BR_114.3_Ship Creek - Steel Package-IFC - Pages 1 - 11.pdf

PDF 5 MB Posted

Attached to
ITB 25-11 ARRC BR 114. 3 Steel Procurement Deck Plate Girder Spans
Solicitation number
itb 25-11-314850
Issued by
Aleutians East Borough, Alaska

About this file

This is a set of detailed engineering drawings and specifications from the Alaska Railroad Corporation for the fabrication and supply of bridge components, including two 79-foot deck plate girder spans and one 30-foot rolled beam span for Bridge 114.3. The drawings, dated February 14, 2025, contain comprehensive structural details including framing plans, bearing details, diaphragm connections, support brackets, and deck plate layouts. The project location is shown near Ship Creek in Anchorage, Alaska, with detailed site maps and vicinity plans included. The documents specify that all components must be designed in accordance with the 2024 AREMA Manual for Railway Engineering standards, with specific requirements for seismic design and steel structures.

The technical specifications outline precise material requirements, including structural steel conforming to ASTM A709 Grade 50 standards, bearing components, and welding specifications. The bid schedule indicates quantities of one 79' deck plate girder span (assembled) at 278,500 lbs and one 30' rolled beam span (assembled) at 61,200 lbs, for a total structural steel quantity of 618,200 lbs. The drawings include detailed stress tables, camber diagrams, and load calculations, with specific requirements for fabrication quality control, surface preparation, and installation procedures. All structural components must meet strict quality assurance standards with shop testing and owner approval requirements before shipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KYLE KAUZLARICH

No. 201316REG ISTERED ST RUCTUR A L ENGINEER

A L

A S

K A

R A

I LROAD CORPO

R

A T

I O

N

E S T . 19 14

FEBRUARY 14, 2025

ALASKA RAILROAD CORPORATION

CAPITAL PROJECTS

P.O. BOX 107500, ANCHORAGE, ALASKA 99510-7500

FABRICATION AND SUPPLY OF 2~79' DECK PLATE GIRDER

ISSUE FOR FABRICATION

SPANS AND 1~30' ROLLED BEAM SPAN FOR BRIDGE 114.3 2/14/2025

2/14/2025

DP1 DP2

DP7

DP3 DP4

DP8

DP14 DP15DP6DP5

DP11

DP16 DP17 DP18 DP19

DP9

DP12

DP10

DP13

DP8

DP14 DP15

DP11

DP16 DP17 DP18 DP19

DP9

DP12

DP10

DP13

KYLE KAUZLARICH

File details come from the government source that posted it. Updated .