biddoc.pdf
PDF 10 MB Posted
- Solicitation number
- B26-056JW
- Issued by
- El Paso County, Colorado Springs City, Colorado
About this file
This Invitation for Bid (IFB B26-056JW) is issued by the City of Colorado Springs Parks, Recreation, and Cultural Services Department for construction services to renovate the Garden of the Gods Ranger House into office and breakroom space. The project involves a full interior renovation of an existing residence located at 301 Garden Lane, Colorado Springs, Colorado, including new electrical rough-in and trim, new plumbing rough-in and trim, drywall, texture, paint, windows, doors, flooring, cabinets, and countertops. Approximately 95 percent of demolition has been completed by the City, including asbestos abatement down to the framing; contractors are responsible for any minor remaining demolition and coordination of materials staging and dumpster placement. The project is estimated at $300,000 to $400,000 and must be completed within 120 calendar days of the Notice to Proceed. Bids are due July 1st, 2026 at 2:30 PM MST with a public opening via Microsoft Teams. An optional pre-bid meeting is scheduled for June 22nd, 2026 at 1:00 PM MST at the project site. Bidders must submit three project references for work valued between $300,000 and $500,000 completed within the last three years and must be licensed by the Pikes Peak Regional Building Department.
The contract will be awarded to the lowest responsive and responsible bidder on a lump-sum basis. Bid security is required if the total bid exceeds $50,000, consisting of a bid bond or certified check equal to at least 5 percent of the total bid amount. Successful bidders must furnish Performance, Labor and Materials Payment, and Maintenance Bonds each equal to 100 percent of the contract price within ten calendar days of award. The contractor is responsible for obtaining all required permits, providing shop drawings for fire alarm and sprinkler system modifications, and submitting manufacturer documentation and maintenance manuals. Sales tax exemptions apply only to County, PPRTA, and State taxes on materials incorporated into the project; the City of Colorado Springs Sales and Use Tax must be included in all bids. The contract is fixed unit price with prices remaining firm throughout performance, and the contractor shall comply with 2010 ADA Standards, the 2023 Pikes Peak Regional Building Code, and all applicable local, state, and federal laws.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B26-056JW 1
INVITATION FOR BID
Construction
B26-056JW
Date issued: June 10th, 2026
GARDEN OF THE GODS RANGER
HOUSE RENOVATION
THE CITY OF COLORADO SPRINGS
B26-056JW 2
The City of Colorado Springs hereby solicits, as detailed in this Invitation For Bids (IFB), for Garden of the Gods Ranger House Renovation
This IFB is posted to BidNet Direct and the City of Colorado Springs Procurement
Services Website. It is available for all vendors free of charge, following free registration, at the BidNet Direct website.
SUBMITTALS FOR THIS PROJECT WILL ONLY BE ACCEPTED ON THE BIDNET DIRECT
PLATFORM.
Please login to the following website to register (Free Registration) to submit a bid for this project. All required documents will be uploaded to the BidNet website. The City of
Colorado Springs belongs to BidNet’s Rocky Mountain e-Purchasing Group within BidNet.
https://www.bidnetdirect.com/
BIDNET Direct Support
800-835-4603
Estimated Project Magnitude: $300,000.00 - $400,000.00 https://www.bidnetdirect.com/
B26-056JW 3
SECTION I – BID INFORMATION
1.0 BID INFORMATION
Section I provides general information to potential Bidders, such as bid submission instructions and other similar administrative elements. This Invitation for Bid (IFB) is available on BidNet (www.bidnetdirect.com). All addenda or amendments shall be issued through BidNet and may not be available through any other source.
1.1 SPECIAL TERMS
Please note the following definitions of terms as used herein:
The term “City” means the City of Colorado Springs.
The term “Contractor” or “Consultant” means the Bidder whose offer is accepted and is awarded the contract to provide the products or services specified in the IFB.
The term “Offer” or “Bid” means a bid submitted in response to this IFB.
The term “Offeror” or “Bidder” means the person, firm, or corporation that submits a formal bid or offer and that may or may not be successful in being awarded the contract.
The term “Project” refers to Garden of the Gods Ranger House Renovation Project.
The term “Invitation for Bid” or “IFB” means this solicitation of formal, competitive, sealed bids from prospective bidders in which the intent is to award a contract to the resultant lowest responsible and responsive bidder.
1.2 BID ISSUE DATE
Invitation for Bid (IFB) Number B26-056JW is being issued and posted on www.bidnetdirect.com on June 10th, 2026.
1.3 SUBMISSION OF BIDS
A. Bids are to be submitted electronically on BidNet Direct (www.bidnetdirect.com). Please review the submission requirements well in advance of the submission date and time, and allow for ample time to upload each required document. It is recommended that Offerors begin the submission process at least one (1) day in advance of the proposal deadline.
Offerors are solely responsible for ensuring all required bid documents are uploaded and submitted correctly, and that a confirmation number is obtained upon successful submission. Customer support for BidNet Direct may be reached at (800) 835-4603.
B. Bids shall be received on or before July 1st, 2:30 PM MST. A public opening will be held via Microsoft Teams at that time. Web access and dial-in information is below:
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/232266112290601?p=FXBHYQX9Qg99drcFcp http://www.bidnetdirect.com/ http://www.bidnetdirect.com/ https://teams.microsoft.com/meet/232266112290601?p=FXBHYQX9Qg99drcFcp
B26-056JW 4
Dial in by phone +1 720-617-3426,,734743193# United States, Denver Find a local number Phone conference ID: 734 743 193#
C. Bid bond is required if the total bid exceeds $50,000.00. (Also see 1.22)
D. The cost of Bid preparation is not a reimbursable cost. Bid preparation shall be at the Bidder’s sole expense and is the Bidder’s total and sole responsibility.
1.4 PRE-BID CONFERENCE
An optional pre-bid meeting will be held on site at 301 Garden Lane, Colorado Springs, CO 80829 on June 22nd, 2026 1:00 PM MST. This meeting is highly encouraged but not mandatory.
1.5 LATE BIDS/LATE MODIFICATIONS OF BIDS
Bids, withdrawals, or modifications of Bids received after the time set for opening, as designated in 1.3 above, are considered “late bids”, and will not be accepted by the City, except as provided for in the City of Colorado Springs Procurement Rules and Regulations and approved by the Procurement Services Manager. Bidders are solely responsible for ensuring their bids arrive on time and to the place specified in this Invitation for Bid.
1.6 MISTAKES IN BIDS - CONFIRMATION OF BID
If it appears from a review of a Bid that a mistake has been made, the Bidder may be requested to confirm its Bid in writing. Situations in which the confirmation may be requested include obvious, apparent errors on the face of a Bid or a Bid unreasonably lower than the other Bids submitted.
All mistakes in Bids will be handled in accordance with the City of Colorado Springs Procurement Rules and Regulations.
1.7 PROCUREMENT RULES AND REGULATIONS
All formal IFBs advertised by the City of Colorado Springs are solicited in accordance with the City's Procurement Rules and Regulations. The City's Procurement Rules and Regulations can be reviewed and/or downloaded from the City’s Procurement Services Division website at www.coloradosprings.gov. Any discrepancies or conflicting statements, decisions regarding bidding irregularities, or clarifications regarding clauses or specifications will be rectified utilizing the City’s Procurement Rules and Regulations, when applicable. It is the Bidder’s responsibility to advise the Contracts Specialist listed in this IFB of any perceived discrepancies, conflicting statements, or problems with clauses or specifications prior to the Bid opening date and time.
1.8 MINOR INFORMALITIES/IRREGULARITIES IN BIDS
A. A minor informality or irregularity is one that is merely a matter of form and not of substance.
It also pertains to some immaterial defect in a Bid or variation of a Bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other Bidders. The defect or variation is considered immaterial when the effect on price, quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the goods and/or services being acquired.
tel:+17206173426,,734743193 https://dialin.teams.microsoft.com/d58d2c37-f693-46f6-b7f3-e0f09f524a51?id=734743193
B26-056JW 5
B. If the City Procurement Services Division determines that a Bid submitted contains a minor informality or irregularity, then the Procurement Services Manager shall either give the Bidder an opportunity to cure any deficiency resulting from the minor informality or irregularity or waive the deficiency, whichever is to the advantage of the City. In no event will the Bidder be allowed to change the Bid amount. Examples of minor informalities or irregularities include but are not limited to the following:
1. Bidder fails to sign the Bid, but only if the unsigned Bid is accompanied by other material evidence, which indicates the Bidder’s intention to be bound by the unsigned Bid (such as Bid security, or signed cover letter which references the Bid Number and amount of Bid).
2. Bidder fails to acknowledge an Amendment, although this may be considered a minor informality only if the Amendment, which was not acknowledged, involves only a matter of form or has either no effect or merely a negligible effect on the price, quantity, quality, or delivery of the item or services bid upon.
1.9 REJECTION OF BIDS
The Procurement Services Manager has the authority to reject any Bid based on, but not limited to, the following:
A. Any Bid that fails to conform to the essential requirements of the Invitation for Bids shall be rejected.
B. Any Bid that does not conform to the applicable specifications shall be rejected unless the IFB authorizes the submission of alternate bids and the items or services offered as alternates meet the requirements specified in the IFB.
C. A Bid that fails to conform to the specified delivery schedule.
D. A Bid shall be rejected when the Bidder imposes conditions that would modify the requirements of the IFB or limit the Bidder’s liability to the City since to allow the Bidder to impose such conditions would be prejudicial to other Bidders.
For example, Bids shall be rejected in which the Bidder:
1. Protects against future changes in conditions, such as increased costs, if total possible costs to the City cannot be determined. This includes failure to completely fill out the required bid schedule.
2. Fails to state a price and indicates that price shall be “price in effect at time delivery”.
3. States a price but qualifies it as being subject to “price in effect at the time of delivery”.
4. Takes exceptions to the IFB terms and conditions.
5. Inserts the Bidder’s terms and conditions.
6. Limits the rights of the City under any Contract/Invitation for Bid clause.
E. Any Bid in which the price is considered to be unreasonable or is over budget.
F. Any Bid if the prices are determined to be unbalanced.
G. Bids received from any person or contractor that is suspended, debarred, proposed for debarment, or under investigation for fraud, including failure to pay federal, state, local, or city
B26-056JW 6
taxes.
H. When a bid guarantee is required and the bidder fails to furnish the guarantee in accordance with the requirements of the IFB.
I. Low Bids received from bidders who are determined to be non-responsible in accordance with the City’s Procurement Rules and Regulations.
J. Any Bid that was prepared and submitted by a vendor who has been determined by the
Procurement Services Manager to have an unfair advantage over other Bidders. Examples of an unfair advantage include, but are not limited to, the following:
1. A previous or prior employee who in the last six (6) months was directly involved in the design or specification preparation of the completed procurement.
2. A vendor who was directly involved in the design or specification preparation of the completed project either for pay or voluntarily.
1.10 ESTIMATED QUANTITIES
If the Bid Form (Schedule A) herein contains estimated quantities, this provision is applicable.
The quantities listed for each of the items in the Bid Form are only estimated quantities.
Contractors are required to bid a firm unit price for each item specified. The actual quantities ordered may fluctuate up or down. The unit prices proposed by each Bidder will remain firm and will not be re-negotiated if the estimated quantities are not met or are exceeded. This clause will take precedence over any/all other estimated quantity clauses that conflict with this clause.
For bidding purposes, if there is a conflict between the extended total of an item and the unit price, the unit price shall prevail and be considered as the amount of the Bid. All unit prices shall include all necessary overhead and profit. Items not listed in the Bid Form such as overhead, profit, mobilization, de-mobilization, bonding, etc. shall be distributed throughout the Bidder's Unit Prices for the items listed on the Bid Form.
1.11 NUMBER OF COPIES
Bidders shall submit one electronic copy of each required document on the BidNet Direct Procurement Platform (www.bidnetdirect.com. Upon submission, all Bid documents shall become and remain the property of the City.
1.12 IDENTIFICATION OF BID
Bids must be submitted to the BidNet Direct Procurement Platform (www.bidnetdirect.com). The solicitation number and Offeror name must be clearly marked within the Bid.
Bid No.: B26-056JW Due Date and Time: July 1st, 2026 2:30PM MST
1.13 SALES TAX
The successful Offeror, if awarded a contract, shall apply to the Colorado Department of Revenue for a tax-exempt certificate for this project. The certificate does not apply to the City of Colorado Springs Sales and Use Tax which shall be applicable and should be included in all bids and
B26-056JW 7
proposals. The tax-exempt project number and the exemption certificate only apply to County, PPRTA (Pikes Peak Rural Transportation Authority), and State taxes when purchasing construction and building materials to be incorporated into this project.
Furthermore, the exemption does not include or apply to the purchase or rental of equipment, supplies, or materials that do not become a part of the completed project or structure. In these instances, the purchase or rental is subject to full taxation at the current taxation rate.
The Offeror and all subcontractors shall include in their Offer the City of Colorado Springs Sales and Use Tax on the work covered by the offer, and all other applicable taxes. Any increase in applicable sales or use tax occurring after the contract has been let shall be borne by the contractor and not passed through to the City.
Forms and instructions can be downloaded at the City of Colorado Springs Website:https://coloradosprings.gov/sales-tax/page/additional-sales-tax-forms?mlid=30771.
Questions can be directed to the City Sales Tax Division at (719) 385-5903 or Construction_SalesTax@ColoradoSprings.gov.
Our Registration Numbers are as follows:
City of Colorado Springs Federal I.D.: 84-6000573 Federal Excise: A-138557 State Sales Tax: 98-03479
1.14 PREPARATION OF BID OFFER
A. Bidders are expected to examine the drawings, specifications, bid documents, proposed contract forms, terms and conditions, and all other instructions and solicitation documents.
Bidders are expected to visit the job site to determine all requirements and conditions that will affect the work. Failure to do so will not relieve a Bidder from their responsibility to know what is contained in this Invitation for Bid, or site conditions affecting the work.
B. The Bidder certifies that it has checked all of its figures and understands that the City will not be responsible for any errors or omissions on the part of the Bidders in preparing its Bid.
C. All items, (unless the invitation specifically states otherwise) including any additive or deductive alternates on the Bid Form, must be completely filled out or the Bid will be determined non-responsive and ineligible for consideration for award.
D. The Bidder declares that the person or persons signing this Bid is/are authorized to sign on behalf of the firm listed and to fully bind the Bidder to all the requirements of the IFB.
E. The Bidder certifies that no person or firm other than the Bidder or as otherwise indicated has any interest whatsoever in the Bid or the contract that may be entered into as a result of the Bid and that in all respects the Bid is legal and firm, submitted in good faith without collusion or fraud.
F. By submitting a Bid the Bidder certifies that it has complied and will comply with all requirements of local, state, and federal laws and that no legal requirements have been or will be violated in making or accepting this Bid. Bidders are expected to review the City’s Procurement Rules and Regulations, which will be used when determining whether a Bidder https://coloradosprings.gov/sales-tax/page/additional-sales-tax-forms?mlid=30771 mailto:Construction_SalesTax@ColoradoSprings.gov
B26-056JW 8
is responsive and responsible and awarding contracts in the best interest of the City.
G. If there is a discrepancy between the unit price and the total price, the unit price shall be used to determine the applicable total price. Bidders are responsible for including profit and overhead associated with the project when determining their unit prices.
1.15 BASIS OF AWARD
A. The City of Colorado Springs intends to award a contract to the lowest responsive and responsible Bidder whose Bid meets the requirements and the criteria set forth in the Invitation for Bids and is determined to be in the best interest of the City.
B. The City reserves the right to reject any or all Bids and to waive informalities and/or irregularities in a Bid. Whether or not a contract is awarded as a result of this Invitation for Bid, as stated above, Bid preparation costs are not reimbursable.
C. Total Bid will be evaluated and awarded as follows: It is the City’s intent to award this bid based on the TOTAL BASE BID, not on a line item-by-line item basis.
1.16 PERIOD OF ACCEPTANCE
The Bidder agrees that its Bid shall remain open for acceptance by the City for a period of sixty
(60) calendar days from the date specified in the IFB for receipt of Bids.
1.17 CONTRACT AWARD
The signature of the Bidder indicates that within ten (10) calendar days from acceptance of its Bid, it will execute a contract with the City and, if indicated in this IFB, furnish a project-specific Certificate of Insurance naming the City as Additional Insured, furnish Performance, Labor and Materials, Payment and Maintenance Bonds and any other documents required by the Specifications or Contract Documents.
1.18 NOTICE TO PROCEED
Work may not start under any awarded contract until a written notice to proceed is issued by the City. The City may issue the Notice to Proceed any time after the contract is signed and, if required, insurance and bonds have been provided in accordance with 1.22 below.
1.19 AMENDMENTS TO THE SOLICITATION
Amendments are also referred to as addendum or addenda, and these terms shall be considered synonymous. It is the Bidder’s responsibility to contact the Contracts Specialist listed in 1.21 below to confirm the number of Amendments which have been issued.
A. If this solicitation is amended, then all specifications, terms, and conditions, which are not specifically amended, remain unchanged.
B. Bidders shall acknowledge receipt of any amendment to this solicitation by signing and returning the amendment and by identifying the amendment number and date in the space provided on the form for submitting a Bid.
B26-056JW 9
C. Acknowledged amendments must be received prior to Bid opening. Bidders are encouraged to include signed addenda or initialed acknowledgment with returned Bids.
1.20 EXPLANATIONS TO PROSPECTIVE OFFERORS
Any prospective Bidder desiring an explanation or interpretation of the IFB documents, drawings, specifications, etc., must request it in writing within ten days of the Bid due date to allow enough time for a reply to reach all prospective offerors before the time for submission of offers. Oral explanations or instructions given before the opening of Bids will not be binding. Any information provided to a prospective Bidder during the Bid preparation stage will be promptly furnished to all other prospective Bidders as an amendment to the solicitation, if that information is necessary in submitting Bids or if the lack of it would be prejudicial to other prospective Bidders.
1.21 QUESTIONS AND OTHER REQUESTS FOR INFORMATION
All questions shall be submitted electronically via the BidNet Direct Procurement Platform (www.bidnetdirect.com) to the following Contract Specialist. All questions must be received no later than June 24th, 2026 2:00PM MST.
Requests for Information, support, and questions shall be directed to:
Joel Woolley Contract Specialist 1 Joel.Woolley@coloradosprings.gov
DO NOT CONTACT ANY OTHER INDIVIDUAL AT THE CITY OF COLORADO SPRINGS
REGARDING THIS SOLICITATION.
1.22 SECURITY REQUIREMENTS
A. Bid Security
1. If the total amount of the accumulative Bid is more than $50,000, or a bond is required elsewhere in this IFB, the Bidder is required to furnish with their Bid a bid security in the form of a bank-certified check, bank cashier’s check or a one-time bid bond underwritten by a company licensed to issue bonds in the State of Colorado and acceptable to the City in an amount equal to at least 5% of the total amount of the Bid payable without condition to the City.
2. The Bid security shall guarantee that the Bid will not be withdrawn or modified for a period of sixty (60) calendar days after the time set for the receipt of Bids, and, if the Bid is accepted within those sixty (60) calendar days, that the person, firm or corporation submitting same shall within ten (10) calendar days after being notified of the acceptance of its Bid, enter into a Contract and furnish the required bonds and all insurance certificates called for under this Invitation for Bid.
3. The Bid bonds of unsuccessful Bidders will not be returned to the respective Bidders unless a self-addressed, stamped envelope is provided along with a written request for bid bond return. However, if a certified check or a cashier’s check is submitted as Bid security, it will be returned as soon as possible after the lowest responsive and responsible Bidder is determined and a contract is executed.
4. In the event the Bidder whose Bid is accepted fails to enter into the contract and/or furnish the required contract bonds, its certified check, cashier’s check or bid bond will be forfeited mailto:Joel.Woolley@coloradosprings.gov
B26-056JW 10
in full to the City.
B. Performance, Labor and Materials Payment, and Maintenance Bonds
1. For contracts in excess of $50,000, the Contractor shall furnish to the City each of the following: a Performance Bond, a Labor and Materials Payment Bond, and a Maintenance Bond. Each such bond shall be in the amount of one hundred percent (100%) of the contract price. Bonds shall be submitted within ten (10) calendar days after notification of award of a Contract. The cost of all bonds shall be included in the Contractor’s Bid.
2. Bonds shall:
a. Be for the full amount of the Contract price.
b. Guarantee the Contractor's faithful performance of the work under the Contract, and the prompt and full payment for all labor and materials involved therein.
c. Guarantee protection to the City against liens of any kind.
d. Be from a surety company operating lawfully in the state of Colorado and accompanied by an acceptable "Power-of-Attorney" form attached to each bond copy.
e. Be issued from a surety company that is acceptable to the City.
f. Be submitted using the forms in the Exhibit section of this IFB or such forms as are approved by the City Attorney’s Office.
1.23 SPECIFICATIONS AND DRAWINGS
No Fee solicitations: Specifications and Drawings are normally included in the IFB. If the Specifications and Drawings are too large to be included in the IFB, all interested Bidders may obtain one copy of the Project Specifications and a set of the Project Drawings for use in preparing Bids from the City Procurement Services Division office. If the Bidder requires additional sets, it is the Bidder’s responsibility to duplicate any additional copies, at its own expense.
1.24 TYPE OF CONTRACT
As a result of this Invitation for Bids, it is the City’s intention to award a fixed unit price Contract based on the prices offered by the lowest responsive and responsible bidder. Contract prices shall remain firm and fixed throughout the Contract performance period.
1.25 F.O.B. DESTINATION
Unless otherwise specified in the Invitation for Bid, all goods, materials, supplies, equipment, or services covered by this IFB shall be delivered F.O.B. Destination shall be the location indicated in the awarded Contract or Purchase Order.
1.26 BID RESULTS
The City does not mail Bid results or tabulations. However, Bid tabulations are posted and can be downloaded from BidNet. Bidders submitting Bids in response to this solicitation may also request the Bid tabulation for this solicitation via email to the Contracts Specialist indicated as the point of contact for this solicitation.
1.27 APPROPRIATION OF FUNDS
A. In the event funds are not appropriated in whole or in part sufficient for the performance of the
City's obligations under this IFB, or appropriated funds may not be expended due to the City
B26-056JW 11
Charter spending limitations, then the City, without compensation to Bidders, may terminate or cancel this IFB or not award any contracts under this IFB.
B. In accordance with the Colorado Constitution and City Charter, performance of the City's obligations under any resultant Contract will be expressly subject to appropriations of funds by the City Council, and, in the event the budget or other means of appropriation for any year of the Contract fails to provide funds in sufficient amounts to discharge such obligations, such failure (i) shall act to terminate the Contract at such time as the then-existing and available appropriations are depleted, and (ii) neither such failure nor termination shall constitute a default or breach of the Contract, including any sub-agreement, attachment, schedule, or exhibit thereto, by the City.
1.28 PERIOD OF PERFORMANCE
The Contractor shall complete all work within 120 Calendar Days after the Notice to Proceed.
The Contractor shall start work promptly after receipt of the Notice to Proceed and Pre- Construction Meeting and continue to work diligently until all work is completed and accepted by the City.
1.29 BID DOCUMENTS
The following comprise this Invitation for Bid.
Schedule A – Bid Form Schedule B – General Construction Terms and Conditions Schedule C – Special Contract Terms and Conditions Schedule D – Scope of Work Schedule E – Project Plans Schedule F - Exhibits
The following listed documents must be included with your Bid in order for your Bid submittal to be considered responsive.
Schedule A – Bid Form Schedule D - Scope of Work (Project References List) Exhibit 2 – Solicitation Qualifications Documents (Completed) Exhibit 3 – Bid Bond if applicable (see 1.23) Acknowledged Addenda, if issued
B26-056JW 12
SECTION II – SCHEDULES
Schedule A – Bid Form Schedule B – General Construction Terms and Conditions Schedule C – Special Contract Terms and Conditions Schedule D – Scope of Work Schedule E – Project Plans Schedule F – Exhibits
B26-056JW 13
SCHEDULE A – BID TAB
Please Provide an Itemized Excel document breaking down your proposal lump sum by line item.
B26-056JW 14
SCHEDULE B – GENERAL CONSTRUCTION TERMS AND CONDITIONS
Schedule B -- General Construction Terms and Conditions, Version 100316 are hereby incorporated by reference, with the same force and effect as if they were given in full text. Upon request, the City will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
https://www.coloradosprings.gov/finance/page/procurement-regulations-and-documents
The referenced General Construction Terms and Conditions will be incorporated in the resultant Contract.
https://www.coloradosprings.gov/finance/page/procurement-regulations-and-documents
B26-056JW 15
SCHEDULE C – SPECIAL CONTRACT TERMS AND CONDITIONS/SPECIAL
SOLICITATION PROVISIONS
In addition to the special contract terms and conditions listed below, the City’s sample contract (see Exhibit 1) contains contract terms and conditions.
ADA Standards: It is a requirement of the City and required by law that any new or renovated facility meet the scoping and technical requirements of the 2010 ADA Standards for newly designed and constructed or altered local government facilities, public accommodations, and facilities. The selected Design Professional shall design the project so it both conforms to the 2010 ADA Standards, as applicable and as amended, and is readily accessible to and usable by individuals with disabilities. The selected Contractor shall build the project so it both conforms to the 2010 ADA Standards, as applicable and as amended, and is readily accessible to and usable by individuals with disabilities. Facilities that are designed, constructed, and/or altered facilities that meet or exceed the IBC 2015/ANSI A117.1 2009, used by Pikes Peak Regional Building Department, will be accepted as meeting or exceeding the 2010 ADA Standards.
GENERAL
Contractor acknowledges the City is subject to Title II of the Americans with Disabilities Act (“ADA”) and other laws that prohibit public entities from excluding from participation in, denying the benefits of, or discriminating against qualified individuals with disabilities on the basis of disability in the entity’s services, programs, and activities and agrees to comply with the following requirements as applicable to the goods or services that are the subject of this Agreement.
1) Videos for public dissemination must be captioned. This non-inclusive list could include training program videos for the public, for web content, or even a museum setting. If the goods or services that are the subject of this Agreement are being purchased by the City to enhance or augment a City program, service, or activity, then the materials must be captioned.
2) Digital documents must be properly formatted and accessible. Digital documents intended for public use must meet accessibility guidelines as required by the City’s Administrative Regulation 2020-02, as it now exists or is amended, (examples include: doc, .docx, .xlsx, .pptx, .pdf, .jpg). Exclusions to this requirement can be found on page four (4) of Administrative Regulation 2020-02 and include:
a. Blueprints
b. Architectural Drawings
c. Diagrams displaying information that is also provided in narrative text
d. Complex and/or atypical images and diagrams
e. Scanned historical publications
f. Handwritten correspondence
g. Technical drawings
h. Site plans, development plans, and maps
i. Complex and comprehensive tables and charts
Note: Information intended for the public contained in document types excluded under Administrative Regulation 2020-02 must be made available to the City by the Contractor in other accessible formats upon request. The City requests that content be delivered in an accessible format regardless of exclusion if possible.
More information on document accessibility can be found on the City’s Accessible Digital Documents Reference Page https://coloradosprings.gov/sites/default/files/inline-images/admin_reg_2020-02.pdf https://coloradosprings.gov/sites/default/files/inline-images/admin_reg_2020-02.pdf https://coloradosprings.gov/office-accessibility/page/accessible-information-technology?mlid=43891 https://coloradosprings.gov/office-accessibility/page/accessible-information-technology?mlid=43891
B26-056JW 16
3) Kiosks purchased for public use must adhere to the City’s adopted Kiosk Accessibility Standards
4) A Software Statement of Accessibility from the vendor is required for all purchases of software for programs the public will use.
A certificate of WCAG 2.0 (AA) or higher minimal compliance will be requested and required. In the alternative, the City can accept a certificate of 508 compliance. Typically, these are going to be “plug-in-play” software programs for such things as vendor payments, customer service surveys, and citizen requests. Learn more about the City’s Procurement of Accessible Information Technology policy.
5) The City maintains a list of technical resources for other ADA related Works:
a. ADA/City Standards for Public Right of Way for Sidewalks, Protruding Objects, and
Vertical Clearance
b. Pedestrian Accessibility in the Public Way During Construction
c. ADA Restroom Requirements and Considerations
d. ADA Requirements and Considerations: Dining and Work Surface Requirements
e. ADA Requirements and Considerations: Sales and Service Counters
Documentation of Accessibility Within 10 days of the City’s written request, the Contractor will provide the City with accessibility testing results and/or other written documentation as assurance and verification of the state of accessibility required. Documentation of accessibility as required by the City’s Administrative Regulation 2020-02 and the City’s Accessible IT Procurement policy is considered to be:
1) A current VPAT (2020), which can be found at http://www.itic.org/policy/accessibility, or
2) A completed copy of the City’s Accessibility Checklist, which can be found at https://coloradosprings.gov/sites/default/files/accessible_it_procurement_002.pdf, or
3) An independent third-party evaluation from an accessibility consultant.
Resolution of Accessibility Matters The City, in its sole discretion and at its own expense, may choose to obtain an independent assessment of the Contractor’s compliance with these requirements but will not be responsible for doing so. If the City so chooses to obtain an independent assessment, then upon the City’s notice or request to the Contractor, the Contractor shall:
1) Provide a Point of Contact (including name, address, phone number, and email address) specifically to confer with the project manager on accessibility matters.
2) Promptly respond to complaints about accessibility made or received by the City related to the Contractor’s performance of this Agreement.
https://coloradosprings.gov/sites/default/files/kiosk_standards_2020_final_september_apc_committee.pdf https://coloradosprings.gov/sites/default/files/kiosk_standards_2020_final_september_apc_committee.pdf https://coloradosprings.gov/sites/default/files/accessible_it_procurement_002.pdf https://coloradosprings.gov/sites/default/files/accessible_it_procurement_002.pdf https://coloradosprings.gov/public-works/page/resources-ada-construction?mlid=33661 https://coloradosprings.gov/sites/default/files/images/public_right_of_way_ada_reviews.pdf https://coloradosprings.gov/sites/default/files/images/public_right_of_way_ada_reviews.pdf https://coloradosprings.gov/sites/default/files/ada_-_guide_for_ped_accessibility_during_construction_0.pdf https://coloradosprings.gov/sites/default/files/inline-images/ada_restroom_requirements_and_considerations_-_final_6-5-19.pdf https://coloradosprings.gov/sites/default/files/inline-images/ada_dining_and_work_surface_requirements_and_considerations_final_2-20-20.pdf https://coloradosprings.gov/sites/default/files/inline-images/ada_sales_and_service_counter_requirements_and_considerations_final_2-20-20.pdf http://www.itic.org/policy/accessibility https://coloradosprings.gov/sites/default/files/accessible_it_procurement_002.pdf
B26-056JW 17
SCHEDULE D – SCOPE OF WORK
Follows this page.
B26-056JW 18
Garden of the Gods Ranger House Renovation
Statement of Work
301 Garden Lane, Colorado Springs, CO 80829 Background:
The City of Colorado Springs Parks, Recreation, and Cultural Services (PRCS) Department manages Garden of the God Regional Park. The site is a National Natural Landmark, having been recognized by the Department of the Interior as "a nationally-significant natural area." The Park offers towering sandstone formations, a wonderful view of Pikes Peak, both paved and unpaved hiking paths, horseback trails, a mountain bike area, and several picnic areas. Historically, the park was privately-owned until 1909 and then 480 acres donated to the City of Colorado Springs by the Perkins’ Family. Over the past 100 plus years the city has added acreage to the park and currently, the Garden of the Gods Park is 1320 acres in size. Today, Garden of the Gods Park has 1 manager, 7 Ranger/Maintenance staff, 3 full time interrupters and 11 seasonal staff throughout the year.
Objectives:
The City of Colorado Springs seeks a contractor to perform a renovation of an existing ranger/caretaker residence into office space for Garden of the Gods staff. This is a full renovation of the facility to support operation staff and their job duties, interior work will improve accessible routes in the building. A set of plans is provided for a comprehensive renovation of the interior. This project supports the City’s Americans with Disabilities Act (ADA).
Minimum Qualifications:
Bidders must be licensed by the Pikes Peak Regional Building Department to perform the scope of work awarded. General contractors shall employ only subcontractors that are appropriately licensed to perform plumbing and electrical work, for example. Evidence of insurance will be supplied to the City during the award process. Successful bidder will have to obtain all needed permits required for this renovation.
Bidders shall supply at least three (3) references for projects completed within the last three years that were valued between $300,000 and $500,000. Below provide a brief description of the project, the amount of project cost and a contact person with a phone number and email.
This is a “lowest bid scenario” and a lump sum to complete the job, provide one price to complete the renovation according to the plan set provided. The winning bidder will have the opportunity to provide change orders during the project depending on what conditions are encountered as well as reductions to the city.
Scope – General:
Bidders shall become familiar with the details of the work specified in these plans and existing conditions in the field and shall advise the facility owner of any discrepancies prior to performing any tasks.
B26-056JW 19
As stated before this is a full interior rebuild of an existing residence into office and shop/breakroom space. Bidders will be responsible to follow the plans working with Colorado Springs Project Manager and Garden of the Gods Manager to provide finishes and advise what will work best for the space.
There is new electric rough-in and trim, new plumbing rough-in and trim, all new drywall texture and paint, new windows, doors and flooring. Bidders are responsible for all secured fixtures like cabinets and countertops for the breakroom space and bathroom. The City will provide all moveable items needed, for example kitchen appliances, desks, chairs and tables.
95 percent of demolition is completed. These was asbestos present in the structure. The City of Colorado Springs bid and managed the abatement of the asbestos as well as the demo down to the framing. There might be minor. demo or moving of electric, plumbing or framing. The city will provide air clearances results showing all asbestos have been abated.
The contractor shall coordinate with staff to place a dumpster outside of the facility and coordinate delivery and staging of construction materials at the site so that they minimally interfere with operations
Scope – Closeout:
All debris will be hauled from the site. All requisite permits and inspections shall be obtained by the contractor, and documentation shall be provided to the City.
Projects totaling more than $1,000,000 require that the contractor complete and submit City Form ST-17 to the City Sales Tax Review Auditor. Additionally, the contractor shall submit all manufacturer-supplied documentation from the specified equipment and furnishings prior to final acceptance, including directions for performing preventative maintenance and any written warranties.
Delivery:
Upon contract award, the contractor shall provide the City project manager with a proposed schedule of construction activities in the format of their choosing. Additionally, before beginning construction activities, the contractor shall supply a site plan indicating where supplies / materials will be staged (including the location of dumpsters or containers, etc.) and which entrances to the building will have restricted access.
Travel: N/A
Special Material Requirements: Requests to substitute materials may be submitted to the City’s project manager for consideration after the award of the contract.
Other Unique Requirements: N/A
Place of Performance:
Garden of the Gods Ranger House, 301 Garden Lane, Colorado Springs, CO 80829
B26-056JW 20
Period of Performance:
120 days form the Notice to Proceed Letter
B26-056JW 21
Project 1 Description Contact Information_________________________________________________________________________________
Project 2 Information Contact Information_________________________________________________________________________________
Project 3 Information Contact Information_________________________________________________________________________________
Provide a Lump Sum Price to complete the interior renovation of Garden of the Gods Ranger House/office
B26-056JW 22
SCHEDULE E – PROJECT PLANS
Follows this page.
NEW METAL STUD PARTITION
ONE HOUR RATED WALL CONSTRUCTION
CONTINUOUS SHADED LINE INDICATES
(E) WALL PARTITION
LAM
HM
LAMINATE
HOLLOW METAL
TUBE STEEL
PRECAST PANEL JOINT
ROOF DRAIN
OVERFLOW DRAIN
NOT TO SCALE
MIRROR
RUBBER BASE
VINYL COMPOSITION TILE
VINYL BASE
PLUS OR MINUS
ROUGH OPENING
ON CENTER
NOT IN CONTRACT
SPECIFICATIONS
EXTERIOR INSULATION AND
ACOUSTICAL CEILING TILE
GENERAL CONTRACTOR
FIRE RETARDANT TREATED
ELECTRIC WATER COOLER
CONCRETE MASONRY UNIT
EXPANSION JOINT
FIRE EXTINGUISHER CABINET
ABOVE FINISH FLOOR
CENTER LINE
ELEV
FV
GC
GA
FRT
FD
EWC
EQ
F.E.
EIFS
(E)
EJ
CT
DIA
CMU
ELEVATION
FIELD VERIFY
FLOOR DRAIN
GAUGE
EQUAL
FINISH SYSTEM
EXISTING
CERAMIC TILE
DIAMETER
B.O.
CJ
ANOD
ALUM
ACT
AFF
ANODIZED
ALUMINUM
BOTTOM OF
CONTROL JOINT
ANGLE
OD
WD
TS
P.J.
T.O.
SIM
RD
RB
VCT
VB
R.O.
RAD
RE.
TYP
SPEC
SIMILAR
WOOD
TOP OF
TYPICAL
RADIUS
REFER TO
NO.
NTS
MIRR
OC
NIC
MIN
MAX
NUMBER
MAXIMUM
MINIMUM
DETAIL REFERENCE NUMBER
SHEET NUMBER
ROOM NAME AND NUMBER
PLAN NOTE
REVISION NOTE
SECTION / ELEVATION NUMBER
SHEET NUMBER
P.R. PAIR
FIRE EXTINGUISHER CABINET FEC
A6.4
A4.2
P.T. PRESSURE TREATED
TBD TO BE DETERMINED
UNO UNLESS OTHERWISE NOTED
FLOOR MATERIAL CHANGEFMC
THE PROJECT IS THE CONVERSION OF A RESIDENCE TO OFFICE USE AND ASSOCIATED
CONSTRUCTION WORK
RAT'G RATING
MAT'L MATERIAL
GLAZINGGLZ'G
STEELSTL
OCCUPANCY CLASSIFICATION B
CONSTRUCTION TYPE V-B
INTERIOR NON-BEARING WALL NON-RATED
FIRE SPRINKLERS NON-SPRINKLERED
OVERALL BUILDING AREA: 2,117 GSF
OCCUPANT LOAD CALCULATION:
OCCUPANCY AREA OCCUPANTS
BUSINESS (B) (1100) 1,653 GSF 16.5
STORAGE (S1) (1300) 464 GSF 1.5
TOTAL OCC. LOAD 18
BUILDING HEIGHT: 1+ (MECH) BASEMENT 10'-6"
GOVERNING CODES
PROJECT DESCRIPTION
CODE DATA
COVER SHEET
G1.1 PROJECT INFORMATION SHEET
G1.2 SITE PLAN
G2.1 PROJECT SPECIFICATIONS
G2.2 PROJECT SPECIFICATIONS
G2.3 PROJECT SPECIFICATIONS
T1.1 ACCESSIBILITY INFORMATION
T1.2 ACCESSIBILITY INFORMATION
ARCHITECTURAL
D1.1 DEMOLITION FLOOR PLAN
A1.1 FIRST FLOOR PLAN
A1.2 FINISH PLAN , REFLECTED CEILING PLAN, SCHEDULE
A2.1 DETAILS, INTERIOR ELEVATIONS
STRUCTURAL
S1.1 PLAN DETAILS AND GENERAL NOTES
MECHANICAL
M001 GENERAL INFORMATION
MD111 MECHANICAL DEMOLITION PLAN
M111 MECHANICAL LOWER LEVEL PLAN
M112 CRAWL SPACE MECHANICAL PLAN
PLUMBING
P001 GENERAL INFORMATION
PD111 PLUMBING DEMOLITION WASTE AND VENT PLAN
P111 PLUMBING WASTE AND VENT PLAN
P111A PLUMBING PLAN DOMESTIC WATER
ELECTRICAL
E001 GENERAL INFORMATION AND SCHEDULES
ED111 ELECTRICAL DEMOLITION PLAN LIGHTING
ED121 ELECTRICAL DEMOLITION PLAN POWER
E111 ELECTRICAL LIGHTING PLAN
E121 ELECTRICAL POWER PLAN
1. ALL WORK WILL BE PERFORMED IN STRICT ACCORDANCE WITH ALL LOCAL LAWS.,
ORDINANCES, RULES AND REGULATIONS OF GOVERNMENT AUTHORITIES HAVING
JURISDICTION. CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING ALL BUILDING
PERMITS
2. FIRE ALARM AND FIRE SPRINKLER SYSTEM SHALL BE MODIFIED ACCORDING TO ALL
LOCAL CODES AND THE NFPA. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO,
AND OBTAIN NECESSARY PERMITS FROM THE LOCAL FIRE AND BUILDING
DEPARTMENT. FIRE ALARM MODIFICATIONS REQUIRED ARE SHOWN ON THE PLANS.
IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FIRE SPRINKLER DESIGN AND
PERMITS FOR THIS PROJECT
3. PRIOR TO BIDDING CONTRACTOR SHALL VISIT JOB SITE TO REVIEW SCOPE OF WORK
AND EXISTING JOB CONDITIONS, THIS INCLUDES ALL DEMOLITION WORK, DIMENSIONS,
HVAC, PLUMBING AND ELECTRICAL WORK THAT ARE PART OF THIS CONTRACT.
4. CONTRACTOR SHALL IMMEDIATELY NOTIFY ARCHITECT OF ANY CONFLICTS OR
OMISSIONS, PRIOR TO THE PERFORMANCE OF THE WORK IN QUESTION.
5. CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER FOR A PRELIMINARY
WALK-THROUGH AFTER ELECTRICAL AND DATA BOXES HAVE BEEN SET BUT NOT
PIPED. OWNER SHALL HAVE THE OPPORTUNITY TO MAKE MINOR REVISIONS TO
OUTLET LOCATIONS BEFORE FINISHING OF ROUGH IN WORK.
6. WHERE ELECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINET WORK,
LAMPS AND FIXTURES ARE TO BE PROVIDED BY ELECTRICAL CONTRACTOR.
CUTOUTS ONLY FOR SWITCHES, OUTLETS ETC. ARE THE RESPONSIBILITY OF THE
CABINET CONTRACTOR AND SHOULD BE COORDINATED WITH THE ELECTRICAL
CONTRACTOR.
7. ALL DIMENSIONS ARE FROM ONE SIDE OF FINISHED WALL UNLESS OTHERWISE NOTED.
8. CONTRACTOR SHALL PROVIDE ADEQUATE BLOCKING IN WALLS TO RECEIVE ALL
ATTACHED EQUIPMENT, PLUMBING FIXTURES, MILLWORK, CASEWORK, ETC. NOTE:
ALL FRAMING OR CONCEALED BLOCKING SHALL BE METAL OR FIRE RETARDANT
TREATED WOOD.
9. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN ALL PARTITION
LOCATIONS. ALL DOOR AND OPENING LOCATIONS SHALL BE INDICATED ON PLAN. IN
CASE OF CONFLICT, NOTIFY THE ARCHITECT. ALL DIMENSIONS MARKED "CLEAR" SHALL
BE MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL FINISHES INCLUDING
CARPET, PAD, TILE, SHEET VINYL, WAINSCOT, ETC.
10. ITEMS INDICATED IN THIS SET OF DOCUMENTS BY OWNER ARE NOT A PART OF THIS
CONTRACT, AND ARE TO BE FURNISHED AND INSTALLED BY OWNER UNLESS
OTHERWISE NOTED.
11. ITEMS INDICATED IN THIS SET OF DOCUMENTS ARE NOT TO BE ALTERED WITHOUT
WRITTEN CONSENT FROM THE ARCHITECT OR ENGINEER. IF ALTERATIONS MADE BY
THE OWNER OR CONTRACTOR, THE ARCHITECT AND/OR ENGINEER ASSUME NO
RESPONSIBILITY FOR SUCH CHANGES.
12. ALL WORK SHALL HAVE FINAL INSPECTION BY ARCHITECT AND OWNER. ARCHITECT
WILL PREPARE FINAL PUNCH LIST OF DEFICIENT ITEMS THAT MUST BE CORRECTED
BEFORE FINAL PAYMENT TO THE CONTRACTOR
2023 PIKES PEAK REGIONAL BUILDING CODE (PPRBC)
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2020 NATIONAL ELECTRICAL CODE (NEC)
2017 ICC/ANSI A117.1 ACCESSIBILITY STANDARD
THE 2021 INTERNATIONAL FIRE CODE AND AMENDMENTS AS ADOPTED BY THE
COLORADO SPRINGS FIRE DEPARTMENT.
GARDEN OF THE GODS CARETAKER'S COTTAGE OFFICE CONVERSION
301 GARDEN LANE
COLORADO SPRINGS, COLORADO
DASHED/BROKEN LINE INDICATES
WALL TO BE DEMOLISHED
WALL TYPE
DRAWING SYMBOLS GENERAL NOTES
GRAPHIC PLAN SYMBOLS
ABBREVIATIONS
KEY PLAN SCALE = NOT TO SCALE
CODE STATEMENT DRAWING INDEX
PARTICIPANTS
BUILDING OWNER
PIKES PEAK LIBRARY DISTRICT
CONTACT: TRAVIS KEETON
TEL: 719.492.8562
ARCHITECT
DESIGN EDGE, P.C.
482 S BROADWAY, SUITE 100
DENVER, CO 80209
CONTACT: SWAGATA GUHA, AIA
TEL: 719.667.1972 X 114
MECHANICAL, ELECTRICAL ENGINEER
CHIARTANO ENGINEERING GROUP LLC
10186 MT. LINCOLN DR.
PEYTON, CO 80831
CONTACT: MICHAEL CHIARTANO, PE
TEL: 719-257-2091
CELL:719-330-6823
VICINITY MAP (NOT TO SCALE)
OFCI
OFOI
OWNER FURNISHED
CONTRACTOR INSTALLED
OWNER FURNISHED OWNER
INSTALLED
OPPOSITEOPP
PROJECT LOCATION
CARETAKER'S COTTAGE
DOOR TYPE (R= REUSE EXISTING)
OPENING
WIDTH
HARDWARE
SCHED #
FRAME TYPE (R= REUSE EXISTING)
36 WD
HM11
DOOR TYPE
EXAM
DOOR NO.
PLUMBING FIXTURE CALCULATION
9 MALE AND 9 FEMALE OCCUPANTS
DESCRIPTION
MALE
WATER CLOSET
REQ'D PROV'D
FEMALE
REQ'D PROV'D
LAVATORIES
MOP SINK
DRINKING FOUNTAIN
FIXTURES
REQ'D PROV'D
REMARKS
*SINGLE FOUNTAIN
WITH BOTTLE FILLER
(ALT. MEANS AND
METHODS)
1 1 1 1
1 1 1 1
1 1
1 1*
OFFICE
TRAINING/
CONF ROOM
OFFICE
OFFICE
BREAK
ROOM
MEN'S
TOILET
WOMEN'S
TOILET
JAN
CLO.
100B
MUD ROOM
OFFICE
100A
VEST.
(E) GARAGE/
STORAGE
HALLWAY
HALLWAY
HALLWAY
PROJECT DATA
G1.1
DESCRIPTION:DATE:
SHEET NUMBER
SHEET TITLE
ISSUE / REVISION
PROJECT INFO
SEAL
PROJECT NO:
PROJECT MGR:
PREPARED BY:
24124
SGT
SGT
GARDEN OF THE GODS
CARETAKER'S HOUSE
OFFICE CONVERSION
301 GARDEN LN
COLORADO SPRINGS, CO
711 N. CASCADE AVE. SUITE 10
TELEPHONE: (719) 667-1972
COLORADO SPRINGS, CO 80903
C COPYRIGHT, DESIGN EDGE, P.C.
ALL RIGHTS RESERVED. ANY COPYING OR OTHER
REPRODUCTION OF THESE DRAWINGS WITHOUT
THE PRIOR WRITTEN AUTHORIZATION OF DESIGN
EDGE, P.C. CONSTITUTES A VIOLATION OF
COPYRIGHT LAW AND WILL BE SUBJECT TO LEGAL
ACTION.
EDGED E S I G N
PRINT DATE: 9/27/2024
ISSUED FOR PLAN REVIEW09-27-24
EXISTING GARAGE USED
FOR GENERAL STORAGE
S-1 (464 SF)
NO FUEL BURNING
APPLIANCES IN
STORAGE
B OCCUPANCY 1653 SF
EXIT DISTANCE 63 FT.
EXIT
PROJECT DATA
G1.2
DESCRIPTION:DATE:
SHEET NUMBER
SHEET TITLE
ISSUE / REVISION
PROJECT INFO
SEAL
PROJECT NO:
PROJECT MGR:
PREPARED BY:
24124
SGT
SGT
GARDEN OF THE GODS
CARETAKER'S HOUSE
OFFICE CONVERSION
301 GARDEN LN
COLORADO SPRINGS, CO
711 N. CASCADE AVE. SUITE 10
TELEPHONE: (719) 667-1972
COLORADO SPRINGS, CO 80903
C COPYRIGHT, DESIGN EDGE, P.C.
ALL RIGHTS RESERVED. ANY COPYING OR OTHER
REPRODUCTION OF THESE DRAWINGS WITHOUT
THE PRIOR WRITTEN AUTHORIZATION OF DESIGN
EDGE, P.C. CONSTITUTES A VIOLATION OF
COPYRIGHT LAW AND WILL BE SUBJECT TO LEGAL
ACTION.
EDGED E S I G N
PRINT DATE: 9/27/2024
ISSUED FOR PLAN REVIEW09-27-24
SCALE:
SITE PLAN1
PROJECT DATA:
BUILDING INFORMATION
GENERAL SPECIFICATIONS
01 00 00 GENERAL REQUIREMENTS 01 00 00 GENERAL REQUIREMENTS (CONT.) 07 92 00 JOINT SEALANTS
1.1 General Requirements
A. General
1. All work shall conform to governing codes.
2. Specific notes and details take precedence over general notes and details.
3. Contractor shall visit the site and study all contract documents prior to commencing the work and shall notify the Architect of any discrepancies or inconsistencies found.
4. Permits and Fees: Contractor shall obtain and pay for required permits and fees.
5. Contractor is responsible for safety on site and shall comply with all applicable regulations.
1.2 Alternates
A. General
1. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into the Project.
2. Execute accepted alternates under the same conditions as other work of the Contract.
3. Schedule: A schedule of alternates is included on the drawings. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
1.3 Substitutions
A. General
1. Submittals
a. Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
b. If necessary, Architect will request additional information or documentation for evaluation within 7 days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request.
2. Quality Assurance
a. Investigate and document compatibility of proposed substitution with related products and materials.
3. Substitutions
a. Substitutions for Cause: Submit requests for substitution immediately on discover of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
b. Substitutions for Convenience: Not allowed unless otherwise indicated.
1.4 Project Management and Coordination
A. General
1. Requests for Information (RFI)
a. Immediately on discovery of the need for additional information, clarification, or interpretation of the
Contract Documents, Contractor shall prepare and submit an RFI.
2.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .