This is an addendum to the bid documents for the Jim Moore Road Water Main Improvements Project issued by the Gwinnett County Department of Water Resources in Georgia. The project involves the installation of approximately 2,000 linear feet of 12-inch ductile iron water main, including hot-taps, road cuts, driveway crossings, valves, hydrants, and appurtenances. Addendum No. 2, issued on August 22, 2022, clarifies specifications regarding detail drawings for the project and modifies the previous response provided in Addendum No. 1, specifically addressing which detail specification—G5 or G5b—will be used. All bidders must acknowledge receipt of this addendum by inserting its number and date in the Bid Form, with failure to do so potentially resulting in bidder disqualification.

The addendum specifies that the estimated quantities listed in the Bid Schedule reflect the G5b detail specification, and bidders must submit pricing based on these estimated quantities. However, the Owner reserves the right to use the G5 detail specification instead and will coordinate with the awarded contractor should the plans change from G5b to G5. This modification ensures bidders have clarity on which specification to base their cost estimates while maintaining Owner flexibility to adjust specifications if necessary during project execution.

Text of this file

Project No. 100482.06.17 1 ADDENDUM NO. 2 JIM MOORE ROAD WATER MAIN IMPROVEMENTS PROJECT Revised: 08/22/2022

RE: Gwinnett County Department of Water Resources Jim Moore Water Main Improvements Project

CEI Project No. 100482.06.17 Bid Number: BL083-22

ADDENDUM NO. 2 – August 22, 2022

TO: ALL HOLDERS OF RECORD OF CONTRACT DOCUMENTS

Acknowledge receipt of this addendum by inserting its number and date in the Bid Form. Failure to do so may subject bidder to disqualification. This addendum forms a part of the Contract Documents. It modifies them as follows:

General

• Revise answer from Addendum No. 1, Question No. 8 – “Is Detail G5 or G5b used for this project?”

to the following:

The estimated quantities listed in the Bid Schedule reflect G5b. Bidders must submit pricing based on the estimated quantities listed. However, the Owner reserves the right to use G5.

Owner will work with the awarded contractor should plans to use G5b change.

END OF ADDENDUM NO. 2

Other files

File Type Posted
Award Information —
BL083-22 —
BL083-22 ADD1 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .