This document is a Bill of Quantities for a Request for Quotation (RFQ) to replace the Air Handling Unit (AHU) at the Multiple Use Building in Rome, Italy. The RFQ, identified as Solicitation Number 191T7024Q0027, is issued by the Department of State.

The Bill of Quantities details the work required, including site preparation, removal and disposal of the existing AHU and related equipment, installation of a new AHU, rebuilding of walls, modifications to windows and doors, installation of new ductwork and electrical components, and testing and balancing of the system. The work is to be performed on a lump sum basis, with a requirement for the AHU startup to be performed by the manufacturer's authorized technicians. The document also includes provisions for safety costs and final cleaning of the premises.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. DESCRIPTION QUANTITY

UNITY COST

TOTAL COST

Site preparation including fences, provisional staging area, protection of materials and furniture, protection of floors and walls lump sum

Removal of all furniture that may impact on the correct execution of the work and transportation to a storage location as directed by the COR, within the Tri‐Missions Campus.

lump sum

Removal and disposal of the existing Air Handling Unit, piping, ducts, heat insulation, valves, etc.). The

Contractor will provide disposal certificates to the COR.

lump sum

Removal and storage of the existing lighting fixtures and removable false ceiling and transportation to a storage location as directed by the COR, within the Tri‐Missions Campus. Lighting fixtures will be reinstalled at the end of the work lump sum

5 Demolish the wall adjacent to the corridor. Remove and store the door. lump sum

Install the AHU. This includes the move of the unit, the installation, the connection to the new electrical panel, the connection to the new BAS panel, the connection to the existing piping and the installation of the sound siliencers.

lump sum

Rebuild the wall with drywall system, Knauf, Acustika series, Sistema W626 model. The drywall package wall shall be composed of a 12.5mm thick Diamant type sheet, a 12.5mm thick Silent type sheet, structure with C50 / 50 warping, insulation with a density of 40/50 Kg/m3. Rw request = 65dB.

lump sum

8 Prepare and paint the corridor walls (approx. 90 m2) lump sum

9 Modify and reinstall the door so that it can swing in the opposite direction. lump sum

Create adequate passage for ductwork on the floor slab. Opening in the concrete slab shall be performed with a boring machine. Borings shall be made with an adequate machine that includes a system for self‐ containing water and dust.

lump sum

11 Close the existing holes in the floor. lump sum

Refurbish the AHU room replacing the existing plaster with new one. Refurbish the floor and install new screed. Install antislip (R11) gres tiles.

lump sum

13 Supply and install new ductwork lump sum

Supply and install of new flexible, closed‐cell insulation material and aluminum finishing to protect the ducts lump sum

15 Connect the new ducts to the existing air distribution network at the floor below. lump sum

16 Modify existing windows to fit new ducts. lump sum

Install a new AHU distribution panel in the AHU room on roof level. The panel shall be composed of:

oDisconnector: 4 poles 80 A disconnector oMagneto thermic GFCI serving the Supply fan: 4 poles 10A, Ith:10A, Idn: 0.3, Im:100A, Icu/Icn: 6kA –

Contactor ‐ electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G1.5 oMagneto thermic and GFCI serving the Exhaust fan: 2 poles 10A, Ith:10A, Idn: 0.3, Im:100A, Icu/Icn:

6kA – Contactor – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 3G1.5 oMagneto thermic GFCI serving the Hea ng coil: 4 poles 16A, Ith:16A, Idn: 0.3, Im:160A, Icu/Icn: 6kA –

Contactor – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G1.5 oMagneto thermic and GFCI serving the electric Heat recovery wheel: 2 poles 10A, Ith:10A, Idn: 0.3, Im:100A, Icu/Icn: 6kA – Contactor – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 3G1.5 oMagneto thermic and GFCI serving the BAS panels: 2 poles 10A, Ith:10A, Idn: 0.03, Im:100A, Icu/Icn:

6kA – electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 3G1.5 oStepdown transformer 230V/24Vac with disconnectors to feed the BAS panel auxiliaries.

lump sum

18 Supply and install a new BAS panel that includes at a minimum a UC600. Connect AHU to UC600 lump sum

19 Install a new 20A magneto thermic circuit breaker (provided by USG) on the PG/BG Panel. lump sum

20 Supply and install new electrical cable: FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G6 lump sum

21 Connect the UC600 to the existing TRACER SC panel installed at ground floor through a AWG22 cable lump sum

Create new graphic pages and configure all the new equipment with the BAS as per table below. All the IT work needed to configure the new boiler room to the existing BAS (graphic pages, equipment operation rules, etc.) shall be performed by a TRANE authorized technician.

lump sum

Test and balance of the system. Start‐up of the unit must be performed by Manufacturer’s authorized technicians.

lump sum

24 Final professional cleaning of the premises. lump sum

25 Costs for safety lump sum 1,000.00€ € 1,000.00

Total