This solicitation is for rehabilitation work on roadways and bridges within the National Mall and Memorial Parks. The project consists of asphalt resurfacing, concrete repairs, bridge deck work including an overlay, sidewalk construction, traffic signals, light pole refurbishment, signage and pavement markings. The work will be split into multiple schedules with a total cost expected between $1 million to $5 million. Bids are due in May 2020 with award/NTP contingent on permit approval. Interested small business concerns should download bid documents from SAM.gov and register as interested vendors for project updates. Annual representations and certifications must be completed on SAM.gov along with Vets-4212. Questions should be sent to the specified email. SAM registration is required for payment. Security screening is required for on-site visitors.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 3400-034P
MAINE AVENUE BRIDGE INSPECTION DATE: 4/17/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... FRAME NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 56.5 FT (17.2 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 56.5 FT (17.2 M)
WEARING SURFACE: .......... MODIFIED CONCRETE DECK WIDTH: ...................... 50.3 FT (15.3 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 34.0 FT (10.4 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 2001
PROJ./PLAN REF. NO: ......... DAWR4B / NONE SKEW ANGLE: ..................... 40 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1978-JOINT REPAIR; 2001-PARTIAL DEPTH DECK/SIDEWALK REPLACEMENT (FULL DEPTH IN
SEVERAL AREAS) W/SILICA FUME OVERLAY.
LOCATION
NATIONAL MALL AND MEMORIAL PARKS MILE POINT: ..................... 0.77 (KM PT 1.24)
STATE: ................................. DISTRICT OF COLUMBIA LOCATION: 0.2 miles east of Kutz Bridge.
FACILITY CARRIED: ............ INDEPENDENCE AVENUE
FEATURE INTERSECTED: .. MAINE AVENUE
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in good condition overall. The main problems are moderate cracking and delamination of the north end of the west abutment breastwall, and moderate to severe map cracking of the modified concrete wearing surface with a cracked and delaminated area at mid-span in the north lane. Additional problems include minor to moderate collision damage to the edges of the slab, and moderate to severe random cracking of the approach pavement with pothole forming in the center lane of east approach.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: Z. BAILEY, H. SALAD
CONDITION ASSESSMENT:
ZANE BAILEY, FIELD TEAM LEADER 703-404-6242
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 8/30/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3400-034P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.2 CLEAN AND SEAL GAPS BETWEEN APPROACH PAVEMENT AND ARMORED DECK
ENDS.
89 LF
58.3 REMOVE UNSOUND CONCRETE AND PATCH CRACKED AND DELAMINATED AREA
OF WEARING SURFACE AT MID-SPAN IN NORTH LANE.
18 SF
60.1 REPAIR CRACKING AND DELAMINATION OF ORNAMENTAL CONCRETE AT NORTH
END OF WEST ABUTMENT BREASTWALL.
5 SF
58.5 FILL UNPAVED AREA IN SOUTH SIDEWALK WEST END TO ELIMINATE POTENTIAL
TRIPPING HAZARD.
1 LS
60.6 REMOVE VEGETATION FROM ORNAMENTAL STONE AT NORTHWEST WINGWALL. 1 EA
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.3 REPLACE WEARING SURFACE WITH MODIFIED CONCRETE
OVERLAY.
1 LS
222.4 REPAVE APPROACHES 1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)
PLUS PARK LOCATION FACTOR.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 3400-034P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N N G N N N N N G
N G
P G G F G N
N
G
G
G
58.1, 59.3 MINOR LONGITUDINAL AND TRANSVERSE CRACKING OF SLAB
UNDERSIDE WITH EFFLORESCENCE AND RUST STAINING; MINOR
LEAKAGE AND EFFLORESCENCE AT INTERSECTION OF
LONGITUDINAL CONSTRUCTION JOINTS AND EAST ABUTMENT
BREASTWALL CAPSTONES. MODERATE VEHICLE SCRAPES ALONG
UNDERSIDE. SLAB UNDERSIDE SEALED WITH EPOXY; EPOXY
PEELING AT ISOLATED LOCATIONS (30 SF TOTAL).
MODERATE COLLISION DAMAGE TO CONCRETE ALONG EDGE OF
SLAB, BOTH SIDES; NO REBAR EXPOSED. MINOR DELAMINATION
(10"L X 8"H) OF NORTH FACE OF SLAB AT EAST ABUTMENT
BREASTWALL.
58.2 UP TO 1-1/2" WIDE GAPS BETWEEN APPROACH PAVEMENT AND
ARMORED DECK ENDS.
58.3 MODERATE TO SEVERE MAP CRACKING THROUGHOUT MODIFIED
CONCRETE WEARING SURFACE. DELAMINATED AND CRACKED
AREA (7'W X 3.5'L) IN NORTH LANE AT MID-SPAN.
58.5 MINOR LONGITUDINAL AND TRANSVERSE CRACKING THROUGHOUT
BOTH SIDEWALKS. UP TO 4" DROP OFF AT ENDS OF SIDEWALKS AT
TRANSITION FROM PAVED TO UNPAVED SIDEWALK. MINOR
VEGETATION GROWTH ALONG JOINT BETWEEN CONCRETE RAIL
AND SIDEWALK.
58.6 MINOR DETERIORATION OF PARAPET MASONRY MORTAR JOINTS
THROUGHOUT. MINOR VERTICAL CRACKING OF APPROACH AND
BRIDGE PARAPETS AT ISOLATED LOCATIONS, SOME WITH
EFFLORESCENCE. MINOR DETERIORATION OF GROUT PAD AT BASE
OF NORTH PARAPET, FULL LENGTH. SEE ALSO 60.8.
ISOLATED AREAS OF MINOR DELAMINATION AND SPALLING OF
FASCIA PANELS AT APPROACHES.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS G
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS N
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR N
18. SETTLEMENT OR DEFLECTION N
19. OTHER N
FIELD INSPECTION REPORT STRUCTURE NO. 3400-034P
ITEM REFERENCE AND REMARKS
61. CHANNEL N
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
9. STREAM BED COMPOSITION :
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N N P G G G G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
60.1
60.3
60.6
60.8
222.4
222.6
222.7
AREA OF MODERATE CRACKING AND DELAMINATION (3'L X 1.5'H) OF
ORNAMENTAL CONCRETE AT BOTTOM CORNER OF WEST
ABUTMENT BREASTWALL, NORTH END. MINOR DELAMINATION AND
SPALLING AT BOTTOM CORNER OF EAST ABUTMENT BREASTWALL,
NORTH END. MINOR FULL HEIGHT VERTICAL CRACK IN ONE STONE
AT TOP OF EAST ABUTMENT BREASTWALL NEAR MID-LENGTH.
MINOR MASONRY MORTAR JOINT DETERIORATION AT CORNERS OF
BOTH BREASTWALLS; MODERATE DETERIORATION OF PREVIOUS
REPAIRS USING CAULKING MATERIAL.
MINOR TO MODERATE STAINING ON NORTHEAST AND SOUTHWEST
BREASTWALL CAPSTONES.
MINOR EFFLORESCENCE FROM WINGWALL MASONRY MORTAR
JOINTS. MINOR TO MODERATE HORIZONTAL CRACKING,
DELAMINATION, AND SPALLING OF ORNAMENTAL STONE AT
WINGWALLS. TREES GROWING FROM CRACK IN NORTHWEST
ORNAMENTAL STONE.
MINOR ADHESION FAILURE OF SEALANT IN VERTICAL EXPANSION
JOINTS, PRIMARILY ALONG INSIDE FACE OF PARAPETS.
MODERATE TO SEVERE RANDOM CRACKING OF APPROACH
PAVEMENT. MINOR POTHOLE IN EAST APPROACH, CENTER LANE.
MINOR SETTLEMENT IN EAST AND WEST APPROACH SLAB AT DECK
ARMORING.
BRIDGE POSTED FOR 12'-0" ON RIGHT SHOULDER OF UNDERPASS
APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 3400-034P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 34 31
HS 23 21 38 34
TYPE 3 22 20 37 34
TYPE 3S2 31 28 53 48
TYPE 3-3 38 34 63 57
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 6/16
LOAD RATING CONTROLLED BY: MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3400-034P
STRUCTURE IDENTIFICATION
(201) PARK: NATIONAL MALL AND MEMORIAL PARKS (1) STATE: ....................................... 113 - DISTRICT OF COLUMBIA
(202) STRUCTURE NAME: .......... MAINE AVENUE BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 001 - DISTRICT OF COLUMBI
(204) STRUCTURE NUMBER: ..... 3400-034P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 2 - NATIONAL CAPITAL (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 502 (6) FEATURES INTERSECTED:....... MAINE AVENUE
(207) ROAD SECTION NO: ..........034P (7) FACILITY CARRIED: .................. INDEPENDENCE AVENUE
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 3400034P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 0.2 miles east of Kutz Br
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................DAWR4B (11) MILE POINT: .............................0.77 (KM PT 1.24)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
07 - FRAME
56.5 FT (17.2 M)
56.5 FT (17.2 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
6 - N/A
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 3 - MODIFIED CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 23.0 TONS (20.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 38.0 TONS (34.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 4/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3400-034P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 38°53'12.20"
(17) LONGITUDE: ......................... 77°02'12.90"
(19) DETOUR LENGTH: ............... 0 MI (0 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 5.5 FT (1.7 M)
(56) LEFT: ......................... 4.9 FT (1.5 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
34.0 FT (10.4 M)
50.3 FT (15.3 M)
36.0 FT (11.0 M)
36.0 FT (11.0 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - NO MEDIAN
40 °
NO
34.0 FT (10.4 M)
6.0 FT (1.8 M)
6.0 FT (1.8 M)
1 - FULL HEIGHT (NO PARAPE
9 - OTHER
1 - CONTINUOUS RAIL
3.00 FT (0.91 M)
99.99 FT (99.99 M)
12.17 FT (3.71 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1978-JOINT REPAIR; 2001-PARTIAL DEPTH DECK/SIDEWALK REPLACEMENT (FULL DEPTH IN SEVERAL AREAS) W/SILICA FUME
OVERLAY.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 3400-034P
PHOTOGRAPHS STRUCTURE NO. 3400-034P
PHOTO #1 - LOOKING WEST
PHOTO #2 - NORTH SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING EAST; NOTE MAP
CRACKING OF APPROACH ASPHALT AT WEST END
PHOTO #4 - MAP CRACKING OF DECK NEAR SOUTH SIDE OF
STRUCTURE
PHOTO #5 - POTHOLE IN EAST APPROACH PAVEMENT; NOTE
PREVIOUSLY PATCHED POTHOLE
PHOTO #6 - LOCAL CRACKING OF MODIFIED WEARING SURFACE IN
EASTBOUND LANE NEAR MIDSPAN; NOTE DELAMINATION
PHOTO #7 - TYPICAL LONGITUDINAL AND TRANSVERSE CRACKING OF
THE SIDEWALK, SOUTH SIDEWALK SHOWN
PHOTO #8 - DETERIORATION OF GROUT PAD AT BASE OF NORTH
PARAPET; NOTE DEBRIS ACCUMULATION
PHOTO #9 - CRACKING AND DELAMINATION OF
NORTH PARAPET NEAR WEST END; NOTE
FAILURE OF VERTICAL JOINT SEALANT
PHOTO #10 - VERTICAL JOINT IN SOUTH
PARAPET NEAR EAST END; NOTE ADHESION
FAILURE OF SEALER MATERIAL. SPALL, AND
VEGETATION GROWTH
PHOTO #11 - VERTICAL CRACKING AND SPALL
OF SOUTH PARAPET NEAR WEST END
PHOTO #12 - VEGETATION GROWTH
ENCROACHING ON NORTH SIDEWALK AT
WEST END
PHOTO #13 - TYPICAL ADHESION FAILURE BETWEEN SIDEWALK AND
PARAPET, SOUTH SIDEWALK AT WEST END SHOWN
PHOTO #14 - DROP OFF AT END OF SIDEWALK TRANSITION TO PAVED
AND UNPAVED AT SOUTHWEST CORNER; NOTE TEMPORARY FENCING
PHOTO #15 - VIEW OF EXPANSION JOINT AT EAST END; NOTE
POTHOLE FORMATION ALONG CENTRAL LANE
PHOTO #16 - GENERAL UNDERSIDE VIEW LOOKING WEST
PHOTO #17 - TYPICAL COLLISION DAMAGE TO CONCRETE ALONG
EDGE OF SLAB; NORTH SIDE SHOWN
PHOTO #18 - VEHICULAR SCRAPES, COLLISION DAMAGE, AND
SPALLING ON DECK UNDERSIDE
PHOTO #19 - SOUTH SIDE; NOTE COLLISION DAMAGE AND
EFFLORESCENCE ON RINGSTONES
PHOTO #20 - CLOSE-UP VIEW OF COLLISION DAMAGE TO EDGE OF
BRIDGE AT NORTHWEST CORNER
PHOTO #21 - CRACKING WITH EFFLORESCENCE ON ARCH UNDERSIDE
NEAR SOUTH END
PHOTO #22 - HONEYCOMBING ON ARCH UNDERSIDE AT EAST SIDE OF
SEGMENT #2 FROM NORTH
PHOTO #23 - CRACKING WITH EFFLORESCENCE ON ARCH UNDERSIDE
SEGMENT #2 FROM NORTH
PHOTO #24 - NORTHWEST CORNER OF ABUTMENT; NOTE CRACKING,
SPALLING, AND WATER LEAKAGE
PHOTO #25 - GENERAL VIEW OF EAST ABUTMENT
PHOTO #26 - WATER LEAKAGE AT VERTICAL JOINT BETWEEN
ABUTMENT AND SOUTHEAST WINGWALL
PHOTO #27 - SPALL AND DELAMINATION OF BASE ON NORTH SIDE OF
EAST ABUTMENT
PHOTO #28 - GENERAL VIEW OF WEST ABUTMENT
PHOTO #29 - SPALL ON NORTHWEST PARAPET OVER ABUTMENT
PHOTO #30 - HORIZONTAL CRACKING SPALLING AND DELAMINATION
OF ORNAMENTAL STONE AT SOUTHWEST WINGWALL
PHOTO #31 - SPALLING AND DELAMINATION OF ORNAMENTAL STONE
AT NORTHEAST WINGWALL
PHOTO #32 - VEGETATION GROWTH IN NORTHWEST ORNAMENT
STONE; NOTE CRACKING AND SPALLING
PHOTO #33 - TYPICAL EFFLORESCENCE FROM WINGWALL MASONRY
JOINTS, SOUTHWEST WINGWALL SHOWN
PHOTO #34 - TYPICAL VEGETATION GROWTH ALONG NORTHWEST
WINGWALL
PHOTO #35 - VERTICAL CLEARANCE SIGN AT SOUTH SIDE OF
STRUCTURE
PHOTO #36 - TYPICAL MAP CRACKING OF APPROACH PAVEMENT, EAST
PAVEMENT SHOWN
PHOTO #37 - TYPICAL RANDOM CRACKING OF APPROACH PAVEMENT,
EAST SIDE SHOWN
PHOTO #38 - TYPICAL DETERIORATION OF APPROACH PAVEMENT,
WEST APPROACH SHOWN; NOTE POTHOLE BEGINNING TO FORM
PHOTO #39 - GAP BETWEEN ARMORING AND WEST APPROACH
PAVEMENT