This is a bid document for the City of Fort Collins, Colorado Purchasing Division for Bid No. 10382, Drake Water Reclamation Facility (DWRF) Septage Station construction project. The project will construct a new standalone septage receiving facility within the DWRF property outside the main traffic and operations area, including a new asphalt access road, concrete truck bay area, pre-cast utility vault, septage receiving process piping, concrete culvert crossing the Boxelder Ditch, non-potable water piping, site electrical, and landscaping improvements. The existing facility will remain operable through construction and then be abandoned; no demolition or reconfiguration of the existing septage receiving station is included. The project site is adjacent to active work areas that must remain operational throughout construction. A pre-bid conference and job walk will be held at 3:00 PM MT on Wednesday, December 2, 2026, at Drake Water Reclamation Facility, 3036 Environmental Dr., Fort Collins, CO 80525. Written questions must be submitted by 3:00 PM MT on December 10, 2026. Bids are due by 3:00 PM MT on December 22, 2026, via the Rocky Mountain E-Purchasing System (RMEPS). Public bid opening will be conducted via Microsoft Teams video conference. Construction is anticipated to begin in March 2027, with Substantial Completion and Final Completion dates to be determined based on the proposed and agreed-upon construction schedule. Award will be made to the lowest responsive and responsible bidder within forty-five days of bid opening.
The bid schedule includes forty items (A through HH) with quantities and unit prices to be completed by bidders, with all phases of work to be performed under these listed items. Bid security of not less than five percent of the total bid must accompany each submission. The successful bidder must furnish Performance and Payment Bonds guaranteeing faithful performance and payment of all bills and obligations. Owner is exempt from Colorado State Sales and Use Tax. The contract will include five percent retainage on progress payments, though the Owner may waive retainage if work progress remains satisfactory. Progress payments will be processed monthly following invoice submission to invoices@fcgov.com, with the City paying on Net 30 terms. The contract is subject to annual appropriation by the City Council as required by the City Charter and Colorado Constitution. Liquidated damages provisions apply for delays in Substantial Completion and Final Completion. No set-aside is specified in the bid documents. The contract will be governed by Colorado state law, with venue in Larimer County District Court.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID INFORMATION
AND
CONTRACT DOCUMENTS
FOR
Drake Water Reclamation Facility (DWRF)
Septage Station
BID NO. 10382
November 18, 2026
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580 Fort Collins, CO 80522
970.221.6775 fcgov.com/purchasing
CONTRACT DOCUMENTS TABLE OF CONTENTS
BID INFORMATION
00020 Invitation to Bid 00100 General Information 00300 Bid Form 00400 Supplements to Bid Forms 00410 Bid Bond 00420 Statements of Bidders Qualifications 00430 Schedule of Subcontractors 00440 Safety Form
CONTRACT DOCUMENTS
00500 Agreement Forms 00510 Notice of Award 00520 Agreement 00525 Scope of Work 00530 Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release 00660 Consent of Surety 00670 Application for Exemption Certificate
CONDITIONS OF THE CONTRACT
00700 General Conditions
00900 Addenda, Modifications, and Payment 00950 Contract Change Order 00960 Application for Payment
ADDITIONAL CONTRACT DOCUMENTS
DRAWINGS
Sheet Number Sheet Title
GENERAL
G-001 COVER
G-002 GENERAL NOTES
G-003 GENERAL NOTES
G-004 LEGEND & ABBREVIATIONS
G-005 LEGEND & ABBREVIATIONS
SURVEY
V-101 TOPOGRAPHIC SURVEY AND CONTROL
V-102 SUE
CIVIL: REMOVALS
RM-301 REMOVALS
RM-302 REMOVALS
CIVIL: GENERAL
C-101 OVERALL SITE LAYOUT
CIVIL: GRADING
CG-101 PLAN
CG-102 PLAN
CG-103 PLAN
CG-201 PLAN & PROFILE
CG-202 PLAN & PROFILE
CG-203 PLAN & PROFILE
CIVIL: UTILITIES
CU-101 TRANSFER STATION
CU-201 PLAN & PROFILE
CU-202 PLAN & PROFILE
CU-203 PLAN & PROFILE
CIVIL: DETAILS
CD-501 DETAILS
CD-502 DETAILS
CD-503 DETAILS
CD-504 DETAILS
CD-505 RESERVED
CD-506 DETAILS
CD-507 DETAILS
CIVIL: SWMP
SW-001 SWMP NOTES
SW-002 SWMP NOTES
SW-003 SWMP NOTES
SW-004 SWMP NOTES
SW-101 SWMP INITIAL & INTERIM
SW-102 SWMP FINAL
PROCESS MECHANICAL
D-101 PLAN VIEW
D-201 SECTION VIEW
STRUCTURAL
S-901 GENERAL NOTES AND TYPICAL SECTION
S-902 BOX CULVERT PLAN AND ELEVATION
S-903 WINGWALL AND FOOTING LAYOUT
S-904 WINGWALL DETAILS
S-905 STRUCTURAL DETAILS
S-906 SEWER LINE PROTECTION
ELECTRICAL
E-001 GENERAL CONSTRUCTION NOTES
E-100 ELECTRICAL SITE PLAN
E-101 ENLARGED VALVE VAULT ELECTRICAL
E-500 ELECTRICAL ONE-LINE
E-700 ELECTRICAL DETAILS
ATTACHMENT A – Bid Set Specifications ATTACHMENT B - DWRF EMS Guide for Contractors
SECTION 00020
INVITATION TO BID
BID DUE: 3:00 PM MT (MT our clock), December 22, 2026
As part of the City’s commitment to sustainability, sealed Bids must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://bidnetdirect.com/colorado/city-of-fort-collins.
Public Bid Opening: The bid opening will be conducted by video conference per the following information. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. To access the public Bid opening, please follow the link to join the TEAMS meeting:
Join: https://teams.microsoft.com/meet/2827091686447139?p=2WMjrfHRRL9ogZtCI8 Meeting ID: 282 709 168 644 713 9 Passcode: Va7Si2di
The Contract Documents provide for the construction of Bid 10382 DWRF Septage Station.
The Septage Receiving project at the Drake Water Reclamation Facility (DWRF) will construct a new standalone septage receiving facility within the DWRF property but outside the main traffic and operations area. The new facility includes a new asphalt access road, a concrete truck bay area, a pre-cast utility vault, septage receiving process piping, a concrete culvert crossing the Boxelder Ditch, non-potable water piping, site electrical, and landscaping improvements. The existing facility will be operable through construction and then abandoned. There is no demolition or reconfiguration of the existing septage receiving station included in this project.
The project site is next to active work areas of DWRF, which must stay in operation throughout construction. Construction should ideally start in March 2027.
A pre-bid conference and job walk with representatives of prospective Bidders will be held at 3:00PM MT on Wednesday, December 2, 2026, at Drake Water Reclamation Facility located at 3036 Environmental Dr., Fort Collins, CO 80525. Please bring safety/high visibility vest to the job walk.
Weather permitting, a job walk will take place immediately after the pre-bid conference.
Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting.
All questions should be submitted, in writing via email, to Jake Rector, Senior Buyer at jrector@fcgov.com, no later than 3:00 PM MT on December 10, 2026. Please format your e-mail to include: Bid 10382 DWRF Septage Station in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an Addenda and posted on RMEPS.
The Contract Documents and Construction Drawings may be examined online at:
http://www.bidnetdirect.com/colorado/city-of-fort-collins http://bidnetdirect.com/colorado/city-of-fort-collins http://bidnetdirect.com/colorado/city-of-fort-collins https://teams.microsoft.com/meet/2827091686447139?p=2WMjrfHRRL9ogZtCI8
Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders.
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids.
The Owner reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein.
Prohibition Against Unlawful Discrimination. The Bidder acknowledges that the City, in the provision of its services and in its contractual and employment relationships, prohibits discrimination to the fullest extent authorized by federal, state and City law. The Bidder agrees to meet this standard in performing any work for the City and to apply that standard to its subcontractors at every tier. Characteristics protected from discrimination, depending on the particular context, may include an individual’s race, color, sex, gender (regardless of gender identity or gender expression), religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. Pursuant to City policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality.
The Bidder further acknowledges that: the City prohibits unlawful harassment in the workplace, including sexual harassment; and the City prohibits unlawful retaliation against a person who engages in protected activity, which includes an employee complaining that he or she has been discriminated against in violation of the City’s nondiscrimination policy, opposing discriminatory, harassing or retaliatory conduct, and participating in an employment discrimination proceeding.
The Bidder agrees to comply with the City’s policy to prohibit harassment and unlawful retaliation. This requirement applies to Bidder’s subcontractors at every tier.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited.
Contractor Registration: The City requires new Contractors receiving awards from the City to submit IRS form W-9 and requires all Contractors to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at https://www.fortcollins.gov/Department- Directory/Purchasing under Vendor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit (Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion.
https://www.fortcollins.gov/Department-Directory/Purchasing https://www.fortcollins.gov/Department-Directory/Purchasing
Colorado Open Records Act: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any bid submitted hereunder is subject to public disclosure by the City pursuant to CORA and City ordinances. All submitted bids, Bid Forms, and the awarded contract will be considered public records subject to disclosure under CORA. By responding to this Bid, Contractor hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA.
Collusive or Sham Bid: Any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal.
City of Fort Collins
Jake Rector Purchasing Director
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (2018 edition) prepared by the Engineers Joint Contract Documents Committee (EJCDC) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to City (Owner), as distinct from a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom Owner (on basis of Owner's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid.
2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.3. The submitted Bid proposal shall include Sections 00300 and 00400, fully executed.
2.4. Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications provided in Section 00420. As applicable, Bidder must possess all required state and local licenses.
3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in determining whether a Bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the Bidder to perform the contract or provide the services required, (2) whether the Bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the Bidder,
(4) the quality of the Bidder's performance of previous contracts or services, (5) the previous and existing compliance by the Bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the Bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the Bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the Bidder's performance of the contract.
3.3. Each Bidder may be required to show that any Work previously performed by the Bidder has no claims pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair their ability to perform or finance this Work.
3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City.
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize itself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize itself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents.
4.2. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
5.0 INTERPRETATIONS AND ADDENDA.
5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Owner. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
5.2. All questions concerning the scope of this project and submittal of Bids must be directed to the City of Fort Collins' Purchasing Division.
5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer.
5.4. Responses to all questions submitted before the deadline will be addressed in an Addenda and posted on the Rocky Mountain E-Purchasing System webpage.
6.0 BID BOND
6.1. Each Bid must be accompanied by Bid Security in an amount no less than five (5) percent of the Bid. The Bid Bond must be executed by a Surety meeting the requirements of the General Conditions for surety bonds. If a Surety does not issue electronic Bid Bonds, a scanned copy of the Bid Bond must be submitted electronically through Rocky Mountain E-Purchasing System at the time of the Bid submittal.
6.2. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, Owner may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom Owner believes to have reasonable chance receiving the award may be retained by Owner until the earlier of the seventh day after the effective date of the Agreement or forty-five days after the Bid Opening.
7.0 CONTRACT TIME
The number of days within which, or the date by which the Work is to reach Substantial Completion and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement.
8.0 LIQUIDATED DAMAGES
Provisions for liquidated damages are set forth in Section 00520.
9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by Contractor and consideration by Engineer is set forth in the General Conditions which may be further defined in the Supplementary Conditions.
10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS
10.1. Each Bidder shall submit at the Bid opening to Owner a list of principal subcontractors proposed for use in the Work. Refer to Section 00430 contained within the Contract Documents. The Bidder may only utilize the subcontractors stated in Section 00430 except in the event that the Owner requires a change in accordance with Section 10.2 below. Should the Bidder request a change to the subcontractor list, Owner’s written approval shall be required. Proposed subcontractor/supplier qualifications and references may be requested to be submitted within 3 business days after Bid opening. Subcontractor/supplier responsibility will be determined in accordance with Section 8-160 of the Code of the City of Fort Collins.
10.2. If Owner or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, Owner may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors.
Subcontractors, suppliers, other persons or organization listed and to whom Owner or Engineer does not make written objection prior to the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in the General Conditions.
11.0 BID FORM
11.1. A copy of the Bid Form will be posted at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence.
Unit prices shall govern over extensions of sums. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. In the event that there are unit price items in a Bid Schedule and the "extended amount" indicated for a unit price of a Bid item does not equal the product of the unit price and quantity listed, the unit price shall govern, and the extended amount will be corrected accordingly. If there is more than one Bid item in a Bid Schedule, and the total indicated for the schedule does not agree with the sum of prices of the individual Bid items, the prices Bid on the individual items shall govern and the total for the schedule will be corrected accordingly. The Contractor will be bound by said corrections.
11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name.
11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, the title must appear under signature and the official address of the partnership must be shown below the signature.
11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form.
11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).
11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, Owner may require the Bidder to identify any alteration so initialed.
12.0 BID PRICING
Bids must be priced as set forth in the Bid Schedule or Schedules.
13.0 SUBMISSION OF BIDS
13.1. Bids shall be submitted prior to the time and date stated in the Bid Documents or any extension thereof made by Addenda, electronically using Rocky Mountain E- Purchasing System at the time and place indicated in the Invitation to Bid and accompanied by the documents identified as required in Sections 00300 & 00400.
Bids received after the time and date for receipt of Bids will not be accepted.
Bidder shall assume full responsibility for timely Bid submittal as stated in the Instructions to Bidders, Section 00100.
13.2. Oral, telephonic, telegraphic, physically mailed or delivered or facsimile Bids are invalid and will not receive consideration.
13.3. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one Bidder.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS
14.1. Bids may be modified or withdrawn prior to the Bid Opening time stated in the Invitation to Bid, Section 00020.
14.2. Withdrawn Bids may be resubmitted up to the Bid Opening time stated in the Invitation to Bid provided that they are fully in conformance with the Instructions to Bidders.
15.0 BID OPENING
Bids will be opened and read aloud publicly as indicated in the Invitation to Bid, Section 00020. A Bid Tally of the amounts of the Base Bids and alternates (if any) will be made available on RMEPS after the Bid Opening.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE
All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but Owner may, in his sole discretion, release any Bid prior to that date.
17.0 AWARD OF CONTRACT
17.1. Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, Owner reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Owner to make an award to that Bidder, whether because the Bid is not responsive, or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner.
17.2. In evaluating Bids, Owner will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
17.3. Owner may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by Owner. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.
17.4. Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.
17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interest of the Owner. The basis for award shall be as noted in Section 00300. Only one contract will be awarded.
17.6. If the Contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening, or a mutually agreed upon date.
18.0 PERFORMANCE & PAYMENT BONDS
The General Conditions set forth Owner's requirements as to Performance and Payment Bonds. When the awarded Contractor delivers the executed Agreement to the Owner, it shall be accompanied by the required Performance and Payment Bonds.
19.0 SIGNING OF AGREEMENT
When Owner gives a Notice of Award to the awarded Contractor it will be accompanied by the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, Contractor shall sign and deliver the Agreement and attached documents to Owner with the required Bonds. Within ten (10) days thereafter, Owner shall deliver the executed Agreement to Contractor.
20.0 TAXES
Owner is exempt from Colorado State Sales and Use Tax as applicable. Said taxes shall not be included in the Contract Price.
21.0 RETAINAGE
Provisions concerning retainage are set forth in the Agreement.
22.0 BID RESULTS
Bid results will be posted at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
24.0 SCHEDULE
The anticipated schedule for this project is as follows:
Item Dates
Bid Issue Date November 18, Pre-Bid Meeting
3:00PM MT
Wednesday, December 2nd, Question Deadline
3:00 PM MT
December 10, Bid Opening December 22, Tentative Notice to Proceed March 2027
Substantial Completion Date
TBD based on Proposed and Agreed Upon Construction
Schedule
Final Completion Date
TBD based on Proposed and Agreed Upon Construction
Schedule
END OF SECTION
SECTION 00300
BID FORM
SECTION 00300
PROJECT: 10382 DWRF Septage Station Date:
1. In compliance with your Invitation to Bid dated , 20 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule(s).
2. The undersigned Bidder does hereby declare and stipulate that this Bid is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Contract Documents pertaining to the Work to be done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a Bid Bond in the sum of
($ ) in accordance with the Invitation to Bid and Instructions to
Bidders.
4. The undersigned Bidder agrees to execute the Agreement and the Performance and
Payment Bonds for the total amount of this Bid within fifteen (15) calendar days from the date when the written Notice of Award is delivered to the address given on this Bid. The name and address of the corporate Surety with which the Bidder proposes to furnish the specified Performance and Payment Bonds is as follows:
5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the Contractor under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule(s) subject to change(s) as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through .
8. COLORADO OPEN RECORDS ACT
The undersigned Bidder acknowledges that the City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any Bids submitted hereunder is subject to public disclosure by the City pursuant to CORA and City ordinances. All submitted Bids, Bid Forms, Bid Schedules, and the awarded contract will be considered public records subject to disclosure under CORA.
By responding to this Bid, Contractor waives any and all claims for damages against the City for the City’s good faith compliance with CORA.
9. The undersigned Bidder acknowledges the documents listed below are required elements of the Bid and must be submitted with the Bid. The City may reject any incomplete Bids as non-responsive.
Bid Form (this Section 00300)
Electronic Bid Bond (Item 3 above and Section 00410) for five (5) percent of the base Bid amount
Acknowledgement of Bid Addenda (Item 7 above)
Statement of Bidder's Qualifications (Section 00420)
Schedule of Subcontractors (Section 00430)
Safety Form (Section 00440)
Proposed Construction Project Schedule Beginning March 2027
10. BID SCHEDULE (Base Bid) At the City’s option the basis of award is the low responsive and responsible Bidder based on the total price for Base Bid or the total price for the Base Bid plus selected Alternates.
Please complete Bid Schedule included in Microsoft Excel File and submit in Excel and PDF formats:
PROJECT: DATE:
Drake Water Reclamation Facility (DWRF) Septage Station
PROJECT DESCRIPTION:
Septage Receiving Station Upgrades: Bid Set
CLIENT:
ITEM
NO.
DESCRIPTION
QNTY
UNIT
UNIT PRICE
TOTAL COST
A. Mobilization 1 LS
B. Erosion Control 1 LS
C. Construction Surveying 1 LS
D. Traffic Control 1 LS
E. Asphalt Pavement Removal 20 SY
F. Curb & Gutter Removal 35 LF
G. Concrete Ditch Removal 5 SY
H. 4-Inch C906 HDPE Non-Potable Waterline Installation 725 LF
I. Yard Hydrant Assembly 2 EA
J. Storm Pipe Installation 1 LS
K. Aggregate Base Course 1,000 TN
L. Hot Mix Asphalt Grading 420 TN
M. Recycled Asphalt Grading 120 CY
N. Concrete Pavement (8-Inch) 270 SY
O. Class D Concrete 10 CY
P. Subgrade Stabilization Geosynthetics 3,160 SY
Q. Embankment Material (Complete in Place) 1,050 CY
R. Concrete Curb & Gutter Type 2 (Section II-B) 400 LF
S. Site Fencing 500 LF
T. Landscape Rock 275 CY
U. Landscape Repair 1 LS
V. Site Work 1 LS
W. 36” Sewer Pipe Encasement – Stiff Leg 1 LS
X. 42” Sewer Pipe Encasement – Stiff Leg 1 LS
Y. 36” Sewer Pipe Encasement – (existing encasement) 1 LS
Z. 42” Sewer Pipe Encasement – (existing encasement) 1 LS
AA. Transfer Station Over-excavation and re-compaction 1 LS
BB. 8” gravity sewer 125 LF
CC. Interceptor MH modifications 1 LS
DD. Valve vault 1 LS
EE. Process Piping 1 LS
FF. 48” manhole 3 EA
GG. Box Culvert 1 LS
HH. Electrical 1 LS
TOTAL
BID TOTAL IN WORDS: ____________________________________________________________
*NOTE: ALL BID ITEMS MUST HAVE A COST ENTERED WHICH CANNOT BE
ZERO, BLANK OR DASH ("-"), BIDS WILL BE CONSIDERED NON-RESPONSIVE
WITH NO COST ENTERED FOR EACH LINE ITEM.
11. PRICES
The foregoing prices shall include but are not limited to all labor, materials, overhead, profit, insurance, etc., for completion of the Work.
RESPECTFULLY SUBMITTED:
Legal Firm Name:
Physical Address:
Remit to Address:
Phone:
Name of Authorized Agent of Firm:
Signature of Authorized Agent:
Primary Contact for Project:
Title: Email Address:
Phone: Cell Phone:
(Seal - if Bid is by corporation)
Attest:
Address
Telephone
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
00440 Safety Form
SECTION 00410
BID BOND
KNOW ALL PEOPLE BY THESE PRESENTS: that we, the undersigned as Principal, and , as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as Owner, in the sum of $
($ ) for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a
Construction Agreement for the construction of Fort Collins Project, 10382 DWRF Septage
Station.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute the Contract attached hereto
(properly completed in accordance with said Bid) and shall furnish a Bond for their faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the
Agreement created by the acceptance of said Bid, then this obligation shall be void;
otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the State of
Colorado and be accepted by the Owner.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
PRINCIPAL SURETY
Name:
Address:
By: By:
Title: Title:
ATTEST:
By:
(SEAL) (SEAL)
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered, and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information if needed.
1. Name of Bidder:
2. When was Bidder’s firm organized:
3. If your firm is a corporation, where is the firm incorporated:
4. How many years has the firm been engaged in the contracting business under the present firm or trade name?
5. Provide a list of the contracts on hand: (list these, showing the amount of each contract and the appropriate anticipated dates of completion.)
6. What is the general character of Work performed by your company:
7. Have you or a firm for which you were a principal ever failed to complete any Work awarded to you?
If so, where and why?
8. Has the firm ever defaulted on a contract?
If so, where and why?
9. Is the firm debarred by any government agency?
If yes, list agency name.
10. Provide the background and experience of the principal members of your organization, including officers:
11. Credit available: $
12. Bank Reference:
13. Will you, upon request, provide a detailed financial statement for your Company and furnish any other information that may be required by the Owner?
14. Is the firm licensed as a General Contractor, if applicable, in the City of Fort Collins?
15. Are any lawsuits pending against you or your firm at this time?
If yes, provide detail
16. REFERENCES
The Contractor shall provide:
1. Three (3) reference projects within the last five (5) years that emphasize work with the following elements:
a. Integrated site civil construction - construction of a multi-discipline site facility or project that may include any or all of the following: roadway paving, heavy-duty concrete pavement or slabs for truck traffic, precast or cast-in-place structure installation, yard piping, and site electrical.
b. Concrete culvert or drainage structure construction within an active waterway - Installation of a precast or cast-in-place concrete box culvert, bridge-class culvert, or similar structure within an irrigation ditch, stream, or drainage channel, including coordination with ditch companies, water rights holders, or other regulatory stakeholders as well as water control, bypassing pumping, and/or dewatering for the actual installation.
c. Construction at an operating facility near active utilities - Construction at an active water or wastewater treatment facility, or similar critical public infrastructure site, including excavation near existing in-service underground utilities. Experience should include locating, potholing, and protecting utilities in place as well as coordinating with owner operations staff and utility owners, maintaining facility access, and phasing work to avoid service interruptions or disruption of ongoing operations.
d. For each reference projects provided, contractor shall include a project description summarizing how the project incorporated any of the above mentioned elements, information on initial project schedule, final project schedule, initial contract value, final contract value, and change orders on each project and Owner reference contact information.
2. The Proposed project team that includes members that have worked on these reference projects and their role on this project. Include resume for each team member.
Project 1 Name:
Brief Description:
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
Project 2 Name:
Contact Name: Title:
Phone: Email:
Project 3 Name:
Contact Name: Title:
Phone: Email:
17. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the Owner in verification of the recital comprising this Statement of Bidder's Qualifications.
By signing below, the Contractor agrees that the answers to the foregoing questions and all statements therein contained are true and correct.
Company:
By: Printed:
Title:
State of ____________________
County of ____________________
Signed before me on _______________________, 20____ by __________________________________ (name(s) of individual(s) making statement).
(Notary’s official signature)
(Title of office)
(Commission Expiration)
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all Subcontractors performing 10% or more of the Base Bid total and their corresponding Work items.
WORK ITEM (ESTIMATED %) SUBCONTRACTOR
SECTION 00440
SAFETY FORM
Please complete the following form to provide information about your Company’s safety records and procedures. This information will be included in the evaluation of the submitted proposal. We reserve the right to request additional documentation, at any point, that supports the accuracy of this form.
Contractor(s) safety record will be evaluated by the evaluation team as an element of determining whether the Contractor(s) is responsible. Contractor(s) whose safety record is above 1.0 for Experience Modification Rating (EMR) and 5.0 for Total Recordable Incident Rate (TRIR) will be reviewed in depth and may be deemed ineligible to be considered for award at the City’s sole discretion.
Section 1. General Information
Company Name
Number of Employees Full Time: Part Time: Seasonal:
Insurance Carrier
Self-insured for Workers Compensation?
Y ☐ N ☐
Section 2. Health and Safety Professional Information
Does your company have a full-time dedicated Safety Officer?
If yes, provide the following information for the dedicated Safety Officer:
Name:
Title:
Phone Number:
Email:
If no, provide the following information of the person responsible for safety in your company:
Name:
Title:
Phone Number:
Email:
Provide the following information for the site safety Point of Contact:
Name:
Title:
Phone Number:
Email:
Section 3. Health and Safety Program
Does your company have a written Company Safety Program?
Does the written Company Safety Program cover the work activities proposed by your company for this project?
Does the written Company Safety Program include the following:
Health and Safety Training Y ☐ N ☐
Employee/Management Responsibility Y ☐ N ☐
Hazard Recognition and Control Y ☐ N ☐
Incident Reporting and Investigation Y ☐ N ☐
Describe a typical job site safety briefing (time, location, frequency, topics, documentation).
How does your company ensure health and safety program compliance throughout the project?
Does your company perform written Job Hazard Analysis’s (JHA’s) regularly and document them?
How often does your company conduct Health and Safety audits or inspections?
Does your company have a written corrective action plan for any findings?
Section 4. Training and Certifications
List required safety training ALL employees receive:
List specialized safety training employees receive as needed:
Does your company maintain records of all safety training and certifications?
Section 5. Safety Equipment (Engineered Controls)
Will your company be performing any Trenching/Excavation and Confined Space Activities?
If yes, list what protective shoring equipment you will have available for the job site?
If entering Permit Required Confined Spaces (PRCS), such as vaults or sewers, what is your procedure for these activities?
Section 6. Health and Safety Records
List the Company’s Experience Modification Rate (EMR) for the previous 3 years
Year: EMR:
Year: EMR:
Year: EMR:
Provide the number of injuries and illnesses recorded (OSHA 300 log or equivalent) in the previous 3 years:
Calendar Year Year: Year: Year:
Number of Fatalities
Number of OSHA recordable cases
Number of OSHA modified duty cases
Number of OSHA lost time cases
OSHA Total Recordable Incident Rate
(TRIR)
Number of recordable cases x 200,000 Number of hours worked
OSHA DART Rate (Days Away Restricted or Transferred)
Number of DART cases x 200,000 Number of hours worked
Average number of employees on payroll
Have any OSHA citations been issued to your company in the past 3 years?
If yes, list the citations and for each, provide the type of violation, an explanation for the citation, the penalty issued, and describe the corrective action taken by the Company. Limit your response to projects that have occurred in the Rocky Mountain region. Use additional pages if needed.
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
SECTION 00510
NOTICE OF AWARD
DATE: [Date]
TO: [Contractor]
PROJECT: 10382 DWRF SEPTAGE STATION
OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the Owner")
Contractor is hereby notified that your Bid dated [Contractor's Bid Date] for the above project has been considered. Contractor is the apparent successful Bidder and has been awarded an Agreement for 10382 DWRF SEPTAGE STATION.
The Price of the Agreement is ($ ).
One (1) copy of all Contract Documents accompany this Notice of Award. Additional copies of the drawings may be requested from the Project Manager.
Contractor must comply with the following conditions within fifteen (15) days of the date of this Notice of Award, that is by [Date].
1. Contractor must deliver to the Owner a fully executed Agreement complete with authorized signature on the signature page.
2. Contractor must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders.
Failure to comply with these conditions within the time specified will entitle Owner to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited.
OWNER
By:
Jake Rector Purchasing Director
SECTION 00520
AGREEMENT
THIS Agreement is dated as of the [Day] day of [Month] in the year of 20[Year] and shall be effective on the date this Agreement is signed by the City.
The City of Fort Collins (hereinafter called Owner) and [Contractor] (hereinafter called Contractor)
Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 10382 DWRF
SEPTAGE STATION.
ARTICLE 2. CHANGE ORDERS
The City, may, at any time during the term and without invalidating the Agreement, make changes to the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as 00950, consisting of one (1) page and incorporated herein by this reference.
ARTICLE 3. ENGINEER
The Project has been designed by JUB ENGINEERS. However, all references in the Contract Documents to the Engineer shall be the City’s Project Manager, William McHugh, who will assume all duties and responsibilities and will have the rights and authority assigned to Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. The Project Manager is subject to change by the Owner by written notice via email to the Contractor.
ARTICLE 4. CONTRACT TIMES
4.1. The Work shall be Substantially Completed by the Contractor, as evidenced by the issuance of the Certificate of Substantial Completion, within ( ) calendar days after the date of the Notice to Proceed.
4.3. Liquidated Damages. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in paragraphs 4.1 and 4.2 above, plus any extensions thereof allowed in accordance with Article 11 of the General Conditions.
They also recognize the delays, expenses and difficulties involved in proving in a legal preceding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as Liquidated Damages for delay (but not as penalty) Contractor shall pay Owner the amounts set forth hereafter.
1) Substantial Completion. Written Dollar Amount ($Numerical Dollar Amount) for each calendar day or fraction thereof after until the work is Substantially Complete.
2) Final Payment and Acceptance: After Substantial Completion, Written Dollar Amount ($Numerical Dollar Amount) for each calendar day or fraction thereof after until the Work is ready for Final Payment and Acceptance.
ARTICLE 5. CONTRACT PRICE
5.1. Owner shall pay Contractor for performance of the Work in accordance with the Contract Documents as follows: ($ ), in accordance with Section 00300, attached and incorporated herein by this reference.
ARTICLE 6. PAYMENT PROCEDURES
Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.1. PROGRESS PAYMENTS. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Application for Payment as recommended by Engineer, once each month during construction as provided below. All progress payments will be calculated on the basis of the progress of the Work. In the case of Unit Price Work, progress payments will be based on the number of units completed and pricing will be in accordance with the Bid Form, Section 00300.
6.1.1. APPLICATION FOR PAYMENT
Applications for Payment should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the Work completed shall be paid to the Contractor each month following the submittal of a correct invoice completed in accordance with the Application for Payment, Section 00960.
Payments will be made using the prices stated on the Bid Schedule. In the event Work is requested that is not stated in the Contract, the Contractor and the City will negotiate an appropriate unit price for the Work prior to the Contractor initiating such Work.
The City pays invoices on Net 30 terms.
6.1.2. Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as Engineer shall determine, or Owner may withhold, in accordance with Article 15.01 of the General Conditions. If, in the sole discretion of Owner, on recommendation of Engineer, Owner mailto:invoices@fcgov.com determines that the character and progress of the Work have been satisfactory to Owner and Engineer, Owner may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed.
95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to Owner as provided in Article 15.01 of the General Conditions) may be included in the Application for Payment 00960.
6.1.3. Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to Contractor to 95% of the Contract Price, less such amounts as Engineer shall determine or Owner may withhold in accordance with Article 15.01 of the General Conditions or as provided by law.
6.2. FINAL PAYMENT AND ACCEPTANCE. Upon Final Payment and Acceptance of the Work in accordance with Article 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Article 15.06.
ARTICLE 7. CONTRACTOR'S REPRESENTATION
In order to induce Owner to enter into this Agreement, Contractor makes the following representations:
7.1 Contractor has familiarized himself with the nature and extent of the Contract
Documents, Work, site, locality, local conditions, and all applicable Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.
7.2. Contractor has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Contract Documents as provided…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .