BOM- Labor only (overhead and underground).pdf

PDF 413 KB Posted

Attached to
Fiber Optic Service to Parks and Facilities in Scholl Canyon
Solicitation number
Specification No. 3979
Issued by
Los Angeles County, El Paso De Robles (paso Robles) City, California

About this file

This document is a Bill of Materials (BOM) for labor costs associated with the Glendale Water and Power (GWP) fiber optic infrastructure project in Scholl Canyon, California. The BOM details labor installation requirements across three primary categories: Underground Installation, Aerial Installation, and Splicing/Termination/Testing Labor. Underground installation tasks include trenching and installing 1-4" SCH40 PVC conduit, installing tracer wire, restoring asphalt and concrete surfaces, and mounting fiber optic splice closures. Aerial installation labor includes installing and lashing 48 CT fiber across 84 wood poles, installing messenger and anchor systems, and mounting guard arms. The splicing and testing labor involves butt splicing, ring cutting, installing splice closures, and conducting fiber optic testing (bi-directional and OTDR).

The document provides detailed quantitative breakdowns for each labor category, with specific unit measurements and quantities. For underground installation, quantities range from 10 linear feet for PVC installation to 15,645 linear feet for fiber installation. Aerial installation involves 13,220 linear feet of fiber lashing and 10,887 linear feet of messenger installation, with various anchor and guy wire placements. The splicing and testing labor includes 48 strand terminations, 24 strand splices, and multiple splice closure installations. While no specific pricing is visible in the provided document, the detailed labor breakdown suggests a comprehensive approach to fiber optic infrastructure deployment, with precise documentation of expected labor requirements and quantities for each project component.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ITEM

NO.

BID INSTALLATION LABOR‐UNDERGROUND

1 Trench & Install 1‐4" SCH40 PVC

2 Install 1‐4" SCH40 PVC RISER

3 Install #6 TW / Tracer Wire Orange In trench/bore

4 Install 48SMF (New Undergound)

5 Restore Asphalt and Concrete (Asphalt (1.5'X6'), Concrete 2x(5'x5'))

6 Open Trenching/Breaking Asphalt and Concrete (Asphalt (1.5'X6'), Concrete 2x(5'x5'))

Install Commscope FOSC 600 Fiber Optic Splice Closure W/Accessories

(VAULT MOUNT)

BID ITEM

NO.

BID INSTALLATION LABOR‐AERIAL

1 Install and Lash 48 CT Fiber (Aerial ‐84 Wood poles)

2 Install New 1/4" Messenger

3 Install New 1" TE Anchor & Down Guy (3/8")

4 Install New 1" TE Anchor & Down Guy (1/4")

5 Install Sidewalk Down Guy (3/8")

6 Install New Span Guy (3/8") (240' Total)

7 Install New 4FT Guard Arm (Wood)

BID ITEM

NO.

BID SPLICING/TERMINATION/TESTING LABOR

1 Splice ST (Butt splice (Reel end) 8 strands (6 Locations) AERIAL

2 Splice ST (Ring Cut 8 strands (3 Locations UG))

3 Install Commscope FOSC 600 Fiber Optic Splice Closure W/Accessories (AERIAL)

4 FOC Testing (Bi‐Directional & OTDR)

5 REEL TESTING 48SMF X 4 REELS

UNIT QTY. LABOR COST $

LF 10

EA 4

LF 10

LF 15645

EA 1

EA 1

EA 3

SUBTOTAL

UNIT QTY. LABOR COST $

LF 13220

LF 10,887

EA 6

EA 20

EA 2

EA 3

EA 2

SUBTOTAL

UoM QTY LABOR COST $

ST 48

ST 24

EA 6

EA 8

ST 1

SUBTOTAL

GRAND TOTAL