Bldg 1044 Electrical and Heating Upgrade Materials Equipment In-Place List.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Bldg. 1044 - Electrical and Heating Upgrade Federal contract opportunity
Solicitation number
N00253-22-Q-0032
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract No:
Project Title:
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:Replace Breathing Air Filters and Install Carpet
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043563/12/213/12/175094-0-101-154A-40-1H
Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043573/12/213/12/175094-0-101-154A-40-1J
CARPET5094116, 117, 118300SQFT$4,200.00Carpets - 156 Lumber Way,

Bert WA 98317 carpets@msn.com

360-266-0154MohawkMOHAWH - STRBUN/A3/21/193/12/17N/A
Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

File details come from the government source that posted it. Updated .