BRIDGEPORT_WEST_PHASE1_BID_Drawings_07302025.pdf
PDF 30 MB Posted
- Solicitation number
- WPB016269
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
The document is a set of detailed civil engineering drawings for the West Side Wastewater Treatment Plant (WWTP) Improvements, Phase 1 - Site Preparation project, issued by the City of Bridgeport's Water Pollution Control Authority (WPCA) in Connecticut. The drawings, dated July 2025 and marked "Issue for Bid", cover 17 sheets including site plans, existing conditions, removals, erosion control, grading, drainage, paving, fencing, landscaping, and site details for a comprehensive site preparation project. Electronic bid submissions will be accepted through the city's OpenGov Procurement portal until 2:00 PM on Tuesday, September 9, 2025, with a question submission deadline of 3:00 PM on Tuesday, September 2, 2025.
The project requires bidders to be prequalified through the Connecticut Department of Administrative Services (DAS) in the Sitework classification, with substantial subcontractors exceeding $1,000,000 also requiring prequalification. The procurement includes specific set-aside requirements of 8.0% total participation for Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE), with 3.0% MBE and 5.0% WBE mandates. The project is partially funded by the State of Connecticut Clean Water Fund and requires a 5% bid bond for bids of $50,000 or more, with successful bidders providing 100% performance and payment bonds. Contract documents are available for $175.00 from Joseph Merritt & Company or can be downloaded free from the city's procurement portal after registration. The project is subject to both Connecticut state prevailing wages and federal Davis-Bacon wage requirements, with the higher rate applying where differences exist.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST SIDE WASTEWATER TREATMENT PLANT IMPROVEMENTS
WATER POLLUTION CONTROL AUTHORITY (WPCA)
EAST HARTFORD, CONNECTICUT
Water Environment EnergyTransportation Facilities
N
ISSUE FOR BIDJULY 2025
CITY OF BRIDGEPORT, CONNECTICUT
GENERAL
G-00 COVER SHEET
CIVIL
C-01 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
C-02 EXISTING CONDITIONS AND SITE BORINGS PLAN I
C-03 EXISTING CONDITIONS AND SITE BORINGS PLAN II
C-04 BOSTWICK STAGING AREA - REMOVALS PLAN
C-05 BOSTWICK STAGING AREA - EXCAVATION PLAN
C-06 REMOVALS PLAN I
C-07 REMOVALS PLAN II
C-08 EROSION AND SEDIMENTATION CONTROL PLAN
C-09 IMPACTED SOIL EXCAVATION PLAN
C-10 GRADING AND DRAINAGE PLAN
C-11 PAVING AND FENCING PLAN I
C-12 PAVING AND FENCING PLAN II
C-13 LANDSCAPING AND COMPLETION PLAN
C-14 SITE DETAILS I
C-15 SITE DETAILS II
C-16 SITE DETAILS III
C-17 SITE DETAILS IV
Interim Chairman of the Board
PHASE 1 - SITE PREPARATION
CT DEEP PROJECT NO. CWF-
LIST OF DRAWINGS
General Manager
734C
WEST SIDE WWTP DATUM (FT)=NAVD88 (FT) +14.80 FT
WEST SIDE WWTP DATUM (FT)=CITY OF BRIDGEPORT DATUM (FT) +0.20 FT
DATUM CONVERSION TABLE
C-01GENERAL NOTES, LEGEND, AND ABBREVIATIONS
ABBREVIATIONS
PROPOSEDEXISTING
SURVEY LEGEND
ISSUE FOR BID
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108
B
IR
D S
TR
EE
T (R
EP
O
R
TE
D T
O C
O U
N C
IL
O W
N
ER
O F
R
EC
O R
D N
O T
A
SC
ER
TA
IN
ED
MORRIS STREET (DISCONTINUED)
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREETMORRIS STREET (DISCONTINUED)
B O
ST
W
IC
K
A
V
EN
U E
N
C-02
EXISTING CONDITIONS AND SITE BORINGS
PLAN I
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
O
ST
W
EN
U E
B
IR
D S
TR
EE
T (R
EP
O
R
TE
D T
O C
O U
N C
IL
O W
N
ER
O F
R
EC
O R
D N
O T
A
SC
ER
TA
IN
ED
YACHT STREET
CEDAR CREEK
BU
RR CREEK
B
IR
D S
TR
EE
T (R
EP
O
R
TE
D T
O C
O U
N C
IL
O W
N
ER
O F
R
EC
O R
D N
O T
A
SC
ER
TA
IN
ED
N
C-03
EXISTING CONDITIONS AND SITE BORINGS
PLAN II
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-04BOSTWICK STAGING AREA - REMOVALS PLAN
N
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-05
BOSTWICK STAGING AREA
EXCAVATION PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-06REMOVALS PLAN I
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
ST
W
EN
U E
C-07REMOVALS PLAN II
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A
ST
W
EN
U E
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-08EROSION AND SEDIMENTATION CONTROL PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-09
IMPACTED SOIL EXCAVATION PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108
AREA A
AREA B
AREA C
AREA
C
AREA
A
AREA
B-1
AREA
B-2
AREA
B-3
AREA
D
AREA D
AREA A
AREA B
AREA C
AREA D
ST
W
EN
U E
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
DR
DR
DR
DR
DR
DR
DR
DR
DR
DR DR DR DR DR
C-10GRADING AND DRAINAGE PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A
DR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-11PAVING AND FENCING PLAN I
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
ST
W
EN
U E
CEDAR CREEK
C-12PAVING AND FENCING PLAN II
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
ST
W
EN
U E
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-13LANDSCAPING AND COMPLETION PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108
N
C-14SITE DETAILS I
DETAIL A
DETAIL B
DETAIL C
DETAIL K
DETAIL E
DETAIL G
DETAIL H
DETAIL J
DETAIL F
DETAIL L
DETAIL D
DETAIL M
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108 C-15SITE DETAILS II
DETAIL A
DETAIL B
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108 C-16SITE DETAILS III
DETAIL C
PLAN
DETAIL D
DETAIL A
DETAIL B
SECTION 1
TREE SPACING
SHRUB SPACING
DETAIL E
DETAIL E
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108 C-17SITE DETAILS IV
DETAIL C DETAIL D
DETAIL A
DETAIL B
DETAIL E DETAIL F
| COVER |
| C-01 - GENERAL NOTES, LEGEND, AND ABBREVIATIONS |
| C-02 - EXISTING CONDITIONS AND SITE BORINGS PLAN I |
| C-03 - EXISTING CONDITIONS AND SITE BORINGS PLAN II |
| C-04 - BOSTWICK STAGING AREA - REMOVALS PLAN |
| C-05 - BOSTWICK STAGING AREA EXCAVATION PLAN |
| C-06 - REMOVALS PLAN I |
| C-07 - REMOVALS PLAN II |
| C-08 - EROSION AND SEDIMENTATION CONTROL PLAN |
| C-09 - IMPACTED SOIL EXCAVATION PLAN |
| C-10 - GRADING AND DRAINAGE PLAN |
| C-11 - PAVING AND FENCING PLAN I |
| C-12 - PAVING AND FENCING PLAN II |
| C-13 - LANDSCAPING AND COMPLETION PLAN |
| C-14 - SITE DETAILS I |
| C-15 - SITE DETAILS II |
| C-16 - SITE DETAILS III |
| C-17 - SITE DETAILS IV |
| 2025-07-30T12:17:44-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:18:17-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:18:30-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:18:53-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:19:14-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:27:35-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:27:55-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:12-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:24-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:36-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:48-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:02-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:13-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:25-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:41-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:53-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:30:04-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:15:46-0400 | |
| Daniel R Murphy | |
| I am approving this document |
File details come from the government source that posted it. Updated .