BL136_23 Award Notice.pdf

PDF 208 KB Posted

Attached to
BL136-23 Commercial Flooring Installation, Replacement and Repairs on an Annual Contract
Solicitation number
PE-77023-NONST-2023-000000007
Issued by
Gwinnett County, Georgia

About this file

This is a Bid Tabulation and Award Notice for BL136-23, a Commercial Flooring Installation, Replacement and Repairs annual contract issued by Gwinnett County, Georgia, involving the Departments of Support Services and Water Resources. The contract encompasses flooring installation, removal, and related labor services across multiple material types including carpet, luxury vinyl plank (LVP), luxury vinyl tile (LVT), vinyl composition tile (VCT), ceramic or porcelain tile, hardwood flooring, and cove base installation. Section A addresses Department of Support Services requirements with approximately 75,000 square feet of carpet installation, 10,000 square feet each of LVP and LVT installation, 15,000 square feet of VCT installation, 2,500 square feet of ceramic or porcelain tile and hardwood flooring, and 10,000 linear feet of cove base, along with removal services for these materials. Section B covers Department of Water Resources needs with 30,000 square feet of carpet installation, 10,000 square feet of VCT installation, and 10,000 linear feet of cove base, plus corresponding removal services. The contract includes hourly labor rates for regular time and holiday work, service call charges, and material markup percentages tiered by cost ranges. DCO, Inc. dba DCO Commercial Floors (OC) was selected as the recommended vendor with a grand total bid of $1,278,100.00, compared to competing bidder Quintech Solutions, Inc. at $1,254,025.00.

The award notice specifies that DCO Commercial Floors will hold pricing firm with renewal options available at 5% increases for years one through three and a 3% increase for year two. The vendor's contact is Matthew Fasick, located at 3690 Atlanta Highway, Suite 110, Athens, Georgia 30606. Several line items were rejected from both bidders' proposals, including LVP and LVT installation and removal for the Department of Water Resources Section B, ceramic or porcelain tile installation and removal, and hardwood flooring installation and removal for that same section, indicated by "N/B" (no bid) designations. The pricing analysis reveals variations between the two bidders across labor rates, with DCO Commercial Floors generally offering lower per-unit installation costs but higher removal rates and material markups compared to Quintech Solutions. The contract is subject to Gwinnett County's ineligible source list requirements, and no bidders on that list were permitted to submit.

View the file

Other files

File Type Posted
BL136_23 Ad _1.pdf PDF
BL136_23 Inv.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION Page 1 of 2

BL136-23

Flooring Installation, Replacement and Repairs on an Annual Contract

ITEM

DESCRIPTION UNIT

PRICE

TOTAL

PRICE

UNIT

PRICE

TOTAL

PRICE

1 State carpet installation rate (per sq ft) 75,000 SQ FT. $1.00 $75,000.00 $0.65 $48,750.00 2 State LVP installation rate (per sq ft) 10,000 SQ FT. $2.75 $27,500.00 $2.25 $22,500.00 3 State LVT installation rate (per sq ft) 10,000 SQ FT. $2.75 $27,500.00 $2.25 $22,500.00 4 State VCT installation rate (per sq ft) 15,000 SQ FT. $2.75 $41,250.00 $1.50 $22,500.00 5 Ceramic or Porcelain tile installation rate (per sq ft) 2,500 SQ FT. $10.69 $26,725.00 $7.50 $18,750.00 6 Hardwood flooring installation rate (per sq ft) 2,500 SQ FT. $0.55 $1,375.00 $6.50 $16,250.00 7 Cove base installation rate (per linear ft) 10,000 FT. $1.00 $10,000.00 $0.75 $7,500.00 8 State regular time hourly rate 50 HOURS $125.00 $6,250.00 $60.00 $3,000.00 9 State holiday hourly rate 20 HOURS $195.00 $3,900.00 $60.00 $1,200.00

10 Service Call Charge (up to 500 sq ft only) 20 EA $1,500.00 $30,000.00 $850.00 $17,000.00

11 State carpet removal rate (per sq ft) 75,000 SQ FT. $0.15 $11,250.00 $0.75 $56,250.00 12 State LVP removal rate (per sq ft) 10,000 SQ FT. $0.55 $5,500.00 $1.65 $16,500.00 13 State LVT removal rate (per sq ft) 10,000 SQ FT. $0.55 $5,500.00 $1.65 $16,500.00 14 State VCT removal rate (per sq ft) 15,000 SQ FT. $1.10 $16,500.00 $2.00 $30,000.00 15 State Ceramic or Porcelain tile removal rate (per sq ft) 2,500 SQ FT. $5.45 $13,625.00 $3.40 $8,500.00 16 State Hardwood flooring removal rate (per sq ft) 2,500 SQ FT. $2.25 $5,625.00 $4.40 $11,000.00

State Percentage of mark-up above cost for materials and Sub- Contractor labor (Not to Exceed 25% on items $0-$500.00)

20% $6,000.00 23% $6,150.00

State Percentage of mark-up above cost for materials and Sub- Contractor labor (Not to Exceed 20% on items $501.00-$2,000.00)

15% $17,250.00 18% $17,700.00

State Percentage of mark-up above cost for materials and Sub- Contractor labor (Not to Exceed 15% on items $2,000.00 or more)

10% $550,000.00 13% $565,000.00

20 Equipment Rental (With no markup) 0% $20,000.00 0% $20,000.00

1 State carpet installation rate (per sq ft) 30,000 SQ FT. $1.00 $30,000.00 $0.65 $19,500.00 2 State LVP installation rate (per sq ft) (REJECTED) 0 SQ FT. $2.75 $0.00 N/B N/B 3 State LVT installation rate (per sq ft) (REJECTED) 0 SQ FT. $2.75 $0.00 N/B N/B 4 State VCT installation rate (per sq ft) 10,000 SQ FT. $2.75 $27,500.00 $1.50 $15,000.00

$608,850.00

Quintech Solutions, Inc.

(OC)

$179,950.00

$138,750.00

Departments of Support Services and Water Resources

SECTION A: DEPARTMENT OF SUPPORT SERVICES

II. FLOORING REMOVAL

III. LABOR AND MATERIALS

LABOR AND MATERIALS TOTAL

FLOORING INSTALLATION TOTAL

FLOORING REMOVAL TOTAL

$5,000.00

$15,000.00

$500,000.00

$20,000.00

I. FLOORING INSTALLATION

$58,000.00

$249,500.00

$593,250.00

DCO, Inc. dba DCO Commercial Floors

(OC)

APPROX. QTY.

DEPARTMENT OF SUPPORT SERVICES - SECTION A TOTAL $900,750.00 $927,550.00

SECTION B: DEPARTMENT OF WATER RESOURCES

I. FLOORING INSTALLATION

bc

BID TABULATION Page 2 of 2

BL136-23

Flooring Installation, Replacement and Repairs on an Annual Contract

ITEM

DESCRIPTION UNIT

PRICE

TOTAL

PRICE

UNIT

PRICE

TOTAL

PRICE

Quintech Solutions, Inc.

(OC)

Departments of Support Services and Water Resources

DCO, Inc. dba DCO Commercial Floors

(OC)

APPROX. QTY.

5 Ceramic or Porcelain tile installation rate (per sq ft) (REJECTED) 0 SQ FT. $10.69 $0.00 N/B N/B

6 Hardwood flooring installation rate (per sq ft) (REJECTED) 0 SQ FT. $6.55 $0.00 N/B N/B 7 Cove base installation rate (per linear ft) 10,000 FT. $1.00 $10,000.00 $0.75 $7,500.00 8 State regular time hourly rate 25 HOURS $125.00 $3,125.00 $60.00 $1,500.00 9 State holiday hourly rate 20 HOURS $195.00 $3,900.00 $60.00 $1,200.00

10 Service Call Charge (up to 500 sq ft only) 10 EA $1,500.00 $15,000.00 $850.00 $8,500.00

11 State carpet removal rate (per sq ft) 30,000 SQ FT. $0.15 $4,500.00 $0.75 $22,500.00 12 State LVP removal rate (per sq ft) (REJECTED) 0 SQ FT. $0.55 $0.00 N/B N/B 13 State LVT removal rate (per sq ft) (REJECTED) 0 SQ FT. $0.55 $0.00 N/B N/B 14 State VCT removal rate (per sq ft) 10,000 SQ FT. $1.10 $11,000.00 $2.00 $20,000.00

15 State Ceramic or Porcelain tile removal rate (per sq ft) (REJECTED) 0 SQ FT. $5.45 $0.00 N/B N/B

16 State Hardwood flooring removal rate (per sq ft) (REJECTED) 0 SQ FT. $2.25 $0.00 N/B N/B

State Percentage of mark-up above cost for materials and Sub- Contractor labor (Not to Exceed 25% on items $0-$500.00)

20% $6,000.00 23% $6,150.00

18 State Percentage of mark-up above cost for materials and Sub- Contractor labor (Not to Exceed 20% on items $501.00-$2,000.00)

15% $17,250.00 18% $17,700.00

19 State Percentage of mark-up above cost for materials and Sub- Contractor labor (Not to Exceed 15% on items $2,000.00 or more)

10% $220,000.00 13% $226,000.00

20 Equipment Rental (With no markup) 0% $5,000.00 0% $5,000.00

Recommended Vendor:

DCO, Inc. dba DCO Commerical Floors Attn: Matthew Fasick 3690 Atlanta Highway, Suite 110 Athens, GA 30606 Phone: 404-542-2337 mfasick@dcocf.com

3% Increase 3% Increase

3% Increase

Will Vendor Hold Pricing Firm? Renewal Option Four 5% Increase

Will Vendor Hold Pricing Firm? Renewal Option One 5% Increase

Will Vendor Hold Pricing Firm? Renewal Option Three 5% Increase 3% IncreaseWill Vendor Hold Pricing Firm? Renewal Option Two 5% Increase

$5,000.00

DEPARTMENT OF WATER RESOURCES - SECTION B TOTAL $353,275.00 $350,550.00

GRAND TOTAL $1,254,025.00 $1,278,100.00

II. FLOORING REMOVAL

FLOORING INSTALLATION TOTAL $89,525.00 $53,200.00

$5,000.00

III. LABOR AND MATERIALS

FLOORING REMOVAL TOTAL $15,500.00 $42,500.00

LABOR AND MATERIALS TOTAL $248,250.00 $254,850.00