Boiler Burners Question and Answer B40226.docx

DOCX document 14 KB Posted

Attached to
IRCC - R&M - Boiler Burners - 1230 - JSW
Solicitation number
24-426DOC-ILRIV-B-40226
Issued by
Fulton County, Illinois

About this file

This document is a question and answer (Q&A) for an Invitation for Bid (IFB) related to a state and local contract opportunity for boiler burner replacement in Illinois. The contract requires the installation of two retrofit boiler burners for Kewanee boilers by a qualified installer. The burners must meet the minimum qualifications to qualify for Ameren's energy efficiency rebate. Vehicle access to the work location is allowed, but security inspections upon arrival and departure are required. The estimated total project hours are 24, not 24 hours per burner.

The pricing and funding details are not explicitly stated in the Q&A, but the contract is being managed by the Illinois Rehabilitation Coordination Council (IRCC) for the R&M (Repair and Maintenance) division. The contract is for the Boiler Burners - 1230 - JSW project located in Illinois.

View the file

Other files

File Type Posted
Standard Certification~79.docx DOCX document
Boiler Burner Question and Answer.docx DOCX document
24RM065 Boiler Burner RFQ~3.docx DOCX document
Standard Term and Condition~85.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boiler Burner IFB Question and Answer B-40226

1. Do you required the burners to meet the minimum to qualify for Ameren’s energy efficiency rebate?

Yes, the burners are required to meet minimum qualifications for Ameren’s rebate.

2. Will the Sally Port be the access point, and will the vehicle be allowed to drive to the work location?

Yes, vehicles will be allowed to be driven to work location. However, an inspection upon arrival and departure is required for security purposes.

3. On your Bid Buy solicitation, the quantity for burners shows two. There are four boilers on-site. Will you need four burners?

No, only two burners need replaced at this time.

4. On your Bid Buy solicitation, the quantity for labor show 24 hours. Will this be per burner, or for the complete project?

The hours listed is an estimation of hours for the complete project.

File details come from the government source that posted it. Updated .