Boardwalk Drawing Set_with Signatures.pdf
PDF 4 MB Posted
- Attached to
- Wild Ricing Site Access Boardwalk Federal contract opportunity
- Solicitation number
- 12445522Q0177
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| mn103 Cass and Hubbard Counties.txt | TXT text file | |
| 3_ScheduleOfItems.pdf | ||
| SOW_Wild Ricing Site Access Improvements.pdf | ||
| RFQ Solicitation 12445522Q0177.docx | DOCX document | |
| mn79 Itaska County.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
Scale
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
General Notes
CH10704
D. Dennis
C. Taylor
06/28/2021
General Notes:
1) Contractor Responsibilities include:
a. Utility Locates and Erosion Control (If ground disturbance is required)
2) Take all precautions to prevent silt, soil, and other suspended particles from being discharged into bodies of water or wetlands in the construction vicinity. The cost of this work shall be considered incidental, unless paid for specifically in the schedule of items.
3) Before beginning any work, the following shall be submitted and approved by CO/COR: (See submittal schedule in spec)
a. Construction schedule
b. Gopher State ticket and list of utilities in the area
c. Hazardous spill plan
d. List of subcontractors and suppliers
e. Cut sheets, shop drawings, specifications, certifications, and/or gradations for all products and materials to be supplied to the project.
4)Prior to mobilizing, wash all equipment and vehicles to avoid introducing noxious weed seeds to the site.
5) All existing material that is not incorporated into the work becomes the property of the Contractor and shall be removed from National
Forest or State of Minnesota land.
Government Provided Material:
-None
Existing Conditions and Improvements:
The intent of this project is to provide safe and environmentally friendly public access to three high priority wild rice gathering areas located on
State of Minnesota and Federal land. This will be achieved through the installation of floating boardwalks as shown in the plans. Protect all existing improvements and coordinate any needed clearing operations with the Government before proceeding with the work.
Boardwalk:
1) Bid boardwalks as shown in plan and details.
2) Alternate designs for the boardwalk may be considered. Submit any requested alternates and associated pricing in addition to submitting a price to construct boardwalk as shown.
Material Specifications:
1) Lumber:
-All lumber shall be treated southern yellow pine #1.
-Lumber treatment shall meet AWPA U1 category UC4A (Ground
Contact, General Use). Treat with MCA to 0.15 PCF retention.
2) Metal:
-Framing shall be 12 gauge galvanized steel.
-Steel frames shall be fully welded then hot-dip galvanized after assembly.
-Fasteners shall be rated for exterior use and coated for compatibility with treated wood and steel frame contact.
3) Flotation:
-Dock float drums shall be one piece, enclosed, consisting of a
UV-resistant polyethylene shell filled with expanded polystyrene.
4) Seed: (If ground disturbance occurs)
-MnDOT Category & Mix #36-311 (Woodland Edge Northeast)
5) Erosion Control Blanket / Mulch: (If ground disturbance occurs)
-Ero-Guard EG-2S (NN) or approved equal
-Weed Free Mulch Certified by Minnesota Crop Improvement
Association (MCIA)
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
Boardwalk Location Maps
CH10704
D. Dennis
C. Taylor
06/28/2021
CHUB LAKE
SITE
F
R
S
T
S
CHUB
LAKE
CHUB LAKE BOARDWALK SITE
PINE GROVE
SITE
C
C
INGER
SAND LAKE
PINE GROVE BOARDWALK SITE
1) See Specifications for additional wayfinding information and driving directions to the project work sites.
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
All Sites
Steel Framing with Floats
Boardwalk Details
CH10704
D. Dennis
C. Taylor
06/28/2021
1"=12'-0"
10' SECTION
ALL FRAMING MEMBERS ARE
4"x8"x4" 12 GAUGE GALV. STEEL CHANNEL
2x4 TREATED WOOD TOE RAIL
STAGGER JOINTS OF RAIL
WITH FRAMING SECTIONS
2x8 TREATED WOOD DECKING FASTENED
WITH (6) 2-3/4" TEKS SCREWS
FRAMING PLAN
PLAN VIEW
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
All Sites
Steel Framing with Floats
Boardwalk Details
CH10740
D. Dennis
C. Taylor
06/28/2021
1"=12'-0"
PERSPECTIVE VIEW
1'2'2'1'
2x4 TREATED WOOD TOE RAIL
2x4x12" TREATED WOOD
RAIL BLOCKING
2x8 TREATED WOOD DECKING
WITH (6) 2-3/4" TEK SCREWS
5/8" DIA. x 1-1/2" GALV STEEL BOLT
ALL FRAMING MEMBERS ARE
4"x8"x4" 12 GAUGE GALV.
STEEL CHANNEL
3'x6'x12" DOCK FLOAT
LOCATE 8" FROM END OF SECTION
SECTION
ANCHOR PIPE STAGGERED 20'
SEE PROFILES
8"
20'
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
All Sites
Boardwalk Shore Access
CH10704
D. Dennis
C. Taylor
06/28/2021
1"=12'-0"
PERSPECTIVE VIEW
ELEVATION
FULL-WIDTH HINGE FULL-WIDTH HINGE
2x8 TREATED FRAME
STEEL TREAD PLATE
6x6 TREATED SILL
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
All Sites
Anchor Pipe and Bracket Details
CH10704
D. Dennis
C. Taylor
06/28/2021
PERSPECTIVE VIEW
BRACKET PLAN VIEW
1'-0"
RUBBER OR PLASTIC PIPE CAP
3" DIA. ANCHOR PIPE
4" DIA. BRACKET PIPE
1/4" THICK
STEEL PLATE
3/8"Øx1-1/2" DOMEHEAD BOLT
DRILL 1/2" HOLE IN BRACKET
AND FRAME
BRACKET SIDE VIEW
A P
P R
O X
A
B O
V E
D
E C
K
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
Floating Tee End
With Benches
Chub Lake Site
CH10704
D. Dennis
C. Taylor
06/28/2021
TEE END SECTION PLAN
TEE END SECTION PERSPECTIVE
1'-0"
3 4
CORNER BRACKET PLAN VIEW
CORNER BRACKET SIDE VIEW
CORNER BRACKET
6'-0"
Date
CAD File No.
Checked
Drawn
Drawing No.
Project
Project Name
No.
Revision/Issue Date
NOTES
FOREST SERVICE
EASTERN REGION
WILD RICING SITE ACCESS
IMPROVEMENT PROJECT
CHIPPEWA NATIONAL FOREST
Blackduck-Deer River Ranger Districts
Bench Details
Chub Lake Site
CH 10704
D. Dennis
C. Taylor
06/28/2021
BENCH END VIEW
1"
1 4
2x6x6'
3/8"x6" DOMEHEAD BOLT
WITH NUT AND WASHER
3/8"x4" DOMEHEAD
BOLT WITH NUT AND
WASHER
3/8"x6" DOMEHEAD BOLT
WITH NUT AND WASHER
2x4
1'-3
2x4x6' FASTEN BENCH PLANKS WITH
(2) 2-1/2" SCREWS EACH END
2x4
2x4
1 2
6'-0"
5'-5"
1 4
2"
BENCH BRACKET ELEVATION
BENCH BRACKET
" DIA. HOLE
3"x3"x3
" ANGLE IRON
" 1
3"
3 4
3 4
1 2
BENCH BRACKET PLAN
BENCH ELEVATION
3/8"x2-1/2" DOMEHEAD BOLT
WITH NUT AND WASHER
NOTE: ONE BENCH BRACKET PER BENCH LEG
| boardwalk_cst 01 title (1).pdf |
| boardwalk_cst.pdf |
| Sheets and Views |
| boardwalk_cst-02 NOTES |
| boardwalk_cst-03 location maps |
| boardwalk_cst-05 steel plan |
| boardwalk_cst-06 steel section |
| boardwalk_cst-07 hinged |
| boardwalk_cst-08 anchor |
| boardwalk_cst-09 tee |
| boardwalk_cst-10 BENCH |
| boardwalk_cst 11 chub profile (1).pdf |
| boardwalk_cst 12 pine grove profile (1).pdf |
| boardwalk_cst 04 SITES (1).pdf |
| 2022-04-18T10:10:54-0500 | |
| MILLIE BAIRD |
| 2022-05-10T05:25:57-0500 | |
| MICHAEL STANSBERRY |
File details come from the government source that posted it. Updated .