This is a traffic signal installation plan document for the City of Douglasville, Georgia, prepared by the Douglas County Traffic Operations Division. The project involves upgrading the traffic signal system at the intersection of Bright Star Road and Bright Star Connector. The scope of work includes installation of new traffic signal equipment with LED signal heads, pedestrian signals with countdown timers, video detection cameras, mast arms with luminaire lighting, underground conduit and cabling, directional bores, and associated infrastructure. The materials list specifies one Safetran Cobalt controller unit, two steel strain poles with 55-foot and 65-foot mast arms, eight pedestrian signal heads with countdown displays, four video detection cameras, four luminaires with LED lighting, multiple regulatory signs including overhead street name signs, and extensive conduit and directional bore work totaling approximately 1,850 linear feet. The project includes traffic control during construction, ADA-compliant ramps, pavement markings, and grading work. The contractor is responsible for locating underground utilities, coordinating with the County Office of Utilities, maintaining existing traffic signal detection throughout the construction period, and completing a 30-day test period before final acceptance by the Douglasville City Engineer and Douglas County Traffic Operations Division Manager.
The contractor assumes responsibility for all "make ready" work, utility coordination, power service installation, and monthly utility costs during the test period. All signal equipment must comply with current Georgia Department of Transportation (GDOT) specifications and the Manual on Uniform Traffic Control Devices. The contractor is required to replace any existing infrastructure damaged during construction, including pavement, curbing, sidewalks, and utility lines, at no additional cost to the department. Erosion control measures must comply with all state and federal laws and guidelines, with costs included in the overall bid price. The contractor must relocate any existing equipment not noted on the plans without additional compensation and maintain traffic signal detection throughout the project duration, replacing inductive loops damaged during construction within specific timeframes based on detection type priority ratings. Installation work is subject to field verification of clearances between proposed equipment and existing overhead power lines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB 2026_008 Brightstar Rd at Brightstar Conn.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27-0000
PROPOSED TRAFFIC SIGNAL
BRIGHT STAR ROAD @ BRIGHT STAR CONNECTOR
8. WHEN REMOVED, EXISTING EQUIPMENT SHALL BE DISPOSED OF.
DOUGLASVILLE CITY ENGINEER PRIOR TO FINAL ACCEPTANCE.
COUNTYT TRAFFIC OPERATIONS DIVISION MANAGER AND
7. INSTALLATION IS TO BE CHECKED AND ACCEPTED BY THE DOUGLAS
BY THE ENGINEER.
INTERCONNECT CABLE TO THE POLES UNLESS OTHERWISE DIRECTED
EXISTING UTILITY TIMBER POLES WHEN ATTACHING SPAN WIRE OR
6. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL NEW GUYS ON
CAUSE ANY PART OF THE SIGNAL OPERATION TO BE INOPERABLE.
OF NEW SIGNAL EQUIPMENT. AT NO TIME SHALL THE CONTRACTOR
THE PROJECT DURING THE INTERIM PERIOD THROUGH INSTALLATION
INCLUDING TEMPORARY SUPPORT POLE LOCATION(S) REQUIRED BY
FOR ALL TRAFFIC SIGNAL AND/OR CONTROL SYSTEM ADJUSTMENTS,
5. THE CONTRACTOR SHALL BE RESPONSIBLE
OFFICE OF UTILITIES FOR ALL "MAKE READY" WORK.
ON THE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE
PLACEMENT OF THE SIGNAL HEADS SHALL BE RETAINED AS SHOWN
CLEARANCES FROM EDGE OF PAVEMENT SHALL BE MAINTAINED.
ACCEPTABLE TO AVOID UNDERGROUND UTILITIES. MINIMUM
MAXIMUM OF 5 FEET), IN LOCATION OF NEW SIGNAL POLES, ARE
AT THE DISCRETION OF THE ENGINEER, MINOR SHIFTS, (UP TO A
VICINITY OF NEW TRAFFIC SIGNAL POLES PRIOR TO ORDERING.
4. THE CONTRACTOR SHALL LOCATE UNDERGROUND UTILITIES IN
TO THE CONTROL CABINET.
THE DETAIL SHEET, DETECTORS SHALL HAVE SEPARATE LEAD-INS
3. SHIELDED CABLE WILL BE USED FOR DETECTOR RUNS AS SHOWN ON
MEASURED HORIZONTALLY BETWEEN CENTERS OF SIGNAL FACES.
HEADS TO TOP OF ROAD SURFACE AND A MINIMUM OF 8 FEET
BUT NO MORE THAN 19 FEET CLEARANCE FROM BOTTOM OF SIGNAL
2. SIGNAL HEADS SHALL BE ERECTED TO PROVIDE AT LEAST 17 FEET
DEVICES, CURRENT EDITION.
APPROPRIATE PARTS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL
1. THE COMPLETE SIGNAL INSTALLATION SHALL CONFORM TO ALL
SHALL COMPLY WITH THE CURRENT GDOT SPECIFICATIONS.
ON THE PLANS, AT NO ADDITIONAL COST TO THE DEPARTMENT. RE-INSTALLATION
18. THE CONTRACTOR SHALL RELOCATE ANY EXISTING EQUIPMENT NOT NOTED
REPLACED SHALL BE PAID FOR IN THE TRAFFIC CONTROL LUMP SUM ITEM.
17. ALL TRAFFIC MARKING, SYMBOLS OR STRIPING TO BE REMOVED AND/OR
SHALL BE MADE TO THE CONTRACTOR FOR EROSION CONTROL.
BE INCLUDED IN THE OVERALL BID PRICE. NO ADDITIONAL PAYMENTS
AND GUIDELINES. THE COST SHALL BE CONSIDERED INCIDENTAL AND
MEASURES TO ENSURE COMPLIANCE TO ALL STATE AND FEDERAL LAWS
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL
REMOVED, DAMAGED OR DESTROYED, DUE TO CONTRACTOR'S ACTIVITY.
LINES, STORM DRAIN PIPES, MASONRY WALLS AND PAVING THAT IS
SIGNS, GUARDRAILS, LANDSCAPING, GRASSINGS, UTILITY SERVICE
DITCH PAVING, CURBING, SIDEWALK, GUTTER, SLOPE PAVEMENT,
SEPARATE EXPENSE TO THE COUNTY, ANY BARRIER WALL, FENCE,
15. THE CONTRACTOR SHALL REPLACE IN KIND AND SIZE, AT NO
RAMPS SHALL BE INCLUDED IN THE SIDEWALK PAY ITEM.
14. SAWCUTS AND REMOVAL OF ALL CONCRETE ASSOCIATED WITH CURB CUT
FROM EXISTING UTILITIES.
PROVIDE REQUIRED SIGNAL HEAD MOUNTING HEIGHTS AND CLEARANCE
ATTACHMENT HEIGHTS SHALL BE FIELD DETERMINED BY INSTALLER TO
PROVIDED AS GENERAL GUIDELINES TO INSTALLER, ACTUAL
13. PROPOSED SIGNAL SUPPORT WIRE ATTACHMENT HEIGHTS ON POLES ARE
WITH CURRENT GDOT STANDARDS.
ARE NOT REMOVED OR RELOCATED SHALL BE REPLACED IN ACCORDANCE
12. ALL EXISTING STOP BARS, WORDS, ARROWS AND CROSSWALKS THAT
REQUIRED BY THE CONTRACTOR, NOTED PRIOR TO FINAL ACCEPTANCE.
DEMONSTRATION OF NETWORK CAPABILITIES ON COUNTY NETWORK IS
BY DOUGLAS COUNTY, OR VIA FIBER, PER THE GDOT STANDARDS.
ETHERNET NETWORKS FROM EXISTING CELLULAR MODEMS, PROVIDED
11. THE INSTALLATIONS SHALL BE CAPABLE OF MONITORING OVER
PROCEDURES OUTLINED IN THE GDOT SPECIFICATION.
SIGNAL INSTALLATION WORK. THE CONTRACTOR SHALL FOLLOW
10. MATERIAL CERTIFICATION IS REQUIRED PRIOR TO BEGINNING ANY
STRAIN POLE AND MAST ARM POLE FOUNDATION SHEET.
9. FOR STRAIN POLE FOUNDATION SIZE AND REINFORCEMENT, SEE
GENERAL NOTES - TRAFFIC SIGNALS
RESPONSIBILITY OF THE CONTRACTOR.
OF THE LOOPS DAMAGED DURING CONSTRUCTION SHALL BE THE
WITH COUNTY APPROVAL. ALL COSTS ASSOCIATED WITH THE REPLACEMENT
VIDEO, MAY TEMPORARILY BE USED (WITHIN THE SAME TIME FRAMES),
IF NOT FEASIBLE, OTHER FORMS OF DETECTION, SUCH AS RADAR OR
LOW 28 DAYS 28 DAYS 28 DAYS
MEDIUM 14 DAYS 14 DAYS 28 DAYS
CRITICAL / HIGH 5 DAYS 5 DAYS 28 DAYS
RATING DETECTION DETECTION DETECTION
PRIORITIZATION LEFT-TURN STREET PRESENCE SET-BACK
STATE ROUTE MAINLINE / SIDE-
FOLLOWING ROUTE PRIORITIZATION RATING:
OPERATION WITHIN THE FOLLOWING TIME FRAMES, BASED ON THE
MAINTENANCE PROJECT SHALL BE REPLACED AND RETURNED TO FULL
OR DESTROYED AS PART OF A CONSTRUCTION, REHABILITATION, OR
THE DURATION OF THE PROJECT. EXISTING LOOPS THAT ARE REMOVED
21. THE CONTRACTOR SHALL MAINTAIN EXISTING DETECTION THROUGHOUT
THE CITY OF DOUGLASVILLE.
THE CONTRACTOR WILL COMPLETE A TRANSFER OF UTILITY COST TO
OPERATION, FOR 30 DAYS. UPON COMPLETION OF THE TEST PERIOD,
HAS SATISFACTORILY COMPLETED A TEST PERIOD OF UNINTERRUPTED
SUPPORT DEVICES, UNTIL THE NEW TRAFFIC SIGNAL INSTALLATION
COMMUNICATION SERVICE TO THE TRAFFIC SIGNAL INSTALLATION AND
20. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL MONTHLY POWER AND
RESPECTIVE UTILITY REQUIRES PAYMENT FOR INSTALLATION.
THEIR BID PRICE, FOR THAT TRAFFIC SIGNAL INSTALLATION IF THE
THE RESPONSIBLITY OF THE CONTRACTOR TO INCLUDE AS PART OF
TRANSFORMER IS REQUIRED FOR TRAFFIC SIGNAL EQUIPMENT, IT IS
SYSTEMS AND/OR CCTV CAMERAS ON THIS PROJECT. IF A UTILITY
COMMUNICATIONS SERVICES FOR TRAFFIC SIGNAL, VIDEO DETECTION
WITH MODIFYING EXISTING AND ESTABLISHING NEW POWER AND
19. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL FEES ASSOCIATED
SIGNAL PLANS
0015145
- NO SCALE -
TRAFFIC OPERATIONS
OFFICE OF
REVISION DATES
8/19/2026
DanielJean
GPLOT-ORD
gplotborder-ORD-PO.tbl
0000000_27-0002_GENERAL NOTES.dgn
6:02:39 PM
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
SIGNAL HEAD
PROPOSED
SIGNAL HEAD
EXISTING
SIGNAL HEAD
RELOCATED
SIGNAL HEAD
PEDESTRIAN
(CLUSTER) SIGNAL HEAD
PROPOSED 5-SECTION
SIGNAL HEAD
PROPOSED 4-SECTION
SIGNAL LEGEND DETECTION LEGEND
PROPOSED MAGNETOMETER PROPOSED RADAR
PROPOSED VIRTUAL DETECTION ZONE
PROPOSED INDUCTIVE LOOP
PROPOSED VIDEO DETECTION CAMERA
RETROREFLECTIVE TAPE ON BACKPLATES
LED SIGNAL HEADS W/
BRIGHT STAR ROAD @ BRIGHT STAR CONNECTOR
TRAFFIC SIGNAL PLAN
DOUGLAS COUNTY
PHASING DIAGRAM
01/ 02/ 03/ 04/
05/ 06/ 07/ 08/
W W
W W
W
W
W
W
OMITOMITOMIT
BrightStarConn
BrightStarConn
12"
12"
12"
12"
12"
12"
12"
12"
BrightStarRd
SIGNAL PLANS
R
G
Y Y
R
G
G
Y
GPLN
30 120
SCALE IN FEET
0 60 27-0002
0015145
REVISION DATES
9/24/2026
DanielJean
GPLOT-ORD
SG002_Bright_Star_Sheet.dgn
11:42:28 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
DATE SUBMITTED: 9/24/2026
Marietta, GA 30060 27 N Fairground St. NE www.lumin8.com
Phone: 678.423.0050
OVERHEAD STREET NAME SIGNS
2,3,4,6
P2,P3,P4,P6
D3-1(1)
D3-1(3)
D3-1(2)
REGULATORY SIGNS
24" X 30"
R560-5 30" X 36"
R12-5A
W3-3
36" X 36"
POST-MOUNTED SIGNS
D3-1(1)
84" X 18"
D3-1(3)
120" X 18"
D3-1(2)
120" X 18"
- PULL BOX (1), TP 2
- SINGLE PUSH BUTTON STATION AND SIGN, R10-3E
- SINGLE PED HEAD CONFIGURATION, P3
- PEDESTRIAN POLE
INSTALL:
- CONDUIT, TP2 (2) 2" (20 GLF)
- TRENCH,(10LF)
- PULL BOX (1), TP 2
- SINGLE PUSH BUTTON STATION AND SIGN, R10-3E
- SINGLE PED HEAD CONFIGURATION, P2
- PEDESTRIAN POLE
INSTALL:
UTILITY POLE
EXISTING
R560-5
INSTALL
TO BE REMOVED
R1-2
EXIST.
FROM PROPOSED STOP BAR
@ 350' UPSTREAM
W3-3
INSTALL
R560-5
INSTALL R560-5
R560-5
INSTALL
FROM PROPOSED STOP BAR
@ 350' UPSTREAM
W3-3
INSTALL
FROM PROPOSED STOP BAR
@ 350' UPSTREAM
W3-3
INSTALL
R560-5
INSTALL
- CONDUIT, NM, TP 2, 2-1"
- DIRECTIONAL BORE 5", 10 LF
- DUAL PUSH BUTTON STATION AND SIGNS, R10-3E
- DUAL PED HEAD CONFIGURATION, P4 & P6
- PEDESTRIAN POLE
INSTALL:
- CONDUIT, GRS,2", (1), (100 GLF)
- CONDUIT, TP 3, (3) 2" (300 GLF)
- DIRECTIONAL BORE 9", 100 LF
INSTALL:
- CONDUIT, GRS, 2", (1)
- CONDUIT, NM, TP 2, 2-1"
- CONDUIT, NM, TP 2, 3-2"
-TREMCH, 10 LF
- PULLBOX (1),TP3
- POWER SERVICE DISCONNECT
- 15' LUMINAIRE W/ LUMINAIRE (2 EA)
- W/55'AND 65' MAST ARMS
- TP IV STEEL STRAIN POLE,
INSTALL:
- CONDUIT, GRS, 2", (1), (130 GLF)
- CONDUIT,TP 3,(3) 2"(390 GLF)
- DIRECTIONAL BORE 7",130 LF
INSTALL:
- CONDUIT, GRS, 2" (1), (100 GLF)
- CONDUIT, TP 3, (2) 2" (200 GLF)
- DIRECTIONAL BORE 7", 100 LF
INSTALL:
- CONDUIT, NM, TP 2, 2-1"
- CONDUIT, NM, TP 2, 3-2"
- POWER SERVICE DISCONNECT
- 15' LUMINAIRE W/ LUMINAIRE (1 EA)
- W/55'AND 65' MAST ARMS
- TP IV STEEL STRAIN POLE
INSTALL:
- PULLBOX, TP 3
- POWER SERVICE DISCONNECT
- WIRELESS COMMUNICATION MODEM
CABLES, & PROCESSORS (ETHERNET CAPABLE) CONECTION CARD
- INTERSECTION VIDEO DETECTION SYSTEM, CAMERAS (4 EA),
- MODEL SAFETRAN COBALT RACK MOUNT CONTROLLER
- MODEL HYBRID 332 CABINET & BASE W/ BATTERY BACKUP SYSTEM
INSTALL:
- CONDUIT, NM, TP 2, 2-1"
- TRENCH, 5 LF
- DUAL PUSH BUTTON STATION AND SIGNS, R10-3E
- DUAL PED HEAD CONFIGURATION, P4 & P2
- PEDESTRIAN POLE
INSTALL:
VDS
- CONDUIT, TP2 (2) 2" (30 GLF)
- DIRECTIONAL BORE, 5" (15 LF)
- PULL BOX (1), TP 2
- SINGLE PUSH BUTTON STATION AND SIGN, R10-3E
- SINGLE PED HEAD CONFIGURATION, P6
- PEDESTRIAN POLE
INSTALL:
TO CROSS
PUSH BUTTON
START CROSSING
DON'T START
FINISH CROSSING
IF STARTEDFLASHING
STEADY
VEHICLES
WATCH FOR
DON'T CROSS
R10-3E(L)
TO CROSS
PUSH BUTTON
START CROSSING
STEADY
VEHICLES
WATCH FOR
DON'T CROSS
R10-3E(R)
TIMER
TO FINISH CROSSING
DON'T START
FINISH CROSSING
IF STARTEDFLASHING
TIMER
TO FINISH CROSSING
TIME REMAINING TIME REMAINING0808
9" X 15"9" X 15"
PUSHBUTTON SIGNS
PEDESTRIAN
- CONDUIT, TP2 (2) 2" (20 GLF)
- TRENCH, (10LF)
- PULL BOX (1), TP 3
- SINGLE PUSH BUTTON STATION AND SIGN, R10-3E
- SINGLE PED HEAD CONFIGURATION, P3
- PEDESTRIAN POLE
INSTALL:
FOR POWER FROM UTILITY POLE TO 4' PEDESTAL
- CONDUIT, GRS, 2" (10 LF)
- TRENCH,(10 LF)
- PULLBOX (1), TP 2
- PEDESTAL POLE, 4' (FOR POWER METER)
INSTALL:
- CONDUIT, TP 2, (1) 2" (125 GLF)
FOR POWER SERVICE TO CABINET
- CONDUIT, GRS, 2" (125 GLF)
- DIRECTIONAL BORE 5", 125 LF
INSTALL:
- CONDUIT, GRS, 2" (1), (30 GLF)
- CONDUIT, TP2 (2) 2" (60 GLF)
- TRENCH,(30 LF)
INSTALL:
D3-1(1)
(PER GDOT DETAIL A-3)
WITH RED TRUNCATED DOMES
ADA RAMP TYPE B
500' OF OUTDOOR RATED INDUSTRIAL CAT6E SHIELDED TWISTED PAIR 23AWG, 600 MHZ HIGH SPEED CABLE.
CORE DCM, MIOVISION DETECTION & COUNTS PLUS, UNIVERSAL SMARTVIEW 360 EXTENSION (GRAY), ALL VIDEO DETECTION CAMERAS SHALL BE MIOVISION SMARTVIEW 360 CAMERA (HEATED, BELL ONLY, GRAY), AND EXISTING OVEHEAD POWER LINES PRIOR TO INSTALLATION.
- CONTRACTOR SHALL FIELD VERIFY VERTICAL CLEARANCES BETWEEN ALL PROPOSED SIGNAL AND LIGHTING EQUIPMENT
- ALL ADA RAMPS SHALL BE TYPE B AND SHALL HAVE RED TRUNCATED DOMES AS DETECTABLE WARNING SURFACES.
CABINET BASE, CABINET, CONTROLLER AND (4) BATTERIES.
- THE UPS BATTERY BACKUP SYSTEM SHALL BE MULTILINK BATTERY BACKUP SYSTEM (BBS). MULTILINK BBS W/
SHALL BE IN COLOR BLACK.
- ALL SIGNAL MAST-ARM (ARMS & POLES), PED POLES, PED HEADS, AND PED BUTTON BRACKETS
NOTE:
R12-5A
3A,4A1
CCTV CAMERA TO BE INSTALLED AT 65' HEIGHT (10' EXTENSION ABOVE POLE)
- (1) VIDEO DETECTION CAMERA
(1) SHIELDED EZ-RJ45 CONNECTOR
CAT6E SHIELDED TWISTED PAIR 23AWG,600 MHZ HIGH SPEED CABLE AND
SKYBRACKET CABLE CLAMPKIT-90",AND 200'OUTDOOR RATED INDUSTRIAL
" ALUMINUM X 96" HEIGHT,936-4904, AXIS PENDANT MOUNT KIT; 2
1.
- (1) AXIS Q6086-E PTZ CAMERA WITH J-PIPE TUBULAR MOUNT;
- 15' LUMINAIRE W/ LUMINAIRE (1 EA)
- TP IV STEEL STRAIN POLE
INSTALL:
6P
6P
4P
3P
3P
3A
4A
2P
4P
2P
EXIST R/W
EXIST R/W
R
IP
RA
P
T
YP
E
PR
O
P
GD
O T
H
Y D
W M
B F
P
BB
L
(40 MPH) L1
BRIGHT STAR ROAD
L2
L
B R
IG
H
T S
T A
R C
O N
N E
C T
O R
BRIGHT STAR ROAD
(40 MPH)
(4 M
P H
L6
REQUIRED R/W
EXISTING R/W
EXISTING R/W
REQUIRED R/W
EXISTING R/W
EXISTING R/W
REQUIRED R/W
EXISTING R/W
FUTURE R/W
H
Y D
W M
B F
P
S
S S
F H
F H
W V
W V
PROP R/W
PROP R/W
EXIST R/W
EXIST R/W
R
IP
RA
P
T
YP
E
PR
O
P
GD
O T
OVERHEAD STREET NAME SIGN PANEL DETAILS
WITH WHITE REFLECTORIZED LEGENDS, BORDERS AND ARROWS.
3. SIGNS SHALL HAVE STANDARD REFLECTORIZED INTERSTATE GREEN BACKGROUND
2. EACH SIGN SHALL BE MADE OF ONE CONTINUOUS PIECE OF ALUMINUM.
1. EACH SIGN SHALL CONTAIN A MINIMUM OF TWO (2) HANGERS OR BRACKETS.
OVERHEAD STREET NAME SIGN GENERAL NOTES:
27-0002A
TRAFFIC SIGNAL PLANS
OVERHEAD SIGN DETAILS
BRIGHT STAR ROAD @ BRIGHT STAR CONNECTOR
DOUGLAS COUNTY
STREET NAME SIGN (D3-1) PANEL #3
BrightStarRd
3 34 4 23 4 13 3
STREET NAME SIGN (D3-1) PANEL #1
STREET NAME SIGN (D3-1) PANEL #2
D3-1(1)
D3-1(3)
18 X 84
18 X 120
21.00
51.00
15.001
CODE SQUARE FEET
SIGNS - TYPE 2 MAT'L, REFL SHEETING TYPE 11
QUANTITYSIZE (INCHES)
SUMMARY OF QUANTITIES FOR OVERHEAD STREET NAME SIGN SHEETING
LOCATION:
TOTAL
WB & EB
NB
SB D3-1(2) 18 X 120 1 15.00
StarBright Conn
4 14
5 34 4 24 4 27 4
4 3
- NO SCALE -
ConnBrightStar
4 34 5 24 4 27
4 14 4
3 4
0015145
REVISION DATES
12/27/2025
DanielJean
GPLOT-ORD
0000000_27-0003_OVERHEAD SIGN DETAILS.dgn
12:21:09 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
DATE SUBMITTED: 12/27/2025
Marietta, GA 30060 27 N Fairground St. NE www.lumin8.com
Phone: 678.423.0050
09-24-2026
UNIT QUANTITY
A. CONTROLLER UNIT, MODEL SAFETRAN COBALT "MODEL C" - RACK MOUNT EA 1
F. SWITCH PACK (Load Switch) EA 13
G. DC ISOLATOR EA 2
H. VIDEO DETECTOR, 2 CHANNEL EA 10
L. 2010 SIGNAL MONITOR, TYPE A (Ethernet) EA 1
BATTERY BACKUP SYSTEM (BBS) - EXTERNAL MOUNTED, CABINET (PER GDOT SPEC) MULTILINK EA 1
MODEL 332 "HYBRID CABINET" w/ PREFABRICATED CONTROLLER CABINET BASE & BBS EXTENSION EA 1
PED LEAD-IN WIRE (SHIELDED, TWISTED/1000 FT): REEL 3
No. 18 AWG, 3-PAIR, PER. GDOT SPEC.
SIGNAL CABLE (STRANDED/1000 FT): REEL 3
No. 14 AWG, 7-CONDUCTOR, PER. GDOT SPEC.
ONE WAY, 3-SECTION, 12 IN LED SIGNAL HEAD, PLATIC, w/ INCANDESCENT MODULES (YELLOW HOUSING W/ BLACK FRONT) EA 4
ONE WAY, 4-SECTION, 12 IN LED SIGNAL HEAD (T-SHAPED), PLATIC, w/ INCANDESCENT MODULES (YELLOW HOUSING W/ BLACK FRONT) EA 3
BACK PLATE FOR ONE-WAY, 3-SECTION, 12 IN SIGNAL HEAD, ABS PLASTIC, BLACK w/ 2 IN TP IX RETROREFLECTIVE STRIP EA 6
BACK PLATE FOR ONE-WAY, 4-SECTION (T-SHAPED), 12 IN SIGNAL HEAD, ABS PLASTIC, BLACK w/ 2 IN TP IX RETROREFLECTIVE STRIP EA 3
HARDWARE FOR MAST ARM MOUNTING EA 7
1-SECTION, 16" x18" LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, FULL HAND/MAN OVERLAP EA 8
9" HIGH Numbers & 12" HIGH Symbols
PEDESTRIAN PUSH BUTTON STATION, ONE-WAY BRACKET ASSEMBLY: EA 4
9" x 15", w/ Single Push Button Station Adapter for 4" Dia Pedestrian Pole, Adjustable
PEDESTRIAN PUSH BUTTON STATION, TWO-WAY BRACKET ASSEMBLY: EA 2
9" x 15", w/ Double Push Button Station Adapter for 4" Dia Pedestrian Pole, Adjustable
PEDESTRIAN PUSH BUTTON & ADA COMPLIANT SIGN: EA 8
9" x 15", R10-3e, (L)eft or (R)ight Countdown & Bulldog Type Push Buttons EA 8
HARDWARE FOR PEDESTAL POLE, TOP POST MOUNTING, ONE-WAY BRACKET ASSEMBLY EA 4
HARDWARE FOR PEDESTAL POLE, TOP POST MOUNTING, TWO-WAY BRACKET ASSEMBLY EA 2
PEDESTAL POLE 10' & BASE EA 6
PEDESTAL POLE 4' & BASE (FOR UTILITY POWER) EA 1
PULLBOX, TP 2 EA 3
PULLBOX, TP 3 EA 4
IP ADDRESSABLE 360 VIDEO CAMERA DETECTION EA 1
IP ADDRESSABLE CCTV CAMERA EA 1
CONDUIT, NONMETAL, TP 2, 1 IN LF 445
CONDUIT, NONMETAL, TP 2, 2 IN LF 1245
RIGID RISER W/ WEATHERHEAD, 2 IN (30 FT) EA 2
R3-4 SIGN EA 1
36" x 36", "No U-Turn" Sign w/ Span Wire Mounting Bracket
R560-5 SIGN EA 5
R12-5A SIGN EA 1
30" x 36", "Left Turn Yield On Flashing Yellow w/ Mast-arm Mounting Bracket
TRAFFIC CONTROL LS 1
ADA RAMPS LS 2
GRADING EA 2
ADVANCE SIGNAL HEAD (W3-3) SIGN EA 4
ITEM NO. ADDITIONAL PAY ITEMS & DECRIPTION UNIT QUANTITY
636-1033 HIGHWAY SIGNS, TP 2 MATL, REFL SHEETING, TP 11 SF 51
639-1230 5"-2' DASH-6' SKIP WHITE, PAVEMENT MARKING LF 275
639-1235 12"-SOLID WHITE, PAVEMENT MARKING LF 400
639-1240 24" - SOLID WHITE, PAVEMENT MARKING LF 110
639-1245 5"-SOLID WHITE, PAVEMENT MARKING LF 3470
639-1600 5"-DOUBLE-YELLOW, PAVEMENT MARKING LF 700
639-2001 ARROW, TP 1, PAVEMENT MARKING EA 3
ARROW, TP 2, PAVEMENT MARKING EA 8
ARROW, TP 3, PAVEMENT MARKING EA 4
639-3004 STEEL STRAIN POLE, TP IV w/ 55 FT & 65 FT MAST ARMS w/ 15' LUMINAIRE ARM EA 2
639-4014 STEEL STRAIN POLE, TP IV w/ 15' LUMINAIRE ARM EA 1
647-1000 TRAFFIC SIGNAL INSTALLATION NO. 1 LS 1
682-2170 PULLBOX, TP 7 EA 1
680-5260 LUMINAIRE BRACKET ARM, 15 FT ARM EA 4
680-6130 LUMINAIRE, TP 3, 40 W, LED EA 4
682-6110 CONDUIT, RIGID, 2 IN (FOR POWER SERVICE) LF 170
682-6233 CONDUIT, NONMETAL, TP 3, 2 IN LF 1725
939-5010 ELECTRICAL POWER SERVICE ASSEMBLY (AERIAL SERVICE POINT) EA 1
682-9950 DIRECTIONAL BORE, 3 IN LF 1370
682-9950 DIRECTIONAL BORE, 5 IN LF 150
682-9950 DIRECTIONAL BORE, 7 IN LF 230
DIRECTIONAL BORE, 9 IN LF 100
682-9950 TRENCH LF 70
FOR INFORMATION PURPOSES ONLY (REVISED 10/22/13)
TRAFFIC SIGNAL INSTALLATION
LOCATION: DUGLAS COUNTY - BRIGHT STAR RD @ BRIGHT STAR CONNECTOR
LIST OF MATERIALS
PROJECT NUMBER: 25-20-2165
WIRE
TRAFFIC SIGNAL CABINET ASSEMBLIES, PER GDOT SPEC.
LIST OF MATERIALS PAID FOR AS PART OF 647-1000 LUMP SUM PAY ITEM
PULLBOXES
CONDUIT
REGULATORY SIGNS
LUMP SUM | MISCELLANEOUS
VEHICLE DETECTION
SIGNAL HEADS
PEDESTRIAN SIGNALS