About this file
This document is an addendum to the request for bids for the West Gwinnett Aquatic Center Pool Renovations project (Bid No. BL038-24) in Gwinnett County, Georgia. The addendum revises the scope of work to require the indoor pools to be completed by August 23, 2024, and the outdoor pool work to start after Labor Day on September 3, 2024. It also provides clarification on the replacement of tiles, expansion joints, plaster, depth markers, and the play structure tiles. The addendum requires the contractor to be responsible for re-grouting and cleaning the tile in the outdoor pool and replacing the main drain covers and hydrostats.
The bid schedule has been revised to include an alternate bid item for the full plaster removal on the outdoor pool. Bidders are required to state the number of days to begin work once the bid is awarded and the number of days to complete the work once the project has started. The contract is being issued by Gwinnett County, Georgia, and submittals from firms currently on the county's ineligible source list will not be considered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL038_24 INV.pdf | ||
| BL038_24 Award Notice.pdf | ||
| BL038_24 Ad1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 12, 2024
ADDENDUM #2
BL038-24, West Gwinnett Aquatic Center Pool Renovations
REVISIONS:
R1. I. SCOPE OF WORK, #1 shall be revised to the following: Work on the indoor pools should be completed no later than August 23, 2024. Work on the outdoor pool should start on September 3, 2024 after the Labor Day holiday. All work shall be coordinated with the County Representative.
QUESTIONS & ANSWERS:
Q1. Is Gwinnett County providing all of the replacement tile?
A1. Yes, the County will provide replacement tiles for all pools. All black tiles shall be left in place and all blue tiles shall be removed and replaced with black tiles.
Q2. Are the expansion joints being removed and replaced?
A2. Yes.
Q3. How many layers of plaster are in each pool?
A3. The indoor pools are original, and the outdoor pool has one additional layer.
Q4. Does the plaster on the outdoor pool need to be removed?
A4. Plaster removal for the outdoor pool shall be included as an Add Alternate to the project.
Please see Attachment 1 for the REVISED BID SCHEDULE.
Q5. Is the plaster to be replaced with white plaster?
A5. Yes, plaster shall be conventional white marble finish.
Q6. Will the contractor be responsible for installing depth markers?
A6. Yes, the contractor will be responsible for installing new depth markers. Depth markers shall be provided by the County.
Q7. Are the 1”x1”s on the play structure being removed and replaced?
A7. Only chipped or damaged tiles shall be replaced.
Q8. Do we need to re-grout the tile in the outdoor pool?
A8. Yes, the awarded contractor shall be responsible for re-grouting and cleaning the tile in the outdoor pool.
Q9. Please specify the start date and/or time allotted to complete the indoor pools.
A9. The contractor shall commence work within 10 days of the issuance of the Notice to
Proceed. Indoor pools should be completed no later than August 23, 2024. All installation shall be coordinated with the Department of Community Services.
Q10. Are the main drains being replaced?
A10. Yes, the main drain covers and hydrostats shall all be replaced.
This addendum should be acknowledged in the space provided on page 13 of the bid documents and returned with your bid. Failure to do so may result in your bid being deemed non-responsive.
Thank you, Jake Scarpone
Jake Scarpone Purchasing Associate II
Attachments:
1. REVISED BID SCHEDULE, Page 3R
2. Pre-Bid Conference Sign In Sheet
Gwinnett County, Georgia Page 3R West Gwinnett Aquatic Center Pool Renovations BL038-24
FAILURE TO RETURN THIS PAGE AS PART OF YOUR BID MAY RESULT IN BID BEING REJECTED.
REVISED BID SCHEDULE
DESCRIPTION PLASTER TILE TOTAL PRICE
BASE BID: Pool Renovations at West Gwinnett Aquatic Center
Pool Renovations at West Gwinnett Aquatic Center, per specifications
ALTERNATE #1: West Gwinnett Aquatic Center Outdoor Pool Plaster Removal
Full plaster removal on outdoor pool at West Gwinnett Aquatic Center
BID TOTAL (BASE BID + ALTERNATE #1) $
State number of days to begin work once the bid has been awarded: ___________________
State number of days to complete work once the project has started: __________________
Company Name _______________________________________________________________________________________
| BL038-24 Ad2 draft |
| BL038-24 PBC Sign In Sheet |
File details come from the government source that posted it. Updated .