bidnotice.pdf

PDF 112 KB Posted

Attached to
Road Improvements and Tree Removal on Barden Road from Coleman Road to Saginaw Road
Solicitation number
56000-221995
Issued by
Macomb County, Michigan

About this file

This is a Bid Notice from the State of Michigan for a Local Agency road improvement project on Barden Road in Midland County. The project involves 5.07 miles of hot mix asphalt cold milling, resurfacing, shoulder widening, drainage improvements, guardrail installation, and tree removals extending from Coleman Road to Saginaw Road. The letting is scheduled for December 10, 2026, at 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan 48933. The project has two call numbers (010 and 56000-221995) with associated contract IDs 221995AHRRR and 56000 26A1175, and federal project number 223458ASTL. The completion date for the project is July 30, 2027. Plans totaling approximately 36 pages are available for online examination. Prime contractors must be prequalified in classifications 2820 Cb or 2820 Ea, or must engage prequalified subcontractors in these subclassifications prior to contract award.

The project requires 3.00% Small Business Participation (SBP) with no Disadvantaged Business Enterprise (DBE) participation requirement. No DBE set-aside is applicable to this project. The project was advertised on November 6, 2026. Bidders are required to provide a guaranty as specified in the proposal documentation. This is a Local Agency project, indicating that a non-MDOT entity is the contracting authority.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting of: 261204

10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933

Call Number Contract ID Control Section Project Number Federal Project Number

010 56000-221995 221995AHRRR 56000 26A1120

223458ASTL 56000 26A1175

Description: 5.07 mi of hot mix asphalt cold milling, resurfacing, shoulder widening, drainage improvements, guardrail installation, and tree removals on Barden Road from Coleman Road to Saginaw Road, Midland County. This is a Local Agency project.

Required DBE Participation: 0.00%

Required SBP Participation: 3.00%

Net Classification Required For This Project: ** 2820 Cb or 2820 Ea **

Estimated Pages For Plans: 36

Completion Date: 7/30/2027

12:00:00 AM

In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.

Date Advertised: 11/6/2026

See proposal for bidder guaranty information.

Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>

Notice of Advertisement Report v1

AASHTOWare Project™ Version 5.04.04 Revision 047

File details come from the government source that posted it. Updated .