BRIDGE STRENGTHENING PROGRAM_22x34_SEALED.pdf
PDF 40 MB Posted
- Solicitation number
- S-KS0043-00012509
- Issued by
- Marion County, Oregon
About this file
Unable to provide summary. The provided file reference contains only identifying information (ID and filename) but no actual content to analyze. The filename suggests it may be related to a bridge strengthening program and appears to be a sealed engineering drawing (given the 22x34 dimensions and "SEALED" notation), but without access to the actual file contents, I cannot provide details about specifications, requirements, dates, pricing, or other key information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 722515-Intent to Award.pdf | ||
| 722515- Redbook for OB.pdf | ||
| 722515-Bid Register.pdf | ||
| 2024.161 Legal Ad.pdf | ||
| 245090 Bid Opening Zoom Link.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SALEM - DEPARTMENT OF PUBLIC WORKS
555 LIBERTY STREET SE - SALEM, OREGON 97301
VICINITY MAP
PN 722515
BRIDGE
STRENGTHENING
PROJECT
SCHEDULE AREAS
NO. BRIDGE
ID. LOCATION
Call before you dig.
Know what's below.
ATTENTION:
UTILITY CONTACTS
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:0
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
G
.d w g (G
-0 ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
G-01
COVER PAGE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
PROJECT AREA 'D'
PROJECT AREA 'A'
PROJECT AREA 'B'
PROJECT AREA 'C'
NOT TO SCALE
tthomson Snapshot
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:1
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
G
.d w g (G
-0 ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
G-02
DRAWING INDEX
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
SCHEDULE SHEET INDEX
NO. ID. DESCRIPTION
GENERAL
1 G-01 COVER PAGE
2 G-02 DRAWING INDEX
EROSION CONTROL
3 EC-01 EPSC NOTES AND COVER SHEET
4 EC-02 EPSC NOTES
5 EC-03 MISSION STREET TEMPORARY STREAM
DIVERSION DETAILS
TEMPORARY TRAFFIC CONTROL
6 TC-00 TEMPORARY TRAFFIC CONTROL SIGNS
7 TC-01 TEMPORARY TRAFFIC CONTROL NOTES
8 TC-02 TEMPORARY TRAFFIC CONTROL ADVANCED
SIGNING PLAN LIBERTY ST NE
9 TC-03 TEMPORARY TRAFFIC CONTROL ADVANCED
SIGNING PLAN 15TH ST NE
10 TC-04 TEMPORARY TRAFFIC CONTROL ADVANCED
SIGNING PLAN 17TH ST NE
11 TC-05 TEMPORARY TRAFFIC CONTROL ADVANCED
SIGNING PLAN MISSION ST SE
12 TC-06 TEMPORARY TRAFFIC CONTROL PLAN
LIBERTY ST NE
13 TC-07 TEMPORARY TRAFFIC CONTROL PLAN 15TH
ST NE
14 TC-08 TEMPORARY TRAFFIC CONTROL PLAN 17TH
ST NE
15 TC-09 TEMPORARY TRAFFIC CONTROL PLAN
MISSION ST SE
CROSS SECTIONS
16 X-01 PAVING CROSS SECTIONS
SCHEDULE SHEET INDEX
NO. ID. DESCRIPTION
BR #470206 (LIBERTY ST)
17 BR-01 SITE PLAN
18 BR-02 CONTRACTOR ACCESS PLAN
19 BR-03 CONTRACTOR ACCESS ELEVATION
20 BR-04 BRIDGE STRENGTHENING PLAN
21 BR-05 BRIDGE STRENGTHENING PROFILE
22 BR-06 BEAM ELEVATION
23 BR-07 DETAILS
BR #470226 (15TH ST)
24 BR-11 SITE PLAN
25 BR-12 CONTRACTOR ACCESS PLAN
26 BR-13 CONTRACTOR ACCESS ELEVATION
27 BR-14 BRIDGE STRENGTHENING PLAN
28 BR-15 BRIDGE STRENGTHENING PROFILE
29 BR-16 BEAM ELEVATION AND DETAILS
BR #470230 (17TH ST)
30 BR-21 SITE PLAN
31 BR-22 CONTRACTOR ACCESS PLAN
32 BR-23 CONTRACTOR ACCESS ELEVATION
33 BR-24 BRIDGE STRENGTHENING PLAN
34 BR-25 BRIDGE STRENGTHENING PROFILE
35 BR-26 BENT 2 AND 3 DETAILS
36 BR-27 EDGE BEAM DETAILS
37 BR-28 DECK SLAB DETAILS
BR #470612 (MISSION ST)
38 BR-31 SITE PLAN
39 BR-32 CONTRACTOR ACCESS PLAN
40 BR-33 CONTRACTOR ACCESS ELEVATION
41 BR-34 BRIDGE STRENGTHENING PLAN
42 BR-35 BRIDGE STRENGTHENING PROFILE
43 BR-36 BEAM DETAILS
STRIPING PLANS
44 S-01 STRIPING PLAN
45 S-02 STRIPING PLAN
GENERAL CONSTRUCTION NOTES
1. ALL CONSTRUCTION SHALL BE TO CITY OF SALEM STANDARDS AND SPECIFICATIONS AND THE
SPECIAL PROVISIONS DEVELOPED FOR THIS PROJECT.
2. REFERENCE SALEM CONSTRUCTION SPECIFICATIONS, 2017 (SCS) FOR REQUIREMENTS
REGARDING PROTECTION OF EXISTING FACILITIES AND TREES.
3. REFERENCE SCS FOR TRAFFIC PROTECTION AND CONTROL REQUIREMENTS.
4. UTILITY COORDINATION:
A. THE LOCATION AND DESCRIPTION OF EXISTING UTILITIES SHOWN ARE COMPILED FROM
AVAILABLE RECORDS AND/OR FIELD SURVEYS. THE CITY OR UTILITY COMPANIES DO NOT
GUARANTEE THE ACCURACY NOR THE COMPLETENESS OF SUCH RECORDS.
B. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON
UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE:
THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (502)-232-1987).
C. PROVISIONS SHALL BE MADE BY THE CONTRACTOR TO KEEP ALL EXISTING UTILITIES IN SERVICE
AND PROTECT THEM DURING CONSTRUCTION.
5. REFERENCE SCS FOR ANY ADDITIONAL UTILITY COORDINATION REQUIREMENTS.
6. THE CONTRACTOR SHALL BE EXPECTED TO VISIT THE SITE AND MAKE THEIR OWN DETERMINATION
OF TOPOGRAPHIC FEATURES REQUIRING RESTORATION FROM CONSTRUCTION IMPACTS TO LIKE
OR BETTER CONDITIONS (SEE SP 208.3.09).
7. DO NOT REMOVE TREES EXCEPT AS APPROVED BY THE ENGINEER. PROTECT ALL ROOTS. TRIM
TREES, SHRUBS AND HEDGES ONLY AS DIRECTED OR APPROVED BY THE ENGINEER.
8. IT IS POSSIBLE THAT TOPO CHANGES HAVE OCCURRED WITHIN THE STREAM CORRIDOR.
CONTRACTOR TO VERIFY SITE CONDITIONS PRIOR TO BEGINNING WORK.
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:1
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
EC
-0
0.
dw g (E
C -0 ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
EC-01
EPSC NOTES AND
COVER SHEET
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) NOTES
DESIGN STANDARDS NOTES
(A) PRE-CONSTRUCTION
(1). PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING AND GRADING LIMITS, VEGETATED BUFFERS, AND ANY SENSITIVE AREAS SHOWN ON THIS PLAN SHALL BE CLEARLY DELINEATED IN THE FIELD. UNLESS OTHERWISE APPROVED, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS. THE CONTRACTOR MUST MAINTAIN THE DELINEATION FOR THE DURATION OF THE PROJECT. NOTE: VEGETATED CORRIDORS TO BE DELINEATED WITH ORANGE
CONSTRUCTION FENCE OR APPROVED EQUAL.
(2). BMPS THAT MUST BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES ARE CONSTRUCTION ENTRANCE, PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION.
(3). HOLD A PRECONSTRUCTION CONFERENCE TO REVIEW THE EPSC AND WITH THE CITY’S PROJECT MANAGER AND INSPECTOR.
(B) CONSTRUCTION
(1). ALL SEDIMENT IS REQUIRED TO STAY ON SITE. SEDIMENT AMOUNTS GREATER THAN ½ CUBIC FOOT WHICH LEAVE THE SITE MUST BE CLEANED UP WITHIN 24 HOURS AND PLACED BACK ON THE SITE AND STABILIZED OR PROPERLY DISPOSED. VACUUMING OR DRY SWEEPING MUST BE USED TO CLEAN UP RELEASED SEDIMENT AND IT MUST NOT BE SWEPT OR WASHED INTO STORM SEWERS, DRAINAGE WAYS, OR WATER BODIES. THE CAUSE OF THE SEDIMENT RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE PERFORMED
ACCORDING TO THE DSL REQUIRED TIME FRAME.
(2). CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF EROSION PREVENTION AND SEDIMENT CONTROL FACILITIES IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED, APPROVED, AND PERMANENT EROSION CONTROL (I.E., VEGETATION/LANDSCAPING) IS ESTABLISHED ON
ALL DISTURBED AREAS.
(3). ALL RECOMMENDED EROSION PREVENTION AND SEDIMENT CONTROL PROCEDURES ARE DEPENDENT ON CONSTRUCTION METHODS, STAGING, SITE CONDITIONS, WEATHER, AND SCHEDULING. DURING THE CONSTRUCTION PERIOD, EROSION CONTROL FACILITIES SHALL BE REVISED, UPGRADED, REPLACED, OR ADDED, TO COMPLY
WITH SRC AND STATE AND FEDERAL REGULATORY REQUIREMENTS.
(4). THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROTECTION OF ALL ADJACENT PROPERTY AND DOWNSTREAM FACILITIES FROM EROSION AND SILTATION DURING PROJECT CONSTRUCTION. ANY DAMAGE RESULTING FROM SUCH EROSION AND SILTATION SHALL BE CORRECTED AT THE SOLE EXPENSE OF THE CONTRACTOR.
(5). WHEN SATURATED SOIL IS PRESENT, WATER-TIGHT TRUCKS MUST BE USED TO TRANSPORT SATURATED SOILS FROM THE CONSTRUCTION SITE. SOIL MAY BE DRAINED ON SITE AT A DESIGNATED LOCATION, USING APPROPRIATE BMPS. SOIL MUST BE DRAINED SUFFICIENTLY TO DRIP LESS THAN ONE GALLON PER HOUR PRIOR TO
LEAVING THE SITE.
(6). ALL MATERIALS SPILLED, DROPPED, OR WASHED INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY, AND THE CONTRACTOR SHALL PROVIDE PROTECTION OF DOWNSTREAM INLETS AND CATCH BASINS TO ENSURE SEDIMENT-LADEN WATER DOES NOT ENTER THE STORM DRAIN SYSTEM.
(7). ALL DISCHARGE OF SEDIMENT-LADEN WATER MUST BE TREATED WITH AN APPROPRIATE BMP TO REMOVE SEDIMENT FROM DISCHARGE WATERS AND TO COMPLY
WITH SRC AND STATE AND FEDERAL REGULATORY PERMITS.
(8). IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMPS MUST BE USED WHICH MAY INCLUDE THE APPLICATION OF FINE WATER SPRAYING, PLASTIC SHEETING, MULCHING, OR OTHER APPROVED MEASURES.
(9). THE EPSC MEASURES AND BMPS SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE MEASURES SHALL BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE WITH ALL REGULATIONS.
(10). THE CONTRACTOR SHALL PROVIDE ONSITE WATER OR OTHER APPROPRIATE BMPS TO PREVENT DUST AND WIND EROSION OF FINE GRAIN SOILS.
(11). DISTURBED AREAS MUST BE STABILIZED AFTER 14 DAYS OF INACTIVITY, OR IMMEDIATELY IF RAIN IS FORECASTED. SEE SALEM CONSTRUCTION STANDARD
SUBSECTION 207.4.04C - WET WEATHER SEASON.
(12). DURING THE WET WEATHER WORK PERIOD OR WHEN RAIN IS FORECASTED, ALL ACTIVE AND INACTIVE SOIL STOCK PILES MUST BE COVERED WITH APPROPRIATE PLASTIC SHEETING. PLASTIC SHEETING MUST COVER THE ENTIRE STOCK PILE AND BE SUFFICIENTLY ANCHORED.
(C) POLLUTANTS, SOLID WASTE AND HAZARDOUS MATERIALS MANAGEMENT
(1). ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST INCLUDE PROPER STORAGE, APPLICATION, AND DISPOSAL.
(2). THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROPERLY MANAGE POLLUTANTS, HAZARDOUS WASTES, USED OILS, CONTAMINATED SOILS, CONCRETE WASTE, SANITARY WASTE, LIQUID WASTE, OR OTHER TOXIC SUBSTANCES DISCOVERED OR GENERATED DURING CONSTRUCTION TO PREVENT LEAKAGE, SPILLS OR RELEASE OF
POLLUTANTS TO THE ENVIRONMENT AND SURFACE WATERS.
(3). CONTRACTOR SHALL DEVELOP A PROJECT SPECIFIC WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES THAT INCLUDES EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES; REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY; AND MATERIAL DELIVERY AND STORAGE CONTROLS, SIGNAGE, MATERIAL USE, AND USE OF COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. THE PLAN SHALL COMPLY WITH SRC AND FEDERAL AND STATE
REQUIREMENTS, AND SHALL BE AVAILABLE ON SITE AT ALL TIMES.
(D) WET WEATHER PERIOD (OCTOBER 15 THROUGH APRIL 30)
(1). CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE THE DURATION OF DISTURBED AREAS.
(2). TEMPORARY STABILIZATION OF THE SITE INCLUDING COVERING OF BARE SOILS WITH APPROVED BMPS, MUST BE INSTALLED AT THE END OF THE SHIFT BEFORE A HOLIDAY OR WEEKEND, OR AT THE END OF EACH WORKDAY IF RAINFALL IS FORECAST IN THE NEXT 24 HOURS.
(3). TEMPORARY STABILIZATION OR COVERING OF SOIL STOCKPILES AND PROTECTION OF STOCKPILES LOCATED AWAY FROM CONSTRUCTION ACTIVITY MUST OCCUR AT
THE END OF EACH WORKDAY.
(E) MAINTENANCE
(1). EROSION CONTROL MEASURES SHALL BE MAINTAINED IN SUCH A MANNER AS TO ENSURE THAT EROSION IS PREVENTED AND SEDIMENT-LADEN WATER DOES NOT
ENTER A DRAINAGE SYSTEM, ROADWAY, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
(2). SEDIMENT SHALL NOT BE WASHED OR SWEPT INTO STORM SEWERS, DRAINAGE WAYS, OR WATER BODIES.
(3). SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL MEASURES WHEN IT HAS REACHED A HEIGHT OF 1/3 THE BARRIER HEIGHT, AND PRIOR TO THE
CONTROL MEASURES REMOVAL.
(4). REMOVAL OF TRAPPED SEDIMENT IN A SEDIMENT BASIN OR SEDIMENT TRAP OR CATCH BASINS MUST OCCUR WHEN THE SEDIMENT RETENTION CAPACITY HAS BEEN REDUCED BY 50 PERCENT; IS NOT FUNCTIONING PROPERLY AND/OR AT THE COMPLETION OF PROJECT.
(5). CLEANING OF ALL STRUCTURES, INLET PROTECTION BMPS, AND SUMP PUMPS MUST BE COMPLETED REGULARLY AND AS REQUIRED TO ENSURE STRUCTURES AND
INLETS FUNCTION PROPERLY AND FLOW FREELY.
(6). CONSTRUCTION SITE EXITS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOW OF MUD ONTO THE ROW OR APPROVED ACCESS POINT.
THE ENTRANCE MAY REQUIRE PERIODIC TOP DRESSING AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT.
WHEEL WASHING SHALL BE REQUIRED TO PREVENT SEDIMENT AND MATERIAL TRACKING ON ROAD SURFACES IF PASSIVE BMPS ARE NOT EFFECTIVE.
(F) INSPECTION
(1). THE EPSC MUST BE KEPT ONSITE AT ALL TIMES. ALL MEASURES SHOWN ON THE PLAN MUST BE INSTALLED PROPERLY TO ENSURE COMPLIANCE WITH SRC AND STATE AND REGULATORY PERMITS, AND THAT SEDIMENT DOES NOT ENTER A SURFACE WATER SYSTEM, ROADWAY, OR OTHER PROPERTIES.
(2). WRITTEN EPSC INSPECTION LOGS SHALL BE MAINTAINED ONSITE AND AVAILABLE TO CITY INSPECTORS UPON REQUEST.
(3). ALL BMPS SHALL BE INSPECTED AT LEAST EVERY WEEK. WHEN A RAINFALL EVENT EXCEEDS ½" IN A 24-HOUR PERIOD, DAILY INSPECTION OF THE EROSION CONTROLS, SEDIMENT CONTROLS, AND DISCHARGE OUTFALLS MUST BE CONDUCTED AND DOCUMENTED. INSPECTIONS SHALL BE DONE BY A REPRESENTATIVE OF THE PERMIT REGISTRANT WHO IS KNOWLEDGEABLE AND EXPERIENCED IN THE PRINCIPLES, PRACTICES, INSTALLATION, AND MAINTENANCE OF EROSION AND SEDIMENT CONTROLS.
(G) INACTIVE CONSTRUCTION PERIODS AND POST-CONSTRUCTION
(1). SHOULD WORK CEASE IN ANY AREA FOR 14 DAYS, THE INACTIVE AREA MUST BE STABILIZED WITH APPROPRIATE SOIL STABILIZATION BMPS. IF ALL CONSTRUCTION ACTIVITY CEASES THE ENTIRE SITE MUST BE TEMPORARILY STABILIZED USING VEGETATION, HEAVY MULCH LAYER, TEMPORARY SEEDING, OR OTHER METHOD.
(2). ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL FACILITIES SHALL BE REMOVED BY THE CONTRACTOR WITHIN 30 DAYS AFTER PERMANENT LANDSCAPING/VEGETATION IS ESTABLISHED AND THE THREAT OF EROSION AND SEDIMENT TRANSPORT HAS BEEN MITIGATED.
(3). TEMPORARY GRASS COVER MEASURES MUST BE FULLY ESTABLISHED BY OCTOBER 15 OR OTHER COVER MEASURES (I.E., EROSION CONTROL BLANKETS WITH ANCHORS, ONE-INCH OF STRAW MULCH, SIX MIL HDPE PLASTIC SHEET, ETC.) SHALL BE IN PLACE OVER ALL DISTURBED SOIL AREAS UNTIL APRIL 30. TO ESTABLISH AN ADEQUATE GRASS STAND FOR CONTROLLING EROSION BY OCTOBER 15, IT IS RECOMMENDED THAT SEEDING AND MULCHING OCCUR BY SEPTEMBER 1.
(4). PERMANENT EROSION CONTROL VEGETATION ON ALL EMBANKMENTS AND DISTURBED AREAS SHALL BE RE-ESTABLISHED AS SOON AS CONSTRUCTION IS
COMPLETED.
(H) SPECIFICATIONS
(1). SOIL PREPARATION. TOPSOIL SHOULD BE PREPARED ACCORDING TO THE LANDSCAPE PLANS AND SPECIFICATIONS. SLOPES SHALL BE TEXTURED BEFORE SEEDING BY RACK WALKING (I.E., DRIVING A CRAWLING TRACTOR UP AND DOWN THE SLOPES TO LEAVE A PATTERN OF CLEAT IMPRINTS PARALLEL TO SLOPE CONTOURS) OR OTHER METHOD TO PROVIDE STABLE AREAS FOR SEEDS TO REST.
(2). SEEDING. EROSION CONTROL GRASS SEED MIX SHALL BE AS FOLLOWS: DWARF GRASS MIX (LOW HEIGHT, LOW MAINTENANCE) CONSISTING OF DWARF PERENNIAL RYEGRASS (60 PERCENT BY WEIGHT), CREEPING RED FESCUE (40) PERCENT BY WEIGHT). APPLICATION RATE SHALL BE 100
POUNDS PER ACRE MINIMUM.
(3). NO FERTILIZER SHALL BE USED WITHIN 50 FEET OF OHWM OR ON SLOPES STEEPER THAN 4: 1 (h : v).
(4). WHEN USED, HYDROMULCH SHALL BE APPLIED WITH GRASS SEED AT A RATE OF 2,000 POUNDS PER ACRE BETWEEN APRIL 30 AND JUNE 10, OR BETWEEN SEPTEMBER 1 AND OCTOBER 1. ON SLOPES STEEPER THAN TEN PERCENT, HYDROSEED AND MULCH SHALL BE APPLIED WITH A BONDING AGENT (TACKIFIER). APPLICATION RATE AND METHODOLOGY SHALL BE IN ACCORDANCE WITH SEED SUPPLIER RECOMMENDATIONS.
(5). WHEN USED IN LIEU OF HYDROMULCH, DRY, LOOSE, WEED-FREE STRAW USED AS MULCH SHALL BE APPLIED AT A RATE OF 4,000 POUNDS PER ACRE (DOUBLE THE HYDROMULCH APPLICATION REQUIREMENT). ANCHOR STRAW BY WORKING IN BY HAND OR WITH EQUIPMENT (ROLLERS, CLEAT TRACKERS, ETC.). MULCH SHALL BE SPREAD UNIFORMLY IMMEDIATELY FOLLOWING SEEDING.
(6). WHEN CONDITIONS ARE NOT FAVORABLE TO GERMINATION AND ESTABLISHMENT OF THE GRASS SEED, THE CONTRACTOR SHALL IRRIGATE
THE SEEDED AND MULCHED AREAS AS REQUIRED TO ESTABLISH THE GRASS COVER.
(7). SEDIMENT FENCES SHALL BE CONSTRUCTED OF CONTINUOUS FILTER FABRIC TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM SIX-INCH OVERLAP, AND BOTH ENDS SECURELY
FASTENED TO A POST.
(8). THE STANDARD STRENGTH FILTER FABRIC SHALL BE FASTENED SECURELY TO STITCHED LOOPS INSTALLED ON THE UPSLOPE SIDE OF THE POSTS, AND SIX INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 30 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES.
(9). BIO-FILTER BAGS SHALL BE CLEAN 100 PERCENT WOOD PRODUCT WASTE. BAGS SHALL BE 18-INCH X 18-INCH X 30-INCH, WEIGH
APPROXIMATELY 45 POUNDS, AND BE CONTAINED IN A BAG MADE OF ½ INCH PLASTIC MESH.
(10). MINIMUM WET WEATHER SLOPE PROTECTION. FOR 3H:1V OR STEEPER SLOPES USE BON TERRA TYPE C2 OR NORTH AMERICAN GREEN TYPE C125 EROSION CONTROL BLANKETS. USE A MINIMUM OF TWO INCHES STRAW MULCH OR NORTH AMERICAN GREEN TYPE S150 FOR SLOPES FLATTER THAN 3H:1V AND GREATER THAN 6H:1V. SLOPES FLATTER THAN 6H:1V USE ONE INCH STRAW MULCH, HYDROSEED WITH HYDROMULCH AND TACKIFIER. SLOPE PROTECTION SHALL BE PLACED ON ALL DISTURBED AREAS IMMEDIATELY AFTER COMPLETION OF EACH SECTION OF CONSTRUCTION ACTIVITY, UNTIL THE EROSION CONTROL SEEDING HAS BEEN ESTABLISHED. AS AN OPTION DURING TEMPORARY OR SEASONAL WORK STOPPAGES, A SIX-MIL HDPE PLASTIC SHEET MAY BE PLACED ON EXPOSED SLOPES. THE PLASTIC SHEET SHALL BE PROVIDED WITH AN ANCHOR TRENCH AT THE TOP AND BOTTOM OF THE SLOPE, AND SHALL BE SANDBAGGED ON THE SLOPES AS REQUIRED TO PREVENT DAMAGE OR
DISPLACEMENT BY WIND.
(I) A COMPREHENSIVE LIST OF AVAILABLE BEST MANAGEMENT PRACTICES (BMP) OPTIONS BASED ON DEQ'S GUIDANCE MANUAL HAS BEEN REVIEWED TO COMPLETE THIS EROSION AND SEDIMENT CONTROL PLAN. SOME OF THE BELOW LISTED BMP'S WERE NOT CHOSEN BECAUSE THEY WERE DETERMINED TO NOT EFFECTIVELY MANAGE EROSION PREVENTION AND SEDIMENT CONTROL FOR THIS PROJECT BASED ON SPECIFIC SITE CONDITIONS, INCLUDING SOIL CONDITIONS, TOPOGRAPHIC CONSTRAINTS, ACCESSIBILITY TO THE SITE, AND OTHER RELATED CONDITIONS, AS THE PROJECT PROGRESSES AND THERE IS A NEED TO REVISE THE ESC PLAN, AN ACTION PLAN WILL BE SUBMITTED.
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:3
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
EC
-0
0.
dw g (E
C -0 ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
EC-02
EPSC NOTES
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) NOTES (CONTINUED)
1. THE CONTRACTOR SHALL PROVIDE DAILY MEASURES TO ENSURE SEDIMENT
CONTROL DURING NON-WORK HOURS.
2. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED ON PUBLIC AND
PRIVATE INLETS TO ENSURE SEDIMENT CONTROL WITHIN THE WORK AREA.
3. ALL TEMPORARY STOCKPILES AND CONCRETE MANAGEMENT FACILITIES SHALL BE
LOCATED A MINIMUM OF 50 FEET FROM ANY DRAINAGE INLET OR WATER COURSE.
4. EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) PLAN (SEE BR-01, BR-11,
BR-21, AND BR-31 SHEETS) SHALL SERVE AS THE MINIMUM OF CONTROLS
NECESSARY TO PROTECT THE SITE. CONTRACTOR SHALL MONITOR TURBIDITY IN
THE STREAM. ADDITIONAL CONTROL MEASURES MAY BE REQUIRED IN ORDER TO
DIMINISH THE POTENTIAL FOR SEDIMENT-LADEN WATER TO ENTER THE STORM
DRAIN SYSTEM OR WATERWAY
GENERAL EPSC NOTES
CONSTRUCTION SEQUENCING
WORK AREA ISOLATION DAM
TEMPORARY EASEMENT FOR
CONSTRUCTION STAGING AND ACCESS
REMOVE EXISTING FENCE// // // // //
GRAVITY BYPASS PIPE
INLET PROTECTION
LEGEND
PERMANENT EASEMENT
1. PLACE PERIMETER PROTECTION BMPS IN WORK AREA AND STAGING/ACCESS AREAS.
2. INSTALL ISOLATION SYSTEM FOR IN-STREAM WORK AREAS AND NOTIFY ENGINEER TO
SCHEDULE FISH SALVAGE TO BE PREFORMED BY OWNER'S REPRESENTATIVE.
3. ESTABLISH TEMPORARY PUMPS, PIPES, AND ASSOCIATED BMPS IN THE ISOLATED
WORK ZONE. DEWATER THE SITE.
4. CONSTRUCT TEMPORARY ACCESS IMPROVEMENTS AS NEEDED.
5. ALL EQUIPMENT ACCESS TO BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO
ANY INSTALLATIONS IN THE WATERWAY. INSTALL TEMPORARY MATS OVER THE
STREAMBED GRAVEL FOR ANY APPROVED EQUIPMENT ACCESS.
6. REMOVE WORK ISOLATION MEASURES.
7. PERFORM RIPARIAN PLANTING AND OTHER SITE STABILIZATION WORK.
TREE PROTECTION FENCE
FLOW
IF LOCATED OVER SOIL, PLACE BAG ON
3" OF CLEAN 1" COARSE AGGREGATE
SEDIMENT CONTROL
BAG
FLOW ACROSS
VEGETATION
8' X 10' (MIN.)
SEDIMENT
CONTROL BAG
FLOW
FROM
PUMP
C C'
PUMP DISCHARGE
4" HOSE (TYP.)
STRAW BALE BERM
SECTION C-C'
PUMP DISCHARGE
4" HOSE (TYP.)
STRAW BALE BERM
PLAN
FLOW
NOTE:
THIS BARRIER WILL NOT PREVENT
SUBSURFACE FLOW FROM ENTERING
WORK ZONE. CONTINUED PUMPING MAY
BE REQUIRED IN ISOLATED WORK AREAS
THAT NEED TO BE DEWATERED.
IMPERMEABLE LINER
5FT
STABILIZE WITH
SANDBAG
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:4
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
EC
-0
0.
dw g (M
IS
SI
O N
S
TR
EE
T
TE
M
PO
R
AR
Y
ST
R
EA
M
D
IV
ER
SI
O N
D
ET
AI
LS
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
EC-03
MISSION STREET
TEMPORARY
STREAM DIVERSION
DETAILS
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
SEDIMENT CONTROL BAG1 NOT TO SCALE
WORK AREA ISOLATION DAM DETAIL2 NOT TO SCALE
1. THE SEDIMENT CONTROL BAG SHALL BE MANUFACTURED USING A POLYPROPYLENE 8 OZ. NON-WOVEN
GEOTEXTILE SEWN INTO A BAG WITH A DOUBLE NEEDLE, USING A HIGH-STRENGTH THREAD.
2. THE NON-WOVEN GEOTEXTILE SHALL MEET OR EXCEED THE PROPERTIES LISTED IN TABLE 1.
3. AVOID PLACEMENT OF THE SEDIMENT CONTROL BAG ABOVE STEEP SLOPES OR WHERE SATURATED SOIL
CONDITIONS MAY CAUSE SOIL INSTABILITY.
4. INSTALL THE SEDIMENT CONTROL BAG ON A MILD SLOPE SO INCOMING WATER FLOWS DOWNHILL THROUGH THE
BAG.
5. THE SEDIMENT CONTROL BAG MUST BE MONITORED DURING USE. THE SEDIMENT CONTROL BAG IS FULL WHEN IT
NO LONGER CAN EFFICIENTLY FILTER SEDIMENT OR PASS WATER AT A REASONABLE RATE.
6. DISPOSE OF THE SEDIMENT CONTROL BAG WHEN FULL OR AS DIRECTED BY THE ENGINEER.
7. WHEN PLACED IN UPLAND LOCATIONS, THE SEDIMENT CONTROL BAG MAY BE CUT OPEN IN AN APPROPRIATE
LOCATION AND THE CONTENTS SEEDED AFTER REMOVING VISIBLE FABRIC.
8. SIZING AND MAINTENANCE OF THE SEDIMENT CONTROL BAG IS DEPENDENT ON THE PUMPED FLOW RATE AND
AMOUNT OF SEDIMENT. CONTRACTOR SHALL VERIFY THAT SEDIMENT CONTROL BAG IS SUFFICIENT TO TREAT PUMPED DEWATERING WATER TO MEET ALL APPLICABLE STANDARDS AND PERMIT CONDITIONS. IF TURBIDITY CANNOT BE REDUCED WITH ONE SEDIMENT TRAP, CONTRACTOR TO PLACE ADDITIONAL TRAPS IN SERIES.
9. DEWATERING DEVICES SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. NO DISCHARGE SHALL BE MADE TO A PAVED STREET OR STORMWATER COLLECTION SYSTEM WITHOUT APPROVAL AND REMOVING SEDIMENT. SEDIMENT CONTROL BAG PLACED ON A NON-STREAM VEGETATED AREA IS THE MINIMUM SEDIMENT CONTROL TO BE USED FOR DEWATERING. ADDITIONAL MEASURES MAY BE NECESSARY TO PREVENT DISCHARGE
OF SEDIMENT.
10. ALTERNATIVE DIVERSION DAM MATERIALS SUCH AS AQUABAG AND BIG BAG SYSTEMS OR DETAILS SHOWN ON CITY OF SALEM STANDARD DRAWING 911 MAY BE USED. SUBMIT DETAILS IN ACCORDANCE WITH 211.2.02 FOR
ENGINEER'S ACCEPTANCE PRIOR TO PROCURING MATERIALS.
NOTES
TABLE 1
PROPERTY TEST METHOD TEST RESULTS
WEIGHT ASTM D-3776 8 OZ/YD
GRAB TENSILE ASTM D-4632 205 LB.
CBR PUNCTURE ASTM D-6241 525 LB.
FLOW RATE ASTM D-4491 90 GAL/MIN/FT2
PERMITTIVITY ASTM D-4491 1.4 SEC-1
UV RESISTANCE ASTM D-4355 70%
AOS %
RETAINED
ASTM D-4751 SIEVE NO. 80
OVERALL
REMOVAL
EFFICIENCY
ASTM D-7880 97.55%
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:5
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
T0 1.
dw g
(S
IG
N S ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
36" x 36" W20-3W20-1
36" x 36" R11-2
48" x 30" W20-2
36" x 36"
M4-9L 30" x 24"
M4-9R 30" x 24"
END
DETOUR
M4-8A 24" x 18"
36" x 36"
BICYCLE
60" x 30" R11-4
24" x 30"
LOCAL
ONLY
ACCESS
STREET CLOSED
TO
THRU TRAFFIC
R3-5 30" x 36"
R3-5 30" x 36"
60" x 24" G20-2
END
ROAD WORK
R9-11A 24" x 12"
SIDEWALK CLOSED
CROSS HERE
R9-11A 24" x 12"
SIDEWALK CLOSED
CROSS HERE
30" x 30" W1-4 R9-10
24" x 12"
SIDEWALK
CLOSED
30" x 36"
R9-11 24" x 12"
SIDEWALK CLOSED
CROSS HERE
AHEAD
33" x 12"
(BLACK ON ORANGE)
1 6
12R 18C
12L 16A
18D
16L
18E
16R
17L
18A
24 3228
TC-00
TEMPORARY
TRAFFIC
CONTROL
SIGNS
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
AHEAD
WORK
ROAD
BUFFER
SPACETAPER
LANE WORK
AREA
ROAD WORK
END
15TH STREET, 17TH STREET, MISSION STREET - 25 MPH
LIBERTY STREET - 30 MPH
TYPICAL TEMPORARY TRAFFIC CONTROL SIGN SPACING
LIBERTY ST
TYPICAL TEMPORARY
TRAFFIC CONTROL SIGNS
18F
R9-11 24" x 12"
SIDEWALK CLOSED
CROSS HERE
AHEAD
NO
PARKING
ANY
TIME
R7-1 12" x 18"
48"x 48"
(SIGN FURNISHED BY CITY)
BUSINESSES
OPEN DURING
CONSTRUCTION
36"x 36"
(SIGN FURNISHED BY CITY)
32A
OW 23-3
36" x 36"
PREPARED
TO
STOP
W20-7 36" x 36"
FLAGGER
AHEAD4 5
BE
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISI
VIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:3
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
T0 1.
dw g
(N O
TE
S ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
TC-01
TEMPORARY
TRAFFIC
CONTROL
NOTES
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
PEDESTRIAN NOTES:
TYPE III BARRICADE
TRAFFIC CONTROL SIGN LIST
PORTABLE SIGN ON TYPE II BARRICADE
WORK ZONE
(MIN. 8' WIDE - REFER
TO THE OTTCH, PAGE 36)
PLASTIC DRUMS
PCMS MESSAGES
TIME PERIOD OF USE
7 DAYS PRIOR TO AND DURING CONSTRUCTION.
P PORTABLE CHANGEABLE
MESSAGE SIGN (PCMS)
(P = PANEL MESSAGE NUMBER)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
(SPACING = AS SHOWN)TEMPORARY SIGN SUPPORT (TSS)
DOUBLE POST
(SEE ODOT STD DWG TM821)
LIBERTY
CLOSED
XX/X - XX/X
USE
DIVISION
DETOUR
PANEL 1 PANEL 2
NOTES:
PORTABLE CHANGEABLE MESSAGE SIGN
(PCMS) INSTALLATION DETAIL
PORTABLE CHANGEABLE MESSAGE SIGN (PCMS)
P
1.) CONTRACTOR TO PROVIDE PROPER SIGNAGE AND MAINTAIN ONE SAFE
ACCESSIBLE ROUTE FOR PEDESTRIAN TRAFFIC AT ALL TIMES DURING CONSTRUCTION.
TRAFFIC CONTROL NOTES:
8.) THE TEMPORARY TRAFFIC CONTROL PLANS PROVIDE GUIDANCE FOR PLACEMENT
OF SIGNAGE AND CHANNELIZING DEVICES, CERTAIN CONSTRUCTION ACTIVITIES
MAY REQUIRE ADDITIONAL TEMPORARY TRAFFIC CONTROL PLANS, SIGNS, OR
CHANNELIZING DEVICES.
10.) ALL FLEXIBLE SIGNS AND PORTABLE SIGN SUPPORTS SHALL BE CRASHWORTHY.
9.) SIGNS PLACED CONTINUOUSLY FOR LONGER THAN THREE DAYS SHALL BE
POST-MOUNTED.
11.) RIGID SIGNS MAY BE USED ON BARRICADES WHEN APPROPRIATELY CRASH TESTED.
7.) SIGN LOCATIONS SHOWN ARE APPROXIMATE AND SHOULD BE ADJUSTED IN THE
FIELD FOR CONFLICTS SUCH AS SIGHT DISTANCE, DRIVEWAYS, LANDSCAPING,
UTILITIES, ETC.
6.) CONTRACTOR SHALL PROTECT TRAFFIC AND SHALL PROVIDE TRAFFIC CONTROL
AT ALL TIMES DURING CONSTRUCTION.
5.) MAINTAIN LOCAL ACCESS AT ALL TIMES.
4.) SEE SPECIAL PROVISIONS FOR WORK HOURS AND SPECIAL RESTRICTIONS.
3.) USE FLAGGERS AND TEMPORARY TRAFFIC CONTROL AS REQUIRED WITH
APPROVED PERMIT. REFER TO THE MUTCD AND THE OTTCH.
2.) REFER TO THE MUTCD AND THE OREGON TEMPORARY TRAFFIC CONTROL
HANDBOOK (OTTCH) FOR DISTANCES BETWEEN SIGNS AND CONES,
UNLESS OTHERWISE NOTED.
1.) CONTRACTOR TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL GUIDELINES
FOR TRAFFIC CONTROL.
12.) PROVIDE BLUE BUSINESS ACCESS SIGNS WHENEVER PUBLIC ACCESS TO A BUSINESS
DRIVEWAY IS RESTRICTED BY A LANE CLOSURE, ROAD CLOSURE, OR ACCESS
VISIBILITY IS OBSTRUCTED BY CONSTRUCTION ACTIVITIES.
13.) ALL BARRICADES SHALL BE LIGHTED AT NIGHT.
14.) SIGNS SHALL NOT BE MOUNTED ON THE SIDEWALK AT ANY LOCATION.
MESSAGE - LIBERTY ST
PCMS MESSAGES
BRIDGE
WORK
AHEAD
EXPECT
DELAYS
XX/X - XX/X
PANEL 1 PANEL 2
MESSAGE - 17TH ST
INSTALL PCMS BEYOND THE OUTSIDE SHOULDER, WHEN POSSIBLE.
USE THE APPROPRIATE TYPE OF BARRICADE PANELS FOR PCMS LOCATION.
RIGHT SHOULDER, USE TYPE B(III)R
LEFT SHOULDER, USE TYPE B(III)L
USE SIX DRUMS IN SHOULDER TAPER ON 20' SPACING.
FLAGGER STATION DELINEATION
NOTES:
· USE A MINIMUM OF 3 TUBULAR MARKERS TO DELINEATE EACH FLAGGER STATION (DAY TIME)
· USE A MINIMUM OF 6 TUBULAR MARKERS TO DELINEATE EACH FLAGGER STATION (NIGHT TIME)
· INSTALL FLAGGER STATION LIGHTING BEYOND THE OUTSIDE SHOULDER, WHERE PRACTICAL (NIGHT TIME)
· PLACE CART / GENERATOR / POWER SUPPLY OFF THE SHOULDER, AS FAR AS PRACTICAL (NIGHT TIME)
PCMS MESSAGES
MISSION
BRIDGE
WORK
EXPECT
DELAYS
XX/X - XX/X
PANEL 1 PANEL 2
MESSAGE - MISSION ST
TIME PERIOD OF USE
7 DAYS PRIOR TO AND DURING CONSTRUCTION.
TIME PERIOD OF USE
7 DAYS PRIOR TO AND DURING CONSTRUCTION.
CONTRACTOR TO PROVIDE FOUR PCMS BOARDS. PCMS BOARDS WILL BE RELOCATED AS REQUIRED.
PCMS MESSAGES
15TH ST
CLOSURE
X/XX-X/XX
PANEL 1
MESSAGE - 15TH ST
TIME PERIOD OF USE
7 DAYS PRIOR TO AND DURING CONSTRUCTION.
DETOUR ROUTE
FOR TIME PERIODS, USE THREE-CHARACTER MONTH AND DATES. SEE OREGON PCMS HANDBOOK.
TEMPORARY PEDESTRIAN ACCESS ROUTE
CD
CDTEMPORARY SIGN SUPPORT (TSS)
SINGLE POST
(SEE ODOT STD DWG TM821)
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:3
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
T0 1.
dw g
(A D
VA
N
C
ED
L
IB
ER
TY
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
1" = 200'-0"
PLAN1 LIBERTY ST
P
P
GENERAL NOTES:
TC-02
TEMPORARY
TRAFFIC CONTROL
ADVANCED
SIGNING PLAN
LIBERTY ST NE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
28 12R
16A
1" = 200'-0"
PLAN1 15TH ST
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:1
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
SX
X_
TH
.d w g (A
D
VA
N C
ED
5t h
ST
R
EE
T ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
GENERAL NOTES:
8 1
12L
16A
16A
12R
12L
12R
P P
TC-03
TEMPORARY
TRAFFIC CONTROL
ADVANCED
SIGNING PLAN
15TH ST NE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
7 6
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:5
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
SX
X_
TH
.d w g (A
D
VA
N C
ED
7T H
S
TR
EE
T ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
1" = 200'-0"
PLAN1 17TH ST
P
GENERAL NOTES:
P
1 32
TC-04
TEMPORARY
TRAFFIC CONTROL
ADVANCED
SIGNING PLAN
17TH ST NE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:3
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
SX
X_
M
IS
SI
O
N .d w g
(A D
VA
N
C
ED
M
IS
SI
O
N S
TR
EE
T ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
TC-05
TEMPORARY
TRAFFIC CONTROL
ADVANCED
SIGNING PLAN
MISSION ST SE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
1" = 200'-0"
PLAN1 MISSION ST
P
GENERAL NOTES:
19 1
P
50174148.33ARROWlt
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:1
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
T0 1.
dw g
(P
LA
N L
IB
ER
TY
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
TC-06
TEMPORARY
TRAFFIC
CONTROL PLAN
LIBERTY ST NE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
1" = 50'-0"
PLAN1 LIBERTY ST
16A
12R
18F
18A 16L
18E
16A
18A
16R 16R 16R
16L16L 16L16L 6
32A
X
OHL OHL
WWWWWW
1" = 40'-0"
PLAN1 15TH ST
������� 6H((7 O)
6H((7�7,7L(
HO5,=�'$780�
9(57�'$780�
HO5,=�6&$L(�
9(57�6&$L(� '(6,*1� '5$W1� &H(&.('�
$335O9('�
1O� '$7( %<'(6&5,37,O1 5(9,6,O16
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
'$7(�6,*1('�� &(57,),&$7(�(X3,5(6��
BRIDGE
STRENGTHENING
PROJECT
6H((7�35(3$5('�%<�
$0
??R
WD
N�
FR
P ?O 7$
O
7?
Z J?
�B
6X
XB
7H
�G Z J�
�W K�
7�
WD
E�
����6W�7KLUG�$YHQXH��6WH�����
3RUWODQG��O5������
�ZZZ�RWDN�FRP
OWDN��,QF�
31��������
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
TC-07
TEMPORARY
TRAFFIC
CONTROL PLAN
15TH ST NE
1$'����63&6 1*9'���������
$6�6HOW1
$6�6HOW1
$0O -W7
51 51 516
W
W W
W W
W
1" = 40'-0"
WEST SIDE ACCESS1 17TH STREET NE
������� 6+((7 2)
6+((7�7,7/(
+25,=�'$780� 9(57�'$780� +25,=�6&$/(� 9(57�6&$/(� '(6,*1� '5$W1�
$33529('�
12� '$7( %<'(6&5,37,21 5(9,6,216
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
'$7(�6,*1('�� &(57,),&$7(�(;3,5(6��
BRIDGE
STRENGTHENING
PROJECT
6+((7�35(3$5('�%<�
$0
??R
WD
N�
FR
P ?2 7$
7?
Z J?
�B
6;
;B
7+
�G Z J�
�7 �6
7�
WD
E�
����6W�7KLUG�$YHQXH��6WH�����
3RUWODQG��25������
�ZZZ�RWDN�FRP
2WDN��,QF�
31��������
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
17L
18F
18A
TC-08
TEMPORARY
TRAFFIC
CONTROL PLAN
17TH ST NE
1$'����63&6 1*9'��������� $6�6+2W1 $6�6+2W1 $02 -W7
18E
*(1(5$/�127(6
18A 32
32 23
P
1" = 40'-0"
TRAFFIC STAGE 33 MISSION ST
1" = 40'-0"
TRAFFIC STAGE 22 MISSION ST
1" = 40'-0"
TRAFFIC STAGE 11 MISSION ST
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:0
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
SX
X_
M
IS
SI
O
N .d w g
(M
IS
SI
O
N S
TR
EE
T ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
17L 1
17L
CD
18F
18F
18A
TC-09
TEMPORARY
TRAFFIC
CONTROL PLAN
MISSION ST SE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
GENERAL NOTES
18A
18A
16R
4 5
16R18E
18A 18E
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:5
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
X-
.d w g (X
-0 ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
64178PE
EXPIRES: 12/31/2024
OREGONAMANDA M. OWI NGS
JULY 13 , 2004
REGISTERED PROFESS IONALE NG I NE E R
X-01
PAVING CROSS
SECTIONS
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
AMO
JWT
17TH STREET BRIDGE1 1" = 5'-0"
MISSION STREET BRIDGE2 1" = 5'-0"
NOTE:
NOTE:
D
C
X
X
X
X
NE LIBERTY ST
OHL
W W W W W
8(TYP.)
5 46
CONSTRUCTION SEQUENCENOTES
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:5
AM
\\o ta k.
co m
\O
TA
K\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
Si te
P la n_ Li be rty
S t.d w g
(S
IT
E
PL
AN
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
LEGEND
X
BR-01
LIBERTY STREET NE
AT MILL CREEK
SITE PLAN
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
1" = 10'-0"
PLAN1 BR #470206 (LIBERTY ST)
50318146.98WAT-FIREhyd
50426148.19GAS-METER
D X
X
X
X
OHL
W W W W W
N: 223877.79 E: 176583.55
N: 223904.10 E: 176603.08
N: 223899.22 E: 176598.12
N: 223881.49 E: 176572.87
N: 223909.36 E: 176539.35
N: 223908.50 E: 176535.12
N: 223916.74 E: 176530.86
BR-03
N: 223948.39 E: 176535.82
N: 223984.63 E: 176579.46
N: 223974.76 E: 176586.30
N: 223937.97 E: 176541.76
N: 223926.56 E: 176541.34
N: 223912.70 E: 176585.42
N: 223908.52 E: 176597.15
N: 223879.49 E: 176585.63
CONSTRUCTION
ACCESS SEQUENCE
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
:3 7:
P
M \\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
C O
N
TR
AC
TO
R _A
C C
ES
S_
LI
BE
R
TY
.d w g (C
O N
TR
AC
TO
R
A C
C
ES
S
PL
AN
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
1" = 10'-0"
PLAN1 BR #470206 (LIBERTY ST) BR-02
LIBERTY STREET NE
AT MILL CREEK
CONTRACTOR
ACCESS PLAN
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
LEGEND
BR-03
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
0:
:0
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
C O
N
TR
AC
TO
R _A
C C
ES
S_
LI
BE
R
TY
.d w g (p ro fil e
LI
BE
R
TY
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
1" = 5'-0"
ELEVATION (LOOKING EAST UPSTREAM)
BR #470206 (LIBERTY ST)BR-02
NO SCALE
SITE PHOTO (LOOKING NORTH)4 BR #470206 (LIBERTY ST)
BR-03
LIBERTY STREET NE
AT MILL CREEK
CONTRACTOR
ACCESS ELEVATION
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
NOTE:
1" = 5'-0"
SECTION
BR #470206 (LIBERTY ST)BR-03
LEGEND
X
X
W W W W W W W W W W W
BR-06
BR-05
135 140
GENERAL NOTES
BRIDGE STRENGTHENING
CONSTRUCTION NOTES
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISI
VIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:0
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
ST
R
EN
G
TH
EN
IN
G
_L
IB
ER
TY
.d w g (B
R
ID
G E
ST
R
EN
G
TH
EN
IN
G
P
LA
N ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
1" = 5'-0"
PLAN1 BR #470206 (LIBERTY ST) BR-04
LIBERTY STREET NE
AT MILL CREEK
BRIDGE
STRENGTHENING
PLAN
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
LEGEND
BR-03
1" = 5'-0"
ELEVATION (LOOKING WEST DOWNSTREAM)
BR #470206 (LIBERTY ST)BR-04
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISI
VIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:1
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
ST
R
EN
G
TH
EN
IN
G
_L
IB
ER
TY
.d w g (p ro fil e
LI
BE
R
TY
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
BR-05
LIBERTY STREET NE
AT MILL CREEK
BRIDGE
STRENGTHENING
PROFILE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
1" = 5'-0"
TYPICAL SECTION
BR #470206 (LIBERTY ST)BR-04
LEGEND
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:3
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
ST
R
EN
G
TH
EN
IN
G
_L
IB
ER
TY
.d w g (S
TE
EL
L
IB
ER
TY
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
BR-07
1/2" = 1'-0"
ELEVATION
BEAM ABR-06
1" = 5'-0"
PLAN
BR 470206BR-04
1/2" = 1'-0"
ELEVATION
BEAM B BR-06
BR-07
BR-06
BR-06
BR-06
LIBERTY STREET NE
AT MILL CREEK
BEAM ELEVATION
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
BR-07
BR-07
BR-07
BR-07
11 2"
NO SCALE
GROOVE DETAIL9 1" = 1'-0"
STIRRUP DETAIL10 BEAM B
1" = 1'-0"
SECTION
BEAM ABR-06
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISI
VIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:5
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
ST
R
EN
G
TH
EN
IN
G
_L
IB
ER
TY
.d w g (S
TE
EL
L
IB
ER
TY
(O ) I
N T ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
NO SCALE
BAR TERMINATION DETAIL (TYP)11
BR-07
LIBERTY STREET NE
AT MILL CREEK
DETAILS
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
1" = 1'-0"
SECTION
BEAM BBR-06
S
OHL OHL OHL
W
SD SD
X X X X
X
OHL OHL OHL OHL OHL OHL OHL OHL OHL
SD
1(�157H�S7
1(�157H�S7
5 166
0 165
WWWWWWWWWWWWWWWWWWWWWWWW
&O1S758&7,O1�S(48(1&(�1O7(S
L(*(1D
7654321
D
7654321 SH((7 O)
SH((7�7,7L(
HO5,=�D$780�
9(57�D$780�
HO5,=�S&$L(�
9(57�S&$L(� D(S,*1� D5$W1� &H(&.(D�
$335O9(D�
1O� D$7( %<D(S&5,37,O1 5(9,S,O1S
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
D$7(�S,*1(D�� &(57,),&$7(�(X3,5(S��
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SH((7�35(3$5(D�%<�
�1 8� 2�
�1 1� �2
�3 $0
??R
WD
N�
FR
P ?O 7$
O
7?
2�
2?
�4
$D
$D
?D Z J?
2B
SL
WH
�3
OD
QB
WK
�G Z J� ��S
,7 3L
$1
�WD
E�
8�8�SW�7KLUG�$YHQXH��SWH��3��
3RUWODQG��O5�972�4
�5�3��287��6825
�ZZZ�RWDN�FRP
OWDN��,QF�
31��722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
X
BR-11
157H�S7((7�1(
$7�0,LL�&5((.
SITE PLAN
1$D�83�S3&S 1*9D�1929�47�
$S�SHOW1
$S�SHOW1
S01 -W7
1" = 10'-0" PLAN1 BR #470226 (15th ST)
OHL OHL OHL
SD SD
X X X X
X
OHL OHL OHL OHL OHL OHL OHL OHL OHL
SD
WWWWWWWWWWWWWWWWWWWWWWWW
BR-13
1�����������
1����������� (����������� 1�����������
1�����������
D
������� SH((7 O)
SH((7�7,7L(
HO5,=�D$780�
9(57�D$780�
HO5,=�S&$L(�
9(57�S&$L(� D(S,*1� D5$W1� &H(&.(D�
$335O9(D�
1O� D$7( %<D(S&5,37,O1 5(9,S,O1S
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
D$7(�S,*1(D�� &(57,),&$7(�(X3,5(S��
BRIDGE
STRENGTHENING
PROJECT
SH((7�35(3$5(D�%<�
$0
??R
WD
N�
FR
P ?R
WD
N?
O
7?
$D
$D
?D Z J?
�B
O
7O
B$
(S
SB
7H �G Z J�
O
7O
(S
S� 3L
$1
�WD
E�
����SW�7KLUG�$YHQXH��SWH�����
3RUWODQG��O5������
�ZZZ�RWDN�FRP
OWDN��,QF�
31��������
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
1" = 10'-0" PLAN1 BR #470226 (15th ST)
&O1S758&7,O1
$&&(SS�S(48(1&(
L(*(1D
BR-12
��7H�S75((7�1(
$7�0,LL�&5((.
CONTRACTOR
ACCESS PLAN
1$D����S3&S 1*9D���������
$S�SHOW1
$S�SHOW1
S01 -W7
1" = 5'-0"
ELEVATION (LOOKING WEST DOWNSTREAM)
BR #470226 (15th ST)BR-12
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:4
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
C O
N
TR
AC
TO
R _A
C C
ES
S_
TH
.d w g (P
R O
FI
LE
5t h ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
NO SCALE
SITE PHOTO (LOOKING NORTH)3 BR #470226 (15th ST)
BR-13
15TH STREET NE
AT MILL CREEK
CONTRACTOR
ACCESS ELEVATION
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
NOTE:
LEGEND
OHL OHL
SD SD SD SD SD
OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL
SD SD
5 16
BR-15
%5���
D
������� SH((7 O)
SH((7�7,7L(
HO5,=�D$780�
9(57�D$780�
HO5,=�S&$L(�
9(57�S&$L(� D(S,*1� D5$:1� &H(&.(D�
$335O9(D�
1O� D$7( %<D(S&5,37,O1 5(9,S,O1S
SALEM PUBLIC WORKS DEPART
MEN
T
NOISI
VIDGNIREE
N NIGE
D$7(�S,*1(D�� &(57,),&$7(�(X3,5(S��
BRIDGE
STRENGTHENING
PROJECT
SH((7�35(3$5(D�%<�
$0
??R
WD
N�
FR
P ?R
WD
N?
O
7?
$D
$D
?D Z J?
�B
S7 (1
7H
(1 ,1 B�
�7 H �G Z J�
,D S7
(1
7H
(1 ,1 �3 L$
�WD
E�
����S:�7KLUG�$YHQXH��SWH�����
3RUWODQG��O5������
�ZZZ�RWDN�FRP
OWDN��,QF�
31��������
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
1" = 5'-0" PLAN1 BR #470226 (15th ST)
*(1(5$L�1O7(S
%5,D*(�S75(1*7H(1,1* &O1S758&7,O1�1O7(S
BR-14
��7H�S75((7�1(
$7�0,LL�&5((.
BRIDGE
STRENGTHENING
PLAN
1$D����S3&S 1*9D���������
$S�SHO:1
$S�SHO:1
S01 -:7
L(*(1D
ELEVATION (LOOKING EAST UPSTREAM)
BR #470226 (15th ST)BR-14
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISI
VIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:4
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
ST
R
EN
G
TH
EN
IN
G
_1 5T
H .d w g
(P R
O
FI
LE
5t h ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
BR-15
15TH STREET NE
AT MILL CREEK
BRIDGE
STRENGTHENING
PROFILE
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
LEGEND
1" = 1'-0"
SECTION
CAP BEAMBR-16
NO SCALE
GROOVE DETAIL6
BR-16
1/2" = 1'-0"
PLAN BENT 2
BR #470226 (15th ST)BR-14
1/2" = 1'-0"
SECTION VIEW BENT 2 (AHEAD ON STATION)
BR #470226 (15th ST)BR-16
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:1
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
ST
R
EN
G
TH
EN
IN
G
_1 5T
H .d w g
(S
TE
EL
5t h ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
NO SCALE
BAR TERMINATION DETAIL (TYP)7
BR-16
BR-16
15TH STREET NE
AT MILL CREEK
BEAM ELEVATION
AND DETAILS
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
1(�177+�67
W
W%
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W
X
W ,1 1$
7� 1(
7654321
7654321 6+((7 2)
6+((7�7,7/(
+25,=�'$780� 9(57�'$780� +25,=�6&$/(� 9(57�6&$/(� '(6,*1� '5$W1�
$33529('�
12� '$7( %<'(6&5,37,21 5(9,6,216
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
'$7(�6,*1('�� &(57,),&$7(�(X3,5(6��
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
6+((7�35(3$5('�%<�
�1 8�
�1 1�
�1 8� $0
??R
WD
N�
FR
P ?2 7$
7?
0?
2?
Z J?
2B
6L
WH
�3
OD
QB
WK
�6 W�G
Z J� ��6
,7 3/
$1
�WD
E�
808�6W�7KLUG�$YHQXH��6WH��300
3RUWODQG��25�97204
�503��287��6825
�ZZZ�RWDN�FRP
2WDN��,QF�
31��722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
/(*(1'
*(1(5$/�127(6 &216758&7,21�6(48(1&(�127(6
BR-21
177+�675((7�1( $7�0,//�&5((.
SITE PLAN
1$'�83�63&6 1*9'�1929�47� $6�6+2W1 $6�6+2W1 -W7
1" = 10'-0"
PLAN1 BR #470230 (17TH ST)
B
WB
WB
X
X
W W W W W W W W W W W W W W W W W W W W W W W W W W W
X
N: 220469.06 E: 180801.62
N: 220476.69 E: 180788.41
N: 220466.86 E: 180789.72
N: 220439.31 E: 180766.79
N: 220456.43 E: 180710.65
N: 220492.66 E: 180731.50
N: 220501.24 E: 180719.13 N: 220522.39
E: 180729.06
N: 220475.53 E: 180787.74
0 16
5 17
5 17
BR-23
N: 220563.48 E: 180745.72
N: 220544.58 E: 180761.67
N: 220486.26 E: 180740.73
N: 220382.38 E: 180733.15
N: 220375.29 E: 180745.22
N: 220442.80 E: 180802.39
N: 220457.61 E: 180782.03
N: 220462.26 E: 180797.72
1" = 10'-0" PLAN1 BR #470230 NE 17th ST
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:1
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
C O
N
TR
AC
TO
R _A
C C
ES
S_
TH
.d w g (C
O N
TR
AC
TO
R
A C
C
ES
S
PL
AN
ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
CONSTRUCTION
ACCESS SEQUENCE
WB
WB
LEGEND
BR-22
17TH STREET NE
AT MILL CREEK
CONTRACTOR
ACCESS PLAN
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
SMN
JWT
ELEVATION (LOOKING WEST DOWNSTREAM)2 BR #470230
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
DATE SIGNED:
CERTIFICATE EXPIRES:
BRIDGE
STRENGTHENING
PROJECT
8 9
8 9
SHEET PREPARED BY:
/1
8/
1:
:2
AM
\\o ta k.
co m
\o ta k\
PR
O
JE
C T\
0\
2\
C
AD
\A
C
AD
\D w g\
2_
C O
N
TR
AC
TO
R _A
C C
ES
S_
TH
.d w g (P
R O
FI
LE
7t h ta b)
808 SW Third Avenue, Ste. 300 Portland, OR 97204
503. 287. 6825 www.otak.com
Otak, Inc.
PN: 722515
17262PE
EXPIRES: 12/31/2024
OREGONSCOTT M. NETTLETON
JULY 19 , 1994
REGISTERED PROFESS IONALE NG I NE E R
NO SCALE
SITE PHOTO (LOOKING SOUTH)3 NE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .