Brand Name Justification - Redacted.pdf
PDF 215 KB Posted
- Attached to
- Roof Repair
- Solicitation number
- 12505B20R0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ARS-371.pdf | ||
| Past Performance.docx | DOCX document | |
| ARS-372.pdf | ||
| Statement of Work.pdf | ||
| Drawing.pdf | ||
| SF-1442 with Clauses and Provisions.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION
FOR FEDERAL PROCUREMENTS UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
(The use of this template is optional and solely for the convenience of the Contracting Officer)
1. Estimated Dollar Value:
2. Anticipated Period of Performance:
3. Does the anticipated Period of Performance include option years? If no, explain.
4. Sources Sought Notice posted to Contract Opportunities and attached to this document?
Yes No
5. Market Research conducted and attached to this document?
Yes No
6. Is this a new requirement or a follow-on to an expiring award?
7. Describe the requirement. Please note that the requirement is the minimum acceptable specification or capability, and is not necessarily the best in the industry. Please note whether any additional follow-on work is anticipated in response to the current proposed effort.
8. List the proposed vendor and contact information.
9. Describe why the proposed vendor is the only vendor from which the requirement can be obtained. Examples of acceptable justifications include but are not limited to: sole manufacturer and seller, adherence to warranty provisions, urgency, etc. If other vendors can provide similar products or services, describe why they cannot meet our particular requirement.
120 days after Notice to Proceed
✔ Not a recurring requirement
Thermoplastic Polyolefin (TPO) Roofing repairs where the membrane adhesion has released from base material.
Any Carlisle Roof Systems approved installer
The building has a TPO roof with a roof warranty that extends to January 24, 2024. The new roof sections need to be tied into those adjacent Carlisle Roofing systems that are still under warranty.
Using a contractor who is not an approved Carlisle Roof Systems installer will void the warranty.
JUSTIFICATION
FOR FEDERAL PROCUREMENTS UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
(The use of this template is optional and solely for the convenience of the Contracting Officer)
10. Certification:
I hereby certify that the information provided above is accurate and complete to the best of my knowledge and belief.
Technical Representative Date
11. CO Certification:
I hereby determine that the circumstances of this procurement action deem only one source reasonably available. Also, the quoted price is determined to be fair and reasonable as documented on the SAP e-File Checklist and Award Summary.
Contracting Officer Date
07/13/2020Digitally signed by JOSHUA DOBEREINER Date: 2020.07.13 11:19:32 -05'00'
File details come from the government source that posted it. Updated .