Bids-Received_11.17.2027.pdf
PDF 3 MB Posted
- Solicitation number
- S-27400-00016236
- Issued by
- Lake County, Oregon
About this file
This file is a bids-received document dated November 17, 2027, for ITB S-27400-00016236 submitted to the Oregon Department of Veterans' Affairs (ODVA) for HVAC replacement at the Lebanon Veterans' Home in Lebanon, Oregon. The project involves furnishing tools, equipment, materials, supplies, permits, and manufactured articles necessary for replacing the HVAC system and related components, including demolition and alterations to plumbing, electrical, fire suppression, fire alarm, telephone, and security systems. Five bidders submitted proposals: Advantage Heating and Air Conditioning, LLC; Apex Mechanical, LLC; DSL Builders, LC; Fulcrum Construction; and Umpqua Sheet Metal, Inc. The mandatory pre-bid conference was held October 7, 2026, with attendance required for bid responsiveness. Bids were due November 17, 2026 at 1:00 p.m. Pacific Time under Addendum 002. Work must commence within 30 days of the Notice to Proceed, with substantial completion required by November 30, 2028, and final completion by December 31, 2028. Liquidated damages of $1,000 per calendar day apply for missing substantial completion dates.
The pricing form identifies line items for Demolition (A1), Construction and Improvements (A2), Electrical (A3), Plumbing (A4), Mechanical (A5), and Other items (A6-A7), with alternates listed as B1 through B5, with all quantities measured in lump-sum units. The bid submitted by Advantage Heating and Air Conditioning, LLC totaled $5,875,000.00, while Fulcrum Construction submitted $5,079,068.00. Award will be made to the responsible bidder submitting the lowest responsive lump-sum bid, contingent on the agency receiving sufficient funding. The project is estimated at $6.5 million to $7.1 million, funded by approximately $2.5 million in state funds and $4.6 million from the USDVA State Home Construction Grant Program. Contractors must meet Oregon-specific requirements including Oregon Construction Contractors Board registration, five years of legal establishment and licensure in Oregon, and at least 10 years of documented VRF system installation experience with at least three I-occupancy facility installations in the preceding five years. Performance and payment bonds each equal 100% of the awarded price, with bid security at 10% of the total bid.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advantage Heating and Air Conditioning, LLC
$200,000.00 $200,000.00 $2,087,000.00 $2,087,000.00 $600,000.00 $600,000.00 $100,000.00 $100,000.00
1 $2,888,000.00 $2,888,000.00
5,875,000.00
Apex Mechanical, LLC
DSL Builders, LC
ATTACHMENT A
FORM A-2 — PRICING FORM
ITB S-27400-00016236
ODVA HVAC Replacement for the Lebanon Veterans’ Home Project
[Note For Bidders: Bidders must complete Attachment A, Form A-2, Pricing Form and include this in their Bid Package submittal.]
PRICING SUBMITTAL INSTRUCTIONS:
Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as nonresponsive.
All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Agency.
Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets, and job office as needed to perform the Work at no additional charge to the Agency.
No. Bid Item Quantity Unit Unit Price Total Price A1 Demolition A2 Construction and Improvements A3 Electrical A4 Plumbing A5 Mechanical A6 Other A7 Other
No. Alternates Quantity Unit Unit Price Total Price B1
B2
B3
B4
B5
TOTAL BID (Lines from A1 through A7 and B1 through B5) $
NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental.
5,079,068.00
1 LS 267234
1 LS 184935
1 LS 320681
1 LS 374128
1 LS 3685510
1 LS 246579
LS
Fulcrum Construction
Umpqua Sheet Metal, Inc.