BL106_24 Ad2.pdf
PDF 147 KB Posted
- Attached to
- BL106-24, Bryson Park Synthetic Turf Replacement
- Solicitation number
- PE-77023-NONST-2025-000000223
- Issued by
- Gwinnett County, Georgia
About this file
This document is an addendum to the invitation for bid BL106-24, Bryson Park Synthetic Turf Replacement, issued by the Gwinnett County Department of Community Services. The addendum addresses questions and answers related to the project, including clarification on the existing base conditions and the scope of work for the irrigation line. The project involves the replacement of the synthetic turf at Bryson Park, located in Gwinnett County, Georgia.
The addendum states that the existing base shall be left in place, and any issues with the base grading shall be corrected by the awarded contractor prior to the installation of the new turf. Regarding the irrigation line, the contractor shall cap all laterals at the main line, which wraps the field perimeter. The addendum also instructs bidders to acknowledge the addendum in the bid documents and return it with their bid, as failure to do so may result in the bid being deemed non-responsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL106_24 Notice.pdf | ||
| AD434477_jnl.pdf | ||
| BL106_24 Ad1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 16, 2024
ADDENDUM #2
BL106-24, Bryson Park Synthetic Turf Replacement
QUESTIONS & ANSWERS:
Q1. Regarding drawings: 3.1B - are we supposed to laser grade even though plans say leave existing base in place? Existing condition survey shows the center ridge line is 975.0 but then a corner shows 957.1 and another 979.4. Please clarify.
A1. The contours and the ridge line shown appear correct. The base shall be left in place and very little base work is anticipated. The expectation, however, is that any issues with base grading shall be corrected by the awarded contractor prior to laying the new turf down.
Q2. Can you provide some clarification regarding the irrigation line. Could you please provide more details on the scope of work? Specifically, I would like to understand whether this involves installing a new line, removing an existing one, or simply capping it at the field.
A2. The irrigation line shall generally be abandoned in place. The contractor shall cap all laterals at the main line, which wraps the field perimeter.
This addendum should be acknowledged in the space provided on page 15 of the bid documents and returned with your bid. Failure to do so may result in your bid being deemed non-responsive.