Binder1.pdf

PDF 13 MB Posted

Attached to
Cadillac Place Cooling Tower Repair
Solicitation number
RFP-171-250000001477-2
Issued by
Wayne County, Detroit City, Michigan

About this file

This document is a set of mechanical and electrical engineering design drawings for the New Office Center project in Detroit, Michigan, developed by JBG TrizecHahn Development Services LLC in collaboration with Gensler and Albert Kahn Associates. The drawings provide detailed technical specifications for the building's mechanical systems, including penthouse and roof plans for HVAC and piping across multiple areas, an air conditioning unit schedule, electric heat tracing schedule, pump schedule, cooling tower schedule, and plumbing fixture details. The technical drawings are comprehensive, covering various system components such as supply piping, return piping, pumps, and make-up water systems, with precise measurements, equipment locations, and technical parameters.

The documentation indicates a complex, multi-system approach to the building's mechanical infrastructure, with detailed scheduling and specifications for electrical, thermal, and water management systems. The drawings suggest a sophisticated design approach that considers factors like heat tracing, minimum amperage, cable ratings, and specific environmental conditions. The State of Michigan is the project owner, and the design appears to be prepared with high-level technical precision, incorporating multiple engineering disciplines and considering various operational requirements for the new office center in Detroit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-374.pdf

M-375.pdf
M-376.pdf
MK-401.pdf
M501.pdf
M-503.pdf
PUMP SCHDLE.pdf
HEAT TRACE.pdf
SCHDL.pdf

File details come from the government source that posted it. Updated .