Boiler Room Checklist.docx

DOCX document 14 KB Posted

Attached to
Boiler heating maintenance
Solicitation number
6100050685
Issued by
Armstrong County, Pennsylvania

About this file

This document is a Contractor's Boiler Room Checklist of Maintenance Heating System for District 10-1 in Armstrong County. The checklist covers various maintenance items related to the boiler, burner, furnace, water heater, and other heating system components. The contractor is required to complete this checklist during each visit and provide the signed form. The checklist covers 43 different maintenance tasks across the heating system, including items such as boiler blow down, low water cut-offs, burner controls and gauges, and pump and valve inspections.

The document does not provide any information about pricing, set asides, incumbents, funding requirements, or other commercial terms. It appears to be a standard maintenance checklist used to ensure comprehensive inspections and servicing of the heating system components.

View the file

Other files

File Type Posted
Contractors work schedule of maintenance.docx DOCX document
Scope of Work-boiler maintenance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

CONTRACTOR’S

BOILER ROOM CHECKLIST OF

MAINTENANCE HEATING SYSTEM

District 10-1 Armstrong County

Contractor ________________________Date ____________________
Technician _________________________Boiler ___________________
Time Started _______________________Time Finished _____________

Signature ____________________________________________________________________

1. Boiler Blow Down_______________________________________________________

2. Boiler Water Feeder_____________________________________________________

3. Boiler Low Water Cut-offs_________________________________________________

4. Boiler Gauge Glass/Columns_______________________________________________

5. Boiler Safety/Relief Valves_________________________________________________

6. Boiler Barometric Damper__________________________________________________

7. Boiler Tubes/Flues, Breeching (Initial Visit)____________________________________

8. Boiler Combustion Chamber (Initial Visit)_____________________________________

9. Boiler Valves____________________________________________________________

10. Chemical Feed System: Pump Feeder_________________________________________

11. Boiler Burner Controls and Gauges___________________________________________

12. Boiler condition__________________________________________________________

13. Boiler Leaks______________________________________________________________

14. Burner Motor, Blower, Air Intake_____________________________________________

15. Burner Controls___________________________________________________________

16. Burner Scanner, Electrodes, Nozzles___________________________________________

17. Burner Gas/Oil Valves, Regulators____________________________________________

18. Burner Gas/Oil Pressure Switches_____________________________________________

19. Burner Oil Pump, Filter, Gauges______________________________________________

20. Remote Oil Pump, Filter, Gauges_____________________________________________

21. Burner Test – Efficiency__________________________________________________

Burner CO2 ________________________Draft _________________
Burner Stack F ______________________Smoke ________________

22. Burner Condition_______________________________________________________

23. Furnace (Drave, Powermatic, etc.) Initial Visit________________________________

24. Furnace (Drave, Powermatic, etc.)_________________________________________

25. Furnace______________________________________________________________

26. Furnace Condition______________________________________________________

27. Condensate Pumps – Boiler Room__________________________________________

Office Basement________________________________________
Garage Area____________________________________________

28. Circulating Pumps – EW Heating System______________________________________

29. Sump and/or Sewage Ejector Pumps – Boiler room_____________________________

30. Water heater Flue Pipe (Initial Visit)__________________________________________

31. Water Heater – boiler Room (Gas)___________________________________________ (Oil)_____________________________________________ (Electric)__________________________________________ Garage Areas (Gas)___________________________________________ (Electric)________________________________________

32. Water Heater Circulating Pump______________________________________________

33. Water heater Relief Valve___________________________________________________

34. Outside Air Louver and Screen_______________________________________________

35. Gas Wall Heaters (initial visit)________________________________________________

36. Gas or Oil Ceiling Hung Unit Heaters (initial visit)________________________________

37. Boiler Room Condition (Clean)_______ (Dirty) ________ (Trash)_________ (Other) _________

38. Remove plugs or open valves to clean strainer. Check to see if screens are in place (initial visit)______________________________________________________________

39. Remove plugs or open valves and flush F&T traps and verify proper operation (initial visit)_________________________________________________________________

40. Check all radiator valves and other temperature control valves in the heating system (initial visit)____________________________________________________________

41. Perform all maintenance services recommended in manufacturer’s control manual and installation and service manual ____________________________________________

42. Clean coil fins on all unit heaters, fin tubes, and/or cabinet heaters________________

43. Lubricate all unit heaters, cabinet heaters, and fan motors________________________

END OF CONTRACTOR’S BOILER ROOM CHECKLILST OF MAINTENANCE HEATING SYSTEM

File details come from the government source that posted it. Updated .