This is an Addendum No. 1 to a construction contract issued by the Town of Bermuda Run, North Carolina for the Riverbend Drive Sidewalk Plan Phases 1 & 2 project (Contract BR2026SW). The addendum modifies key contract terms and adds new line items to the original bid documents. The project scope includes construction of approximately 1.7 miles of concrete sidewalk with associated drainage infrastructure, utility coordination, and erosion control measures across the Riverbend Drive corridor. Addendum No. 1, dated August 4, 2026, revises the contract availability date to "upon issuance of a purchase order" and extends the completion date for both phases to November 13, 2027, with Intermediate Contract Time Number 1 completion set for November 13, 2026. The revised bid due date is August 25, 2026. The addendum adds two new line items to the itemized proposal: Line Item #56 for Matting for Erosion Control (2,670 square yards) and Line Item #57 for Permanent Soil Reinforcement Matting (310 square yards). Contractors must acknowledge receipt of Addendum No. 1 by signing the revised Itemized Proposal and submitting it with all other bid documents. The Phase 2 plans have been revised to include the Professional Engineer's seal, the two new matting pay items, and associated special provisions.
The permanent soil reinforcement matting specifications outline detailed physical property requirements including tensile strength of 385 pounds per foot, minimum light penetration of 9 percent, and UV stability exceeding 80 percent after 1000 hours of exposure. Material certification from the manufacturer demonstrating chemical and physical properties conforming to the specifications is required. The matting shall be installed over properly prepared, seeded areas brought to final grade with smooth, firm, stable surfaces free of obstructions. Payment for permanent soil reinforcement matting will be made per square yard of actual installation measured along the ground surface, with overlaps excluded from measurement and considered incidental to the work. The itemized proposal contains 69 total line items spanning mobilization, surveying, clearing and grubbing, excavation, pavement removal, drainage pipe installation, concrete sidewalk and curb work, utility relocation, erosion control, and site restoration. All bidders must comply with prevailing wage requirements, coordinate with multiple utility owners including the Town of Bermuda Run, Davie County, and Duke Energy, and obtain required permits and bonds prior to commencing work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 4, 2026
A-1
TO: PROSPECTIVE BIDDERS HOLDING PLANS AND SPECIFICATIONS FOR TOWN OF BERMUDA RUN, CONTRACT
BR2026SW RIVERBEND DRIVE SIDEWALK PLAN – PHASE 1 & 2
RE: BR2026SW RIVERBEND DRIVE SIDEWALK PLAN PHASE 1 & 2
PROJECT ADDENDUM NO. 1
The following changes and clarifications are applicable to the referenced project and are now a part of its contract documents.
Where any article, division, or subparagraph of the original contract documents or other addenda is supplemented herein, the provisions of the original documents shall remain in e�ect. All the supplemental provisions shall be considered as added thereto. Where any such article, division, or subparagraphs are amended, voided, or superseded thereby, the provisions of such article, division, or subparagraph not so specifically amended, voided, or superseded shall remain in e�ect.
The attention of each contractor is called to the following clarifications, additions to, and changes in the project plans sealed Phase 1: July 14, 2026, Phase 2: August 3, 2026, and specifications sealed July 20, 2026, on the above project. It will be the responsibility of each contractor to call such clarifications, additions, and changes in plans and specifications to the attention of subcontractors concerned. The Town in no way assumes any responsibility for notifying any subcontractor, material dealers, or others not having received the original contract documents.
Bidder must acknowledge receipt of Addendum No. 1 by signing appropriately on each of the revised Itemized Proposal and submitting them with other bid documents. Original Pages with strikethroughs will not be accepted.
Item 1: CONTRACT TIME AND LIQUIDATED DAMAGES Page G-2 of the Contract Proposal – The date of availability for this contract for both Phase 1 and 2 is changed to “Upon issuance of a purchase order”. The contract completion date for Phase 1 and 2 has been changed to November 13, 2027
Item 2: INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES The completion date for ICT Number 1 is changed to November 13, 2026.
Item 3: INSTRUCTIONS TO BIDDERS Page C-2 and C-5 of the Contract Proposal - BIDS ARE DUE: AUGUST 25, 2026
Item 4: BID FORM REVISION (ADDITION OF LINE ITEMS) Replace Bid Form Pages 1, 2 and 3 Add line items #56 for “MATTING FOR EROSION CONTROL” and #57 “(PSRM) PERMANENT SOIL REINFORCEMENT MATTING”
Item 5: ADDITIONAL CONTACT INFORMATION FOR
SANITARY SEWER REHABILITATION PROJECT COORDINATION
The contractor shall coordinate with the following, regarding the sanitary sewer rehabilitation project:
James Pflaum, PE Hazen and Sawyer 4011 WestChase Boulevard, Suite 500, Raleigh, NC 27607 Phone Number (919)-277-7933 JPflaum@hazenandsawyer.com I Hazenandsaywer.com
Item 6: REVISED PHASE 2 PLANS The Phase 2 plans are revised to add the Professional Engineer’s seal/date, Permanent Soil Reinforcement Matting (PSRM) pay item, Matting for Erosion Control pay item and special provision.
ALL OTHER CONDITIONS REMAIN THE SAME.
018981
Docusign Envelope ID: 345E4BD4-3254-8EDD-839C-49308CA2B18B
8/4/2026
PERMANENT SOIL REINFORCEMENT MAT:
Description
This work consists of furnishing and placing Permanent Soil Reinforcement Mat, of the type specified, over previously prepared areas as directed.
Materials
The product shall be a permanent erosion control reinforcement mat and shall be constructed of synthetic or a combination of coconut and synthetic fibers evenly distributed throughout the mat between a bottom UV stabilized netting and a heavy duty UV stabilized top net. The matting shall be stitched together with UV stabilized polypropylene thread to form a permanent three-dimensional structure. The mat shall have the following minimum physical properties:
Property Test Method Value Unit
Light Penetration ASTM D6567 9 %
Thickness ASTM D6525 0.40 in
Mass Per Unit Area ASTM D6566 0.55 lb/sy
Tensile Strength ASTM D6818 385 lb/ft
Elongation (Maximum) ASTM D6818 49 %
Resiliency ASTM D1777 >70 %
UV Stability * ASTM D4355 >80 %
Porosity (Permanent Net) ECTC Guidelines >85 %
Maximum Permissible Shear Stress (Vegetated)
Performance Bench Test
>8.0 lb/ft2
Maximum Allowable Velocity (Vegetated)
Performance Bench Test
>16.0 ft/s
*ASTM D1682 Tensile Strength and % strength retention of material after 1000 hours of exposure.
Submit a certification (Type 1, 2, or 3) from the manufacturer showing:
(A) the chemical and physical properties of the mat used, and
(B) conformance of the mat with this specification.
Construction Methods
Matting shall be installed in accordance with Subarticle 1631-3(B) of the Standard Specifications.
All areas to be protected with the mat shall be brought to final grade and seeded in accordance with Section 1660 of the Standard Specifications. The surface of the soil shall be smooth, firm, stable and free of rocks, clods, roots or other obstructions that would prevent the mat from lying in direct contact with the soil surface. Areas where the mat is to be placed will not need to be mulched.
Measurement and Payment
Permanent Soil Reinforcement Mat will be measured and paid for as the actual number of square yards measured along the surface of the ground over which Permanent Soil Reinforcement Mat is installed and accepted. Overlaps will not be included in the measurement, and will be considered as incidental to the work. Such payment shall be full compensation for furnishing and installing the mat, including overlaps, and for all required maintenance.
Payment will be made under:
Pay Item Pay Unit
Permanent Soil Reinforcement Mat Square Yard
Itemized Proposal For Contract BR2026SW County: Davie
Town of Bermuda Run – Riverbend Sidewalk BR2026SW Phase 1 & 2 Page 1 of 3
Line
Item Section
Item Description
Item Quantity
Unit Unit Bid Bid Amount
1 0000100000-N 800 MOBILIZATION 1 LS
2 0000400000-N 801 CONSTRUCTION SURVEYING 1 LS
3 001000000-E 200 CLEARING AND GRUBBING 1 LS
001000000-E
SP
BRICK COLUMN AND LIGHT
REMOVAL
13 EA
5 001010000-N 200 SELECT TREE REMOVAL 34 EA
0001020000-N
GENERIC MISC. ITEM - SHRUB
REMOVAL
34 EA
0022000000-E
UNCLASSIFIED EXCAVATION
CY
0106000000-E
BORROW EXCAVATION
CY
0156000000-E
REMOVAL OF EXISTING ASPHALT
PAVEMENT
866 SYD
0163000000-E
REMOVAL OF EXISTING
CONCRETE PAVEMENT
781 SYD
0318000000-E
FOUNDATION CONDITIONING
MATERIAL, MINOR STRUCTURES
TON
0321000000-E
FOUNDATION CONDITIONING
MATERIAL GEOTEXTILE
270 SYD
13 0360000000-E 310 12" DRAINAGE PIPE (RCP) 25 LFT
14 0536000000-E 310 12" DRAINAGE PIPE (HDPE) 317 LFT
15 0536000000-E 310 15" DRAINAGE PIPE (HDPE) 83 LFT
16 0366000000-E 310 15" DRAINAGE PIPE (RCP) 353 LFT
17 0396000000-E 310 42" DRAINAGE PIPE (RCP) 14.20 LFT
18 0995000000-E 340 PIPE REMOVAL (STORM PIPE) 762 LFT
1519000000-E
ASPHALT CONCRETE SURFACE
COURSE, TYPE S9.5B
55 TON
20 1121000000-E 520 AGGREGATE BASE COURSE 505 TON
21 1275000000-E 600 PRIME COAT 1290 GAL
2761000000-E
6” JOINTED CONCRETE W/ WIRE
MESH
935 SYD
23 2209000000-E 838 REINFORCED ENDWALLS 4.5 CY
24 2253000000-E 840 PIPE COLLAR 0.35 CY
2286000000-N
MASONRY DRAINAGE
STRUCTURES
8 EA
2374000000-N
FRAME WITH TWO GRATES, STD
840.03 (TYPE F)
3 EA
Town of Bermuda Run – Riverbend Sidewalk BR2026SW Phase 1 & 2 Page 2 of 3
Line
Item Section
Item Description
Item
2374000000-N
840.03 (TYPE G)
2 EA
2364000000-N
840.16 (DROP INLET)
2396000000-N
FRAME WITH COVER, STD
840.54
1 EA
2549000000-E
2'-6" CONCRETE CURB &
GUTTER
3431 LFT
31 2570000000-N SP MODIFIED CONCRETE FLUME 10 EA
32 2591000000-E 848 4" CONCRETE SIDEWALK 4450 SYD
33 2605000000-N 848 CONCRETE CURB RAMPS 6 EA
2760000000-N
DETECTABLE WARNING FOR
CURB RAMPS
13 EA
2815000000-N
ADJUSTMENT OF DROP INLETS
2830000000-N
ADJUSTMENT OF MANHOLES
26 EA
2845000000-N
ADJUSTMENT OF METER BOXES
OR VALVE BOXES
12 EA
38 3649000000-E 876 RIP RAP, CLASS B 40 TON
39 3656000000-E 876 GEOTEXTILE FOR DRAINAGE 77 SYD
3575000000-E
HANDRAIL (GENERIC FENCING
ITEM)
24 LFT
41 2752000000-N SP RAISED CROSSWALK 2 EA
4116100000-N
SIGN ERECTION, RELOCATE
SIGN TYPE E
6 EA
43 4457000000-N SP TEMP TRAFFIC CONTROL (SP) 1 LS
4835000000-E
PAINT PAVEMENT MARKING
LINES (24")
272 LFT
45 5672000000-N 1515 RELOCATE FIRE HYDRANT 1 EA
46 5686500000-E 1515 WATER SERVICE LINE 15 LFT
47 6855000000-E SP 2" PVC WATER PIPE, SCH 40 1100 LFT
48 5536000000-N 1515 2” Valve 2 EA
49 5709200000-E 1520 4" FORCE MAIN SEWER 175 LFT
50 5768000000-E 1520 SANITARY SEWER CLEAN-OUT 9 EA
5775000000-E
4' DIA UTILITY MANHOLE
(WATERTIGHT LID AND FRAME)
4 EA
52 6000000000-E 1605 TEMPORARY SILT FENCE 5360 LFT
Town of Bermuda Run – Riverbend Sidewalk BR2026SW Phase 1 & 2 Page 3 of 3
Line
Item Section
Item Description
Item
53 6015000000-E 1615 TEMPORARY MULCHING 9 ACR
54 6018000000-E 1620 SEED FOR TEMP SEEDING 700 LBS
55 6021000000-E 1620 FERT FOR TEMP SEEDING 4 TON
56 6036000000-E 1631 MATTING FOR EROSION CONTROL 2670 SYD
57 6038000000-E SP
(PSRM) PERMANENT SOIL
REINFORCEMENT MATTING 310 SYD
58 6071010000-E 1642 WATTLE 1050 LFT
59 6071020000-E 1642 FLOCCULANT 160 LBS
60 6084000000-E 1660 SEEDING AND MULCHING 9 ACR
61 6087000000-E 1660 MOWING 9 ACR
62 6090000000-E 1661 SEED FOR REPAIR SEEDING 150 LBS
63 6093000000-E 1661 FERT FOR REPAIR SEEDING 0.50 TON
64 6108000000-E 1665 FERTILIZER TOPDRESSING 6.0 TON
65 6111000000-E SP IMPERVIOUS DIKE 12 LFT
3677000000-E
GENERIC EROSION CONTROL
ITEM – BYPASS PUMPING
1 EA
67 6071012000-E 1642 COIR FIBER WATTLE 180 LFT
68 6117000000-N 1675 RESPONSE FOR EROS CONTROL 26 EA
69 6117500000-N SP CONC WASHOUT STRUCTURE 2 EA
Total Amount of Bid for En�re Project: ___________________________________
CONTRACTOR NAME: ___________________________________ ADDRESS: _____________________________________________
SIGNATURE OF CONTRACTOR REPRESENTATIVE: _____________________________________Date: ___________________
EXECUTION OF CONTRACT AND BONDS
APPROVED AS TO FORM:
Engineer: ___________________________________________Date: _________________
CONTRACT ACCEPTED: _____________________________________ Date: _________________
(TOWN OF BERMUDA RUN) SIGNATURE
TITLE: ___________________________________________
| 2026-08-04T13:34:17+0000 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .