BOQ.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Concrete Floors Rehabilitation in GPO Building D, Washington DC
Solicitation number
040ADV-23-Q-0073
Issued by

About this file

This document contains a bill of quantities (BOQ) for concrete floor rehabilitation work in a GPO building in Washington DC under solicitation number 040ADV-23-Q-0073. The BOQ lists 10 line items including utilizing ultra high pressure water jetting to remove mastic adhesive, repairing cracks and spills in concrete, furnishing and installing 2 inches of rapid set leveling underlayment and epoxy primer, shot blasting and applying static dissipative coatings, and installing polyurethane enamel and epoxy binder resin. It provides the description, unit, quantity, rate per unit, and total amount for each item. The solicitation is for a fixed price contract to be awarded by the Government Publishing Office for concrete floor rehabilitation at its building in Washington DC.

View the file

Other files

File Type Posted
040ADV-23-Q-0073-C0001 final.pdf PDF
Attachment J.2 Past Performance Questionnaire.docx DOCX document
RFQ final 10 23 23.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

Bill of quantity 040ADV-23-Q-0073
NNDescriptionUnitQuantityRate per UnitTotal AmountNotes
1Utilizing UHP (Ultra High Pressure) Water Jetting - Remove Mastic Adhesive Under Existing Wood Flooring.sq. ft4200
2Repair Concrete (Cracks & Spills) as Necessarysq. ft2000
3Furnish & Install 2" of Rapid Set LevelFlor&High Strength Self-Leveling Floor Underlayment Cementsq. ft4200
4Polish Rapid Set TRU PC to Medium Reflectivity (800 grit) Finish.sq. ft4200Concrete slab finishes shall be true planes with no deviation exceeding 1/8 of an inch when tested with a 10-foot straightedge. The concrete shall be screened and floated to the required finish level with no coarse aggregate visible. After the moisture test has passed the required measures, floated surfaces shall be steel troweled to a smooth, even finish free from blemish including trowel marks.
5Concrete dryness test completion1
6Shot-Blast Rapid Set Level Flor and Install Rapid Set TXP Epoxy Primer and Full Sand Broadcastsq. ft5800
7After initial preparation has occurred, inspect the concrete for bug holes, voids, fins and other imperfections. Protrusions shall be ground smooth while voids shall be filled with a Sherwin-Williams system filler.sq. ft5800
8Installation of two-component, black, water-based epoxy primer for conductive or static dissipative coatings, slurry and mortar systems. Resuflor™ Aqua 3424. 5305 Static Dissipative Aggregatesq. ft5800
9Install two-component, static dissipative polyurethane enamel Resutile™ 4620E. Install two-component, high-solids epoxy binder resin. Resuflor™ 3564sq. ft5800
10Colorsq. ft5800
TOTAL

File details come from the government source that posted it. Updated .