Big Spring Grubbing Performance Work Statement.pdf
PDF 185 KB Posted
- Solicitation number
- 12805B23Q0828
About this file
This performance work statement outlines requirements for grubbing, raking, and disposal services on 70 acres of land in Big Spring, Texas for the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area. The contractor must have equipment and machinery to remove trees, shrubs, and stumps from the land within 45 days of receipt of the order. Performance will be evaluated based on clearing all debris from the field to allow for shredding and plowing. The related federal contract opportunity is solicitation number 12805B23Q0828 for these grubbing, raking, and disposal services on the 70 acres in Big Spring, Texas to support agricultural research activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2015-5269 Wage Determination.pdf | ||
| Attach 02 Schedule of Items 12805B23Q0828.xlsx | XLSX spreadsheet | |
| 12805B23Q0828.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Project: Grub, Rake and disposal for 70 acres
GENERAL INFORMATION
1.0 Background and Purpose:
The Wind Erosion and Water Conservation (WEWC) Research Unit requires 70 acres of undisturbed land be grubbed and raked to remove non-grass woody species in preparation for on farm research.
This research land will be used to test evaluate different management practices currently implemented in production dryland farms in the surrounding area.
2.0 Definitions:
None
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
The contractor must have the equipment and machinery for tree and shrub removal including stumps, in preparation for plowing. They must also have appropriate permission for the disposal of the material removed from the land.
4.0 Deliverable / Schedule:
The land grubbing and raking is needed immediately as we need to begin work to bring this land into agricultural production standards for the 2024 growing season. The contractor will complete the removal within 45 days from receipt.
5.0 Government Furnished:
6.0 Travel:
7.0 Contractor’s Key Personnel:
none
8.0 Security Requirements:
9.0 Data Rights:
10.0 Section 508 – Electronic and Information Technology Standards:
11.0 Performance Requirement Measures:
Performance
Objective Required Task or
Deliverable Performance
Standard Method of
Surveillance Positive/Negative Incentive
% for NOT meeting the Task
70 acres will be grubbed, raked, and the debris disposed of.
The 70 acres must be ready for shredding and plowing.
Debris must be cleared off site to the extent that a shredder can be used without damage.
WEWC will visually inspect progress weekly
-10% for excessive debris remaining in the field after final inspection
| 2023-08-02T15:01:31-0500 | |
| TIMOTHY GOEBEL |
File details come from the government source that posted it. Updated .