BOM Material Flow System Pilot.pdf
PDF 104 KB Posted
- Attached to
- Material Flow System (MFS) Pilot
- Solicitation number
- SP4701-26-Q-0206
- Issued by
-
Defense Logistics Agency
About this file
This is a Bill of Materials for the Defense Logistics Agency (DLA) J62 IT Hardware Division supporting the Material Flow System (MFS) pilot deployment at Red River in October 2026.
The DLA requires new equipment only—refurbished items will not be accepted. The procurement includes Rockwell Automation/Allen Bradley control hardware and Schweitzer Engineering Laboratories (SEL) network switches. Specific line items include four ControlLogix 5590 Controllers (1756-L925TS) with safety features and 25 MB user memory; nine high-performance Ethernet/IP bridge modules (1756-EN2T); three 13-slot racks (1756-A13); three power supplies (1756-PA75); ControlNet components including a T-tap/ST connector (1786-TPS), RG6 quad shield coax cable (1786-RG6), and a 2X capacity bridge module (1756-CN2); 100 Belden cables (89463); three SEL2742 Ethernet switches and one SEL2741 Ethernet switch; and one Datalogic DX8210-2100 standard resolution unit. Delivery is required 30 days after receipt of order to the Defense Logistics Agency Distribution Red River facility in Texarkana, Texas, Bldg 499 Zone 1, RECEIVING BOSS CAGE, Attn: Darren Kimbrough. All deliveries should be marked for Erin Acevedo at Erin.Acevedo@dla.mil, 269-961-5139.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Logistics Agency
Information Operations (J6)
Bill of Materials
Material Flow System
Date: August 6, 2026
Background: The Defense Logistics Agency (DLA) J62 IT Hardware Division requires Schweitzer
Engineering Laboratories (SEL) network switches and Rockwell Automation/Allen Bradley control hardware automation hardware to support the deployment of the Material Flow System (MFS) pilot that is deploying at Red River in October 2026.
Quantity/Description: New equipment only; refurbished will not be accepted.
Line Qty Part Number Description Brand Name Required
001 4 1756-L925TS
1756-L925TS AB ControlLogix 5590 Controller with Safety, 25 MB
User Memory, 400 EtherNet/IP Devices, 20,000 OPC/UA nodes
Rockwell Automation/
Allen Bradley
002 9 1756-EN2T
1756-EN2T AB CONTROLLOGIX HIGH PERFORMANCE
ETHERNET/IP BRIDGE MODULES PN-184723
003 3 1756-A13 1756-A13 AB CONTLGX 13 SLOT RACK
004 3 1756-PA75 1756-PA75 AB CTRLGX 85-265VAC PWR SUPPLY 5V 13A
005 1 1786-TPS 1786-TPS AB CONTROLNET T-TAP/ST CB
006 1 1786-RG6
1786-RG6 AB CTLNET RG6 QUAD SHIELD COAX CABLE
SOLID CENTER 1000' 1786-RG6
007 100 89463 89463 BELDEN CABLE
008 1 1756-CN2
1756-CN2 AB CONTROLNET 2X CAPACITY BRIDGE
MODULE 61259832442
009 3 SEL2742 2742#4FEB SEL2742 ETHERNET SWITCH Schweitzer Engineering
Laboratories
010 1 SEL2741 2741#7P.56 SEL2741 ETHERNET SWITCH
011 1 DX8210-2100 DX8210-2100 STANDARD RESOLUTION Datalogic
Required delivery date: 30 days after receipt of order
Delivery address and Point of Contact (POC):
DEFENSE LOGISTICS AGENCY
Distribution Red River
Attn: Darren Kimbrough
10th St and K Avenue
Bldg 499 Zone 1, RECIEVING BOSS CAGE
Texarkana, TX 75507-5000
Mark For:
Erin Acevedo
Erin.Acevedo@dla.mil
269-961-5139
File details come from the government source that posted it. Updated .