor shall notify the adjacent property owners in writing a minimum of 72 hours in advance of construction at the work site. Driveway work shall be coordinated with the city inspector and the property owner(s).

6) All plumbing fittings must be manufactured in the US.

7) The relocation of impacted utilities is currently in progress and spans various design and construction stages at the time of this bid. Some relocation efforts may extend beyond this contract’s NTP. The Contractor shall include the cost of any coordination and cooperation of utilities in his bid. No additional compensation shall be allowed for delays or inconvenience sustained by the Contractor due to utility relocation or adjustments. No additional payment will be made for re-mobilization required by the utility’s failure to relocate a utility at the request of the Contractor. Contractor may apply for a contract time extension based on documented delays caused by the utility relocation.

8) The Contractor shall use the most updated NCDOT Monthly Terminal Asphalt Binder FOB Prices for Associated Asphalt – Charlotte NC available at the time of bid, as the Base Index for Asphalt Binder for Plant Mix, per Section 620 of the NCDOT Standard Specifications.

9) See Appendix D for Signals and Intelligent Transportation Systems Project Special Provisions.

10) Existing roadway sign removal and relocation, and new roadway signs furnishing and erection, as shown in the plans, will be completed by the City of Concord Transportation Department.

The Contractor shall include the cost of any coordination and cooperation with City of Concord forces in his bid.

SP-01 – TRAFFIC CONTROL

1.0 DESCRIPTION

Beginning Work and Street Closings: The Contractor is responsible for notifying the Concord Department of Transportation for any work where the number of travel lanes is reduced from normal conditions.

The Contractor shall install advance warning signs for the Project. These signs shall be in place for one week before construction activity begins. The Contractor shall begin construction activity on a street on the scheduled date for the closing of the travel lane.

Traffic Control Plan: Traffic control will be performed by the Contractor based upon the Traffic Control Special Provisions. The Traffic Control Special Provisions may refer to plan sheets for major work items or details, or both.

All traffic control devices and procedures shall conform to the requirements of the current edition of the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD), the current edition of the North Carolina Department of Transportation (NCDOT) Supplement to the Manual on Uniform Traffic Control Devices for Streets and Highways, the NCDOT Roadway Standard Drawings and the current edition of the NCDOT Standard Specifications for Roads and Structures.

The Contractor shall maintain the traffic control as described herein unless the Contractor submits an alternate traffic control plan to the Engineer and it is approved by the Engineer. The Engineer may direct the Contractor to modify the traffic control if, in the Engineer’s opinion, traffic is not moving safely or efficiently.

Traffic Control Phasing for this project shall be in accordance with the Traffic Control Plans. The Contractor shall adhere rigidly to these plans. The standards are the minimum required.

This is the start of the file's text. The full file is on GovTribe.