Bill of Quantities - 191T7024Q0027.pdf
PDF 111 KB Posted
- Attached to
- FAC Locker Room, Rome, Italy
- Solicitation number
- 191T7024Q0027
- Issued by
-
Department of State
About this file
This document is a Bill of Quantities for a Request for Quotation (RFQ) to replace the Air Handling Unit (AHU) at the Multiple Use Building in Rome, Italy. The RFQ, identified as Solicitation Number 191T7024Q0027, is issued by the Department of State.
The Bill of Quantities details the work required, including site preparation, removal and disposal of the existing AHU and related equipment, installation of a new AHU, rebuilding of walls, modifications to windows and doors, installation of new ductwork and electrical components, and testing and balancing of the system. The work is to be performed on a lump sum basis, with a requirement for the AHU startup to be performed by the manufacturer's authorized technicians. The document also includes provisions for safety costs and final cleaning of the premises.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - 191T7024Q0027.pdf | ||
| Bill of Quantities - 191T7024Q0027 - v2.pdf | ||
| Technical Specifications - 191T7024Q0027 - v2.pdf | ||
| Cover Letter - 191T7024Q0027.pdf | ||
| Technical Specifications - 191T7024Q0027.pdf | ||
| RFQ - 191T7024Q0027.docx | DOCX document | |
| SF-1442 - 191T7024Q0027.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. DESCRIPTION QUANTITY
UNITY COST
TOTAL COST
Site preparation including fences, provisional staging area, protection of materials and furniture, protection of floors and walls lump sum
Removal of all furniture that may impact on the correct execution of the work and transportation to a storage location as directed by the COR, within the Tri‐Missions Campus.
lump sum
Removal and disposal of the existing Air Handling Unit, piping, ducts, heat insulation, valves, etc.). The
Contractor will provide disposal certificates to the COR.
lump sum
Removal and storage of the existing lighting fixtures and removable false ceiling and transportation to a storage location as directed by the COR, within the Tri‐Missions Campus. Lighting fixtures will be reinstalled at the end of the work lump sum
5 Demolish the wall adjacent to the corridor. Remove and store the door. lump sum
Install the AHU. This includes the move of the unit, the installation, the connection to the new electrical panel, the connection to the new BAS panel, the connection to the existing piping and the installation of the sound siliencers.
lump sum
Rebuild the wall with drywall system, Knauf, Acustika series, Sistema W626 model. The drywall package wall shall be composed of a 12.5mm thick Diamant type sheet, a 12.5mm thick Silent type sheet, structure with C50 / 50 warping, insulation with a density of 40/50 Kg/m3. Rw request = 65dB.
lump sum
8 Prepare and paint the corridor walls (approx. 90 m2) lump sum
9 Modify and reinstall the door so that it can swing in the opposite direction. lump sum
Create adequate passage for ductwork on the floor slab. Opening in the concrete slab shall be performed with a boring machine. Borings shall be made with an adequate machine that includes a system for self‐ containing water and dust.
lump sum
11 Close the existing holes in the floor. lump sum
Refurbish the AHU room replacing the existing plaster with new one. Refurbish the floor and install new screed. Install antislip (R11) gres tiles.
lump sum
13 Supply and install new ductwork lump sum
Supply and install of new flexible, closed‐cell insulation material and aluminum finishing to protect the ducts lump sum
15 Connect the new ducts to the existing air distribution network at the floor below. lump sum
16 Modify existing windows to fit new ducts. lump sum
Install a new AHU distribution panel in the AHU room on roof level. The panel shall be composed of:
oDisconnector: 4 poles 80 A disconnector oMagneto thermic GFCI serving the Supply fan: 4 poles 10A, Ith:10A, Idn: 0.3, Im:100A, Icu/Icn: 6kA –
Contactor ‐ electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G1.5 oMagneto thermic and GFCI serving the Exhaust fan: 2 poles 10A, Ith:10A, Idn: 0.3, Im:100A, Icu/Icn:
6kA – Contactor – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 3G1.5 oMagneto thermic GFCI serving the Hea ng coil: 4 poles 16A, Ith:16A, Idn: 0.3, Im:160A, Icu/Icn: 6kA –
Contactor – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G1.5 oMagneto thermic and GFCI serving the electric Heat recovery wheel: 2 poles 10A, Ith:10A, Idn: 0.3, Im:100A, Icu/Icn: 6kA – Contactor – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 3G1.5 oMagneto thermic and GFCI serving the BAS panels: 2 poles 10A, Ith:10A, Idn: 0.03, Im:100A, Icu/Icn:
6kA – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 3G1.5 oStepdown transformer 230V/24Vac with disconnectors to feed the BAS panel auxiliaries.
lump sum
18 Supply and install a new BAS panel that includes at a minimum a UC600. Connect AHU to UC600 lump sum
19 Install a new 20A magneto thermic circuit breaker (provided by USG) on the PG/BG Panel. lump sum
20 Supply and install new electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G6 lump sum
21 Connect the UC600 to the existing TRACER SC panel installed at ground floor through a AWG22 cable lump sum
Create new graphic pages and configure all the new equipment with the BAS as per table below. All the IT work needed to configure the new boiler room to the existing BAS (graphic pages, equipment operation rules, etc.) shall be performed by a TRANE authorized technician.
lump sum
Test and balance of the system. Start‐up of the unit must be performed by Manufacturer’s authorized technicians.
lump sum
24 Final professional cleaning of the premises. lump sum
25 Costs for safety lump sum 1,000.00€ € 1,000.00
Total