This is a set of technical drawings for the West Side Wastewater Treatment Plant Improvements Phase 1 - Site Preparation project issued by the Water Pollution Control Authority (WPCA) for the City of Bridgeport, Connecticut. The drawings, dated July 2025 and marked "ISSUE FOR BID," comprise 17 detailed civil engineering plans covering existing conditions, site borings, removals, staging areas, excavation, erosion control, impacted soil excavation, grading and drainage, paving and fencing, landscaping, and various site details. The project involves site preparation work at the West Side WWTP including the Bostwick staging area, with electronic bid submissions due by 2:00 PM on September 9, 2025, through the City's OpenGov Procurement portal, and questions accepted until 3:00 PM on September 2, 2025.
The drawings include datum conversion tables referencing NAVD88 and City of Bridgeport datums, and show various street locations including Bostwick Avenue, Bird Street, Morris Street, Yacht Street, and Shell Street, as well as Cedar Creek and Burr Creek waterways. The project is identified with CT DEEP Project No. CWF-734C and includes detailed technical specifications for impacted soil excavation areas (Areas A, B, C, and D), drainage systems, and landscaping completion work. All drawings have been approved by Daniel R Murphy on July 30, 2025, indicating final engineering approval for the bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST SIDE WASTEWATER TREATMENT PLANT IMPROVEMENTS
WATER POLLUTION CONTROL AUTHORITY (WPCA)
EAST HARTFORD, CONNECTICUT
Water Environment EnergyTransportation Facilities
N
ISSUE FOR BIDJULY 2025
CITY OF BRIDGEPORT, CONNECTICUT
GENERAL
G-00 COVER SHEET
CIVIL
C-01 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
C-02 EXISTING CONDITIONS AND SITE BORINGS PLAN I
C-03 EXISTING CONDITIONS AND SITE BORINGS PLAN II
C-04 BOSTWICK STAGING AREA - REMOVALS PLAN
C-05 BOSTWICK STAGING AREA - EXCAVATION PLAN
C-06 REMOVALS PLAN I
C-07 REMOVALS PLAN II
C-08 EROSION AND SEDIMENTATION CONTROL PLAN
C-09 IMPACTED SOIL EXCAVATION PLAN
C-10 GRADING AND DRAINAGE PLAN
C-11 PAVING AND FENCING PLAN I
C-12 PAVING AND FENCING PLAN II
C-13 LANDSCAPING AND COMPLETION PLAN
C-14 SITE DETAILS I
C-15 SITE DETAILS II
C-16 SITE DETAILS III
C-17 SITE DETAILS IV
Interim Chairman of the Board
PHASE 1 - SITE PREPARATION
CT DEEP PROJECT NO. CWF-
LIST OF DRAWINGS
General Manager
734C
WEST SIDE WWTP DATUM (FT)=NAVD88 (FT) +14.80 FT
WEST SIDE WWTP DATUM (FT)=CITY OF BRIDGEPORT DATUM (FT) +0.20 FT
DATUM CONVERSION TABLE
C-01GENERAL NOTES, LEGEND, AND ABBREVIATIONS
ABBREVIATIONS
PROPOSEDEXISTING
SURVEY LEGEND
ISSUE FOR BID
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108
B
IR
D S
TR
EE
T (R
EP
O
R
TE
D T
O C
O U
N C
IL
O W
N
ER
O F
R
EC
O R
D N
O T
A
SC
ER
TA
IN
ED
MORRIS STREET (DISCONTINUED)
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREETMORRIS STREET (DISCONTINUED)
B O
ST
W
IC
K
A
V
EN
U E
N
C-02
EXISTING CONDITIONS AND SITE BORINGS
PLAN I
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
O
ST
W
EN
U E
B
IR
D S
TR
EE
T (R
EP
O
R
TE
D T
O C
O U
N C
IL
O W
N
ER
O F
R
EC
O R
D N
O T
A
SC
ER
TA
IN
ED
YACHT STREET
CEDAR CREEK
BU
RR CREEK
B
IR
D S
TR
EE
T (R
EP
O
R
TE
D T
O C
O U
N C
IL
O W
N
ER
O F
R
EC
O R
D N
O T
A
SC
ER
TA
IN
ED
N
C-03
EXISTING CONDITIONS AND SITE BORINGS
PLAN II
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-04BOSTWICK STAGING AREA - REMOVALS PLAN
N
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-05
BOSTWICK STAGING AREA
EXCAVATION PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-06REMOVALS PLAN I
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
ST
W
EN
U E
C-07REMOVALS PLAN II
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A
ST
W
EN
U E
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-08EROSION AND SEDIMENTATION CONTROL PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-09
IMPACTED SOIL EXCAVATION PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108
AREA A
AREA B
AREA C
AREA
C
AREA
A
AREA
B-1
AREA
B-2
AREA
B-3
AREA
D
AREA D
AREA A
AREA B
AREA C
AREA D
ST
W
EN
U E
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
DR
DR
DR
DR
DR
DR
DR
DR
DR
DR DR DR DR DR
C-10GRADING AND DRAINAGE PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A
DR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-11PAVING AND FENCING PLAN I
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
ST
W
EN
U E
CEDAR CREEK
C-12PAVING AND FENCING PLAN II
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
ST
W
EN
U E
B
IR
D S
TR
EE
T (D
IS
C
O N
TI
N
U
ED
ST
. S
TE
PH
EN
S
R O
A D
YACHT STREET
SHELL STREET
MORRIS STREET
B O
ST
W
EN
U E
C-13LANDSCAPING AND COMPLETION PLAN
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108
N
C-14SITE DETAILS I
DETAIL A
DETAIL B
DETAIL C
DETAIL K
DETAIL E
DETAIL G
DETAIL H
DETAIL J
DETAIL F
DETAIL L
DETAIL D
DETAIL M
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108 C-15SITE DETAILS II
DETAIL A
DETAIL B
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108 C-16SITE DETAILS III
DETAIL C
PLAN
DETAIL D
DETAIL A
DETAIL B
SECTION 1
TREE SPACING
SHRUB SPACING
DETAIL E
DETAIL E
WATER POLLUTION CONTROL AUTHORITY (WPCA)
WEST SIDE WWTP IMPROVEMENTS
PHASE 1 - SITE PREPARATION
CITY OF BRIDGEPORT, CT
Tel: (860) 529-7615
101 East River Drive, Suite 1A East Hartford, CT 06108 C-17SITE DETAILS IV
DETAIL C DETAIL D
DETAIL A
DETAIL B
DETAIL E DETAIL F
| COVER |
| C-01 - GENERAL NOTES, LEGEND, AND ABBREVIATIONS |
| C-02 - EXISTING CONDITIONS AND SITE BORINGS PLAN I |
| C-03 - EXISTING CONDITIONS AND SITE BORINGS PLAN II |
| C-04 - BOSTWICK STAGING AREA - REMOVALS PLAN |
| C-05 - BOSTWICK STAGING AREA EXCAVATION PLAN |
| C-06 - REMOVALS PLAN I |
| C-07 - REMOVALS PLAN II |
| C-08 - EROSION AND SEDIMENTATION CONTROL PLAN |
| C-09 - IMPACTED SOIL EXCAVATION PLAN |
| C-10 - GRADING AND DRAINAGE PLAN |
| C-11 - PAVING AND FENCING PLAN I |
| C-12 - PAVING AND FENCING PLAN II |
| C-13 - LANDSCAPING AND COMPLETION PLAN |
| C-14 - SITE DETAILS I |
| C-15 - SITE DETAILS II |
| C-16 - SITE DETAILS III |
| C-17 - SITE DETAILS IV |
| 2025-07-30T12:17:44-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:18:17-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:18:30-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:18:53-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:19:14-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:27:35-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:27:55-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:12-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:24-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:36-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:28:48-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:02-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:13-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:25-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:41-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:29:53-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:30:04-0400 | |
| Daniel R Murphy | |
| I am approving this document |
| 2025-07-30T12:15:46-0400 | |
| Daniel R Murphy | |
| I am approving this document |
File details come from the government source that posted it. Updated .