Boiler Room Checklist.docx
DOCX document 14 KB Posted
- Attached to
- Boiler heating maintenance
- Solicitation number
- 6100050685
- Issued by
- Armstrong County, Pennsylvania
About this file
This document is a Contractor's Boiler Room Checklist of Maintenance Heating System for District 10-1 in Armstrong County. The checklist covers various maintenance items related to the boiler, burner, furnace, water heater, and other heating system components. The contractor is required to complete this checklist during each visit and provide the signed form. The checklist covers 43 different maintenance tasks across the heating system, including items such as boiler blow down, low water cut-offs, burner controls and gauges, and pump and valve inspections.
The document does not provide any information about pricing, set asides, incumbents, funding requirements, or other commercial terms. It appears to be a standard maintenance checklist used to ensure comprehensive inspections and servicing of the heating system components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractors work schedule of maintenance.docx | DOCX document | |
| Scope of Work-boiler maintenance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
CONTRACTOR’S
BOILER ROOM CHECKLIST OF
MAINTENANCE HEATING SYSTEM
District 10-1 Armstrong County
| Contractor ________________________ | Date ____________________ |
| Technician _________________________ | Boiler ___________________ |
| Time Started _______________________ | Time Finished _____________ |
Signature ____________________________________________________________________
1. Boiler Blow Down_______________________________________________________
2. Boiler Water Feeder_____________________________________________________
3. Boiler Low Water Cut-offs_________________________________________________
4. Boiler Gauge Glass/Columns_______________________________________________
5. Boiler Safety/Relief Valves_________________________________________________
6. Boiler Barometric Damper__________________________________________________
7. Boiler Tubes/Flues, Breeching (Initial Visit)____________________________________
8. Boiler Combustion Chamber (Initial Visit)_____________________________________
9. Boiler Valves____________________________________________________________
10. Chemical Feed System: Pump Feeder_________________________________________
11. Boiler Burner Controls and Gauges___________________________________________
12. Boiler condition__________________________________________________________
13. Boiler Leaks______________________________________________________________
14. Burner Motor, Blower, Air Intake_____________________________________________
15. Burner Controls___________________________________________________________
16. Burner Scanner, Electrodes, Nozzles___________________________________________
17. Burner Gas/Oil Valves, Regulators____________________________________________
18. Burner Gas/Oil Pressure Switches_____________________________________________
19. Burner Oil Pump, Filter, Gauges______________________________________________
20. Remote Oil Pump, Filter, Gauges_____________________________________________
21. Burner Test – Efficiency__________________________________________________
| Burner CO2 ________________________ | Draft _________________ |
| Burner Stack F ______________________ | Smoke ________________ |
22. Burner Condition_______________________________________________________
23. Furnace (Drave, Powermatic, etc.) Initial Visit________________________________
24. Furnace (Drave, Powermatic, etc.)_________________________________________
25. Furnace______________________________________________________________
26. Furnace Condition______________________________________________________
27. Condensate Pumps – Boiler Room__________________________________________
| Office Basement________________________________________ |
| Garage Area____________________________________________ |
28. Circulating Pumps – EW Heating System______________________________________
29. Sump and/or Sewage Ejector Pumps – Boiler room_____________________________
30. Water heater Flue Pipe (Initial Visit)__________________________________________
31. Water Heater – boiler Room (Gas)___________________________________________ (Oil)_____________________________________________ (Electric)__________________________________________ Garage Areas (Gas)___________________________________________ (Electric)________________________________________
32. Water Heater Circulating Pump______________________________________________
33. Water heater Relief Valve___________________________________________________
34. Outside Air Louver and Screen_______________________________________________
35. Gas Wall Heaters (initial visit)________________________________________________
36. Gas or Oil Ceiling Hung Unit Heaters (initial visit)________________________________
37. Boiler Room Condition (Clean)_______ (Dirty) ________ (Trash)_________ (Other) _________
38. Remove plugs or open valves to clean strainer. Check to see if screens are in place (initial visit)______________________________________________________________
39. Remove plugs or open valves and flush F&T traps and verify proper operation (initial visit)_________________________________________________________________
40. Check all radiator valves and other temperature control valves in the heating system (initial visit)____________________________________________________________
41. Perform all maintenance services recommended in manufacturer’s control manual and installation and service manual ____________________________________________
42. Clean coil fins on all unit heaters, fin tubes, and/or cabinet heaters________________
43. Lubricate all unit heaters, cabinet heaters, and fan motors________________________
END OF CONTRACTOR’S BOILER ROOM CHECKLILST OF MAINTENANCE HEATING SYSTEM
File details come from the government source that posted it. Updated .