BOAST RFOP_PANDTA-24-P-0000 002750 -ELW 7-24.xlsx
XLSX spreadsheet 54 KB Posted
- Solicitation number
- PANDTA-24-P-0000_002750
- Issued by
-
Department of the Army
About this file
This is a Request for Order Proposal (RFOP) under the Basic Ordering Agreement Sustainment Track (BOAST) program issued by the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) on July 24, 2026, with a response deadline of August 24, 2026 at 5:00 PM Eastern.
The solicitation seeks M11 Pistol Small Arms Storage Racks (NSN 1095-00-897-8755) on a firm-fixed-price basis. The requirement includes one unit for First Article Test (FAT) within 120 calendar days after receipt of order, 117 production units, and an unexercised option for 117 additional units. The government's objective delivery schedule is 300 calendar days after receipt of order, with all production units due within 150 calendar days from written FAT approval. Offerors may propose accelerated schedules at no additional cost. This is a full and open competition under NAICS code 332994 (Small Arms, Ordnance, and Ordnance Accessories Manufacturing), classified as non-commercial. The item will ship FOB Destination to DLA Distribution Anniston, Alabama. A Small Business Subcontracting Plan is required if the awardee is a large business. Award will be made to the lowest-priced, responsible Basic Ordering Agreement holder determined to be capable of meeting contractual requirements; mandatory eligibility requires a fully executed BOAST BOA in place prior to the closing date. The contract imposes extensive technical requirements including First Article Approval testing, configuration management per SAE EIA-649-1, military-level packaging and preservation per MIL-STD-2073-1, export control compliance, OPSEC training and coordination requirements, and a Quality Management System requirement of ISO 9001:2015 or equivalent. The offeror must possess current DD Form 2345 militarily critical technical data certification to access the export-controlled Technical Data Package. Payment terms are Net 30 days from receipt of invoice and acceptance of goods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
INSTRUCTIONS FOR OFFERORS
Welcome to the Basic Ordering Agreement Sustainment Track (BOAST) Request for Order Proposal (RFOP).
Please review this entire Excel workbook carefully to prepare your proposal. Your proposal must be complete, signed, and submitted in accordance with the instructions on the 'RFOP' sheet to be considered for award.
How to Complete This Form:
1. Review All Applicable Sheets: Your proposal will be evaluated based on the information you provide across the following sheets:
a) RFOP: This is the main sheet containing the requirement details, submission instructions, and evaluation methodology.
b) Applicable Clauses-Provisions: This sheet lists the specific clauses invoked for this order.
c) Technical & Quality Requirement: This sheet contains any special technical narratives or requirements for this specific order.
2. Complete All Required Fields: Throughout this workbook, any cell or section highlighted in yellow requires your input. You must complete all required fields to submit a compliant proposal. This includes, but is not limited to, the Pricing Sheet and any required information on the evaluation sheets.
3. Submit Your Proposal: Follow the "Proposal Submission Instructions" on the 'RFOP' sheet for details on how, where, and when to submit your final proposal package.
RFOP
BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)
NOTICE ID: PANDTA-24-P-0000 002750 DATE ISSUED: 24-Jul-2026 RESPONSE DUE: 8/24/26, 5:00 PM Eastern*
| ISSUE BY: | U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) | CONTRACTOR: |
| ATTN: | BOAST@army.mil | UIE / CAGE: |
| Mark Hilson, Contract Specialist, mark.d.hilson.civ@army.mil | ADDRESS: | |
| Elizabeth Levine Welhouse, Contracting Officer, elizabeth.l.levinewelhouse.civ@army.mil | POC NAME: | |
| POC EMAIL: | ||
| POC PHONE: | ||
| BOA NUMBER: |
GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program.
II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.
III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 10 Aug 2026 at 5:00 pm Eastern.
| REQUIREMENT DETAILS | Supply / Service: | M11 Pistol Small Arms Storage Rack |
| NSN / Description: | 1095-00-897-8755 | |
| TDP / DWG No . | 8429990:19204 | |
| Commerciality: | Non-Commercial | |
| NAICS: | 332994 - Small Arms, Ordnance, and Ordnance Accessories Manufacturing | |
| Size Standard: | 1,000 employees | |
| Set-Aside Status: | Full and Open Competition | |
| Small Business Subcontracting Plan: | Required if Large Business | |
| Order Rating: | DO | |
| Packaging Level: | Military B | |
| Ship-To Location: | SR W0LX ARMY GENERAL SUPPLY |
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON, AL, 36201-4199
| Inspect / Accept: | Origin |
| FOB: | Destination |
| Delivery Schedule: | The Government's objective is to receive all items within 300 calendar days After Receipt of Order (ARO). Offerors may propose an accelerated delivery schedule that is earlier than the Government's objective. The proposed schedule, stated in days ARO, must be clearly identified in your proposal. Early shipment is permitted at no additional cost to the Government. |
The First Article Test (FAT) specified in CLIN 0001 shall be conducted within 120 calendar days ARO. Alternative schedules for the FAT will not be considered. The Government requires up to 30 days for FAT evaluation and written approval/disapproval. All remaining production units shall be delivered within 150 calendar days from the date of written FAT approval. Any acceleration in First Article Test Approval will be subtracted from the delivery schedule of the production units.
| PRICING SHEET | |||||||||||
| Line Item | Description | Noun | NSN | Part No. | PRON / 1095 | Quantity | Unit of Measure | Del Sch / Rate | Unit Price | Total Price | Notes |
| 0001 | Service | FIRST ARTICLE TEST (FAT) | 1095-00-897-8755 | 8429990 | Eh5C0384EH | 1 | LO | 0 | See FAR 52.209-3 ALT 1 and 2, and CDRL A004. | ||
| 0002 | Supply | RACK, STORAGE, SMALL ARMS, M11 | 1095-00-897-8755 | 8429990 | EH4C0115EH | 117 | EA | 0 | |||
| 0003 | Supply | UNEXERCISED OPTION | 1095-00-897-8755 | 8429990 | TBD | 117 | EA | 0 | See 52.217-7. | ||
| A001 | Contract Data Requirements List (CDRL) | ENGINEERING CHANGE PROPOSAL (ECP) | N/A | N/A | N/A | 0 | Not Separately Priced (NSP) | ||||
| A002 | Contract Data Requirements List (CDRL) | REQUEST FOR VARIANCE (RFV) | N/A | N/A | N/A | 0 | Not Separately Priced (NSP) | ||||
| A003 | Contract Data Requirements List (CDRL) | NOTICE OF REVISION (NOR) | N/A | N/A | N/A | 0 | Not Separately Priced (NSP) | ||||
| A004 | Contract Data Requirements List (CDRL) | ACCEPTANCE INSPECTION EQUIPMENT (AIE) REPORT | N/A | N/A | N/A | 0 | Not Separately Priced (NSP) | ||||
| A005 | Contract Data Requirements List (CDRL) | FIRST ARTICLE TEST REPORT (FATR) | N/A | N/A | N/A | 0 | Not Separately Priced (NSP) | ||||
| Order Total | $ - 0 |
| PROPOSAL SUBMISSION INSTRUCTIONS | Proposal Content: | Submission shall consist of a completed and signed Pricing Sheet contained in this RFOP. No separate technical proposal is required. The Government intends to evaluate proposals and award an order without negotiations. |
| Submission Method: | Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-PANDTA-24-P-0000 002750] - [Your Company Name]". Late proposals will not be evaluated. | |
| Period of Acceptance | Proposals shall remain firm for at least 60 calendar days from the closing date of this RFOP. | |
| Mandatory Eligibility Requirement For Award: | To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated. |
EVALUATION FOR AWARD Price Only The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder who submits the lowest-priced proposal. Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.
Evaluation: Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.
In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.
| REGULATORY COMPLIANCE | BOA Attachment Reference: | FAR Part 13_Simplified Procedures for Non-Commercial Acquisitions | |
| Applicable Clauses: | See 'Applicable Clauses-Provisions' sheet. | ||
| Payment Terms: | Net 30 days from receipt of invoice and acceptance of goods. | ||
| Buy American / Trade Agreements: | |||
| Buy American and Balance of Payments Program |
(DFARS 252.225-7001)
NAME: DATE:
mailto:BOAST@army.mil Applicable Clauses-Provisions
| Applicable Clauses/Provisions | ||||
| Reference | Date | Title | BOA Reference | Remarks |
| 252.203-7000 | 09-01-2011 | REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS | BOA Attachment 0002 - FAR 13 | |
| 252.203-7002 | 12-01-2022 | REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) | BOA Attachment 0002 - FAR 13 | |
| 252.203-7005 | 09-01-2022 | REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022) | BOA Attachment 0002 - FAR 13 | |
| 252.204-7000 | 10-01-2016 | DISCLOSURE OF INFORMATION | BOA Attachment 0002 - FAR 13 | |
| 252.204-7003 | 04-01-1992 | CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT | BOA Attachment 0002 - FAR 13 | |
| 252.204-7007 | 10-01-2025 | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025) | BOA Attachment 0002 - FAR 13 | |
| 252.204-7008 | 10-01-2016 | COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS | BOA Attachment 0002 - FAR 13 | |
| 252.204-7012 | 05-01-2024 | SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1) | BOA Attachment 0002 - FAR 13 | |
| 252.204-7015 | 01-01-2023 | NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) | BOA Attachment 0002 - FAR 13 | |
| 252.204-7017 | 05-01-2021 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION | ||
| 252.204-7018 | 01-01-2023 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023) | BOA Attachment 0002 - FAR 13 | |
| 252.204-7019 | 11-01-2023 | NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS | BOA Attachment 0002 - FAR 13 | |
| 252.204-7020 | 11-01-2023 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) | BOA Attachment 0002 - FAR 13 | |
| 252.211-7003 | 01-01-2023 | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) | BOA Attachment 0002 - FAR 13 | |
| 252.211-7008 | 09-01-2010 | USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS | ||
| 252.215-7013 | 01-01-2023 | SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023) | BOA Attachment 0002 - FAR 13 | |
| 252.225-7001 | 02-01-2024 | BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024) | BOA Attachment 0002 - FAR 13 | |
| 252.225-7048 | 06-01-2013 | EXPORT-CONTROLLED ITEMS | BOA Attachment 0002 - FAR 13 | |
| 252.225-7053 | 08-01-2021 | REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION | ||
| 252.225-7056 | 01-01-2023 | PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023) | BOA Attachment 0002 - FAR 13 | |
| 252.225-7973 | 08-01-2024 | PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014) | ||
| 252.227-7013 | 08-01-2025 | RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025) | ||
| 252.227-7015 | 01-01-2025 | TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) | ||
| 252.227-7016 | 01-01-2023 | RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023) | ||
| 252.227-7025 | 01-01-2025 | LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025) | ||
| 252.227-7027 | 04-01-1988 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE | ||
| 252.227-7028 | 06-01-1995 | TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT | ||
| 252.227-7030 | 03-01-2000 | TECHNICAL DATA--WITHHOLDING OF PAYMENT | ||
| 252.227-7037 | 01-01-2025 | VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025) | ||
| 252.227-7989 | 02-01-2026 | RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7991 | 02-01-2026 | RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036) |
(FEB 2026)
| 252.227-7995 | 02-01-2026 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026) | |
| 252.227-7996 | 02-01-2026 | TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026) | |
| 252.231-7000 | 12-01-1991 | SUPPLEMENTAL COST PRINCIPLES | BOA Attachment 0002 - FAR 13 |
| 252.232-7003 | 12-01-2018 | ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS | BOA Attachment 0002 - FAR 13 |
| 252.232-7006 | 01-01-2023 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) | BOA Attachment 0002 - FAR 13 |
| 252.232-7010 | 12-01-2006 | LEVIES ON CONTRACT PAYMENTS | BOA Attachment 0002 - FAR 13 |
| 252.239-7098 | 04-01-2021 | PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003) | |
| 252.240-7997 | 02-01-2026 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | BOA Attachment 0002 - FAR 13 |
| 252.240-7997 CD | 02-01-2026 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) |
(DEVIATION 2026-O0025)(FEB 2026)
| 252.243-7001 | 12-01-1991 | PRICING OF CONTRACT MODIFICATIONS | BOA Attachment 0002 - FAR 13 | |
| 252.244-7000 | 11-01-2023 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023) | ||
| 252.246-7001 ALT 2 | 03-01-2014 | WARRANTY OF DATA (MAR 2014) -- ALTERNATE II (MAR 2014) | ||
| 252.247-7023 | 10-01-2024 | TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024) | BOA Attachment 0002 - FAR 13 | |
| 252.270-7000 | 11-01-2024 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024) | BOA Attachment 0002 - FAR 13 | |
| 252.270-7001 | 11-01-2024 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024) | BOA Attachment 0002 - FAR 13 | |
| 52.203-19 | 01-01-2017 | PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS | BOA Attachment 0002 - FAR 13 | |
| 52.204-13 | 02-01-2026 | SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.204-19 | 12-01-2014 | INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS | BOA Attachment 0002 - FAR 13 | |
| 52.204-7 | 02-01-2026 | SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026) | BOA Attachment 0002 - FAR 13 | |
| 52.204-91 | 02-01-2026 | CONTRACTOR IDENTIFICATION (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.209-3 ALT 1 and 2 | 09-01-1989 | FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE I (JAN 1997) AND ALTERNATE II (SEP 1989) | The contractor shall test 5 units of Item: RACK, STORAGE, SMALL ARMS, M11 as specifed in this RFOP. |
At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing of the time and locations of the testing so that the Government may witness the tests. The Contractor shall submit the first article test report within 120 calendar days from the date of Order award.
Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article.
| 52.211-14 | 04-01-2008 | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE | BOA Attachment 0002 - FAR 13 | |
| 52.211-15 | 04-01-2008 | DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS | BOA Attachment 0002 - FAR 13 | |
| 52.211-5 | 02-01-2026 | MATERIAL REQUIREMENTS (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.213-4 | 02-01-2026 | SIMPLIFIED ACQUISITIONS (NON COMMERICIAL) (DEVIATION FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.214-34 | 04-01-1991 | SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE | BOA Attachment 0002 - FAR 13 | |
| 52.214-35 | 04-01-1991 | SUBMISSIONS OF OFFERS IN U.S. CURRENCY | BOA Attachment 0002 - FAR 13 | |
| 52.215-1 | 02-01-2026 | INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.217-5 | 02-01-2026 | EVALUATION OF OPTIONS (FEB 2026) | ||
| 52.217-7 | 03-01-1989 | OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM | The Government may require the delivery of the numbered line item, identified in the Schedule as an option item (CLIN 0003), in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 365 calendar days of the base award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree. | |
| 52.219-28 | 02-01-2026 | POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.219-9 | 02-01-2026 | SMALL BUSINESS SUBCONTRACTING PLAN (FEB 2026) | ||
| 52.222-1 | 02-01-1997 | NOTICE TO THE GOVERNMENT OF LABOR DISPUTES | BOA Attachment 0002 - FAR 13 | |
| 52.222-90 | 04-01-2026 | ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS | ||
| 52.225-18 | 08-01-2018 | PLACE OF MANUFACTURE | BOA Attachment 0002 - FAR 13 | |
| 52.226-8 | 05-01-2024 | ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) | BOA Attachment 0002 - FAR 13 | |
| 52.232-23 ALT 1 | 04-01-1984 | ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) | ||
| 52.232-40 | 03-01-2023 | PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023) | BOA Attachment 0002 - FAR 13 | |
| 52.240-90 | 02-01-2026 | SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS | ||
| 52.240-91 | 02-01-2026 | SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.240-93 | 02-01-2026 | BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026) | BOA Attachment 0002 - FAR 13 | |
| 52.242-17 | 04-01-1984 | GOVERNMENT DELAY OF WORK | BOA Attachment 0002 - FAR 13 | |
| 52.243-1 | 02-01-2026 | CHANGES--FIXED PRICE | BOA Attachment 0002 - FAR 13 | |
| 52.246-11 | 12-01-2014 | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT | QMS Requirement: ISO 9001:2015 or equivalent |
Tailored by excluding paragraph(s) 8.3
| 52.246-16 | 04-01-1984 | RESPONSIBILITY FOR SUPPLIES | BOA Attachment 0002 - FAR 13 |
| 52.246-2 | 08-01-1996 | INSPECTION OF SUPPLIES--FIXED-PRICE | BOA Attachment 0002 - FAR 13 |
| 52.246-26 | 08-01-2024 | REPORTING NONCONFORMING ITEMS (AUG 2024) | |
| 52.247-34 | 02-01-2006 | F.O.B. DESTINATION (JAN 1991) | |
| 52.247-48 | 02-01-1999 | F.O.B. DESTINATION--EVIDENCE OF SHIPMENT | |
| 52.247-68 | 02-01-2006 | REPORT OF SHIPMENT (REPSHIP) | BOA Attachment 0002 - FAR 13 |
| 52.249-8 | 04-01-1984 | DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) | BOA Attachment 0002 - FAR 13 |
| 52.252-1 | 02-01-1998 | SOLICITATION PROVISIONS INCORPORATED BY REFERENCE | BOA Attachment 0002 - FAR 13 |
| 52.252-2 | 02-01-1998 | CLAUSES INCORPORATED BY REFERENCE (Feb 1998) | |
| 52.252-5 | 11-01-2020 | AUTHORIZED DEVIATIONS IN PROVISIONS | BOA Attachment 0002 - FAR 13 |
| 52.252-6 | 11-01-2020 | AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020) | BOA Attachment 0002 - FAR 13 |
Technical & Quality Requirement
| TECHNICAL & QUALITY REQUIREMENTS | |
| Title | Instructions/Narrative |
| DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE |
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801–4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C “Technical Data Package” instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
DRAWING LIMITATIONS (a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
CONFIGURATION MANAGEMENT DOCUMENTATION The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN (a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
OPSEC TRAINING REQUIREMENT
| Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO). | ||
| PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) | (a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below. |
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. 8429990
(a) REVISION: H
(b) DATE OF REVISION: 15 FEB 24
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe’s website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the "Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), “Regulation of Wood Packaging Material in International Trade,” current edition, (hereinafter “ISPM 15”), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization’s compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization’s compliance program.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: REPLACE PD AM8429990 REV G WITH PD AM8429990 REV H IN THE TDP.
NOTICE REGARDING FIRST ARTICLE TEST SAMPLE (a) The approved first article items, as described elsewhere in this contract, consist of a quantity of zero (0) that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of five (5) that successfully passes all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL) In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The First Article Test Report (FATR) shall be compiled by the contractor in accordance with CDRL A005. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
INSPECTION AND ACCEPTANCE POINTS: ORIGIN The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION
The Government's acceptance of the First Article Test Report (FATR) offered under this order shall take place at DESTINATION.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip) REWORK AND REPAIR OF NONCONFORMING MATERIAL (a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Representative for review and approval prior to implementation. Rework procedures are subject to the Government’s disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written Government approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence.
(e) The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
NOTICE REGARDING FIRST ARTICLE (a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
TECHNICAL DATA FOR INSPECTION (a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
ACCEPTANCE INSPECTION EQUIPMENT (AIE) (a) The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.
(b) The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.
(c) AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.
(d) Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government. Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data Requirements List, DD Form 1423, CDRL A004. Government approval of AIE design shall not be considered to modify the contract requirements.
(e) When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.
(f) Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.
(g) The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.
(h) If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.
SOURCE NOTES ON DRAWINGS: CONFORMANCE TO MILITARY TECHNICAL DATA REQUIREMENTS Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Bidders shall bear the responsibility of verifying that the approved part as supplied will conform to all such specific technical requirements.
image1.emf
File details come from the government source that posted it. Updated .