This document contains questions and answers related to a solicitation for design-build services for the Building 53 Limited Scope & Tenant Backfill Project located at the Denver Federal Center in Lakewood, Colorado. The solicitation seeks proposals for design and construction services including renovation and tenant upgrades. Phase 1 proposals were due March 5, 2021. Shortlisted firms will receive additional project details and participate in a site walk during Phase 2. The estimated value is over $20 million. Subcontracting plan goals include 30% for small businesses, 5% for small disadvantaged businesses, 3% for service-disabled veteran-owned small businesses, and 5% for women-owned small businesses. Unsuccessful Phase 2 offerors will receive a $25,000 stipend. The General Services Administration Public Buildings Service Region 8 is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_A DB Building 53 Project 3_1_2021.pdf | ||
| Q and A_ DB Building 53 Project.pdf | ||
| SF1442-14b.pdf | ||
| GC Reps and Certs Nov 2020 508.docx | DOCX document | |
| 1 - VOL I STATEMENT OF WORK 20210201.pdf | ||
| SBU Form.pdf | ||
| Phase I - 20210201 - PPQ for Architect.docx | DOCX document | |
| Phase I - 20210201 - PPQ - General Contractor.docx | DOCX document | |
| B53 Solicitation Phase 1_2021.02.01 .pdf | ||
| Phase I - 20210201 - DRAFT Agreement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services Administration Public Building Service
Rocky Mountain Region 1 Denver Federal Center | Denver, CO | 80225
Building 53 Limited Scope & Tenant Backfill
Project Questions & Answers
1. I wanted to reach out regarding the building 53 sources sought notification I saw in
January and see if there is a future plan to bring on a construction manager for this project. Earlier in 2019, I believe we were informed there was intent but not sure when the project would be looking for that procurement. I noticed it was put on hold with the pandemic and it appears it has been revitalized again. Is this something the GSA will be looking for on this project and is there a potential timing planned as well?
A. Yes, a Construction Manager as Advisor (CMa) will be procured as part of this project, but not as part of this solicitation.
2. Does each “Similar Project” have to meet all 5 criteria described in Evaluation Factor 1 on Page 15 of the solicitation to be considered relevant? Could all 5 criteria be met by a combination of projects?
A. Yes, each “Similar Project” must meet all five of the criteria described in Evaluation Factor 1 to be considered a “Similar Project”.
3. Considering the unusually high threshold of Design-Build, Renovation, and $20 Million, would the government consider changing the latter requirement to $10 million?
A. The government will not change the threshold of a similar project to $10 million. The government will keep the “Similar Project” threshold at $20 million.
4. I see that you have a project coming up and I also see that the Town place suites is affiliated with this project. I wanted to see how we can be on this list of opportunities for contractors to stay at our hotel in the Lakewood Federal Center area. I have attached our upgrades to a quick video so you can see the value you are getting in our all-suites hotel.
A. This is a federal government Design Build construction procurement and is not affiliated with any private sector project. There will be no list provided to encourage any interested party in any private sector endeavor.
5. Is there a small business requirement for this contract? It is full and open. Usually, there is a small business participation requirement.
A. There is no small business requirement for this procurement. It is full and open.
However, all interested parties are encouraged to participate.
6. Has design excellence been removed as a criterion from the previous solicitation on this procurement vs. the previous procurement for this facility?
A. Yes, design excellence has been removed
7. Is there a scope on the abatement expected for this facility?
A. Details related to the abatement associated with this procurement will be released during Phase 2 of this procurement.
8. We respectfully request the government consider allowing CPARs evaluations to fulfill the past performance requirement.
A. Submitting a CPARS evaluation in lieu of submitting the past performance questionnaire to fulfill the past performance requirement will not be accepted.
9. If a GC and an AE worked on the same project together, is it acceptable to complete one Past Performance Questionnaire? Having the same reference complete two separate questionnaires may pose an undue burden on them.
A. Since the evaluation questionnaire should be for either the GC or the AE, separate questionnaires should be completed for each entity if coming from the same reference.
10. Will there be a GSA conference call/walk prior to phase 1 submission?
A. No, there will not be a conference call/walk prior to the Phase 1 submission.
11. Knowing that questions will be accepted until March 1st, will questions be answered as they come in or within a certain time frame of being asked? If questions are all answered around March 1st, it may not provide enough time for respondents to complete Phase 1 proposals by March 5th.
A. Questions will be issued as they are submitted, with final questions answered by March 2, 2021.
12. Would the government consider lowering some of the criteria based on the overall project scope being diminished from past building 53 RFPs to allow for more contractors to qualify for the project? If not, would the evaluation factors of similar projects for the experience of the General contractor and A/E be pass fail or will partial credit be given for values near the RFP quantities? Examples below.
a. Project area not less than 100,000 SF, would a project size of 80,000sf be considered?
b. Project Value greater or equal to 20M, would a project value of 15M be considered?
A. The evaluation factor criteria will remain the same as stated within the Phase 1 Solicitation.
13. Understanding that projects submitted by the Prime Contractor/GC must be a Design Build delivery method, would an A/E team partner qualifying project which used a Design Bid Build delivery method be considered?
A. No. The evaluation factor is considering projects utilizing the Design-Build delivery method
14. Is there a preferred format for the 4 pages narrative for each similar project experience of the general contractor and A/E?
A. Single sided, 10 point minimum font.
15. When a similar project involved both the GC and A/E could 2 Similar project narratives be submitted to document the experience of each firm? Would this qualify as 2 of the 3-5 required project submissions?
A. Yes, when a similar project is submitted to document the experience of both the A/E and GC it would qualify as 2 of the required submissions as long as the submissions are submitted separately to document the experience of each firm.
16. For the past performance references, would CPARS be acceptable in place of PPQ’s? If the PPQ’s are required, would CPARS for submitted projects be accepted in addition to other information given in Phase 1 submission?
A. No, CPARs evaluations will not be accepted in lieu of submitting the past performance questionnaires.
17. Looking at previous solicitations it appears that this project was originally going to be a bid build. Would you be able to provide any details on why this is being reissued as a design build?
A. It was an internal business decision
18. Is there an email file size restriction for submitting a response to this solicitation?
A. 10MB
19. In the PPQ for the General Contractor, in the definition for Similar Projects, the first bullet says “ten years”. Should it be changed to “eight years” to match the solicitation?
A. Yes, it should be changed to eight years to match the solicitation.
20. References are to email completed PPQs directly to the contracting officers and “the email subject line should contain the solicitation number…” Could you please provide the solicitation number?
A. The system has not generated a Solicitation Number, please reference the title of the project and the notice identification number "BLDG53_DB_SOL”
21. Will the facility under scope be occupied during construction?
A. Yes, Building 53 will be partially occupied during construction.
22. The RFP was silent on Small and Disadvantaged Goals and whether a small business participation plan and subcontracting plan would be required at Phase II. Please advise on goal
A. If you are designated as a large business then a subcontracting plan will be required.
GSA sets the goals and the expectation is that the contractor attempt to exceed these goals the goals are as follows:
Prime Contract Goals 30%; Prime Small Disadvantaged Business 5.0%; Prime Service-Disabled Veteran-Owned Small Business 3.0%; Prime Women Owned Small Business 5.0%; Prime HUBZone Small Business 3.0%
Subcontract Goals 20.00%; Subcontract Small Disadvantaged Business 5.0%;
Subcontract Service-Disabled Veteran-Owned Small Business 3.0%; Subcontract Women Owned Small Business 5.0%; Subcontract HUBZone Small Business 3.0%
23. For the companies shortlisted for phase two of the proposal stage, what is the anticipated stipend amount for the unsuccessful groups?
A. The anticipated stipend is $25,000 for each of the two unsuccessful offerors.
24. During phase two of the proposal stage, will we be given additional information to help develop our design-build proposal? This might include bridging documents, programming requirements, building assessments, proposed layouts, etc.
A. Yes, additional information will be provided to the short listed firms about the project at the beginning of Phase 2.
25. Will a site walk be offered to the shortlisted firms during phase two of the proposal stage?
A. Yes, a site walk will be conducted during Phase 2 for the shortlisted firms.
26. During phase two of the proposal stage, will each of the short listed firms be allowed to meet with the end-users to verify program needs and to help fine tune our approach and design?
A. No, there will not be any meetings with the end users during Phase 2 of the solicitation.
27. Will the FF&E be part of the design-build scope of work, or will this be provided by the GSA? If provided by the GSA, will the shortlisted teams be allotted time with the vendor to coordinate space plans during phase two of the proposal stage? If supplied by the design-builder, will the shortlisted teams be expected to add this to our qualifications during phase one of the proposal stage?
A. FF&E will be provided by GSA. A vendor has not been selected at this stage. A program of requirements will be provided to the shortlisted firms during Phase 2 of the solicitation.
28. We understand the project is full and open. What will the small business procurement goals (i.e. SDVOSB, 8a, HubZONE, etc.) be for the project during phase two of the proposal stage?
A. Refer the answer to question number 22.
29. On Beta SAM we noticed there is no Plan Holders list. Would you be able to provide that for our firm? Or a list of the General Contractors bidding on this project?
A. GSA will consider this if an available options on beta.SAM
30. We respectfully request that a two-page supplemental narrative be added to the Factor 1
- Experience factor to allow offerors to introduce teaming partners or describe their teaming arrangement. This is a standard element in many federal government proposals. Or, alternatively, that the government advise the contractor on where this information shall be provided.
A. At this time, GSA will not consider adjusting the evaluation criteria.
More answers will be published as questions come in.