CONTRACT DOCUMENTS
FOR
BRISTOL ROAD
REHABILITATION AND
CULVERT REPLACEMENT
CITY OF BURTON
BURTON, MI 48519
OHM Advisors
34000 Plymouth Road Livonia, Michigan 48150
4047-22-0060 September 14, 2023
TOC - 1 4047-22-0060
Bristol Road Rehabilitation and Culvert Replacements
City of Burton
4047-22-0060
TABLE OF CONTENTS
Page No.
Bidding Requirements
Advertisement for Bid ............................................................................................................. AB-1 Instructions to Bidders ........................................................................................................... IB-1-3 Supplemental Instructions to Bidders .................................................................................. SIB-1-3 Insurance Specifications ......................................................................................................... IS-1-4 Bid Form................................................................................................................................BF-1-8 Bid Guarantee .......................................................................................................................... BG-1 Bid Bond.............................................................................................................................. BB–1-3 Statement of Qualifications .................................................................................................. SQ-1-3 Subcontractor Listing ............................................................................................................ SL-1-2 Iran Linked Business Certification ......................................................................................... IL-1-2
Contract Forms
Agreement (Contract) .......................................................................................................... AG-1-6 Performance Bond .............................................................................................................. PFB-1-4 Payment Bond .................................................................................................................... PYB-1-3 Maintenance and Guarantee Bond ....................................................................................... MG-1-2 Contractor’s Affidavit ............................................................................................................. CA-1 Contractor’s Declaration ......................................................................................................... CD-1 Sworn Statement .................................................................................................................. SW-1-2
Conditions of the Contract
General Conditions ............................................................................................................. GC-1-20
General Specifications
General Specifications .......................................................................................................... GS-1-6
Technical Specifications
Method of Payment ................................................................................................................. MP-1 Supplemental Specifications ................................................................................................. SS-1-9
Appendices
Appendix A: Geotechnical Investigation
Appendix B: Special Provisions
September 14, 2023 AB - 1 4047-22-0060
ADVERTISEMENT FOR BID
City of Burton
September 14, 2023
Sealed Bids for Bristol Road Rehabilitation and Culvert Replacements will be received at the office of the City of Burton until 2:00 pm local time, on October 9, 2023, by the office of the City Clerk located at 4303 S. Center Road, Burton, MI 48519. The approximate quantities of major items of work involved are as follows:
1.05 miles of pavement rehabilitation along Bristol Road and Vassar Road including rubblizing and overlaying concrete sections, full depth pavement removal and replacement, HMA cold milling composite sections, pavement markings, signage, and three culvert replacements; one on
Bristol Road at Gilkey Creek within the road rehabilitation limits, one immediately downstream on Bellingham Ct., and one on Bristol Road west of the road rehabilitation limits and east of
Center Rd.
The issuing Office for the Bidding Documents is the office of the ENGINEER, Orchard, Hiltz, &
McCliment, Inc., d/b/a OHM Advisors. Bidding documents may be examined at the following locations after September 14, 2023, at 2:00 PM: ohm-advisors.com: OHM Advisors Plan Room
(Download Fee may apply); Dodge Construction Network, www.construction.com; Construct
Connect, www.constructconnect.com; the Construction Association of Michigan (CAM), www.cam-online.com; MITN Purchasing Group, Bidnetdirect.com; and City of Burton, 4303 S.
Center Road, Burton, MI 48519. Neither Owner nor ENGINEER will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bidders should direct correspondence to the ENGINEER.
Bid Security in the form of a Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid.
The OWNER reserves the right to accept any Bid, reject any Bid, or waive irregularities in Bids.
No Bid may be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receipt of the Bids.
No pre-bid meetings are scheduled for this project.
Rachael Boggs, City Clerk
05/01/00 IB - 1 0999-00-0202
INSTRUCTIONS TO BIDDERS
1. BIDS
A. Sealed Bids will be received as per Advertisement for Bids.
B. Bid Forms shall be submitted only on forms provided by the ENGINEER and shall be of the type specified in the Bid Form.
C. Bid Forms must be completed legibly in ink or by typewriter. In case of a discrepancy between the unit price and the extended amount, the unit price shown shall govern. Illegibility of any figure or word in the Bid Form may be sufficient cause for rejection of the Bid by the OWNER.
D. Bid Forms shall be enclosed in sealed envelopes marked with the name of the project and Bidder and shall be delivered to the OWNER at the place specified in the Advertisement for Bids on or before the time specified in the Advertisement for Bids.
E. Bid Forms shall be made in full conformity with all the conditions set forth in the drawings and in these specifications
2. NAME AND STATUS OF BIDDER
A. The name and legal status of Bidder, that is, as a corporation, partnership or individual, shall be stated in the Bid Form.
B. Anyone signing a Bid Form as an agent of another or others must submit with the Bid Form legal evidence of his authority to do so.
C. The place of residence of each Bidder, or the office address in the case of a firm or company, with county and state, must be given after his signature. Phone and fax numbers are also required.
3. BID SECURITY
Each Bid must be in the form requested in the Advertisement for Bid. The CONTRACTOR shall complete and sign the Bid Guarantee form (page BG-1). If a Bid Bond is requested, it must be from a Treasury Listed surety company licensed to do business in the state of Michigan in the amount as stated in the Advertisement for Bid, payable to the OWNER as a guarantee on the part of the Bidder that he will, if called upon, enter into the attached Agreement.
4. BONDS
A. CONTRACTOR will be required to furnish performance and payment bonds each equal to one-hundred percent (100%) of the Contract Sum. The bonds shall be the OWNER's guarantee of the faithful performance and payment of all the CONTRACTOR's obligations under the Agreement. These bonds shall remain in effect for the period as stated in each bond’s provisions.
B. Maintenance and Guarantee Bonds shall be required.
5. INSPECTION OF SITE
A. Before submitting a Bid Form, each Bidder shall personally inspect the site of the proposed work to arrive at a clear understanding of the conditions under which the work is to be done.
B. Each Bidder shall be held to have compared the premises with the Bid documents and to have satisfied himself as to conditions of the premises, existing construction and any other conditions
05/01/00 IB - 2 0999-00-0202
affecting the carrying out of the work before delivery of his Bid Form.
C. No allowance or extra consideration on behalf of the CONTRACTOR will subsequently be allowed by reason of error or oversight on the part of the CONTRACTOR or on account of interference by the OWNER's or other CONTRACTOR's activities.
6. TIME OF COMPLETION
Time of completion will be as stated in the Agreement.
7. EXPLANATION TO BIDDERS BY
ADDENDA
A. Neither the OWNER nor the ENGINEER will give verbal answers to inquiries regarding the meaning or intent of the Contract Documents prior to award of the Contract. Any verbal statements regarding same by any person prior to the award shall be without legal effect.
B. Explanations desired by Bidders shall be requested of the ENGINEER in writing and, if explanations are necessary, a reply will be made in the form of an addendum, a copy of which will be forwarded to each Bidder of Record whose work is affected.
C. Addenda issued to Bidders prior to date of receipt of Bid Forms shall become a part of the Contract Documents, and all Bid Forms shall include the work described in the Addenda.
D. No inquiry received within four (4) business days of the date fixed for opening of the Bids will be given consideration.
E. Failure of the ENGINEER to send, or the Bidder to receive, any such interpretations shall not relieve the
Bidder from obligation under his Bid as submitted.
F. Bidder of Record is defined as an individual, partnership or corporation having purchased a set of Bid Documents from the ENGINEER.
8. EXPERIENCE AND FINANCIAL
STATEMENT
A. It is the intention of the OWNER to award the Contract to a contractor fully capable, both financially and as regards to experience to perform and complete the work in a satisfactory manner. Each Bidder must complete the Statement of Qualifications, which follows the Bid Form. If required by the OWNER, each Bidder under consideration may be required to submit additional evidence of qualifications.
B. Each Bidder under consideration must be able to demonstrate that the Bidder has successfully completed projects of a similar nature and scope within the last two years.
9. SUBCONTRACTORS
Bidder shall submit to OWNER a list of all subcontractors and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of work as to which such identification is so required. If requested by the OWNER, the apparent successful Bidder and any other Bidder so requested, will, within ten (10) days after the day of Bid opening, submit a Statement of Qualifications with pertinent information as to similar projects and other evidence of qualification for each such subcontractor, person and organization if requested by the OWNER.If the OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed subcontractor, other person or organization, OWNER may request the apparent successful Bidder to submit an acceptable
05/01/00 IB - 3 0999-00-0202
substitute without an increase in Bid price. If the apparent successful Bidder declines to make any such substitutions, the Contract shall not be awarded to such Bidder, but his declining to make any such substitution will not constitute grounds for sacrificing his Bid Security. Any subcontractor, other person or organization so listed and to whom the OWNER or ENGINEER does not make written objection prior to signing of the Agreement will be deemed acceptable to the OWNER and ENGINEER.
10. AWARD OF CONTRACT
The OWNER reserves the right to accept any Bid, to reject any or all Bids, and to waive defects or irregularities in any Bid for any reason or no reason at all. The OWNER also reserves the right to award some, none, or all of the Contract.
11. LIQUIDATED
DAMAGES/INCENTIVES
A. If the CONTRACTOR fails to complete all the work within the time stipulated, he will be assessed liquidated damages as set forth in the Agreement.
B. If set forth in the Agreement, incentives will be paid by OWNER to CONTRACTOR at the rate specified in the Agreement, when the work is completed prior to the time specified in the Agreement.
12. TAXES
The Bidder shall include in the base Bid and shall pay all applicable federal, state and local taxes of whatever character and description.
End of Section
4047-22-0060 SIB - 1 1
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
These Supplemental Instructions to Bidders (SIB) amend or supplement the Instructions to
Bidders. All provisions that are not so amended or supplemented remain in full force and effect.
A. Time of Completion & Construction Schedule
Prior to the execution of the Contract, the CONTRACTOR shall submit an outline of his proposed order of work and indicate dates for completing the major items of work. Major items shall be considered to be installation of roadway, culverts, headwalls, driveways, and shoulder. This schedule, when approved by the OWNER, shall become part of the Contract.
A pre-construction meeting shall be arranged prior to the start of work. The CONTRACTOR shall bring a tentative schedule to the pre-construction meeting. At this time, all Contract requirements shall be reviewed.
It is anticipated that construction of the Bristol Road Rehabilitation will begin on March 18, 2024. The CONTRACTOR has the option to begin the culvert installation(s) prior to the start of road rehabilitation work. Culvert installation(s) can begin as soon as the Notice to Proceed is issued by the OWNER and after the pre-construction meeting, pending permits. If this option is selected, the CONTRACTOR shall provide hard surfacing per the plan over the
Bristol Road culvert road crossings before seasonal shutdown of asphalt plants. The
OWNER may accept a temporary aggregate surface for the Bellingham culvert crossing through the winter months if CONTRACTOR commits to maintaining said aggregate until hard surfacing per plan can be completed. If this option is selected, it is anticipated that all restoration items will be completed by the CONTRACTOR in the Spring of 2024. Further, the OWNER may authorize a full road closure not to exceed a period of one week to facilitate the West Bristol Culvert installation upon request from the CONTRACTOR.
The CONTRACTOR shall complete the proposed work, including final tests thereof, in order to have the project finished as of the substantial completion date. Final cleanup and restoration shall be finished by the project completion date, unless otherwise directed in writing by the OWNER or its ENGINEER.
Summary of anticipated dates:
Contract Award ................................................... October 16, 2023
Notice to Proceed ................................................ October 26, 2023
Construction Start Date (Culverts) ...................... November 1, 2023
Construction Start Date (Road Rehabilitation) .... March 18, 2024
Substantial Completion Date (open to traffic)..... June 23, 2024
Project Completion .............................................. July 24, 2024
All requests for extensions of time shall be submitted in writing in accordance with Section
15 of the General Conditions. Such requests shall:
4047-22-0060 SIB - 2 2
1. Detail the reason for the request.
2. Provide a realistic revised completion date.
3. Indicate any other areas that may be impacted by such an extension.
The CONTRACTOR shall request a deadline extension as soon as it has become apparent the completion date is unreasonable. In no case will a request be considered if it is submitted after the originally required completion date has passed.
B. Geotechnical Data
Geotechnical data has been obtained for this project and attached in Appendix A.
C. Project Financial Information
Project is funded by the City of Burton.
D. Permits
The following permits will be required for project construction. The CONTRACTOR is required to comply with all terms and conditions of the permit as incidental to the unit prices bid and no extra compensation will be allowed.
a. Permitting Agency: __Genesee County Drain Commission
Contact at Agency: __Enayet Ullah__
Phone number: 810-732-7870
Permit Fee: N/A
Bond Amount (if applicable): N/A
Date of Application: 01/31/2023
Person Responsible for Acquiring the Permit: __N/A
Date Permit issued if already in hand:
b. Permitting Agency: EGLE
Contact at Agency: John Skubinna_
Phone number: 517-256-1469
Permit Fee: N/A
Bond Amount (if applicable): N/A
Date of Application: 12/12/2022
Person Responsible for Acquiring the Permit: N/A
4047-22-0060 SIB - 3 3
Date Permit issued if already in hand: 04/17/2023
Application has been made by the Engineer for the permits identified above. Unless otherwise indicated, the CONTRACTOR must secure the permits prior to the start of construction and shall be responsible for all associated fees, deposits, bonds, proof of insurance, etc. The Contractor shall also be responsible for arranging for inspection by the governing agencies.
Work cannot proceed until all permits are obtained.
E. Pre-bid Meeting:
No pre-bid meetings are scheduled for this project.
05/01/00 IS - 1 0999-00-0202
INSURANCE SPECIFICATIONS
1. LIABILITY OF CONTRACTOR
The Contractor shall take all responsibility for the work and shall provide barricades, watchmen and lights, and take all precautions for preventing injuries to persons and property on or about the work; shall bear all losses resulting to him on account of the amount or character of the work or because the nature of the ground in which the work is done is different from what was estimated or expected, or on account of weather, floods, elements or other cause; and shall assume defense of, indemnify and save harmless the party of the first part and its individual officers and agents from all claims relating to labor, equipment and materials furnished for the work, inventions, patents and patent rights used in doing the work, also to injuries to any person or property received or sustained by or from the CONTRACTOR, his agents or employees.
The mention of any specific duty or liability of the CONTRACTOR in any part of the specifications shall not be construed as a limitation or restriction upon any general liability or duty imposed upon the CONTRACTOR by the specifications.
INDEMNIFICATION - HOLD HARMLESS
AGREEMENT
The CONTRACTOR agrees to indemnify, defend, and save harmless the OWNER and ENGINEER, their consultants, agents, and employees, from and against all loss or expense (including costs and attorney's fees) by reason of liability imposed by law upon the OWNER and ENGINEER, their consultants, agents, and employees for damages to property and for damages because of bodily injury, including death at any time resulting therefrom, arising out of or in consequence of the performance of this work, whether such injuries to persons or damage to property is due, or claimed to be due, to the negligence of the CONTRACTOR, his subcontractors, the OWNER, the ENGINEER, and their consultants, agents, and employees, except only such injury or damage as shall have been occasioned by the sole negligence of the
OWNER, the ENGINEER, and their agents and/or consultants.
COMPOSITION OF THE CONTRACTOR
If the CONTRACTOR hereunder is comprised of more than one legal entity, each such entity shall be jointly and severally liable hereunder.
2. INSURANCE
2.1. Insurance Required of the CONTRACTOR:
Prior to commencement of work, the CONTRACTOR shall purchase and maintain during the term of the project such insurance as will protect him, the OWNER(s), and Orchard, Hiltz & McCliment, Inc., Consulting Engineers, from claims arising out of the work described in this Contract and performed by the CONTRACTOR, subcontractor(s) or sub-subcontractor(s) consisting of:
2.1.1. Workers' Compensation Insurance
including Employer's Liability to cover employee injuries or disease compensable under the Workers' Compensation Statutes of the states in which work is conducted under this Contract; disability benefit laws, if any;
or Federal compensation acts such as U.S. Longshoremen or Harbor Workers', Maritime Employment, or Railroad Compensation Act(s), if applicable. Self-insurance plans approved by the regulatory authorities in the state in which work on this project is performed are acceptable.
2.1.2. A Comprehensive General Liability
policy to cover bodily injury to persons other than employees and for damage to tangible property including loss of use thereof, including the following exposures:
A. All premises and operations.
B. Explosion, collapse and underground damage.
05/01/00 IS - 2 0999-00-0202
C. Contractor's Protective coverage for independent contractors or subcontractors employed by him.
D. Contractual Liability for the obligation assumed in the Indemnification or Hold Harmless agreement found under Part l of this Section.
E. The usual Personal Injury Liability endorsement with no exclusions pertaining to employment.
F. Products and Completed Operations coverage. This coverage shall extend through the contract guarantee period.
2.1.3. A Comprehensive Automobile
Liability policy to cover bodily injury and property damage arising out of the ownership, maintenance or use of any motor vehicle, including owned, non-owned and hired vehicles. In light of the standard policy provisions concerning
(a) loading and unloading, and b) definitions pertaining to motor vehicles licensed for road use vs. unlicensed or self-propelled construction equipment, it is strongly recommended that Comprehensive General Liability and Comprehensive Auto Liability be written by the same insurance carrier, though not necessarily in one policy.
2.1.4. CONTRACTOR will purchase for
the OWNER an Owner's Protective Liability policy to protect the OWNER;
the ENGINEER (Orchard, Hiltz & McCliment, Inc.); their consultants, agents, employees and such public corporations in whose jurisdiction the work is located for their contingent liability for work performed by the CONTRACTOR, the subcontractor(s) or the sub-subcontractor(s) under this Contract.
2.1.5. CONTRACTOR shall purchase a
Builder's Risk-Installation Floater in a form acceptable to the OWNER covering property of the project for the full cost of replacement as of the time of any loss which shall include, as named insureds, (a) the CONTRACTOR, (b) all subcontractors, (c) all sub-subcontractors, (d) the OWNER, and Orchard, Hiltz & McCliment, Inc., Consulting Engineers, as their respective interests may prove to be at the time of loss, covering insurable property which is the subject of this Contract, whether in place, stored at the job site, stored elsewhere, or in transit at the risk of the insured(s). Coverage shall be effected on an "All Risk" form, including but not limited to the perils of fire, wind, collapse, vandalism, theft and earthquake, with exclusions normal to the cover. The CONTRACTOR may arrange for such deductibles as he deems to be within his ability to self-assume, but he will be held solely responsible for the amount of such deductible and for any co-insurance penalties. Any insured loss shall be adjusted with the OWNER and CONTRACTOR and paid to the OWNER and CONTRACTOR as Trustee for the other insureds.
2.1.6. Umbrella or Excess Liability
The OWNER or its representative may, for certain projects, require limits higher than those stated in paragraph. 2.2 that follows. CONTRACTOR is granted the option of arranging coverage under a single policy for the full limit required or by a combination of underlying policies with the balance provided by an Excess or Umbrella Liability policy equal to the total limit(s) requested. Umbrella or Excess policy wording shall be at least as broad as the primary or underlying policy(ies) and shall apply both to the CONTRACTOR’s general liability and to his automobile liability insurance.
2.1.7. Railroad Protective Liability
Where such an exposure exists, the CONTRACTOR will provide coverage in the use of each railroad company having jurisdiction over rights-of-way across which work under the Contract is to be performed. The form of policy and limits
05/01/00 IS - 3 0999-00-0202
of liability shall be determined by the railroad company(ies) involved.
2.2. Limits of Liability
The required limits of liability for insurance coverages requested in Section 2.1 shall be not less than the following:
2.2.1. Worker's Compensation
Coverage A Compensation Statutory Coverage B Employer's Liability $100,000
2.2.2. Comprehensive General Liability
Bodily Injury - Each Occurrence $500,000 Bodily Injury - Aggregate (Completed Operations) $500,000 Property Damage - Each Occurrence $100,000 Property Damage - Aggregate $500,000 or combined single limit $1,000,000
2.2.3. Comprehensive Automobile
Liability
Bodily Injury $500,000 Property Damage $200,000 or combined single limit $1,000,000
2.2.4. Owner's Protective
Bodily Injury- Each Occurrence $1,000,000 Property Damage- Each Occurrence $250,000 Property Damage- Aggregate $500,000 or combined single limit $1,500,000
2.2.5. Builder's Risk-Installation Floater
Cost to replace at time of loss
2.2.6. Umbrella or Excess Liability
$2,000,000
2.3. Insurance - Other Requirements
2.3.1. Notice of Cancellation or Intent Not
to Renew
Policies will be endorsed to provide that at least thirty (30) days written notice shall be given to the OWNER and the ENGINEER of cancellation or of intent not to renew.
2.3.2. Evidence of Coverage
Prior to the commencement of work, the CONTRACTOR shall furnish to the OWNER, Certificates of Insurance in force on the Owner's Form of Certificate provided. Other forms of certificate are acceptable only if (1) they include all items prescribed in the Owner's Form of Certificate, including agreement to cancellation provisions outlined in Paragraph 2.3.1 above, and (2) they have the written approval of the OWNER and ENGINEER. The OWNER reserves the right to request complete copies of the policies if deemed necessary to ascertain details of coverage not provided by the certificates. Such policy copies shall be "Originally Signed Copies," and so designated.
05/01/00 IS - 4 0999-00-0202
A. Insurance Required for the
CONTRACTOR
i. Workers' Compensation and Employers' Liability Comprehensive General Liability, including:
a. All premises and operations.
b. Explosion, collapse, and underground damage.
c. Contractors' Protective.
d. Contractual Liability for obligations assumed in the Indemnification-Hold Harmless agreement of this contract.
e. Personal Injury Liability.
f. Products and Completed Operations.
ii. Comprehensive Automobile Liability, including owned, non-owned, and hired vehicles.
iii. Umbrella or Excess Liability.
B. Insurance Required for the OWNER
Owners' Protective Liability which names as insured(s) the OWNER; the ENGINEER, Orchard, Hiltz & McCliment, Inc.; their consultants, agents, employees and such public corporations in whose jurisdiction the work is located.
C. Insurance Required for the CONTRACTOR and the OWNER
Builders Risk-Installation Floater which names as insured(s) the OWNER; the ENGINEER, Orchard, Hiltz & McCliment, Inc.; their consultants, agents and employees; the CONTRACTOR and all subcontractors.
2.3.3. Qualification of Insurers
In order to determine the financial strength and reputation of insurance carriers, all companies providing coverages required shall be licensed or approved by the Office of Financial and Insurance Services of the State of Michigan. The company shall also have a financial rating not lower than X and a policyholder's service rating no lower than A as listed in A.M. Best's Key Rating Guide, current edition.
Companies with ratings lower than A:X will be acceptable only upon the written consent of the OWNER
BF - 1 4047-22-0060
BID FORM
City of Burton
THIS BID IS SUBMITTED TO:
City of Burton
4303 S. Center Road
Burton, MI 48519
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
Bidder accepts all of the terms and conditions of the Advertisement to Bid, Instructions to Bidders and Supplemental Instructions to Bidders.
In submitting this Bid, Bidder represents, as set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.
Addenda No. Addenda Date Signature
B. Bidder has visited the site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplemental Instructions to Bidders, and (2) reports and drawings of a hazardous environmental condition, if any, which has been identified in the Supplemental Instructions to Bidders.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be
BF - 2 4047-22-0060
employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, exploration, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
CATEGORY 1 - Bristol Road Rehab and Culvert space
2 Mobilization, Max 0.60 LSUM $ $
3 Culv, Rem, Less than 24 inch 17.00 Ea $ $
4 Culv, Rem, 24 inch to 48 inch 2.00 Ea $ $
5 Culv, Other than Pipe, Rem 1.00 Ea $ $
6 Guardrail, Rem 100.00 Ft $ $
7 Exploratory Investigation, Vertical 25.00 Ft $ $
8 Pavt, Rem, Modified 3369.00 Syd $ $
9 Ditch Cleanout 51.00 Sta $ $
10 Embankment, CIP 422.00 Cyd $ $
11 Excavation, Earth 1336.00 Cyd $ $
12 Flowable Fill, Non-Structural 72.00 Cyd $ $
13 Subgrade Undercutting, Type II, Modified 250.00 Cyd $ $
14 Backfill, Structure, CIP 475.00 Cyd $ $
15 Aggregate 44.00 Cyd $ $
16 Excavation, Fdn 646.00 Cyd $ $
17 Erosion Control, Check Dam, Stone 300.00 Ft $ $
18 Erosion Control, Inlet Protection, Fabric Drop 3.00 Ea $ $
19 Erosion Control, Silt Fence 3500.00 Ft $ $
20 Erosion Control, Turbidity Curtain, Deep 18.00 Ft $ $
21 Project Cleanup 1.00 LSUM $ $
22 Aggregate Base 1801.00 Ton $ $
23 Aggregate, Filler 1583.00 Ton $ $
24 Pavt, Rubblize, Modified 12776.00 Syd $ $
25 Material, Surplus and Unsuitable, Rem, LM 50.00 Cyd $ $
26 Maintenance Gravel 400.00 Ton $ $
27 Aggregate Residential Drive Approach, Modified 187.00 Ton $ $
28 Shoulder, Cl II, Modified 2603.00 Ton $ $
29 Geotextile, Separator, Non-Woven 18.00 Syd $ $
30 Culv End Sect, Conc, 12 inch 1.00 Ea $ $
31 Culv, Cl F, CSP, 12 inch 367.00 Ft $ $
32 Culv, Cl F, CSP, 15 inch 24.00 Ft $ $
33 Culv, Cl F, CSP, 18 inch 58.00 Ft $ $
34 Culv, Reinf Conc Ellipi, HE Cl III, 97 inch by 151 inch 64.00 Ft $ $
35 Culvert Cleanout, Less than 24 inch, Special 10.00 Ea $ $
36 Sewer, Cl IV, 12 inch, Tr Det B 11.00 Ft $ $
37 Sewer, Cl IV, 18 inch, Tr Det B 80.00 Ft $ $
BF-3
MWhite Text Box
38 Sewer, Cl IV, 24 inch, Tr Det B 84.00 Ft $ $
39 Dr Structure Cover, Adj, Case 1 1.00 Ea $ $
40 Dr Structure Cover, Adj, Case 2 1.00 Ea $ $
41 Dr Structure Cover, Type B 1.00 Ea $ $
42 Dr Structure Cover, Type G 1.00 Ea $ $
43 Dr Structure, 48 inch dia 2.00 Ea $ $
44 Pavt, Cleaning 1.00 LSUM $ $
45 HMA Surface, Rem 829.00 Syd $ $
46 Pavt for Butt Joints, Rem 50.00 Syd $ $
47 Pavt Joint and Crack Repr, Det 7 200.00 Ft $ $
48 Pavt Joint and Crack Repr, Det 8 50.00 Ft $ $
49 Hand Patching 15.00 Ton $ $
50 HMA, 4EML 3390.00 Ton $ $
51 HMA, 5EML 1464.00 Ton $ $
52 HMA Residential Drive Approach, Modified 295.00 Ton $ $
53 Reinforcement, Steel, Epoxy Coated 601.00 Lb $ $
54 Conc, Grade 3500 10.00 Cyd $ $
55 Block Retaining Wall 416.00 Sft $ $
56 Adhesive Anchoring of Vertical Bar, 3/4 inch 76.00 Ea $ $
57 Concrete Residential Drive Approach, Modified 314.00 Syd $ $
58 Post, Mailbox, Remove and Reset 77.00 Ea $ $
59 Fence, Chain Link, 48 Inch, Modified 100.00 Ft $ $
60 Post, Steel, 3 pound 299.00 Ft $ $
61 Sign, Type III, Rem 15.00 Ea $ $
62 Sign, Type IIIA 47.00 Sft $ $
63 Sign, Type IIIB 38.00 Sft $ $
64 Ground Mtd Sign Support, Rem 19.00 Ea $ $
65 Pavt Mrkg, Ovly Cold Plastic, 24 inch, Stop Bar 51.00 Ft $ $
66 Pavt Mrkg, Ovly Cold Plastic, Only 1.00 Ea $ $
67 Pavt Mrkg, Ovly Cold Plastic, Rt Turn Arrow Sym 1.00 Ea $ $
68 Pavt Mrkg, Waterborne, 4 inch, White 10934.00 Ft $ $
69 Pavt Mrkg, Waterborne, 4 inch, Yellow 3094.00 Ft $ $
70 Pavt Mrkg, Waterborne, 2nd Application, 4 inch, White 10934.00 Ft $ $
71 Pavt Mrkg, Waterborne, 2nd Application, 4 inch, Yellow 3094.00 Ft $ $
BF-4
72 Barricade, Type III, High Intensity, Double Sided, Lighted, Furn 25.00 Ea $ $
73 Barricade, Type III, High Intensity, Double Sided, Lighted, Oper 25.00 Ea $ $
74 Channelizing Device, 42 inch, Fluorescent, Furn 125.00 Ea $ $
75 Channelizing Device, 42 inch, Fluorescent, Oper 125.00 Ea $ $
76 Dust Palliative, Applied 10.00 Ton $ $
77 Minor Traf Devices 0.60 LSUM $ $
78 Pavt Mrkg, Wet Reflective, Type NR, Paint, 4 inch, Yellow, Temp2500.00 Ft $ $
79 Sign Cover 25.00 Ea $ $
80 Sign, Type B, Temp, Prismatic, Furn 639.00 Sft $ $
81 Sign, Type B, Temp, Prismatic, Oper 639.00 Sft $ $
82 Sign, Type B, Temp, Prismatic, Spec, Furn 108.00 Sft $ $
83 Sign, Type B, Temp, Prismatic, Spec, Oper 108.00 Sft $ $
84 Traf Regulator Control 0.60 LSUM $ $
85 Riprap, Plain 198.00 Syd $ $
86 Turf Establishment, Performance-No Rye, Special 10000.00 Syd $ $
87 Wetland Seed Mix 400.00 Syd $ $
88 Monument Box 3.00 Ea $ $
89 Monument Preservation 3.00 Ea $ $
90 Protect Corners 5.00 Ea $ $
91 Sanitary Structure Cover, Adj, Case 1 1.00 Ea $ $
92 Sanitary Structure Cover, Adj, Case 2 1.00 Ea $ $
SUBTOTAL FOR ITEMS 1-92 $
SHOW
CATEGORY 2 - Bellingham Culvert SHOW
93 Mobilization, Max 0.10 LSUM $ $
94 Culv, Rem, Less than 24 inch 4.00 Ea $ $
95 Culv, Other than Pipe, Rem 1.00 Ea $ $
96 Fence, Rem 25.00 Ft $ $
97 Guardrail, Rem 68.00 Ft $ $
98 Pavt, Rem, Modified 125.00 Syd $ $
99 Embankment, CIP 40.00 Cyd $ $
100 Excavation, Earth 30.00 Cyd $ $
101 Flowable Fill, Non-Structural 72.00 Cyd $ $
102 Backfill, Structure, CIP 475.00 Cyd $ $
103 Aggregate 44.00 Cyd $ $
104 Excavation, Fdn 646.00 Cyd $ $
105 Erosion Control, Inlet Protection, Fabric Drop 2.00 Ea $ $
106 Erosion Control, Turbidity Curtain, Deep 40.00 Ft $ $
107 Aggregate Base 92.00 Ton $ $
108 Maintenance Gravel 10.00 Ton $ $
109 Aggregate Residential Drive Approach, Modified 9.00 Ton $ $
110 Geotextile, Separator, Non-Woven 18.00 Syd $ $
111 Culv End Sect, 12 inch 4.00 Ea $ $
112 Culv End Sect, Footing 4.00 Ea $ $
113 Culv, Reinf Conc Ellipi, HE Cl III, 97 inch by 151 inch 64.00 Ft $ $
114 Sewer, Cl IV, 12 inch, Tr Det B 101.00 Ft $ $
115 Dr Structure Cover, Type E 2.00 Ea $ $
116 Dr Structure, 48 inch dia 2.00 Ea $ $
117 HMA, 4EML 30.00 Ton $ $
BF-5
MWhite Text Box
Snapshot
118 HMA, 5EML 13.00 Ton $ $
119 Reinforcement, Steel, Epoxy Coated 783.00 Lb $ $
120 Conc, Grade 3500 16.00 Cyd $ $
121 Block Retaining Wall 286.00 Sft $ $
122 Adhesive Anchoring of Vertical Bar, 3/4 inch 76.00 Ea $ $
123 Post, Mailbox, Remove and Reset 1.00 Ea $ $
124 Fence, Chain Link, 60 inch 25.00 Ft $ $
125 Fence, Chain Link, 48 Inch, Modified 78.00 Ft $ $
126 Barricade, Type III, High Intensity, Double Sided, Lighted, Furn 10.00 Ea $ $
127 Barricade, Type III, High Intensity, Double Sided, Lighted, Oper 10.00 Ea $ $
128 Channelizing Device, 42 inch, Fluorescent, Furn 25.00 Ea $ $
129 Channelizing Device, 42 inch, Fluorescent, Oper 25.00 Ea $ $
130 Minor Traf Devices 0.10 LSUM $ $
131 Sign, Type B, Temp, Prismatic, Furn 50.00 Sft $ $
132 Sign, Type B, Temp, Prismatic, Oper 50.00 Sft $ $
133 Traf Regulator Control 0.10 LSUM $ $
SUBTOTAL FOR Bellingham Culvert (Items 93-133) $
SHOW
CATEGORY 3 - West Bristol Culvert SHOW
134 Mobilization, Max 0.30 LSUM $ $
135 Sewer, Rem, 24 inch to 48 inch 75.00 Ft $ $
136 Curb and Gutter, Rem 6.00 Ft $ $
137 Pavt, Rem, Modified 187.00 Syd $ $
138 Erosion Control, Filter Bag 2.00 Ea $ $
139 Erosion Control, Inlet Protection, Fabric Drop 1.00 Ea $ $
140 Aggregate Base 96.00 Ton $ $
141 Shoulder, Cl II, Modified 3.00 Ton $ $
142 Culv End Sect, Conc, 48 inch 1.00 Ea $ $
143 Culv End Sect, Footing 1.00 Ea $ $
144 Sewer, Cl IV, 48 inch, Tr Det B 84.00 Ft $ $
145 Trench Undercut and Backfill 18.00 Cyd $ $
146 Dr Structure, Tap, 48 inch 1.00 Ea $ $
147 Hand Patching 70.00 Ton $ $
148 HMA Approach 10.00 Ton $ $
149 Conc Pavt, Misc, Nonreinf, 8 inch 188.00 Syd $ $
150 Curb and Gutter, Conc, Det F4 6.00 Ft $ $
151 Barricade, Type III, High Intensity, Double Sided, Lighted, Furn 10.00 Ea $ $
152 Barricade, Type III, High Intensity, Double Sided, Lighted, Oper 10.00 Ea $ $
153 Channelizing Device, 42 inch, Fluorescent, Furn 75.00 Ea $ $
154 Channelizing Device, 42 inch, Fluorescent, Oper 75.00 Ea $ $
155 Minor Traf Devices 0.30 LSUM $ $
156 Sign, Type B, Temp, Prismatic, Furn 355.00 Sft $ $
157 Sign, Type B, Temp, Prismatic, Oper 355.00 Sft $ $
158 Sign, Type B, Temp, Prismatic, Spec, Furn 576.00 Sft $ $
159 Sign, Type B, Temp, Prismatic, Spec, Oper 576.00 Sft $ $
160 Traf Regulator Control 0.30 LSUM $ $
161 Riprap, Plain 4.00 Syd $ $
SUBTOTAL FOR CATEGORY 3 - West Bristol Culvert (Items 134-161) $ show
Total Bid Amount (Items 1-161) $
BF-6
BF - 4 4047-22-0060
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price bid items will be based on actual quantities constructed in accordance with the Contract Documents.
Bidder agrees that the road rehabilitation Work will be Substantially Complete on or before June
23, 2024, and completed and ready for final payment in accordance with the General Conditions on or before July 24, 2024.
The following documents are attached to and made a condition of this Bid:
• Bid Guarantee (circle one): Bid Bond
• Statement of Qualifications
• Subcontractor Listing
• Legal Status of Bidder
SUBMITTED on , 20
State Contractor License No. . (If applicable)
If Bidder is:
An Individual
Name (typed or printed):
By: (SEAL)
(Individual’s signature)
Doing business as:
Business address:
Phone No.: FAX No.:
Snapshot
BF - 5 4047-22-0060
A Partnership
Partnership Name: (SEAL)
By:
(Signature of general partner – attach evidence of authority to sign)
Name (typed or printed):
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
By:
(Signature – attach evidence of authority to sign)
Name (typed or printed):
Title:
Attest: (CORPORATE SEAL)
(Signature of Corporate Secretary)
Date of Qualification to do business is:
BF - 7
BF - 6 4047-22-0060
A Joint Venture
Joint Venture Name: (SEAL)
By:
(Signature of joint venture partner – attach evidence of authority to sign)
Name (typed or printed):
Title:
Joint Venture Name: (SEAL)
By:
(Signature of joint venture partner – attach evidence of authority to sign)
Name (typed or printed):
Phone and FAX Number, and Address for receipt of official communications.
(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above).
MWhite Text Box
BF - 8
MWhite
BF - 9
05/01/00 BG - 1 0999-00-0202
BID GUARANTEE
The undersigned attaches bid security in the form of a BID BOND / CERTIFIED CHECK / CASHIER’S CHECK (Circle one) in the amount of _________________________________ Dollars ($_______________).
The undersigned agrees, if awarded the Contract, to deliver the executed Agreement and bonds and furnish evidence of insurance within fourteen (14) business days after the date of the Notice of Award. And to complete the proposed work within the time specified in the Bid Form.
If the Bid is accepted by the OWNER, and the undersigned shall fail to enter into the Agreement as aforesaid and to furnish the required surety bonds within fourteen (14) business days after Notice of Award, the Bid Bond in the amount of $__________________________ accompanying this Bid shall be considered due and payable to the OWNER.
If the undersigned enters into the Agreement in accordance with this Bid or if his Bid is rejected, then the accompanying Bid Guarantee shall be voided.
In submitting this Bid, it is understood that the right is reserved by the OWNER to reject any or all bids, to waive irregularities and/or formalities and, in general, to make award in any manner deemed by it, in its sole discretion, to be in the best interest of the OWNER.
SIGNED AND SEALED THIS DAY OF , 20
Authorized Signature of Bidder:
(TITLE)
(SEAL)
BB - 1 4047-22-0060
BID BOND
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
4303 S. Center Road
Burton, MI 48519
BID
BID DUE DATE: October 9, 2023
PROJECT (Brief Description Including Location):
1.05 miles of pavement rehabilitation along Bristol Road and Vassar Road including rubblizing and overlaying concrete sections, full depth pavement removal and replacement, HMA cold milling composite sections, pavement markings, signage, and three culvert replacements; one on Bristol Road at Gilkey Creek within the road rehabilitation limits, one immediately downstream on Bellingham Ct., and one on Bristil Road west of the road rehabilitation limits and east of Center Rd.
BB - 2 4047-22-0060
BOND
BOND NUMBER:
DATE (Not later than Bid due date):
PENAL SUM:
(Words) (Figures)
IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
Signature and Title Signature and Title
(Attach Power of Attorney)
Attest:
Attest:
Signature and Title Signature and Title
05/01/00 BB - 3 0999-00-0202
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Document.
3. This obligation shall be null and void if:
3.1. OWNER accepts Bidder’s Bid and Bidder
delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents, or
3.2. All Bids are rejected by OWNER, or
3.3. OWNER fails to issue a Notice of Award
to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time of issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer or proposal as applicable.
05/01/00 SQ - 1 0999-00-0202
STATEMENT OF QUALIFICATIONS
Bidder must answer all questions. If more space is needed to complete a question, attach a separate sheet. Bidder may submit any additional information.
Name:
Address: Phone:
Number of years operating under your present name:
Bonding Capacity:
Bonding Company: Phone:
Prequalified by MDOT to bid on projects of this magnitude and type of work
(circle one) YES NO Prequalification Number:
General nature of work performed by your company:
Background and experience of the principal members of your organization including officers:
Major equipment available for this contract:
05/01/00 SQ - 2 0999-00-0202
CURRENT PROJECTS:
Project Project Project
Name:
Owner:
Contact Person:
Phone:
Contract Amount:
Completion Date:
% Complete:
COMPLETED PROJECTS:
Project Project Project
Name:
Owner:
Contact Person:
Phone:
Contract Amount:
Date Completed:
Additional information that may be pertinent to demonstrate your ability to complete this project.
05/01/00 SQ - 3 0999-00-0202
Has your company defaulted on a contract?
If yes, where and why?
I hereby certify that the above answers are correct and true.
Name
Signature
Title
Number of additional sheets attached:
05/01/00 SL - 1 0999-00-0202
SUBCONTRACTOR LISTING
Bidder submits to use the following subcontractors for performance of the work in accordance with Article 9 of the Instructions to Bidders.
Note to Bidder: List all work you propose to sublet on this Contract. Include each subcontractors name, address, phone, fax and e-mail address. Also include a description of work to be performed by subcontractor. For example: restoration, landscaping, lighting, signage, bore and jack, etc. List approximate dollar value of the subcontract.
NAME, ADDRESS & PHONE NO. OF
SUBCONTRACTOR
DESCRIPTION OF
WORK
APPROXIMATE
DOLLAR VALUE
OF SUBCONTRACT
Phone:
FAX:
05/01/00 SL - 2 0999-00-0202
IL - 1
IRAN LINKED BUSINESS CERTIFICATION
Pursuant to Michigan Public Act 517 of 2012, any Bidder that submits a bid on a request for proposal with City of Burton shall certify that Bidder is not an Iran linked business. An Iran linked business is not eligible to submit a bid on a request for proposal with City of Burton. See attached definitions regarding this certification.
The undersigned Bidder does hereby certify,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .