BR_114.3_Ship Creek - Steel Package-IFC - Pages 12 - 22.pdf

PDF 2 MB Posted

Attached to
ITB 25-11 ARRC BR 114. 3 Steel Procurement Deck Plate Girder Spans
Solicitation number
itb 25-11-314850
Issued by
Aleutians East Borough, Alaska

About this file

This is a set of detailed engineering drawings and specifications from the Alaska Railroad Corporation for steel bridge components, including deck plate girders, railings, and support structures. The drawings show specifications for multiple deck plate sections (DP1-DP19), curb beams (CB30 and CB79), handrail panels (HP1L-HP5L), walkway assemblies, and shipping/securements for 79-foot and 30-foot bridge spans. The plans include precise measurements, bolt patterns, drainage details, and assembly instructions for components to be fabricated and shipped via rail to Seattle.

The drawings specify estimated weights for various components ranging from 68 lbs for walkway brackets to over 150,000 lbs for assembled girder groups on 89' flat cars. Detailed shipping and securement notes indicate coordination requirements with ARRC for rail transport, with limitations on unbalanced loads not exceeding 20,000 lbs difference between trucks. The drawings are professionally stamped by registered structural engineer Kyle Kauzlarich (License #201316) with an expiration date of 2/14/2025 and include comprehensive fabrication notes, material specifications, and quality control requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KYLE KAUZLARICH

No. 201316REG ISTERED ST RUCTUR A L ENGINEER

2/14/2025

File details come from the government source that posted it. Updated .