Blair Square Improvements Questions 1.pdf

PDF 90 KB Posted

Attached to
Blair Square Improvement Construction
Solicitation number
BD-22-1627-BOS17-BOS17-76487
Issued by
Middlesex County, Massachusetts

About this file

This document is a set of prospective bidder questions and answers related to the Blair Square Improvements construction project issued by the Town of Holliston Facilities Department in Massachusetts. The first question pertains to the treatment of the triangular kiosk, which is to be textured powder coated in black, and the material for the bulletin cases, which will be cork. The second question concerns the water connection work, for which the Town will provide the main connection with a shut-off valve and meter, and the contractor is responsible for running the piping to the various water access points.

The related state and local contract opportunity is for the Blair Square Improvement Construction project located in the state of Massachusetts. No additional details about the project scope, timeline, or procurement process are provided in the document.

View the file

Other files

File Type Posted
Blair Square Technical Specs.pdf PDF
Blair Square Bid Plans.pdf PDF
IFB Blair Square Improvements Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF HOLLISTON

FACILITIES DEPARTMENT

703 Washington Street 508-958-4416 Holliston, MA 01746 June 28, 2022

PROSPECTIVE BIDDERS QUESTIONS #1

BLAIR SQUARE IMPROVEMENTS

Question 1: Will the Triangular Kiosk be painted or powder coated? Also, would you like the material in the bulletin cases to be metal for magnets or a cork-like material for push pins ?

Answer 1: The kiosk is to be textured powder coated in black color. The inner material in the bulletin case is to be cork.

Question 2: There is a pay item for “Water Connection w/Piping” but there is no information on this work. Can you provide plans for this?

Answer 2: The Town will provide the connection to the water main with a shut off valve and meter. The contractor is responsible for running the piping from the shut off valve to the hose bibs, dog-pots and water bubbler.