Brand Name JA Radio Antennas - CO Signed.pdf

PDF 116 KB Posted

Attached to
Radio Antennas Replacement Federal contract opportunity
Solicitation number
FA480124Q0401
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a sole source justification for the acquisition of radio antennas and related equipment and services from Cambium Networks. The 49th Contracting Squadron at Holloman Air Force Base seeks to upgrade and replace radio microwave dishes used for land mobile radios and air traffic control systems. Cambium Networks will provide 14 radio over fiber units, 12 mounting brackets, 12 local power units with grounding kits, 12 power injectors, 14 encryption bundles, cable, antennas ranging from 3 to 6 feet, jumper cables, extended warranties for 12 radios, license keys, warranty registrations, and staging services. The total estimated contract cost is $327,558.07. A sole source justification is required because Cambium Networks' specialized equipment is currently installed and only operates with their dishes, so an alternative brand would cause mission critical communications to fail. The contracting officer determined the anticipated cost is fair based on a previous $485,000 contract. The action will be awarded as a firm-fixed-price contract under simplified acquisition procedures.

View the file

Other files for this federal contract opportunity

Other files attached to Radio Antennas Replacement, newest first.
File Type Posted
Questions.pdf PDF
Brand Name JA Radio Antennas.pdf PDF
Combo - Radio Antennas Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

CONTROLLED UNCLASSIFIED INFORMATION

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4

NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Funding level for this acquisition: >SAT and < $750K > $750K and < $15M

Contracting Activity: 49th Contracting Squadron

Purchase Request / Local ID Number: F2E3CS3291AW01

Program / Project (and PE, if applicable): Radio Antennas Upgrades and Replacement

Program Type (PEO or Other Contracting): Other Contracting

Authority: AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)

AFFARS 5313.501 - 10 U.S.C. 3403, Special Emergency Procurement Authority (41 U.S.C. 1903)

Estimated Contract Cost (including options): $327,558.07 Justification Type: Class Individual

COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure

** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

Date

30 Oct 2023

RF Transmission Sys Section Chief

MSgt Jeremy W. Taylor

49 CS/SCO, 575-572-3366

Signature

X

APPROVAL (AFFARS 5306.304(a) )

Date

31 Oct 2023

Contracting Officer

SSgt Christian F. Luevano

49 CONS/PKA, 575-572-4869

Signature

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4

I. Contracting Activity.

The 49th Contracting Squadron at Holloman AFB, NM.

II. Nature and/or description of the action being processed.

This requirement is for the upgrade and replacement of radio microwave dishes used to operate the land mobile radios (LMR) and ATC trunk at Holloman AFB, NM. This action will be awarded as a brand-name, firm-fixed-price contract.

III. Description of supplies/services required to meet agency needs.

Under the contemplated contract, Cambium Networks will provide the following supplies:

1. (14 QTY) PTP 700 Connectorized ODU (Global), White, 7125-8500MHz (part number - C070070B001A)

2. (12 QTY) PTP 700 Mounting Brackets (part number - N000070L021A).

3. (12 QTY) PTP 700 (commercial grade) LPU and Grounding Kit (1 kit per PTP 700 END) (part number - C000065L007B).

4. (12 QTY) (Commercial) AC+DC Enhanced Power Injector 58V (TAA with USA Line Cord) (part number -

CTAA065L002D).

5. (14 QTY) PTP 700 FIPS 140-2 Bundle including 256 AES - per END (part number - C000070K006A).

6. (5 QTY) 328 ft (100 m) Reel Outdoor Copper Clad CAT5E (Recommended for PTP)(part number - WB3176).

7. (2 QTY) Tyco/AMP, Mod Plug RJ45 Unscreened, 100 pack (part number - WB3177B).

8. (2 QTY) Tyco/AMP Crimp Tool (part number - WB3211A).

9. (12 QTY) PTP 700 Drop Cable 38999 to 1x RJ45 male extension Cable 2' (part number - N000070L018A).

10. (60 QTY) Cable Grounding Kits For 1/4" And 3/8" Cable (part number - 01010419001).

11. (1 QTY) PTP 700 6' HP antenna, Dual Polarized with 2x N-female connector,White,7125-8500MHz (part number - N070070D004).

12. (14 QTY) 7.1-8.5 GHz, Dual-Polarity Parabolic Antenna, 3' Standard Performance, White, COO TAA w/ Radome (part number - N070070D035).

13. (7 QTY) 7.1-8.5 GHz, Dual-Polarity Parabolic Antenna, 4' Standard Performance, White, COO TAA w/ Radome (part number - N070070D041).

14. (24 QTY) 3 M (9.8 FT) Superflex RF Low Loss jumper cable (part number - RDN5785A).

15. (12 QTY) PTP 700 Extended Warranty, 2 additional years (part number - C000070S002A).

16. (14 QTY) License Key Generation per license (part number - PS-LicenGen-WW).

17. (12 QTY) Warranty Registration per radio (part number - PS-WRNTYACT-WW), and

18. (2 QTY) PTP Radio custom staging services (4 links) - per day (part number - PS-STAGEIC1-WW).

IV. Statutory authority permitting other than full and open competition.

10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901), as implemented by

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4

DAFFARS 5313.501.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

Cambium Networks' highly specialized radio dishes are currently installed at Holloman AFB; this was executed under contract FA4801-16-C-0009 and FA4801-17-P-0012. The current equipment that is in use only operates with Cambium dishes. Alternate brand dishes cannot connect to the current radio trunk at Holloman. Loss of mission critical requirement features and crucial flight communications would occur. Specifically, direct communications, zone control activation, integrated Public Address Voice, and control status signaling. Two way communications and troubleshooting of all High Powered Dishes and range operations would also cease to function.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

Market research conducted under this contract action confirmed that Cambium Networks have federally authorized partners approved to resell its products to the government. A total of four (4) partners, ACG Systems, Immix Group, Fairwinds Technology, and Future Technology, were provided to the government by the manufacturer, in which three (3) confirmed that they can supply the required equipment. Additionally, contract (FA4801-17-P-0012) was solicited as a SB set-aside due to the availability of seven (7) other vendors, in which four (4) at the time were SAM registered, being able to provide the brand name product.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

The cost for this contract action is considered fair and reasonable based on similar acquisition(FA4801-16-C-0009) that was awarded for over $485K. The overall cost of acquisition (16-C-0009) accounts for different quantities of the radio equipment, to include accessories. The price of this acquisition compares favorably and is 15% less than the IGE and past acquisition (16-C-0009). Lastly, due to Cambium's proprietary design any alternative dish solution would induce excessive additional cost to the government and increase system control complexity. The suggested source, Cambium, is the most cost effective solution to meet the Government's need.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

See Section VI. In addition, a GSA search for "microwave radio equipment" resulted in a list of thirty-four (34) potential contractors that could supply the required equipment. Lastly, the cambium solution eliminates integration problems that drive excessive procurement costs by not have to replace equipment that hasn't met the end of its life-cycle just to communicate' with the existing network.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

N/A

X. List of any sources that expressed, in writing, an interest in the acquisition.

ACG Systems, Immixgroup, Fairwinds Technology, and Cambium Networks expressed interest in this acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

In the future, the 49th Contracting Squadron will make efforts to enter early planning efforts with requiring activities in

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4 order identify requirements in earlier/predecisional stages in order to avoid acquisition concerns and adverse mission impact.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

Remove the Guidance pages below.

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items March 2023 Page of International Agreement Competitive Restrictions (IACR) March 2023 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document?

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Funding level for this acquisition:

Authority:

Justification Type:

COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.

(See "Specific Guidance for Completing this Template" below.)

I. Contracting Activity.

II. Nature and/or description of the action being processed.

III. Description of supplies/services required to meet agency needs.

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

Specific Guidance for Completing this Template

I. Contracting Activity. (FAR 6.303-2(b)(1))

Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.

II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))

State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).

An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.

III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))

Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.

If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.

In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.

For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.

IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5)) Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.

Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204) VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

(FAR 6.303-2(b)(6))

Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:

Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.

Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))

Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.

VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))

Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If no market research was conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))

Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.

X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))

If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))

Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.

Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.

If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.

For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.

[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))

As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))

As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

Do You Need to "REDACT" Text?

This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.

9.0.0.2.20120627.2.874785

security_markings: CONTROLLED UNCLASSIFIED INFORMATION
CurrentPage:
PageCount:
new:
amended-with-original:
Yes:
No:
range_under-700K:
range_700K-13.5M:
Contracting-Activity: 49th Contracting Squadron
PR-ID-Number: F2E3CS3291AW01
Program-Project: Radio Antennas Upgrades and Replacement
Program-Type: Other Contracting
class:
individual:
Estimated_Cost: 327,558.07
Sign_and_Save_1:
Date: 30 Oct 2023
Date: 31 Oct 2023
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-CSO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
Section-I-Text:
Section-II-Text:
Section-III-Text:
Section-IV-Text:
Section-V-Text:
Section-VI-Text:
Section-VII-Text:
Section-VIII-Text:
Section-IX-Text:
Section-X-Text:
Section-XI-Text:
Section-XII-Text:
Section-XIII-Text:
Remove-Guidance-Pages: 1

File details come from the government source that posted it. Updated .