BP 01 - Addendum #1.pdf
PDF 1 MB Posted
- Attached to
- Community Pool - Site, Earthwork & Utilities
- Solicitation number
- RFP-WOP-240000003020-3
- Issued by
- Saginaw County, Michigan
About this file
This document is an addendum issued by Triangle Associates, Inc., the Construction Manager, regarding a utility relocation package for the West Ottawa Public Schools community pool project. The addendum revises the bid due date and time, provides clarifications on the demolition and utility relocation work, and includes updates to the site plan and watermain plan sheets. The work includes the removal of existing storm, water, and irrigation utilities, and the installation of new watermain and storm sewer infrastructure. Bidders are required to acknowledge receipt of this addendum on the proposal form.
The addendum notes that the existing watermain relocation, proposed easement, and vacated easement are still under review, and that watermain removal or installation cannot commence prior to permit issuance. Contractors are responsible for obtaining necessary permits, coordinating utility interruptions with the owner, and verifying existing utility elevations prior to construction. The watermain work is to be inspected by the utility owner, with pressure testing and chlorination performed by the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Comm Pool Earthwork Advertisement.pdf | ||
| 05 Schedule.pdf | ||
| 04 Instructions-CMa Ed -WO Pool.pdf | ||
| 05.1 Site Logistics.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1
Construction Manager ADDENDUM #1 West Ottawa Public Schools Triangle Associates, Inc. Page No 1 of 1 Utility Relocation
OWNER: West Ottawa Public Schools
PROJECT: Community Pool Utility Relocation
BID PACKAGE: 01
DESIGN PROFESSIONAL: GMB Architecture & Engineering
Project # 5-6244
CONSTRUCTION MANAGER: Triangle Associates, Inc.
Project #7-24008-0A
Date Issued: 9/9/24
Drawings Issued: C1.50, C4.20
Specifications Issued: None
Documents Issued: GMB Addendum Writeup, RFI #1, 2, 3
REVISIONS AND CLARIFICATIONS
GENERAL:
1. The bid due date and time shall be revised to Thursday September 12th @ 10:00 AM. The location will remain the administration building located at 1138 136th Ave, Holland, MI 49424.
2. The post bid interview for the site work category is intended to be right after the bid opening.
If possible, all trades shall be prepared to attend a 10:30 AM post bid on Thursday September
12th. An in person post bid is preferred, however electronic accommodations can be made if needed.
WORK CATEGORY/RFI CLARIFICATIONS � WC 310:
1. Review RFI #1 for asphalt path, irrigation and topsoil clarifications. This trade shall remove all topsoil from utility trenches from the site. Trenches to be backfilled with clean sand.
2. Review RFI #2 for hard surface clarification. See revised sheet C1.50 � There will be no asphalt replacement. Area at loading dock to be put back with 21AA. The extent of concrete removal and replacement has now been defined. Concrete allowance is still to be carried in addition to the quantity defined. These walks will be needed for life safety and maintenance through the winter.
3. Review RFI #3 for misc. site work clarifications.
4. Review C1.50 for additional demolition clarity and sheet C4.20 for service line clarity. The intent is to not install service laterals to the building because they will conflict with spring excavation. Those will be a part of BP 02.
All bidders are to incorporate these revisions into their proposals and to acknowledge receipt of this addendum where requested on the Proposal Form. Bidders are reminded that verbal clarifications or revisions from the GMB Architecture & Engineering or Construction Manager are non-binding and that only published addenda shall be honored.
RESPECTFULLY SUBMITTED:
TRIANGLE ASSOCIATES, INC.
Distribution: ALL BIDDERS
ADDENDUM
WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 001
COMMUNITY SCHOOL-EARLY SITE UTILITY PACKAGE SEPTEMBER 6, 2024
A/E PROJECT 5-6244 PAGE 1/2
OWNER West Ottawa Public Schools
PROJECT Community Pool-Early Site Utility Package
A/E Project 5-6244
PURPOSE ADDENDUM 001
THIS ADDENDUM SHALL FORM PART OF THE
BIDDING DOCUMENTS. CHANGES, ADDITIONS,
CLARIFICATIONS OR DELETIONS HEREIN
SUPERSEDE THE DRAWINGS AND
SPECIFICATIONS. BIDDERS SHALL INCLUDE ON
THE PROPOSAL FORM ACKNOWLEDGEMENT OF
THE RECEIPT OF THIS ADDENDUM.
ATTACHMENTS Reissued Sheets: C1.50. C4.20
ARCHITECT-ENGINEER GMB
www.gmb.com
616.796.0200
CONSTRUCTION MANAGER TRIANGLE ASSOCATES, INC
3769 3 MILE ROAD, NW
GRAND RAPIDS, MI 49534
P.616.453.3950
WWW.TRIANGLE-INC.OM
http://www.gmb.com/
ADDENDUM
WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 001
COMMUNITY SCHOOL-EARLY SITE UTILITY PACKAGE SEPTEMBER 6, 2024
A/E PROJECT 5-6244 PAGE 2/2
SHEET CLARIFICATIONS / REVISIONS
ITEM NO. 1 SHEET C1.50 – PRELIMINARY UTILITY RELOCATION PLAN (REISSUED)
Refer to updated sheet for additional demolition clarity
ITEM NO. 2 SHEET C4.20 – WATERMAIN PLAN AND PROFILE (REISSUED)
Refer to updated sheet showing capped service lines
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM
STM
ST
M
ST
M
STM STM STM STM STM STM STM STM
STM STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
STM STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
TEMP-101 (4 FT DIA.)
RIM: 621.93
24" (SE) INV: 616.50
EX. 24" (W) INV: ±616.50
TEMP-102 (4 FT DIA.)
RIM: 623.40
24" (NW) INV: 616.41
24" (E) INV: 616.41
71 LF OF 24" STORM @
0.13%
TEMP-103 (4 FT DIA.)
RIM: 623.36
24" (W) INV: 616.26
12" (E) INV: 616.26
113 LF OF 24" STORM @ 0.13%
TEMP-104 (4 FT DIA.)
RIM: 621.61
12" (W) INV: 616.17
12" (N) INV: 616.17
70 LF OF 12" STORM @ 0.13%
TEMP-105 (4 FT DIA.)
RIM: 621.82
EX. 30" (E) INV: ±616.10
12" (S) INV: 616.10
L
F O
F
" S
TO
R M
.1 2%
X X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
STM
STM STM STM STM STM STM STM STM
ST
M
ST
M
STM STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
X
X X
X
X X
X X
X X
X
X X
X X
X X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X X
STM
STM
STM
WTR WTR WTR
WTR WTR WTR WTR WTR WTR WTR WTR WTR
WTR
WTR
WTR
WTR
WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR
EX 12" WATER
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
EX
" W
AT
ER
SE
R
VI
C E
EX
" F
IR
E
PR
O
TE
C
TI
O N x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
G G G
G
G G G G G G G G G G G G G G G G G G G G
GAS SUPPLY LOCATION MUST BE FIELD
VERIFIED---LOCATION SHOWN BASED
UPON FLAGS RECORDED AS PART OF
SURVEY
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
LO
C
ATIO
N
FR
O M
C
LIEN
T M
AR
KU
P
GAS LOC.
PER PLAN
P103 1997
WATR LOC.
PER PLAN
P103 1997
POWR LOC.
PER PLAN
EP103 1997
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
U G
E
PE
R
PL
AN
S
E1
C O
M M
L O
C . P
ER
PL
AN
S
E1
COMM LOC. PER
PLAN SE101 1997
EU
EU
EU
EU
EU
EU EU EU EU EU EU EU EU
EU
EU
EU
EU
EU
EU
EU
EU
UGE PER PLAN
SE101 1997
4" IRRIG.
3"
IR
R
IG
4" IRRIG.
4"
IR
R
IG
4" IRRIG.
COMM LOC. PER
PLAN SE101 1997
FO LOCATION FROM
CLIENT MARKUP
FUTURE BUILDING
PROJECT NO.
DRAWN
REVIEWED
ISSUANCES
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATABASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
GMB COPYRIGHT
ALL RIGHTS RESERVED
c
C O
M M
U N
IT
Y
P O
O L
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
5-6244
H O
LL
A
N D
, M
IC
H
IG
A N
PR
EL
IM
INA
RY
NO
T F
OR
CO
NS
TR
UC
TIO
N
P:
\5
-6
4\ C
AD
\5
-6
C
1.
.d w g
9/ 6/
0:
:3
AM
PRELIMINARY
SITE UTILITY
RELOCATIONS
08.28.2024
09.06.2024 ADDENDUM 001
BKV
NAF
C1.50
PRELIMINAY UTILITY
RELOCATION PLAN
DEMOLITION NOTES:
1. GENERAL: REFERENCE SECTIONS 31 10 00 SITE CLEARING AND 31 20 00 GRADING,
EXCAVATION AND FILL OF THE SPECIFICATION BOOK.
2. REMOVE ALL UNUSABLE DEMOLITION MATERIALS AND DEBRIS FROM THE SITE AND DISPOSE
OF PROPERLY OFFSITE. WHEREVER POSSIBLE, CONTRACTOR SHALL DIVERT DEMOLISHED
MATERIALS FROM LANDFILL AND SEND TO LOCAL RECYCLING FACILITY.
3. BACKFILLING SHALL PROMPTLY FOLLOW UNDERGROUND DEMOLITION OR REMOVAL WORK
AND SHALL CONTINUE AS THE DEMOLITION PROGRESSES.
4. DO NOT BURY DEBRIS, ROOTS, TOPSOIL OR OTHER MATERIALS.
5. ALL WORK SHALL COMPLY WITH APPLICABLE REQUIREMENTS OR THE LOCAL CODE OF
ORDINANCES AND ACCIDENT/FIRE PREVENTION REGULATIONS.
6. PROTECT THE SITE, ADJACENT PROPERTY AND UTILITY SERVICES FROM DAMAGE OR
DISRUPTION OF SERVICE/ACCESS. DAMAGE TO EXISTING STRUCTURES, SITE OR UTILITIES
SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
7. ALL TREES TO REMAIN SHALL BE CAREFULLY PROTECTED. DO NOT DRIVE HEAVY
EQUIPMENT WITHIN 12 FT OF TREE TRUNKS. BRANCHES WHICH ARE DAMAGED DURING
DEMOLITION OF STRUCTURES AND/OR SURFACES SHALL BE CUT OUT AS DIRECTED BY THE
ARCHITECT/ENGINEER. ANY ROOTS OF TREES BEING SAVED WHICH ARE EXPOSED DUE TO
DEMOLITION/REMOVAL SHALL BE COVERED WITHIN 6 HOURS WITH SOIL. DAMAGED TREES
MAY BE REPLACED AT THE DISCRETION OF THE ARCHITECT/ENGINEER AT THE EXPENSE OF
THE CONTRACTOR RESPONSIBLE FOR THE DAMAGE.
8. UTILITIES SHOWN (IF ANY) ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL
MEASUREMENTS OR AVAILABLE RECORDS. THIS MAP IS NOT TO BE INTERPRETED AS
SHOWING EXACT LOCATIONS OR SHOWING ALL UTILITIES IN THE AREA. SIZE AND INVERTS
OF EXISTING PIPE TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO COMMENCING WORK
ON NEW UTILITY CONNECTIONS.
9. DEMOLISH ALL SITE MATERIALS IN ACCORDANCE WITH LOCAL SPECIFICATIONS AND
REQUIREMENTS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR WORK IN
ROW AND ON ANY UTILITY CONNECTIONS OR ABANDONMENT PRIOR TO THE START OF
CONSTRUCTION.
11. CONTRACTOR SHALL NOTIFY LOCAL BUILDING OFFICIALS MINIMUM 48 HOURS PRIOR TO
START OF DEMOLITION.
12. TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR INCLUDING
SIGNAGE, BARRIERS, FLAG PERSONNEL AND ANY ADDITIONAL REQUIREMENTS OF THE
LOCAL ROAD COMMISSION OR MUNICIPALITY. CONTRACTOR SHALL FOLLOW MOST RECENT
EDITION OF MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
13. WHERE PAVEMENT, CONCRETE OR ASPHALT IS INDICATED TO BE REMOVED, IT SHALL BE
SAWCUT FULL DEPTH. ALL CONCRETE CUTS SHALL BE MADE AT NEAREST CONSTRUCTION
OR CONTROL JOINT. ALL ASPHALT CUTS SHALL BE MIN. 1 FT PAST EXISTING JOINTS
WHEREVER POSSIBLE.
14. CONTRACTORS TO REVIEW ALL SHEETS FOR RELATED INFORMATION.
SCALE IN FEET
PRELIMINAY UTILITY RELOCATION PLAN
20 40
SCALE:1" = 20'-0"
UTILITY NOTES:
1. ALL WORK SHALL COMPLY WITH APPLICABLE REQUIREMENTS OR THE LOCAL CODE,
ORDINANCES AND ACCIDENT/FIRE PREVENTION REGULATIONS.
2. PROTECT THE SITE, ADJACENT PROPERTY AND UTILITY SERVICES FROM DAMAGE OR
DISRUPTION OF SERVICE/ACCESS. DAMAGE TO EXISTING STRUCTURES, SITE OR UTILITIES
SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
3. UTILITIES SHOWN (IF ANY) ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL
MEASUREMENTS OR AVAILABLE RECORDS. THIS MAP IS NOT TO BE INTERPRETED AS
SHOWING EXACT LOCATIONS OR SHOWING ALL UTILITIES IN THE AREA. SIZE AND INVERTS
OF EXISTING PIPE TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO COMMENCING WORK
ON NEW UTILITY CONNECTIONS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR WORK IN
ROW AND ON ANY UTILITY CONNECTIONS OR ABANDONMENT PRIOR TO START OF
CONSTRUCTION.
5. CONTRACTOR SHALL COORDINATE ANY UTILITY/SERVICE INTERRUPTIONS WITH OWNER AT
LEAST ONE WEEK IN ADVANCE. CONTRACTOR SHALL ALSO NOTIFY LOCAL UTILITY PROVIDER
WHERE APPLICABLE FOR OPERATION/DISCONNECTION OF PUBLIC OWNED EQUIPMENT.
6. CONTRACTOR SHALL ADEQUATELY PROTECT/SHORE ALL OPEN TRENCHES AS REQUIRED BY
THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
7. EXISTING SEWER AND WATERMAIN LINES SHALL BE PROTECTED FROM DEBRIS AND
CONSTRUCTION.
8. WATERMAIN CONSTRUCTION IS TO BE INSPECTED BY UTILITY OWNER. PRESSURE TESTING
AND CHLORINATION OF THE WATERMAIN TO BE PERFORMED BY THE CONTRACTOR.
WITNESSING OF INSTALLATION, PRESSURIZATION, CHLORINATION AND GATHERING OF
WATER SAMPLES WILL BE PERFORMED BY THE UTILITY OWNER.
9. MAINTAIN A MINIMUM OF 5'-9" FROM FINISH GRADE TO CENTERLINE OF WATERMAIN PIPE.
MAINTAIN A MINIMUM OF 10'-0" CLEARANCE OF SANITARY SEWER MAIN.
10. HYDRANTS AND FITTINGS SHALL BE TIED AND BLOCKED. HYDRANTS AND VALVES SHALL BE
COORDINATED WITH UTILITY OWNER TO OPEN PER UTILITY OWNERS DEVELOPMENT
STANDARDS.
11. CONTRACTOR SHALL BE REQUIRED TO CONTACT MISS DIG PRIOR TO STARTING ANY WORK.
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR
WORK IN ROW AS WELL AS NOTIFYING LOCAL UTILITY OWNERS OF WORK IF PERMITS ARE
NOT REQUIRED.
12. LOCATION OF LATERALS TO BE DETERMINED IN THE FIELD AT THE DIRECTION OF THE
OWNER. AVOID CONFLICT WITH PROPOSED AND/OR EXISTING FACILITIES.
13. QUANTITIES SHOWN ARE FOR INFORMATION ONLY AND CONTRACTOR IS RESPONSIBLE FOR
CHECKING ALL LINES, LEVELS AND DIMENSIONS.
14. CONTRACTOR IS TO VERIFY EXISTING UTILITY ELEVATIONS PRIOR TO STARTING
CONSTRUCTION.
15. CONTRACTORS TO REVIEW ALL SHEETS FOR RELATED INFORMATION.
16. LIST OF STANDARD ABBREVIATIONS -
"A.F.F" = ABOVE FINISHED FLOOR
"CB" = CATCH BASIN
"C/L" = CENTER LINE
"C.O." = CLEAN OUT (INCL. FROST SLEEVE)
"CY" = CUBIC YARDS
"D.I.W.M" = DUCTILE IRON WATER MAIN
"F.E.S" = FLARED END SECTION (CONC. ONLY)
"FFE/F.F.E" = FINISHED FLOOR ELEVATION
"F.V." = FIELD VERIFY
"INV." = INVERT
"LB" = LEACHING BASIN
"LF" = LINEAL FEET
"RCP" = REINFORCED CONCRETE PIPE
"SAN" = SANITARY
"SAN. MH" = SANITARY SEWER MANHOLE
"SF" = SQUARE FEET
"ST. MH" = STORM MANHOLE
"STM" = STORM
"SY" = SQUARE YARDS
"U.N.O" = UNLESS NOTED OTHERWISE
"YD" = YARD DRAIN
SEE C4.20 FOR
WATERMAIN RELOCATION
PLAN
SEE C4.20 FOR
WATERMAIN RELOCATION
PLAN
EXISTING
WATERMAIN TO BE
REMOVED
AND EASEMENT
TO BE VACATED
GAS SERVICE DRAWN FROM
PROVIDER MAPS. FIELD VERIFY
LOCATION AND COORDINATE WITH
SEMCO ENERGY FOR RELOCATION
REMOVE PAVEMENT AND CONCRETE AS
NECESSARY FOR CONSTRUCTION OF UTILITY
RELOCATIONS. COORDINATE REPLACEMENT OF
PAVEMENT WITH OWNER.
TRACK AND FIELD EVENTS
TO BE REMOVED (TYP.)
EXISTING WATERMAIN
TO BE REMOVED AND
EASEMENT TO BE
VACATED
DEMOLITION KEY
DEMO AND REMOVE EXISTING CONCRETE FLATWORK.
DIVERT ALL REMOVED CONCRETE TO LOCAL
CRUSHING/RECYCLING FACILITY. REPLACE IN KIND
2 SAWCUT CONCRETE/ASPHALT FOR CLEAN EDGE/JOINT,
REMOVE TO NEAREST JOINT LINE.
3 COORDINATE REMOVAL OF GAS SERVICE AND
INSTALLATION OF NEW SERVICE WITH SEMCO ENERGY.
4 DEMO AND REMOVE EXISTING CATCH BASINS, MANHOLES
AND CONNECTED PIPING.
5 RELOCATION OF COMMUNICATIONS / FIBER BY OWNER
6 DEMO AND REMOVE EXISTING VEGETATION.
REMOVE OR RELOCATE EXISTING SITE LIGHTING AS
NEEDED FOR UTILITY RELOCATION. COORDINATE
TEMPORARY LIGHTING WITH OWNER.
8 REMOVE EXISTING FENCE.
9 RELOCATION OF IRRIGATION BY OWNER.
REMOVE EXISTING WATERMAIN. WORK SHALL NOT
COMMENCE UNTIL WATERMAIN DRAWINGS HAVE BEEN
APPROVED AND PERMIT HAS BEEN ISSUED.
PRELIMINARY UTILITY RELOCATION NOTES
1. WATERMAIN RELOCATION, PROPOSED EASEMENT, AND VACATED EASEMENT UNDER
REVIEW. WATERMAIN REMOVAL, OR INSTALLATION NOT TO COMMENCE PRIOR TO PERMIT
ISSUANCE.
2. COORDINATE WITH OWNER ON ALL PRIVATE UTILITY RELOCATIONS. ENSURE THAT NO
UTILITIES ARE INSTALLED WITHIN PROPOSED WATERMAIN EASEMENT
3. CONTRACTOR TO PROVIDE DETAILED AS-BUILTS OF ALL RELOCATED UTILITIES UPON
COMPLETION TO BE INCLUDED IN FUTURE PROJECT PACKAGES.
REMOVE EXISTING ASPHALT PAVEMENT. REPLACE WITH
MDOT 21AA AGGREGATE TO BASE OF PAVEMENT
ELEVATION.
AutoCAD SHX Text CATCH BASIN TOP 620.60 12" N & SW 616.60 8" NE 617.05 6" U.D. W & S 616.95 18" S. 616.60 4" SE 617.25 24" E. 616.60
AutoCAD SHX Text
YARD DRAIN TOP 619.13 8" SSW 617.63
AutoCAD SHX Text
STORM MANHOLE TOP 622.66 30" E. 616.16 24" WSW 616.26
AutoCAD SHX Text
CATCH BASIN TOP 622.02 8" SE 618.47 8" W/NE 618.52
AutoCAD SHX Text
CATCH BASIN TOP 622.16 8" E. 618.86
AutoCAD SHX Text
CATCH BASIN TOP 622.78 8" E. 619.28
AutoCAD SHX Text
CATCH BASIN TOP 622.84 8" W. 619.04 8" SW 618.99
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
GATE POST (TYP.)
AutoCAD SHX Text 50.1'
AutoCAD SHX Text 30.1'
AutoCAD SHX Text
MTL. BLDG.
AutoCAD SHX Text
12"CAT.
AutoCAD SHX Text
8"TREE
AutoCAD SHX Text
GAS @ BLDG.
AutoCAD SHX Text
ELEC. BOX
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text 1"M.
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC. (TYP.)
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
YARD DRAIN TOP 622.68 8" W/NE 620.08
AutoCAD SHX Text
YARD DRAIN TOP 622.51 8" E/NW 619.91
AutoCAD SHX Text
YARD DRAIN TOP 621.88 12" S. 620.38
AutoCAD SHX Text
YARD DRAIN (BEEHIVE) TOP 623.78 UNABLE TO OPEN WATER LEVEL AT 620.3
AutoCAD SHX Text
CATCH BASIN TOP 620.85 12" N. 616.85 6" SE/SW 617.77
AutoCAD SHX Text
YARD DRAIN TOP 620.90 12" S. 616.80 8" NW 617.55 8" NE 617.10
AutoCAD SHX Text
STORM MANHOLE TOP 621.40 30" E. 616.05 30" W. 616.05 12" S. 616.30 12" N. 616.40
AutoCAD SHX Text
STORM MANHOLE TOP 623.39 (BOLTED DOWN)
AutoCAD SHX Text 102.4'
AutoCAD SHX Text 27.0'
AutoCAD SHX Text 0.7'
AutoCAD SHX Text 172.9'
AutoCAD SHX Text 17.2'
AutoCAD SHX Text 51.7'
AutoCAD SHX Text 64.5'
AutoCAD SHX Text 66.4'
AutoCAD SHX Text 11.3'
AutoCAD SHX Text 97.3'
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text
14"TREE
AutoCAD SHX Text
8"TREES
AutoCAD SHX Text
6"TREES
AutoCAD SHX Text
14"MAPLE
AutoCAD SHX Text
12"BIRCH
AutoCAD SHX Text
CHAIN-LINK FENCE
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC. (TYP.)
AutoCAD SHX Text
RUBBERIZED TRACK SURFACE (TYP.)
AutoCAD SHX Text
PINES
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
RUBBERIZED TRACK
AutoCAD SHX Text
F.F. EL. 623.98
AutoCAD SHX Text
F.F. EL. 624.08
AutoCAD SHX Text
F.F. EL. 623.93
AutoCAD SHX Text
WEST OTTAWA HIGH SCHOOL SOUTH CAMPUS 2 STORY BRICK BUILDING
AutoCAD SHX Text
BENCHMARK ELEVATION 623.21 TOP OF N'LY FLANGE BOLT ON HYDRANT (UNDER "E")
AutoCAD SHX Text
20' EASEMENT FOR WATERMAIN PER LIBER 2260, PAGE 947
AutoCAD SHX Text
CHAIN-LINK FENCE
AutoCAD SHX Text
FLAG POLE
AutoCAD SHX Text
MTL. SCORE BOARD ON STEEL POSTS
AutoCAD SHX Text
MTL. BLDG.
AutoCAD SHX Text
GATE POSTS
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
42" STRM
FRO
M
PLAN C201 1997
STRM FROM PLAN
C201 1997
ST
M
STM
STM
ST
M
ST
M
STRM UD PLAN
C301 1997
STRM UD PLAN
C301 1997
G
G G G G G G G G G G G G G G
GAS SUPPLY LOCATION
MUST BE FIELD
VERIFIED---LOCATION
SHOWN BASED UPON
FLAGS RECORDED AS
PART OF SURVEY
GAS SUPPLY LOCATION MUST BE FIELDVERIFIED---LOCATION SHOWN BASEDUPON FLAGS RECORDED AS PART OFSURVEY
G G
G
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
EU
U G
E
FR
O M
M
IS
SD
IG
A N
D C
LI
EN
T M
AR
KU
P
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO LOCATION FROM
CLIENT MARKUP
FO
LO
C
ATIO
N
FR
O M
C
LIEN
T M
AR
KU
P
FO LOCATION FROM
CLIENT MARKUP
GAS LOC.
PER PLAN
P103 1997
WATR LOC.
PER PLAN
P103 1997POWR LOC. PER PLAN EP103 1997
EU
EU
EU
EU
EU
EU
EU
EU
EU
U G
E
PE
R P
LA
N
S E1
C O
M M
L O
C . P
ER
PL
AN
S
E1
COMM LOC. PER
PLAN SE101 1997COMM LOC. PER
PLAN SE101 1997
EU
EU
EU EU EU
EU
EU
EU
UGE PER PLAN
SE101 1997
2.
5"
IR
R
IG
6"
IR
R
IG
2.
5"
IR
R
IG
x 4" IRRIG.
4" IRRIG.x x x
3"
IR
R
IG
3"
IR
R
IG
4" IRRIG.
4"
IR
R
IG
4"
IR
R
IG
4"
IR
R
IG
4" IRRIG.
3" IRRIG.
3"
IR
R
IG
4"
IR
R
IG
COMM LOC. PER
PLAN SE101 1997
FO LOCATION FROM
CLIENT MARKUP
STORM MANHOLE
TOP 621.60
36" N. 615.25 42" S. 615.25 30" W. 615.25
ELEV FROM 2015 SURVEY
COMM LOC. PER
PLAN SE101 1997
X
XXXXXXXX
X
X
BUILDING FINISHED
FLOOR
ELEVATION: 624.00
X X
X X
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
X X
X
X
X
X
X X
X
X
X X
X
X
X
X X
X
X X
X X
X X
X
EO
EO
EO
EO
EO
STM STM STM
STM
STM STM STM STM STM STM
ST
M
STM
STM
STM
STM
STM
STM
STM
EO
EO
EO
EO
EO
EO
EO
EO
EO
EO
EO
EO
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
X
X X
X
X
STM
WTR WTR WTR WTR WTR WTR WTR
WTR WTR WTR WTR WTR
WTR
W
TR
W
TR
TB-103
TB-104
TB-107TB-106
TB-102
TB-105
TB-110
TB-101
EX 12" WATER
EX 12" WATER
EX 12" WATER VALVE
W
TR
W
TR
W
TR
W
TR
EX
" W
AT
ER
SE
R
VI
C E
EX
" F
IR
E
PR
O
TE
C
TI
O N
0+
1+
2+00
3+00
4+
5+
6+
7+00
8+00
9+00
CB-203
CB-202
CB-109A
CB-108
CB-109
YD-200
PR
O
P
" S
TO
R M
PR
O
P
" S
TO
R M
PROP 12" STORM
PR
O
P
" S
TO
RM
PR
O
P
" S
TO
R M
PROP 12" STORM
CO-04
SAN-MH-03
SAN-MH-02
PR
O
P 8"
S
AN
PROP 8" SAN
CB-201
co
PLACE:
87 LF - 12" CL 52 DI WM
(TEE TO BEND)
PLACE:
30 LF - 12" CL 52 DI WM
(BEND TO TEE)
PLACE:
159 LF - 12" CL 52 DI WM
(BEND TO TEE)
PLACE:
53 LF - 12" CL 52 DI WM
(BEND TO BEND)
PLACE:
97 LF - 12" CL 52 DI WM
(BEND TO TEE)
CONNECT TO EXISTING
12" WATER MAIN.
(FIELD VERIFY LOCATION
AND DEPTH)
PLACE:
(1) 12" SLEEVE
(1) 12"x12"x12" CUT IN TEE
WITH RESTRAINTS
(MIN. 10' EITHER SIDE)
PLACE:
(1) 12" 45° BEND
CONNECT TO EXISTING 12" WATER MAIN.
(FIELD VERIFY LOCATION & DEPTH)
PLACE:
(1) 12" SLEEVE
(1) 12" 45° BEND
PLACE:
(1) 12"x12"x6" TEE
5 LF - 6" WTR
(1) 6" V&B
(1) HYD. (COMPLETE)
PLACE:
(1) 12"x12"x6" TEE
5 LF - 6" WTR
(1) 6" V&B
(1) HYD. (COMPLETE)
PLACE:
(1) 12" 45° BEND
PLACE:
(1) 12" 45° BEND
PLACE:
(1) 12" - 45° BEND
PLACE:
(1) 12" 45° BEND
PLACE:
75 LF - 12" CL 52 DI WM
(BEND TO BEND)
PLACE:
43 LF - 12" CL 52 DI WM
(TEE TO BEND)
PROPOSED 20' WIDE
WATERMAIN EASEMENT
PLACE:
(1) 12" PLUG / CAP
(1) THRUST BOCK
PLACE:
(1) 12"x12"x6" TEE
5 LF - 6" WTR
(1) 6" V&B
(1) HYD. (COMPLETE)
PLACE:
45 LF - 12" CL 52 DI WM
(TEE TO BEND)
PLACE:
51 LF - 12" CL 52 DI WM
(TEE TO TEE)
PLACE:
(1) 12"x12"x6" TEE
21 LF - 6" WTR
(1) 6" V&B
(1) HYD. (COMPLETE)
PLACE:
(1) 12"x12"x6" TEE
PLACE:
54 LF - 12" CL 52 DI WM
(TEE TO TEE)
PLACE:
(1) 6" V&B
5 LF - 6" FIRE LINE
(TEE TO CAP)
(1) 6" CAP
PLACE:
(1) 8" V&B
5 LF - 8" DOMESTIC WATER
(TEE TO CAP)
(1) 8" CAP
PLACE:
(1) 12"x12"x8" TEE
PLACE:
10 LF - 12" CL 52 DI WM
(TEE TO TEE)
PLACE:
13 LF - 12" CL 52 DI WM
(TIE TO TEE)
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00
2.
2.
2.
1.
1.
2.
2.
3.
3.
3.
3.
3.
3.
2.
1.
1.
0.
1.
1.
1.
1.
2.
2.
2.
3.
2.
2.
2.
2.
1.
2.
2.
2.
2.
EXISTING GRADE
PROPOSED GRADE
EXISTING GRADE
PROPOSED GRADE
WTR
WTR
EX 12" WATERMAIN
WTR
WTR
STORM YARD DRAIN
EX 8" INV: 617.10±
MAINTAIN 18"
VERTICAL
CLEARANCE5'
M
IN
C O
VE
R
(T O
P O
F
PI
PE
PROPOSED HYDRANT
PUMPER NOZZLE TO BE
27" ABOVE GROUND
PROPOSED HYDRANT
PUMPER NOZZLE TO BE
27" ABOVE GROUND
RESTRAINED LENGTH = 72'
STATION 1+75 TO 2+25'
(25' MIN FROM BEND)
RESTRAINED LENGTH = 48'
STATION 1+00 TO 1+38
(25' MIN FROM TEE
RESTRAINED LENGTH = 146'
STATION 2+50 TO 3+75
(25' MIN FROM FITTING)
RESTRAINED LENGTH = 167'
STATION 4+84 TO 6+29'
(25' MIN FROM FITTING)
RESTRAINED LENGTH =151'
STATION 6+76TO 8+17'
(25' MIN FROM BEND)
EX 12" WATERMAIN
PROPOSED HYDRANT
PUMPER NOZZLE TO BE
27" ABOVE GROUND
PROPOSED HYDRANT
PUMPER NOZZLE TO BE
27" ABOVE GROUND
HYDRANT TEE
STA: 1+12.52 ELEV: 614.47
CONNECTION TO
EX 12" WATERMAIN
STA: 1+00.00
ELEV: 614.41
12" 45° HORZ BEND
STA: 2+00
ELEV: 614.87
12" 45° HORZ BEND
STA: 2+75
ELEV: 615.20
12" 45° HORZ BEND
STA: 3+50
ELEV: 615.54
12" 45° HORZ BEND
STA: 5+52
ELEV: 615.85
12" 45° HORZ BEND
STA: 6+04
ELEV: 615.35
12" WATER MAIN
TOP ELEV: 615.54
12" WATER MAIN
TOP ELEV: 615.67
EX 8" WATER MAIN
TOP ELEV: 615.52
HYDRANT TEE
STA: 3+04.49 ELEV: 615.34
12"x12"x8" DOM. TEE
STA: 7+65.74 ELEV: 613.82
12"x12"x6" F.P. TEE
STA: 7+01.50 ELEV: 614.43
HYDRANT TEE
STA: 7+55.74 ELEV: 613.92
CONNECTION TO
EX 12" WATERMAIN
STA: 8+17.04
ELEV: 613.43
HYDRANT TEE
STA: 5+08.61 ELEV: 616.26
CONTRACTOR TO FIELD VERIFY
LOCATION AND DEPTH PRIOR
TO CONSTRUCTION.
CONTRACTOR TO FIELD VERIFY
LOCATION AND DEPTH PRIOR
TO CONSTRUCTION.
PROJECT NO.
DRAWN
REVIEWED
ISSUANCES
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATABASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
GMB COPYRIGHT
ALL RIGHTS RESERVED
c
C O
M M
U N
IT
Y
P O
O L
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
5-6244
H O
LL
A
N D
, M
IC
H
IG
A N
PR
EL
IM
INA
RY
NO
T F
OR
CO
NS
TR
UC
TIO
N
P:
\5
-6
4\ C
AD
\5
-6
C
4.
.d w g
9/ 6/
0:
:0
AM
PRELIMINARY
SITE UTILITY
RELOCATIONS
08.28.2024
09.06.2024 ADDENDUM 001
BKV
NAF
C4.20
WATERMAIN PLAN AND
PROFILE
AGENCY REVIEWS
SCALE IN FEET
WATERMAIN PLAN AND PROFILE
50 100
SCALE:1" = 50'
SCALE IN FEET
WATERMAIN PLAN AND PROFILE
50 100
SCALE:
HOLLAND CHARTER TOWNSHIP UTILITY NOTES:
1. HOLLAND CHARTER TOWNSHIP WATER SUPPLY SYSTEM, SANITARY SEWER AND SIDEWALK
STANDARD CONSTRUCTION REQUIREMENTS DATED JANUARY 2022 ARE TO BE FOLLOWED.
AVAILABLE AT www.hct.holland.mi.us.
2. ALL WATERMAIN TO BE INSTALLED PER HOLLAND CHARTER TOWNSHIP SPECIFICATIONS.
3. POLYWRAP SHALL BE INSTALLED ON ALL WATER MAIN.
4. ALL HYDRANT WEEP HOLES TO BE PLUGGED.
UTILITY NOTES:
1. ALL WORK SHALL COMPLY WITH APPLICABLE REQUIREMENTS OR THE LOCAL CODE, ORDINANCES
AND ACCIDENT/FIRE PREVENTION REGULATIONS.
2. PROTECT THE SITE, ADJACENT PROPERTY AND UTILITY SERVICES FROM DAMAGE OR DISRUPTION OF SERVICE/ACCESS. DAMAGE TO EXISTING STRUCTURES, SITE OR UTILITIES SHALL BE REPAIRED
AT THE CONTRACTORS EXPENSE.
3. UTILITIES SHOWN (IF ANY) ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL
MEASUREMENTS OR AVAILABLE RECORDS. THIS MAP IS NOT TO BE INTERPRETED AS SHOWING
EXACT LOCATIONS OR SHOWING ALL UTILITIES IN THE AREA. SIZE AND INVERTS OF EXISTING PIPE
TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO COMMENCING WORK ON NEW UTILITY
CONNECTIONS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR WORK IN ROW
AND ON ANY UTILITY CONNECTIONS OR ABANDONMENT PRIOR TO START OF CONSTRUCTION.
5. CONTRACTOR SHALL COORDINATE ANY UTILITY/SERVICE INTERRUPTIONS WITH OWNER AT LEAST
ONE WEEK IN ADVANCE. CONTRACTOR SHALL ALSO NOTIFY LOCAL UTILITY PROVIDER WHERE
APPLICABLE FOR OPERATION/DISCONNECTION OF PUBLIC OWNED EQUIPMENT.
6. CONTRACTOR SHALL ADEQUATELY PROTECT/SHORE ALL OPEN TRENCHES AS REQUIRED BY THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
7. EXISTING SEWER AND WATERMAIN LINES SHALL BE PROTECTED FROM DEBRIS AND
CONSTRUCTION.
8. WATERMAIN CONSTRUCTION IS TO BE INSPECTED BY UTILITY OWNER. PRESSURE TESTING AND
CHLORINATION OF THE WATERMAIN TO BE PERFORMED BY THE CONTRACTOR. WITNESSING OF
INSTALLATION, PRESSURIZATION, CHLORINATION AND GATHERING OF WATER SAMPLES WILL BE
PERFORMED BY THE UTILITY OWNER.
9. MAINTAIN A MINIMUM OF 5'-9" FROM FINISH GRADE TO CENTERLINE OF WATERMAIN PIPE. MAINTAIN
A MINIMUM OF 10'-0" CLEARANCE OF SANITARY SEWER MAIN.
10. HYDRANTS AND FITTINGS SHALL BE TIED AND BLOCKED. HYDRANTS AND VALVES SHALL BE
COORDINATED WITH UTILITY OWNER TO OPEN PER UTILITY OWNERS DEVELOPMENT STANDARDS.
11. CONTRACTOR SHALL BE REQUIRED TO CONTACT MISS DIG PRIOR TO STARTING ANY WORK.
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR WORK IN
ROW AS WELL AS NOTIFYING LOCAL UTILITY OWNERS OF WORK IF PERMITS ARE NOT REQUIRED.
12. LOCATION OF LATERALS TO BE DETERMINED IN THE FIELD AT THE DIRECTION OF THE OWNER.
AVOID CONFLICT WITH PROPOSED AND/OR EXISTING FACILITIES.
13. QUANTITIES SHOWN ARE FOR INFORMATION ONLY AND CONTRACTOR IS RESPONSIBLE FOR
CHECKING ALL LINES, LEVELS AND DIMENSIONS.
14. CONTRACTOR IS TO VERIFY EXISTING UTILITY ELEVATIONS PRIOR TO STARTING CONSTRUCTION.
15. CONTRACTORS TO REVIEW ALL SHEETS FOR RELATED INFORMATION.
16. LIST OF STANDARD ABBREVIATIONS -
"A.F.F" = ABOVE FINISHED FLOOR
"CB" = CATCH BASIN
"C/L" = CENTER LINE
"C.O." = CLEAN OUT (INCL. FROST SLEEVE)
"CY" = CUBIC YARDS
"D.I.W.M" = DUCTILE IRON WATER MAIN
"F.E.S" = FLARED END SECTION (CONC. ONLY)
"FFE/F.F.E" = FINISHED FLOOR ELEVATION
"F.V." = FIELD VERIFY
"INV." = INVERT
"LB" = LEACHING BASIN
"LF" = LINEAL FEET
"RCP" = REINFORCED CONCRETE PIPE
"SAN" = SANITARY
"SAN. MH" = SANITARY SEWER MANHOLE
"SF" = SQUARE FEET
"ST. MH" = STORM MANHOLE
"STM" = STORM
"SY" = SQUARE YARDS
"U.N.O" = UNLESS NOTED OTHERWISE
"YD" = YARD DRAIN
G G
STM STM
SAN SAN
E E
SANITARY SEWER
STORM SEWER
SPEC 33 31 11
SPEC 33 41 11
EX. GAS SERVICE
EX. STORM SEWER
EX. SANITARY SEWER
EX. ELECTRICAL
SYMBOL DESCRIPTION DETAIL/SPEC
WTR WTR EX. WATERMAIN
WATERMAIN SPEC 33 11 16
G G GAS SERVICE
E E ELECTRIC SERVICE
UTILITY LINETYPE LEGEND
SANITARY MANHOLE - REFER TO
UTILITY TAG FOR ADDITIONAL INFORMATION
C.O. SANITARY OR STORM CLEANOUT W/ FROST
SLEEVE
SPEC 33 05 13
CATCH BASIN OR STORM MANHOLE- REFER
TO UTILITY TAG FOR ADDITIONAL INFO
SYMBOL DESCRIPTION DETAIL/SPEC
FLARED END SECTION - STORM - REFER TO
UTILITY TAG FOR ADDITIONAL INFORMATION
WATERMAIN FITTINGS & APPURTENANCES -
REFER TO PLAN FOR SIZE SPEC 33 11 16
SPEC 33 05 13
SPEC 33 31 11
GAS METER LOCATION BY UTILITY PROVIDERM
SPEC 33 41 11
UTILITY SYMBOL LEGEND
4/C8.02
3/C8.02
1/C8.02
2/C8.02
HOLLAND CHARTER TOWNSHIP UTILITY NOTES:
1. HOLLAND CHARTER TOWNSHIP WATER SUPPLY SYSTEM, SANITARY SEWER AND SIDEWALK
STANDARD CONSTRUCTION REQUIREMENTS DATED JANUARY 2022 ARE TO BE FOLLOWED.
AVAILABLE AT www.hct.holland.mi.us.
2. ALL WATERMAIN TO BE INSTALLED PER HOLLAND CHARTER TOWNSHIP SPECIFICATIONS.
3. POLYWRAP SHALL BE INSTALLED ON ALL WATER MAIN.
4. ALL HYDRANT WEEP HOLES TO BE PLUGGED.
UTILITY NOTES:
1. ALL WORK SHALL COMPLY WITH APPLICABLE REQUIREMENTS OR THE LOCAL CODE, ORDINANCES
AND ACCIDENT/FIRE PREVENTION REGULATIONS.
2. PROTECT THE SITE, ADJACENT PROPERTY AND UTILITY SERVICES FROM DAMAGE OR DISRUPTION OF SERVICE/ACCESS. DAMAGE TO EXISTING STRUCTURES, SITE OR UTILITIES SHALL BE REPAIRED
AT THE CONTRACTORS EXPENSE.
3. UTILITIES SHOWN (IF ANY) ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL
MEASUREMENTS OR AVAILABLE RECORDS. THIS MAP IS NOT TO BE INTERPRETED AS SHOWING
EXACT LOCATIONS OR SHOWING ALL UTILITIES IN THE AREA. SIZE AND INVERTS OF EXISTING PIPE
TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO COMMENCING WORK ON NEW UTILITY
CONNECTIONS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR WORK IN ROW
AND ON ANY UTILITY CONNECTIONS OR ABANDONMENT PRIOR TO START OF CONSTRUCTION.
5. CONTRACTOR SHALL COORDINATE ANY UTILITY/SERVICE INTERRUPTIONS WITH OWNER AT LEAST
ONE WEEK IN ADVANCE. CONTRACTOR SHALL ALSO NOTIFY LOCAL UTILITY PROVIDER WHERE
APPLICABLE FOR OPERATION/DISCONNECTION OF PUBLIC OWNED EQUIPMENT.
6. CONTRACTOR SHALL ADEQUATELY PROTECT/SHORE ALL OPEN TRENCHES AS REQUIRED BY THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
7. EXISTING SEWER AND WATERMAIN LINES SHALL BE PROTECTED FROM DEBRIS AND
CONSTRUCTION.
8. WATERMAIN CONSTRUCTION IS TO BE INSPECTED BY UTILITY OWNER. PRESSURE TESTING AND
CHLORINATION OF THE WATERMAIN TO BE PERFORMED BY THE CONTRACTOR. WITNESSING OF
INSTALLATION, PRESSURIZATION, CHLORINATION AND GATHERING OF WATER SAMPLES WILL BE
PERFORMED BY THE UTILITY OWNER.
9. MAINTAIN A MINIMUM OF 5'-9" FROM FINISH GRADE TO CENTERLINE OF WATERMAIN PIPE. MAINTAIN
A MINIMUM OF 10'-0" CLEARANCE OF SANITARY SEWER MAIN.
10. HYDRANTS AND FITTINGS SHALL BE TIED AND BLOCKED. HYDRANTS AND VALVES SHALL BE
COORDINATED WITH UTILITY OWNER TO OPEN PER UTILITY OWNERS DEVELOPMENT STANDARDS.
11. CONTRACTOR SHALL BE REQUIRED TO CONTACT MISS DIG PRIOR TO STARTING ANY WORK.
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR WORK IN
ROW AS WELL AS NOTIFYING LOCAL UTILITY OWNERS OF WORK IF PERMITS ARE NOT REQUIRED.
12. LOCATION OF LATERALS TO BE DETERMINED IN THE FIELD AT THE DIRECTION OF THE OWNER.
AVOID CONFLICT WITH PROPOSED AND/OR EXISTING FACILITIES.
13. QUANTITIES SHOWN ARE FOR INFORMATION ONLY AND CONTRACTOR IS RESPONSIBLE FOR
CHECKING ALL LINES, LEVELS AND DIMENSIONS.
14. CONTRACTOR IS TO VERIFY EXISTING UTILITY ELEVATIONS PRIOR TO STARTING CONSTRUCTION.
15. CONTRACTORS TO REVIEW ALL SHEETS FOR RELATED INFORMATION.
16. LIST OF STANDARD ABBREVIATIONS -
"A.F.F" = ABOVE FINISHED FLOOR
"CB" = CATCH BASIN
"C/L" = CENTER LINE
"C.O." = CLEAN OUT (INCL. FROST SLEEVE)
"CY" = CUBIC YARDS
"D.I.W.M" = DUCTILE IRON WATER MAIN
"F.E.S" = FLARED END SECTION (CONC. ONLY)
"FFE/F.F.E" = FINISHED FLOOR ELEVATION
"F.V." = FIELD VERIFY
"INV." = INVERT
"LB" = LEACHING BASIN
"LF" = LINEAL FEET
"RCP" = REINFORCED CONCRETE PIPE
"SAN" = SANITARY
"SAN. MH" = SANITARY SEWER MANHOLE
"SF" = SQUARE FEET
"ST. MH" = STORM MANHOLE
"STM" = STORM
"SY" = SQUARE YARDS
"U.N.O" = UNLESS NOTED OTHERWISE
"YD" = YARD DRAIN
1” = 50' HORIZ
1” = 5' VERT
REMOVE & REROUTE UNDERGROUND
4" IRRIGATION LINE OUTSIDE OF
WATERMAIN EASEMENT BY OWNER
AutoCAD SHX Text
BENCHMARK ELEVATION 625.63 TOP OF N'LY FLANGE BOLT ON HYDRANT
AutoCAD SHX Text
W. 1/4 COR. SECTION 12 T5N, R16W
AutoCAD SHX Text
SPRUCES
AutoCAD SHX Text
SPRUCES
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
12"CAT.
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
8"TREE
AutoCAD SHX Text
GAS @ BLDG.
AutoCAD SHX Text
4"TREE
AutoCAD SHX Text
4"TREE
AutoCAD SHX Text
10"TREE
AutoCAD SHX Text
CO
AutoCAD SHX Text 12"M.
AutoCAD SHX Text
ELEC. BOX
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
SPRUCE TREES/ LANDSCAPING
AutoCAD SHX Text
8"TREES
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC. (TYP.)
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
SPRUCES
AutoCAD SHX Text
10"TREE
AutoCAD SHX Text
10"TREE
AutoCAD SHX Text
6"TREE
AutoCAD SHX Text
8"TREE
AutoCAD SHX Text
10"TREE
AutoCAD SHX Text
10"LOC.
AutoCAD SHX Text G
AutoCAD SHX Text
METAL
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BLOCK DUGOUT
AutoCAD SHX Text
STONEDUST
AutoCAD SHX Text
STONEDUST
AutoCAD SHX Text
BATTING CAGE
AutoCAD SHX Text
BLOCK DUGOUT
AutoCAD SHX Text
METAL
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
METAL
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text 10"M.
AutoCAD SHX Text 10"M.
AutoCAD SHX Text 12"M.
AutoCAD SHX Text 12"M.
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONC.
AutoCAD SHX Text T
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
CENTERLINE OF
AutoCAD SHX Text 152nd AVENUE
AutoCAD SHX Text
E-W 1/4 LINE, SEC. 12
AutoCAD SHX Text 50'
AutoCAD SHX Text R.O.W.
AutoCAD SHX Text
BICYCLE PATH AND WALKWAY EASEMENT PER LIBER 2622, PAGE 77
AutoCAD SHX Text
BICYCLE PATH AND WALKWAY EASEMENT PER LIBER 2622, PAGE 77
AutoCAD SHX Text
16.5' WIDE MICH. BELL TELE. CO. RIGHT OF WAY PER LIBER 720, PAGE 905
AutoCAD SHX Text PERMITTED ROUTE OF POLES & WIRES PER CONSUMERS POWER RIGHT OF WAY FOUND IN LIBER 500, PAGE 422
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text
14"TREE
AutoCAD SHX Text
14"MAPLE
AutoCAD SHX Text
10"OAK
AutoCAD SHX Text
16"BIRCH
AutoCAD SHX Text
8"MAPLE
AutoCAD SHX Text
12"TREE
AutoCAD SHX Text
8"TREE
AutoCAD SHX Text
12"BIRCH
AutoCAD SHX Text
10"OAK
AutoCAD SHX Text
18"MAPLE
AutoCAD SHX Text
12"MAPLE
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
PINES
AutoCAD SHX Text
PINES
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
RUBBERIZED TRACK
AutoCAD SHX Text
& W. LINE, SW 1/4, SEC. 12
AutoCAD SHX Text
16.5' WIDE MICH. BELL TELE. CO. RIGHT OF WAY PER LIBER 725, PAGE 325
AutoCAD SHX Text
GREENLY ST.
AutoCAD SHX Text
WEST OTTAWA HIGH SCHOOL SOUTH CAMPUS 2 STORY BRICK BUILDING
AutoCAD SHX Text
BRICK PIERS FOR BUS STOP CANOPY
AutoCAD SHX Text
BASKETBALL HOOP (TYP.)
AutoCAD SHX Text
FOOTBALL GOAL POST
AutoCAD SHX Text
GATE BOX ON CONC.
AutoCAD SHX Text
SIGN
AutoCAD SHX Text N00%%D17'23"E 2597.98'
AutoCAD SHX Text
CHAIN-LINK FENCE
AutoCAD SHX Text
FLAG POLE
AutoCAD SHX Text
MTL. BLDG.
AutoCAD SHX Text
GOALPOST
AutoCAD SHX Text
GATE POSTS
AutoCAD SHX Text
CLOCK POLE
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
RESPONSE BY: _MDN___ Triangle Associates, Inc. _____ Design Professional
1. No � See updated plan C.1.50. The west path is not included in contract. Fill small bit area at tie in point with compacted 21AA.
2. Irrigation re-route is by Owner via the allowance in this contract. Path modifications, if required, will be tracked on a T&M and are to be excluded from the bid.
3. Removed.
Triangle Associates, Inc. Signature: _____MDN_______________________________ Date: 9/6/24__________
Design Professional Signature: ___________________________________________ Date: __________________
DISTRIBUTION TO:
Field:
File: (project)
PRE BID RFI No.
Date Info. Needed By:
Date: 9/3/24
Subcontractor / Supplier:
Connan Inc
Requested By: Chris Thomas
Phone:
Fax:
West Ottawa Utility Relocation
Request for Information
BIDDING PURPOSES ONLY
Attachments:
Subject:
Reference Specification:
Reference Drawings:
Reference Detail:
Type of Question:
__ CIVIL __ STRUCTURAL __ ARCHITECTURAL __ MECHANICAL __ ELECTRICAL
Question:
1. Does the asphalt path located at the west tie in point of the watermain need to be replaced in this contract? Note: Item 8 under work category description only indicates replacement at dock lot.
2. The proposed rerouting of the irrigation line is crossing the existing path in two locations. Who will be responsible for removal and replacement of the asphalt path at those locations?
3. The topsoil that is required to be stripped for removal and replacement of utilities to be stockpiled on site or removed?
Subcontractor / Supplier Recommendation:
1. See revised sheet C1.50 � There will be no asphalt replacement. Area at loading dock to be put back with 21AA. Extent of concrete removal and replacement has now been defined. Concrete allowance is still to be carried in addition to the quantity defined. These walks will be needed for life safety and maintenance through the winter.
Triangle Associates, Inc. Signature: _____MDN_______________________________ Date: 9/6/24__________
Design Professional Signature: ___________________________________________ Date: __________________
DISTRIBUTION TO: Field:
File: (project)
PRE BID RFI No.
Date Info. Needed By:
Date: 9/3/24
Subcontractor / Supplier:
McCormick Sand, Inc.
Requested By: David P.
Vander Molen, P.E.
Phone:
Fax:
West Ottawa Utility Relocation
Request for Information
BIDDING PURPOSES ONLY
Attachments:
Subject:
Reference Specification:
Reference Drawings:
Reference Detail:
Type of Question:
__ CIVIL __ STRUCTURAL __ ARCHITECTURAL __ MECHANICAL __ ELECTRICAL
Question:
1. In regards to the pavements & sidewalk removals shown removed on sheet C1.50 for the utility work, what portions, if any, are required to be replaced with BP1? It appears that most or all of this hard surface will need to be removed for BP2.
PRE BID RFI No.
Date Info. Needed By:
Date: 9/3/24
Subcontractor / Supplier:
Site Work Solutions
Requested By: Brian Timmer
Phone:
Fax:
West Ottawa Utility Relocation
Request for Information
BIDDING PURPOSES ONLY
Attachments:
Subject:
Reference Specification:
Reference Drawings:
Reference Detail:
Type of Question:
__ CIVIL __ STRUCTURAL __ ARCHITECTURAL __ MECHANICAL __ ELECTRICAL
Question:
1. The plan shows removals beyond what is needed to install and remove utilities, it also doesn�t show removals on the asphalt walkway that would be needed to achieve installing the utilities. What are we to remove as far as concrete and asphalt? And what areas has to be replaced?
2. Does the (darkened) Score board north of the pole vault part of our removal?
3. Does the 14� tree(darkened), NW of bit path by field events part of this project�s removal?
4. Does the asphalt paved path(darkened) part of this project�s removal?
5. Item #8 requires us to replace ALL concrete back to original condition. Why are we removing concrete, just to replace it?
6. Item #8 also requires Asphalt replacement. How can we replace asphalt in December? Where is the loading dock?
7. Is the irrigation and communications going to be bored so as not to remove asphalt patch?
8. Item #11 requiring NFPA rules to flush mains, - can we talk about this as it means different things to different contractors. The excavator should not be doing the NFPA flush with the state fire marshal (also the practical bag test) this should be or has to be a fire protection contractor before hook up of the system to the FPS.
9. The topsoil we remove to install pipe, do we reinstall back? Or do we install sand to the surface?
What about in the field event area? Does the topsoil remain in stockpile or is this part of the spoils?
10. Item #16 Concrete Allowance We assume the work to strip topsoil, cut/trim grade and backfill is part of this allowance. If not provide area of concrete so we can add this costs to our base bid.
11. SW corner of site there is a concrete sidewalk that is darkened and appears to require removal along with a light pole base. Is this part of our removals?
12. Are the hydrant extensions part of this contract or are these going to be done by others?
13. The 8� water service and the 6� fire service do not show what is on the ends of them, we assume just caps mega lugged on ends? Or do they get 90 bends and risers to 1� above FF and then blind flanged?
14. 6� fire service valve is not a PIV?
1. See RFI #2 and revised sheet C1.50.
2. No. This was removed on revised sheet C1.50.
3. No.
4. No. This was removed on revised sheet C1.50
5. See RFI #2. Concrete removal and put back has been defined. This needs to be in place for life safety and maintenance over the winter.
6. There is no more asphalt replacement. See note for backfilling with compacted 21AA at the loading dock.
7. This will be tracked on a T&M as needed. Note the 10k allowance to be carried in this contract. No path removals are to be included at this time for irrigation.
8. There will be no FP contractor for this re-route and we will be hooking up new WM to the existing school. It will need to be flushed per NFPA by this trade to ensure no sand contaminates the existing system.
9. See RFI #2. Install sand at all trenches and remove topsoil from the site.
10. See #5 above and RFI #2. The allowance is in addition to the base bid concrete put back in the event the Owner wants to add walks once the re-route is complete.
11. No. This was removed on revised sheet C1.50.
12. Yes. To be included in this bid.
13. See revised sheet C4.20. Laterals were removed. These will be installed in BP02 after the building is constructed. This BP to include fittings, valves and caps for future extensions.
Triangle Associates, Inc. Signature: _____MDN_______________________________ Date: 9/6/24__________
Design Professional Signature: ___________________________________________ Date: __________________
DISTRIBUTION TO: Field:
File: (project)
| WOPS-BP1 Addendum-Master |
| 5-6244 Early Site Utility Package-Addendum 001 |
| 5-6244 C1.50 |
| 5-6244 C1.50 |
| 5-6244 C4.20 |
| 5-6244 C4.20 |
| RFI #1 |
| RFI #2 |
| RFI #3 |
File details come from the government source that posted it. Updated .