Award Information
153 KB Posted
- Attached to
- Jim Moore Road Water Main Improvements
- Solicitation number
- BL083-22
- Issued by
- Gwinnett County, Georgia
About this file
This Award Notice and Bid Tabulation document from the Gwinnett County Department of Financial Services Purchasing Division announces the award of contract BL083-22 for Jim Moore Road Water Main Improvements. The project involves the installation of approximately 2,000 linear feet of 12-inch ductile iron water main, including hot-taps, road cuts, driveway crossings, valves, hydrants, and appurtenances. Bids were received on August 25, 2022, and the contract was awarded on October 18, 2022. The scope of work encompasses multiple components including asphalt paving and wearing surfaces, graded aggregate base and stone materials, geogrid fabric, asphalt milling, driveway cut restoration, curb and gutter installation, sidewalk restoration, sodding, tree replacement and protection, exploratory excavations, traffic control devices and police officers, erosion and sediment controls, site restoration, project record drawings, ductile iron piping and fittings, water service connections, utility distribution valves and fire hydrants, and related utility work. The project includes both unit price items (Part 1) and owner-directed bid items (Part 2).
The contract was awarded to The Dickerson Group, Inc. (contact: Jason Freeland, 770-513-4558, jason.freeland@dickersongroup.net) in the amount of $928,482.50. This was the lowest bid among four submitted proposals, with competing bids from Site Engineering, Inc. ($1,186,690.00), JDS, Inc. ($1,273,198.75), and GS Construction, Inc. ($1,226,740.00). Part 1 of The Dickerson Group's bid totaled $896,182.50 and Part 2 totaled $32,300.00. The bid tabulation provides detailed unit pricing across numerous line items covering materials and services ranging from asphalt work and stone materials to water infrastructure components and erosion control measures.
Text of this file
Gwinnett
October 18, 2022
AWARD NOTICE
BL083-22
GWINNETT COUNTY
DEPARTMENT OF FINANCIAL SERVICES
PURCHASING DIVISION
75 Langley Drive I Lawrenceville, GA 30046-6935
O: 770.822.8720 I F: 770.822.8735 GwinnettCounty.corn
Jim Moore Road Water Main Improvements
Pursuant to the bids received on August 25, 2022 for BL083-22, Jim Moore Road Water Main Improvements, the bid has been awarded to The Dickerson Group, Inc. in the amount of $928,482.50.
Please note the enclosed bid tabulation.
We appreciate your bid and interest in Gwinnett County.
Sincerely, �� r3JAM� Brittany :?ant • d Purchasing Associate
BB/km
Enclosure
Proud Winner of the Annual Achievement of Excellence Award in Procurement since 1999
BID TABULATION Page 1 of 1
BL083-22
Jim Moore Road Water Main Improvements Department of Water Resources
ITEM
# DESCRIPTION UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
1a Asphalt Paving – Asphalt Pavement Resurfacing 135 TON $200.00 $27,000.00 $400.00 $54,000.00 $300.00 $40,500.00 $260.00 $35,100.00
2a Asphalt Wearing Surface 50 TON $200.00 $10,000.00 $600.00 $30,000.00 $300.00 $15,000.00 $245.00 $12,250.00 2b Asphalt Binder 135 TON $200.00 $27,000.00 $500.00 $67,500.00 $300.00 $40,500.00 $250.00 $33,750.00 2c Graded Aggregate Base 330 TON $75.00 $24,750.00 $60.00 $19,800.00 $80.00 $26,400.00 $85.00 $28,050.00 2d #57 Stone 600 TON $75.00 $45,000.00 $69.00 $41,400.00 $80.00 $48,000.00 $90.00 $54,000.00 2e Geogrid Fabric 1,200 SY $6.00 $7,200.00 $15.00 $18,000.00 $15.00 $18,000.00 $3.00 $3,600.00 3 Asphalt Milling and Haul off 320 TON $100.00 $32,000.00 $110.00 $35,200.00 $500.00 $160,000.00 $50.00 $16,000.00 4 Driveway Cut Restoration - Asphalt 65 SY $100.00 $6,500.00 $300.00 $19,500.00 $110.00 $7,150.00 $75.00 $4,875.00 5 Curb/Combination Curb and Gutter 300 LF $40.00 $12,000.00 $100.00 $30,000.00 $80.00 $24,000.00 $40.00 $12,000.00 6 Sidewalk Restoration 140 SY $75.00 $10,500.00 $70.00 $9,800.00 $70.00 $9,800.00 $55.00 $7,700.00 7 Sodding 3,000 SY $40.00 $120,000.00 $30.00 $90,000.00 $16.00 $48,000.00 $17.00 $51,000.00
8a Tree Replacement 6 EA $500.00 $3,000.00 $4,000.00 $24,000.00 $800.00 $4,800.00 $1,500.00 $9,000.00 8b Tree Save Barrier Fence 885 LF $1.75 $1,548.75 $4.00 $3,540.00 $4.00 $3,540.00 $3.50 $3,097.50 9 Exploratory Excavations 15 EA $7,500.00 $112,500.00 $500.00 $7,500.00 $600.00 $9,000.00 $350.00 $5,250.00
10a Traffic Control – Devices 1 LS $100,000.00 $100,000.00 $6,700.00 $6,700.00 $100,000.00 $100,000.00 $75,000.00 $75,000.00 10b Traffic Control – Police Officer 200 HR $55.00 $11,000.00 $55.00 $11,000.00 $55.00 $11,000.00 $55.00 $11,000.00
11a Erosion and Sediment Controls – Temp Silt Fence C (Sd1-S) 2,000 LF $4.00 $8,000.00 $5.00 $10,000.00 $4.00 $8,000.00 $3.00 $6,000.00
11b Erosion and Sediment Controls – Sediment Trap (Sd2)
8 EA $500.00 $4,000.00 $250.00 $2,000.00 $500.00 $4,000.00 $150.00 $1,200.00
11c Erosion and Sediment Controls – Mulch (Ds1) 2 TON $100.00 $200.00 $400.00 $800.00 $500.00 $1,000.00 $655.00 $1,310.00
11d Erosion and Sediment Controls – Temp Seeding (Ds2) 3,000 SY $5.00 $15,000.00 $2.00 $6,000.00 $1.00 $3,000.00 $0.55 $1,650.00
12 Site Restoration and Cleanup 1 LS $50,000.00 $50,000.00 $2,500.00 $2,500.00 $15,000.00 $15,000.00 $50,000.00 $50,000.00 13 Project Record Drawings 1 LS $15,000.00 $15,000.00 $2,500.00 $2,500.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00
Ductile Iron Pipe (Water) 8-Inch Diameter 20 LF $200.00 $4,000.00 $150.00 $3,000.00 $160.00 $3,200.00 $150.00 $3,000.00
12-Inch Diameter 2,000 LF $250.00 $500,000.00 $317.30 $634,600.00 $190.00 $380,000.00 $198.00 $396,000.00 Water Service Connection 9 EA $1,500.00 $13,500.00 $2,600.00 $23,400.00 $4,000.00 $36,000.00 $1,200.00 $10,800.00
Water Utility Distribution Valves 12” x 12” Tapping Sleeve and Valve 1 EA $10,000.00 $10,000.00 $15,000.00 $15,000.00 $16,000.00 $16,000.00 $25,000.00 $25,000.00
16 Water Utility Distribution Fire Hydrant Assembly 5 EA $6,000.00 $30,000.00 $8,000.00 $40,000.00 $9,000.00 $45,000.00 $5,000.00 $25,000.00
17 Salvage Existing Fire Hydrants 4 EA $500.00 $2,000.00 $1,000.00 $4,000.00 $800.00 $3,200.00 $200.00 $800.00
18 Wire and Conduit for Traffic Control Signal 50 LF $200.00 $10,000.00 $300.00 $15,000.00 $300.00 $15,000.00 $75.00 $3,750.00
1 Additional Utility Pipe Bedding 200 CY $100.00 $20,000.00 $150.00 $30,000.00 $80.00 $16,000.00 $55.00 $11,000.00
2 Miscellaneous Cast-in-Place Concrete 10 CY $200.00 $2,000.00 $275.00 $2,750.00 $1,000.00 $10,000.00 $250.00 $2,500.00
3 Ductile Iron Fittings (Water) 1 TON $8,000.00 $8,000.00 $10.00 $10.00 $20,000.00 $20,000.00 $8,000.00 $8,000.00 4 #57 Stone 20 TON $75.00 $1,500.00 $129.00 $2,580.00 $80.00 $1,600.00 $90.00 $1,800.00 5 Debris Removal 100 TON $200.00 $20,000.00 $50.00 $5,000.00 $80.00 $8,000.00 $50.00 $5,000.00 6 Rock Removal – Trench Rock 20 CY $500.00 $10,000.00 $170.00 $3,400.00 $800.00 $16,000.00 $200.00 $4,000.00
Recommended Vendor:
The Dickerson Group, Inc.
Attn: Jason Freeland 871 Old Peachtree Road, NW Lawrenceville, GA 30043 Phone: 770-513-4558 Jason.Freeland@dickersongroup.net
OVERALL TOTAL (PART 1 + PART 2) $928,482.50$1,186,690.00$1,273,198.75
PART 1 - TOTAL $1,211,698.75 $1,115,090.00 $896,182.50
PART 2 - TOTAL $61,500.00
PART 2 - OWNER DIRECTED BID ITEMS
$1,226,740.00
$43,740.00 $1,270,480.00
The Dickerson Group, Inc.
(L)
APPROX.
QTY
Site Engineering, Inc.
(OC)
$71,600.00 $32,300.00
PART 1 - UNIT PRICE ITEMS
JDS, Inc.
(L)
GS Construction, Inc.
(L) bb mailto:Jason.Freeland@dickersongroup.net
| BL083-22 Award Notice.pdf |
| BL083-22 Tab.pdf |
| Tab |
Other files
| File | Type | Posted |
|---|---|---|
| BL083-22 ADD1 | — | |
| BL083-22 ADD2 | — | |
| BL083-22 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .