biddoc.pdf
PDF 617 KB Posted
- Attached to
- Estes Park Museum Gallery Remodel
- Solicitation number
- 11182026a
- Issued by
- Larimer County, Colorado
About this file
This Invitation to Bid (ITB) is issued by the Town of Estes Park, Colorado for the renovation of the Estes Park Museum Gallery, consisting of two distinct parts: an ADA accessible vestibule entrance on the rear of the building and a complete remodel of the interior gallery space. The project scope includes demolition, structural modifications, installation of doors and windows, HVAC relocation, electrical work, painting, flooring installation, and concrete work for the vestibule component, as well as demolition of interior platforms and walls, electrical upgrades, painting, and new carpet installation for the gallery remodel. The mandatory pre-bid conference is scheduled for November 30, 2026 at 1:00 PM MT at the museum site (200 4th Street, Estes Park, CO 80517). The deadline for written questions is December 8, 2026 at 5:00 PM MT, with final addenda issued by December 10, 2026. Sealed bids are due by December 17, 2026 at 11:00 AM MT, with public bid opening conducted virtually via Google Meet. The anticipated contract term is 60 calendar days from project kick-off through substantial completion, with all work to be completed by April 9, 2027 to allow museum staff time to reset exhibits before public reopening. The Notice to Proceed is scheduled for January 27, 2027, with the project kick-off meeting occurring between January 28 and February 4, 2027.
A 5% bid guarantee is required at the time of bid opening, with successful bidders required to provide Performance and Labor and Material Payment Bonds each equal to the contract price within ten calendar days of the Notice of Award. The approved project budget is $106,000, funded by the Estes Park Museum Friends & Foundation as part of the 2026 Capital Improvement Program with no federal or state funding participation. The bid schedule separates the two project components to allow for potential phased execution if budget constraints require. Contractors are required to submit detailed bid schedules itemizing all labor, materials, general conditions, overhead, and profit; a Gantt chart or equivalent construction schedule; proof of Colorado business licensing; and evidence of insurance naming the Town as an additional insured. Liquidated damages will apply at a rate to be determined in the final contract if substantial completion is not achieved within the specified timeframe. The contractor must obtain all required permits and coordinate inspections at no additional cost to the Town. No federal or state labor preferences or other set-asides are identified in this solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB Museum Gallery Renovation 1
INVITATION TO BID
Museum Gallery Renovation
Wednesday, November 18, 2026
200 4th Street
Estes Park, CO 80517
Proposals due by Thursday, December 17, 2026
ITB Museum Gallery Renovation 2
Table of Contents
1. INVITATION TO BID
2. INSTRUCTIONS FOR BIDDERS
3. BID BOND
4. BIDDER'S QUALIFICATIONS AND DATA
5. SUBCONTRACTORS AND RELATED DATA
6. BID PROPOSAL
7. BID SCHEDULE
8. PROJECT TIMELINE
9. CONSTRUCTION CONTRACT
10. CONSTRUCTION CONTRACT GENERAL CONDITIONS
11. CONSTRUCTION CONTRACT SPECIAL CONDITIONS
Exhibits: (as separate attachments)
A. Part 1: ADA Accessible Vestibule Entrance Site Map
B. Part 2: Gallery Remodel Site Map
C. Bid Schedule (Excel Spreadsheet)
D. Project Timeline (Excel Spreadsheet)
E. 2016 Asbestos Report
ITB Museum Gallery Renovation 3
1. INVITATION TO BID
PROJECT : Renovation of the Museum Gallery to include 1) An ADA accessible vestibule entrance, and 2) Remodel of the gallery space
SCOPE: Provide all labor, materials and equipment necessary to perform to work described below. There was an asbestos study/report conducted on this building in 2016. Although asbestos is present in the building, there was none identified in the project areas. If additional testing is required, please include that as a separate line item in the bid schedule. If asbestos is identified during the construction, all work is to stop immediately until a mitigation strategy is in place.
F. Part 1: ADA Accessible Vestibule Entrance. The intent of this part is to create a similar
(in style, size and appearance) vestibule entrance on the back (east) side of the gallery showroom to that of the main entrance to the Museum Gallery. (See Exhibit A Part 1: ADA
Accessible Vestibule Entrance Site Map, there are no existing architect/engineer drawings for this project). This will consist of the following:
General Conditions (Division 01):
• The Contractor will be responsible for the following:
o Mobilization of equipment and personnel o Provide Bid, Performance, Labor/Materials Bonds, proof of insurance o Obtain all required permits; coordinate inspections as required, and address any corrective actions noted o Construction/Site Management (including safe working conditions) o Administrative duties o Warranty of materials and workmanship for one (1) year o Final site clean o Timely communications and status updates throughout the duration of the project o Overhead and Profit o Provide final ‘As-Built’ plans at conclusion of project
ITB Museum Gallery Renovation 4 o Utilities locating prior to beginning the project o Installation of perimeter fencing/safety zone around project area with accessibility for emergency vehicles must be maintained throughout the entirety of the project o All work to be performed in accordance with current local, state, and federal codes
• Architect/Engineer drawings o Contractor to engage with an architect to create drawings acceptable for permitting
• Walls/Ceiling o Demo of interior and exterior walls (approximately 10ft wide x 8 feet tall) for new vestibule entry o Demo existing single exterior storefront door
▪ Frame and enclose opening
▪ Interior – sheetrock, paint to match existing walls
▪ Exterior – exterior siding to match existing, paint to match o Demo existing interior pony wall o Ensure proper structural support and reinforcement of new opening o Create framed opening for double door exterior storage front doors (qty 2) to match the style of main entry exterior doors o Construct new interior walls to create vestibule (approximately 9ft wide x 9ft long) o Frame in single exterior door opening to match both interior and exterior finishes o Frame in exterior window opening to match both interior and exterior finishes o Create framed opening for double door interior passage doors (qty 2) to match the style of main entry interior doors o Provide and install R13 Thermafiber Fire and Sound Guard Plus Mineral Wool
Insulation in all new walls and any exposed exterior walls.
o Provide and install 1/2in sheetrock o Make necessary repairs to walls and ceiling; prep for painting o Make necessary repairs to exterior of building to match existing conditions
ITB Museum Gallery Renovation 5
• Doors/Windows o Demo existing single exterior door and frame.
o Demo existing window and frame o Provide and install (qty 2) 36in x 84in (3070) exterior storefront door to match style, appearance, color and hardware of main entry exterior doors (see Exhibit A Part 1:
ADA Accessible Vestibule Entrance Site Map) o Provide and install (qty 2) 36in x 80in (3068) interior passage door to match style, appearance, color and hardware of main entry interior doors (see Exhibit A Part 1:
ADA Accessible Vestibule Entrance Site Map) o Provide and install (qty 1) ADA automatic push button door operator on exterior of building to control all 4 doors when activated o Provide and install (qty 1) ADA automatic push button door operator on interior vestibule-side to control all 4 doors when activated o Exterior locks to be keyed to match main entry exterior doors
• HVAC
o Relocate existing HVAC supply vent and ductwork out of the newly created vestibule and within the open gallery space o Provide and install baseboard heating within the vestibule
• Roof o Inspect HVAC roof top unit for possible water intrusions;
▪ Repairs to roof will be treated as a change order once solution(s) has been identified
ITB Museum Gallery Renovation 6
• Electrical o Relocate exterior electrical outlet to be outside of project area of work o Relocate exterior wall-mounted light fixture to be outside of project area of work o Relocate existing ceiling-mounted track lighting to be outside of project area of work o Relocate existing Emergency Sign from single door location to newly constructed vestibule o Relocate existing exterior light to newly created entrance o Provide necessary electrical required for automatic doors and openers o Provided necessary electrical for baseboard heater unit o Provide and install (qty 1) 2x2 LED flat panel, ceiling-mounted light fixture within newly constructed vestibule
▪ White frame
▪ 3500-5000 Kelvin, adjustable
▪ 120-277 V
▪ 20-40 Watt, adjustable
▪ Fixture to be connected to existing gallery light fixtures; no new switches needed
• Paint o Paint (2) coats of Sherwin Williams Pro-Mar 200, egg shell finish to all newly created walls; color TBD o Paint (2) coats of Sherwin Williams Pro-Mar 200, flat finish ceiling within vestibule;
color TBD o Paint (2) coats of Sherwin Williams Exterior Acrylic Latex Paint on exterior walls as needed; color to match existing
ITB Museum Gallery Renovation 7
• Flooring o Remove existing carpeting in newly constructed vestibule area o Prep floor for new product o Provide and install the following:
▪ Floor tile – Crossville Floor Tile, 8x8 inch, Storm, with Cross-Tread
• SKU – EC001.10808CTS
• Stacked patterned; 1/4in spacing
• Provide sample prior to ordering
▪ Wall cove base – Crossville Floor Tile corresponding color cove base, 6x8in
• Provide sample prior to ordering
▪ Grout – Mapei Charcoal #5047
• Keracolor Sanded Grout
• Concrete o Prep exterior for approximately 8 ft x 10 ft concrete pad o Create concrete sidewalk 5ft wide, 4in thick to connect to existing walking paths o Concrete to be 4in thick; 3500 - 4000 psi
• Handrails o Manufacture and install (2) 3ft long ADA-compliant hand rails
G. Part 2: Gallery Remodel. The intent of this part is to create a more open and functional gallery space. Ultimately, this would lead to a more welcoming environment for Museum visitors, easier wayfinding, interpretative flexibility, and a cohesive space. (See Exhibit B
Part 2: Gallery Remodel Site Map, there are no existing architect/engineer drawings for this project). This will consist of the following:
ITB Museum Gallery Renovation 8
General Conditions (Division 01):
• The Contractor will be responsible for the following:
o Mobilization of equipment and personnel o Provide Bid, Performance, Labor/Materials Bonds, proof of insurance o Obtain all required permits; coordinate inspections as required, and address any corrective actions noted o Construction/Site Management (including safe working conditions) o Administrative duties o Warranty of materials and workmanship for one (1) year o Final site clean o Timely communications and status updates throughout the duration of the project o Overhead and Profit o Provide final ‘As-Built’ plans at conclusion of project o All work to be performed in accordance with current local, state, and federal codes
• Demo o Remove all floor platforms o Remove all identified walls and slat walls within gallery area
• Walls / Ceilings o Remove all existing quarter round molding o Create door frame opening on north wall of shop closet (specific location TBD) o Make necessary sheetrock repairs and prep walls for painting
• Doors / Windows o Remove (and keep) existing shop closet door o Reinstall door on north wall of shop closet (specific location TBD) o Remove (and discard) door in theatre room o Remove (and discard) identified exterior window
ITB Museum Gallery Renovation 9
• Electrical o Inspect and repair existing wall mounted electrical outlets o Install new duplex outlets (x3) locations TBD. All at 18in above ground
▪ Confirm existing electrical capacity can accommodate new additions o Install conduit for network drop (x1). Location TBD. Data cable installation by others.
o Relocate existing track lighting (new locations TBD) o Terminate identified existing wall-mounted light switch. Tie existing light fixtures into adjacent light switch o Disconnect all electrical from free-standing walls; reuse and install new ceiling-mounted electrical outlets (x3) o Convert existing surface-mounted outlet and conduit into in-wall outlet at 18in above ground
• Paint o Paint (2) coats of Sherwin Williams Pro-Mar 200, egg shell finish to all gallery interior walls; color TBD o Paint (2) coats of Sherwin Williams Pro-Mar 200, flat finish to all gallery sheetrock ceiling; color TBD o Paint (2) coats of Sherwin Williams Exterior Acrylic Latex Paint on exterior walls as needed; color to match existing o Lobby and front vestibule are not included in painting
• Flooring o Remove all existing carpeting in lobby and gallery areas o Prepare floor for new carpet o Provide and install new carpeting in lobby, gallery and meeting room
▪ Philadelphia Commercial Genius (#54844), color – Mindshift (#44512), 24x24 squares o Install new 4in molding to match existing
ITB Museum Gallery Renovation 10
Terms of Contract
The contract term resulting from this Invitation to Bid shall be based on the anticipated lead time of materials, construction timeline/schedule provided by the contractor (See Section 8 -
Construction Timeline), plus an acceptable number of contingency days to allow for unexpected situations or delays. The Town of Estes Park (TOEP) will generate the
Construction Contract in accordance with TOEP policy (See Section 9 - Construction
Contract).
Funding / Permits
This project will be funded as part of the 2026 Capital Improvement Program by the Estes Park
Museum Friends & Foundation with no Federal or State of Colorado participation. The approved budget is $106,000.
The goal is that both parts of this project can be achieved within the funds available. However, the Bid Schedule has these 2 parts (the vestibule entrance and the gallery remodel) broken up into different/separate projects in the event the budget will only allow for one of these to be executed. The Bid Schedule does have a line item for the cost savings if the 2 projects can happen together.
Any permits required will be the responsibility of the contractor to obtain. Any permit-related inspections, coordination or corrective actions will be the responsibility of the contractor.
If a Proposer believes the scope of work outlined will exceed the approved budget, the proposal for the outlined work should still be submitted. The Town will use this information for planning purposes, to determine if the scope of work needs to be modified, or if additional funding needs to be requested.
ITB Museum Gallery Renovation 11
Construction Duration
The museum gallery will be closed to the public between December 19th – June 2nd. All work must be completed by April 9, 2027, to allow time the museum staff to reset the gallery exhibits in time for public viewings. The Town is estimating the design and construction portion of this project to last 60 calendar days. This duration is from the Project kick-off meeting through substantial completion. Submittals, approvals, requests for information, materials lead times are not included in this project duration. Proposers are required to submit a Gantt chart (or equivalent) demonstrating the projected timeline, phasing and sequencing of the work, in addition to completing the Construction Timeline in this Invitation to Bid. The Projects anticipated start date, end date, and duration will be based on Construction Timeline submitted by the winning bidder. These dates will be reflected in the Construction Contract. If a
Proposer believes the scope of work outlined will extend beyond the expected duration, the proposal for the outlined work should still be submitted. The Town will use this information for planning purposes, to determine if the scope of work needs to be modified, or if expectations and internal accommodations need to be adjusted.
The Town of Estes Park, Colorado will receive sealed Bids for the Museum Gallery
Renovation until Thursday, December 17, 2026
Bids may be submitted via one of the following methods:
1. ‘BidNet’: Response to the solicitation on Rocky Mountain E-Purchasing System
(www.rockymountainbidsystem.com); or
2. Email to the Derek Pastor, Project Manager at dpastor@estes.org
Hand Delivered or Late bids will not be accepted or considered.
http://www.rockymountainbidsystem.com/
ITB Museum Gallery Renovation 12
The Bidding Documents are available on www.rockymountainbidsystem.com as well as on the
Town’s website at www.estes.org/rfp. Interested bidders are responsible for verifying receipt of all applicable documentation, including any associated addenda. The Town of Estes Park cannot guarantee accurate information obtained from sources other than BidNet.
SCHEDULE OF ACTIVITES: (subject to change)
Event Start Date End Date
Invitation to Bid (ITB) Available Wednesday, November 18, 2026 Wednesday, November 18, 2026
Pre-Bid Conference (1:00 PM MT) Monday, November 30, 2026 Monday, November 30, 2026
Deadline for Questions (5:00PM MT) Tuesday, December 8, 2026 Tuesday, December 8, 2026
Final Addenda Issued Thursday, December 10, 2026 Thursday, December 10, 2026
Bid Opening (11:00AM MT) Thursday, December 17, 2026 Thursday, December 17, 2026
Bid Evaluations & Contract Preparation
(Notices of Award/Declination) Friday, December 18, 2026 Monday, January 25, 2027
Town Board Approval (tentative) Tuesday, January 26, 2027 Tuesday, January 26, 2027
Notice to Proceed Wednesday, January 27, 2027 Wednesday, January 27, 2027
Project kick-off Meeting (TBD) Thursday, January 28, 2027 Thursday, February 4, 2027
Project Completed Monday, February 8, 2027 Friday, April 9, 2027
A Mandatory PRE-BID CONFERENCE will be held IN-PERSON on-site at 1:00 PM. (MT) on Monday, November 30, 2026
Estes Park Museum
200 4th Street
Estes Park, CO 80517
This will allow all interested parties the opportunity to see all existing interior and exterior conditions, ask any clarifying questions regarding the proposed scope of work, and gain a better comprehensive understanding of the desired outcome of this project.
All comments, questions/answers and clarifications during this pre-bid meeting will be summarized and distributed (via BidNet and the Town website) in the form of an addendum.
http://www.rockymountainbidsystem.com/ file://///172.26.20.4/dept/shared%20staff/Contracts,%20Prof%20Agreements,%20Etc/Templates/www.estes.org/rfp
ITB Museum Gallery Renovation 13
Prospective offerors may also submit any additional written inquiries concerning the requirements of this solicitation to Derek Pastor via BidNet or e-mail (dpastor@estes.org) by 5:00 p.m. Tuesday, December 8, 2026. Offerors are reminded that any changes to the Invitation to Bid will be by written addenda only and nothing stated verbally shall change or qualify in any way any of the provisions in the Invitation to Bid and shall not be binding on the TOEP.
Bids will be opened and publicly read aloud during a VIRTUAL Bid Opening meeting at 11:00
A.M. (MT) on Thursday, December 17, 2026. The Town will use the Google Meet conferencing platform (unless modified by Addendum). Bidders can join the meeting via video call or phone call:
Video call link: https://meet.google.com/esr-rwty-grg
Or dial: 1923-494-405 PIN: 997 317 076#
A Bid Guarantee in an amount equal to 5% of the total Bid amount is required at the time of the
Bid Opening. The Guarantee must be a certified check payable to the Town of Estes Park or a satisfactory Bid Bond executed by the Bidder.
The successful Bidder shall provide the Town with a Certificate of Insurance naming the Town of
Estes Park as an additional insured for all policies required in the General and Special Conditions, a Statement of Liability and Indemnity, and with proof of Workers' Compensation coverage.
If awarded the Bid, a Performance Bond and a Labor and Material Payment Bond are required within ten days of the date the written Notice of Award, each for the total amount of the Contract
Price.
No Bidder may withdraw a Bid for a period of thirty days after the date fixed for opening the Bids.
mailto:dpastor@estes.org
ITB Museum Gallery Renovation 14
The Town of Estes Park reserves the right to cancel this Invitation to Bid; reject any Bid, in whole or in part; to adjust the quantity of Work to be done as mandated by budgetary requirements; and to waive informalities or irregularities in the Bids received, when it is in the Town's best interest to do so.
Document Accessibility Compliance Requirement
In accordance with State of Colorado law (House Bill 21-1110 and Senate Bill 23-244), all vendors submitting proposals in response to this Request for Proposals (RFP) must ensure that any documents submitted as part of the proposal process, and any deliverables provided under any resulting contract, are fully compliant with the State of Colorado’s Technology Accessibility
Standards.
TOWN OF ESTES PARK
Derek Pastor, PMP
Project Manager
Town of Estes Park
170 MacGregor Ave
Estes Park, CO 80517
970-577-3957 dpastor@estes.org
ITB Museum Gallery Renovation 15
2. INSTRUCTIONS FOR BIDDERS
SUBMISSION OF BIDS
Attendance at the mandatory pre-bid meeting and the following documents are required to be submitted for a proposal to be considered:
• Bid Bond Form
• Bidder Qualifications and Data Form
• Subcontractors and Related Data Form
• Bid Proposal Form
• Bid Schedule Form (and itemized, detailed cost proposal including all labor, materials, general conditions, overhead/profit, etc..)
• Construction Timeline and Gannt Chart
• To expedite the contracting process, proposing firms are asked to review Section 9 – TOEP
Construction Contract of this Invitation to Bid. In addition to the proposal, submit any questions, comments or potential redlines for either contract as a separate document.
Sealed Bids will be received by the means listed in the Invitation to Bid (BidNet, e-mail, and hand delivery). Timely delivery of Bids is the Bidder's responsibility and Bids received after the time and date indicated in the Invitation to Bid will not be accepted.
Hand delivered, late oral, telephone or fax Bids are invalid and will not receive consideration. On occasion, an exception to this procedure may be made. The Project Manager may make an exception under extreme circumstances, in the Manager's sole discretion.
No Bid alterations or interlineations will be permitted, unless made before submission and initialed and dated. If initialed, the Town may require the Bidder to identify the alteration so initialed.
In the Case of No Bid, please return your Bidding Documents indicating No Bid on the form and on the outside of the return envelope.
ITB Museum Gallery Renovation 16
BIDDING DOCUMENTS
The following documents constitute the Bidding Documents for this project:
1. Invitation to Bid
2. Instructions for Bidders
3. Bid Bond
4. Bidder’s Qualifications and Data
5. Subcontractors and Related Data
6. Bid Proposal
7. Bid Schedule
8. Specifications (if any)
9. Drawings (if any)
10. Construction Contract Template
11. General Conditions
12. Special Conditions (if any)
13. Addenda (if any)
The Bidder will download the Bidding Documents as directed in the Invitation to Bid. All forms associated with, bound with, or attached to the Bidding Documents are a necessary part thereof and must not be detached.
The Bidding Documents will state the location and description of the proposed Work and will show the estimate of the various quantities of work to be performed and materials to be furnished, the time in which the work must be completed, the amount of the Bid Guarantee
(which must accompany the Bid) and the date and time of the opening of the Bids. It will also state any special provisions or requirements, which vary from or are not contained in the General
Conditions.
ITB Museum Gallery Renovation 17
ADDITIONAL BID DETAILS
Persons Submitting Bids: Each Bid must contain the full name(s) and U.S. Postal Service mailing address of the Bidder(s), and any person signing any Bid as agent of another, or of a firm, must furnish legal evidence of authority to do so.
A person who submits a Bid and affixes "President," "Secretary," "Agent," or other designation to his or her signature, without disclosing the principal, may be personally held to the Bid.
The Town will not consider more than one Bid from an individual, firm, partnership, or corporation under the same or different names. Evidence that any Bidder is interested in more than one Bid for the same work will be cause for rejection of all such Bids. Collusion between the Bidders will be considered sufficient cause for the rejection of all affected Bids. A party quoting prices to a Bidder is not thereby disqualified from quoting prices to other Bidders or from submitting a direct Bid on the Bidder's own behalf.
Bid Pricing: All prices shall be stated in words and numbers except where the forms provide for numbers only. Use of the provided bid schedule in MS Excel spreadsheet format is acceptable.
Unit Price Bid Schedule: When the Town requests Unit Prices, the Bidder shall fully complete the schedule of unit prices included in the bid schedule.
When the Town includes an additional amount on the bid schedule for minor contract revisions and the Town has estimated bid quantities on the schedule. Bidders shall include that add amount in the total Bid price.
The total of all the unit prices bid multiplied by the estimated quantity of each item shall be the total Bid price. The Town will pay for the final measured, used, or delivered quantities at unit prices in the Bid.
ITB Museum Gallery Renovation 18
Discrepancies: In the event of a difference between extended price and unit price of the bid schedule, the unit price governs.
Modifications: Modifications to Bids already submitted will be allowed if received prior to the time specified in the Invitation to Bid. Modifications shall be submitted as such, and shall not reveal the total amount of either the original or revised Bids. The modifications shall be submitted via BidNet or in writing and shall be signed in the same manner and by the same person(s) who signed the Proposal.
Withdrawal of Proposal: A Bidder may withdraw a Bid at any time prior to the time Bids are to be opened, via BidNet or by written request of the Bidder. Any such request shall be signed in the same manner as, and by the same person(s) who signed the Bid Proposal.
Alternate Bids: Whenever Alternate Bids are called for specifying the use of several different classes of materials or types of improvements for the same work, all Bidders are requested to submit prices for use of each of the several classes of materials or types of improvements as specified. The material to be used or the type of improvement to be adopted will be selected by the Town after the Bids have been opened and read. Unless otherwise specifically provided in the specifications for the improvement, Bids shall be made upon each and every item shown on the blank Bid Schedule.
Variation in Estimated Quantities: The Contractor must reasonably expect a variation in the estimated quantities from the actual quantities and no claims will be allowed for anticipated profits, for loss of profits or for damage of any sort because of a difference between the estimate of any item and the amount of the item actually required. The Town reserves the right to eliminate items from the Bid Schedule when the Town deems it in its best interest.
Cost of Bid Preparation: The total cost of bid preparation and submission shall be assumed by the Contractor.
ITB Museum Gallery Renovation 19
Taxes: The Town of Estes Park is exempt from paying sales or use taxes. Materials and equipment purchased solely for Town projects, that will become a permanent part of the final project, are tax exempt. The Town will furnish its tax exempt number, in lieu of requiring the Contractor and subcontractors to obtain their own certificates of exemption from the
Colorado State Department of Revenue. Contractors and all subcontractors purchasing materials tax exempt must disclose the nature of the Town's project, the Town’s purchase order, and then provide the Town's tax exempt number to the supplier.
FAMILIARIZATION WITH THE WORK AND SITE CONDITIONS
Before submitting Bids, prospective Bidders shall familiarize themselves with the work, the site where the work is to be performed, local labor conditions and all laws, regulations and other factors affecting performance of the work. Bidders shall carefully correlate their observations with requirements of the Contract and otherwise satisfy themselves as to the expense and difficulties attending performance of the work. The submission of a Bid constitutes a representation of compliance by the Bidder. There will be no subsequent financial adjustment for lack of such familiarization.
Site Conditions: Bidders shall visit the site of the work and completely inform themselves relative to construction hazards and procedures, the availability of lands, the character and quantity of surface and sub-surface materials, and utilities to be encountered, the arrangement and condition of existing structures and facilities, the procedures necessary for maintenance of uninterrupted operation of existing sewers and other utilities, the character of construction equipment and facilities needed for performance of the work, and facilities for transportation, handling, and storage of materials and equipment. All such factors shall be properly investigated and considered in the preparation of Bids.
ITB Museum Gallery Renovation 20
REQUESTS FOR EXPLANATION
Bidders should immediately notify the Town of any discrepancies in or omissions from the
Drawings or Specifications, so that the Project Manager can publish an Addendum in response.
Any Bidder may submit a written request for explanation or correction of any part of the Bidding or Contract Documents, as directed in the Invitation to Bid. Questions and points of clarification are requested to be submitted via BidNet or email when possible. The deadline for submitting such requests is detailed in the Invitation to Bid and/or Special Conditions. The Project Manager will also field phone calls, but written communication is preferred. Oral explanations and interpretations made prior to the Bid Opening will not be binding.
ADDENDA
Any explanations or corrections to the Bidding Documents shall be furnished to all Bidders as
Addenda via BidNet and the Town’s website. Final Addenda issuance shall be as directed in the
Invitation to Bid and/or the Special Conditions. All Bidders shall acknowledge receipt of
Addenda in the Bid Proposal form.
If there is to be a postponed Bid Opening, this will be communicated on BidNet as an Addendum
(and an automatically generated notification will be sent to all who downloaded the original
Bidding Documents).
BID GUARANTEE
Each Bid shall be accompanied by a Bid Guarantee (typically a Bid Bond) as directed in the
Invitation to Bid. No Bid will be considered unless accompanied by the Bid Guarantee. No personal or business checks will be accepted as Bid Guarantees.
When Alternate Bids are called for, providing for the use of several different classes of materials or types of improvements for the same work, one Bid Guarantee in the amount of five percent of the total amount of the highest Bid will be sufficient for all Bids.
ITB Museum Gallery Renovation 21
The Bid Guarantee of the Bidder(s) to whom a contract award is made may be returned when the successful Bidder executes a contract and files a Labor and Material Payment Bond, a
Performance Bond, and any other documents required by the Notice of Award. The Bid
Guarantee of the next three lowest responsible Bidders may be retained for a period not to exceed 45 days and may be returned after the execution of the Construction Contract and bonds by the successful Bidder. The Bid Guarantee of all other Bidders may be returned after the contract is awarded. However, Bid Bond surety forms provided with the Bid will not be returned unless specifically requested by the Bidder. Certified Checks (or other forms of bid securities used as Bid Guarantees)) may be returned immediately following the Bid Opening, at the discretion of the Project Manager, to those who are not apparent low Bidders.
If the successful Bidder fails to enter into a contract according to the Bidder's accepted Bid or fails to furnish the required bonds within ten calendar days from Notice of Award, or by such time as modified by Special Conditions, the Bid Guarantee shall be forfeited to the Town of
Estes Park as liquidated damages.
The next lowest responsible Bid shall then be considered the successful Bid and, at the discretion of the Town, the contract may be awarded to the Bidder submitting that Bid.
BONDS
Bonds shall be executed on a form acceptable to the Town, as specified in the General
Conditions, by a corporate bonding company licensed to do business in the State of Colorado and acceptable as Surety to the Town. The forms must be countersigned by the Colorado agent.
A "Power of Attorney" authorizing the attorney-in-fact to bind the Surety company and certified to include the date of the bond shall accompany the bond.
ITB Museum Gallery Renovation 22
The Performance Bond and Labor and Material Payment Bond must remain in full force and effect during the entire period of the guarantee.
The successful Bidder shall give a Performance Bond equal to the amount of the Contract Price.
The Performance Bond shall guarantee: (a) the faithful performance and completion of the work in strict accordance with the terms of the Contract, and each and every covenant, condition and part thereof, according to the true intent and meaning of the Contract Documents, as defined in the Contract and (b) the repair or replacement where required, or the cost thereof, for a period of two years after the issuance of the Notice of Construction Acceptance or until all warranty work is completed, whichever occurs last, of all work performed under the Contract.
A separate Labor and Material Payment Bond equal to the amount of the Contract Price is required to ensure the payments of laborers, materialmen, suppliers, and subcontractors in connection with the work performed under the Contract and to satisfy the requirements of §38-
26-105 and 38-26-106, C.R.S., as amended.
The Town of Estes Park reserves the right to waive bond requirements if permitted by statute. In the event the Performance or Labor and Material Payment Bonds are waived, cost of the bonds shall be reflected as a deduction from the total Bid Price, when so indicated on the Bid Form.
There will be a Unit Price deduction for the waiver indicated on the Bid Schedule, when necessary.
OPENING OF BIDS
The sealed Bids will be opened publicly and read aloud at the time, date, and place set in the
Invitation to Bid. Bids received after the time specified in the Invitation to Bid shall be returned unopened. Bid openings will be public and all Bidders are welcome to attend. Bidders or their authorized agents are invited to be present and examine any Bid after opening.
ITB Museum Gallery Renovation 23
EXAMINATION OF BIDS
All Bids submitted shall be made available for examination by interested parties within a reasonable time following the Bid Opening. All information in the submitted Bid will be available for public scrutiny, unless the Bidder specifically requests confidential treatment of some or all of its commercial data. Requests for confidentiality shall be in writing, and the portions of the commercial data for which confidentiality is requested shall be clearly identified.
Procurement information shall be a public record to the extent provided by Article 24.72, C.R.S., as amended, and shall be available to the public as provided in the statute.
The Final Bid Price and the means by which that price was determined are not commercial data and may not be included in any request for confidentiality.
EVALUATION OF BIDS
Town Discretion: The Town reserves the right to cancel the Invitation to Bid; reject any Bid, in whole or in part; to adjust the quantity of Work to be done as mandated by budgetary requirements; and to waive informalities or irregularities in the Bids received; when it is in the
Town's best interest to do so.
The Town of Estes Park reserves the right to accept the Bid which in the opinion of the Town will best suit the Town's purpose.
Contracts will be awarded only to responsible Bidders capable of performing the class of work contemplated. The Bidder shall furnish a complete statement of the Bidder's experience and of the amount of capital and equipment available for the proposed work on the Bidder's
Qualification and Data form.
ITB Museum Gallery Renovation 24
Irregular Bids: Bids may be rejected if they show any omission, alteration of form, additions not called for, conditional Alternate Bids, or irregularities of any kind which, in the opinion of the Town, tend to make the Bid indefinite or ambiguous. The Town will reject bid schedules with prices which are obviously unbalanced, in the Town’s determination.
Collusion: Bids will be rejected if there is reason for believing that collusion exists among the
Bidders. Participants in such collusion are subject to suspension and debarment.
Pre-qualification of Bidders: For certain projects, the Town may require potential bidders to submit information regarding the bidders' qualifications in addition to the Bidder’s Qualification and Data. The requirement for such information will be identified in the Invitation to Bid or elsewhere in the Bid Documents. Any information requested by or on file with the Town may be used to qualify or disqualify potential bidders.
Prior to the Award of Contract, the Town will notify the Bidder in writing if the Town, after due investigation, has reasonable objection to any person or organization on such list.
If the Town, in its sole discretion, has a reasonable objection to any person or organization on such list, and refuses in writing to accept such person or organization, the Bidder shall submit an acceptable substitute Subcontractor, at no additional cost to the Town.
AWARD OF CONTRACTS
Any or all Bids may be rejected or informalities in bids may be waived at the option of the
Town.
The award of the Contract is contingent upon securing an acceptable Bid which will fall within the amount of funds available for construction of the project, or the acquisition of contracted services.
ITB Museum Gallery Renovation 25
Lowest Responsive and Responsible Bidder: In determining Lowest Responsive and
Responsible Bidder, in addition to price, the factors listed herein will be considered. A Bid may be rejected if, in the judgment of the Town, the Bidder does not comply with or meet the criteria defined in one or more of the following factors:
1. The ability, capacity and skill of the Bidder to perform the Contract or provide the services required.
2. The ability of the Bidder to perform the Contract or provide the service promptly or within the time specified, without delay or interference.
3. The character, integrity, reputation, judgment, experience and efficiency of the Bidder, to be determined at the sole and absolute discretion of the Town.
4. The quality of performance on previous Town contracts or services. Failure on the part of any Bidder to carry out a previous contract satisfactorily shall be deemed sufficient cause for disqualification.
5. The experience of the Bidder and the availability of equipment necessary to complete the current project. Sufficient cause for disqualification of the Bidder will exist if, in the
Town's opinion, the Bidder does not have adequate experience or equipment to properly perform the Work under the Contract.
6. The sufficiency of the financial resources and ability of the Bidder to perform the
Contract or provide the service.
7. The quality, availability, and adaptability of the supplies or contractual services to the particular use required.
8. The ability of the Bidder to provide future maintenance and service for the use of the subject of the contract.
9. Debarment or suspension pursuant to a prior Town determination.
ITB Museum Gallery Renovation 26
ACCEPTANCY OF BIDS AND ITS EFFECT
The Town will act upon the Bids with reasonable promptness after the opening of the Bids. The acceptance of a Bid will be a written Notice of Award signed by the duly authorized representative of the Town. No other act of the Town shall be necessary to constitute acceptance of a Bid. The acceptance of a Bid binds the successful Bidder to execute the required
Construction Contract and take all action necessary to fulfill the Contract.
REQUIREMENTS FOLLOWING NOTICE OF AWARD
The successful Bidder shall, within ten calendar days of receiving the Notice of Award, or by such time as modified by the Special Conditions, execute the Construction Contract and furnish the Performance Bond and the Material and Labor Payment Bond. Acceptance of the Contract shall be subject to approval by the Town.
Unless previously requested or waived by the Project Manager, the successful Bidder shall submit the following information to the Town’s Project Manager within ten calendar days of receiving the Notice of Award:
1. A designation of the work to be performed by the Bidder with the Bidder's own forces.
2. The proprietary names and the suppliers of principal items or systems of material and equipment proposed for the work.
3. A proposed schedule of construction and estimated monthly payments.
4. The Bidder will be required to establish to the satisfaction of the Town, the reliability and responsibility of the proposed Subcontractors to furnish and perform the Work described in the Sections of the Specifications pertaining to such proposed Subcontractor's respective trade.
5. If the Contract includes federal or grant funding, the Bidder will be required to show proof of registration with SAM.gov.
ITB Museum Gallery Renovation 27
6. Proof of possession of a current Town of Estes Park Business License (and any other licenses required by the Bid Documents) for the Contractor and all subcontractors).
DAMAGES FOR FAILURE TO EXECUTE
Any Bidder whose Bid is accepted will be required to execute the Contract and furnish the
Performance Bond and Material and Labor Payment Bond within ten days after written notice that the Contract has been awarded to the Bidder, or by such time as modified by Special
Conditions. Failure to do so shall constitute a breach of the Contract effected by the acceptance of the Bid.
The damages to the Town for such breach will include loss from interference with the construction program and other items, the monetary values of which will be difficult or impossible to quantify. Where required, the amount of the Bid Guarantee accompanying the Bid shall be retained by the Town as reasonable liquidated damages and not as a penalty for such breach.
The Town is authorized, the same as if the Bid Guarantee or Bid contained an expressed stipulation to that effect, to cause such work to be done, or complete the work in-house, or contract with some other Contractor to do so, and/or compute the difference between actual cost to the Town of such improvements and the sum which it would cost if the defaulting Bidder complied with the Bid.
RIGHT TO INSPECT
The Town may, at reasonable times, inspect the part of the plant, place of business or worksite of the Bidder or the Bidder's subcontractors at any tier which is pertinent to the performance of the award of the Contract.
ITB Museum Gallery Renovation 28
BID PROCESS SUBJECT TO PURCHASING CODE
Bidding shall be conducted subject to state statutes and the Town of Estes Park Municipal Code and ordinances.
LAWS TO BE OBEYED
Bidders shall familiarize themselves with the provisions of the laws of the State of Colorado and the Federal Government, and with all local laws and all regulations made which are pertinent to the proposed work and shall comply with the same.
EQUAL OPPORTUNITY
The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, age, sex, gender identity, sexual orientation, or national origin, or other reason prohibited by applicable federal, state or local law, ordinance or regulation. The
Contractor shall abide by all federal laws in effect during the Contract period which govern
Equal Opportunity Employment.
LOCAL LABOR AND MATERIALS
Preference shall be given to employment of Colorado labor pursuant to §8-17-101 and 102, C.R.S., as amended.
Pursuant to statutory authority, preference shall be given to materials, supplies, and provisions produced, manufactured, or grown in Colorado, quality being equal to articles offered by competitor outside the state (§8-18-101 through 103, C.R.S., as amended).
TIME OF COMPLETION
TIME IS OF THE ESSENCE and the Bidder agrees to complete the project within the stated time, as defined in the Construction Contract. The Bidder also agrees to comply with all completion dates specified in the Bidding and Contract Documents.
ITB Museum Gallery Renovation 29
3. BID BOND
, (insert the full name and address or legal title of the Contractor) as Principal, and, __________________________________________ (insert the legal title of the Surety) as
Surety, a corporation organized under the laws of the State of _________________, and authorized to transact business in the State of Colorado, with a general office at
, are hereby bound to the Town of Estes Park, Colorado, (Town) as Obligee, in the amount of DOLLARS or PERCENT, in
United States currency, for the payment of which amount the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally.
The Principal has submitted the accompanying Bid dated ________________, 2026, for construction of the
(insert the project name).
The Town requires, as a condition for receiving the Bid, that the Principal deposit with the Town a Bid Guaranty, of at least five percent of the amount of the Bid, conditioned so that if the
Principal fails to execute the Agreement for Construction Contract, and furnish the required
Bonds if the Principal is awarded the Contract, that the sum be paid immediately to the Town, as liquidated damages and not as a penalty, for the Principal's failure to perform.
If the Principal, within the specified period, executes the Construction Contract with the Town according to the Bid, as accepted, and furnishes a Performance Bond and a Labor and Material
Payment Bond with good and sufficient Surety or Sureties, upon forms acceptable to the Town for the faithful performance and proper fulfillment of the Contract, or pays to the Town the proper amount of liquidated damages, then this obligation shall be null and void; otherwise it shall remain in full force and effect.
ITB Museum Gallery Renovation 30
Executed this day of , 2026.
WITNESS PRINCIPAL
By:
Its President
WITNESS SURETY
Its Attorney-in-fact
I, , certify that I am the (title) of the Corporation named as Surety; that
______________________________________, who signed the bond on behalf of the Principal, was then _______________________________________ (title) of the Corporation; that I know his or her signature, and the signature thereto is genuine; and that the bond was duly signed, sealed, and attested to for and on behalf of the Corporation by authority of this governing body.
(CORPORATE SEAL) Signed:
Title:
ITB Museum Gallery Renovation 31
4. BIDDER'S QUALIFICATIONS AND DATA
The signatory of this Statement guarantees the truth and accuracy of all statements and of answers to all questions herein. All questions must be answered clearly and comprehensively. If necessary, separate sheets may be attached. The Bidder may submit additional information.
Failure to complete and return this Statement may render a bid non-responsive.
Name of Bidding Firm:
Main office address:
Phone: Fax #
The Bidder is organized as a (corporation/partnership/other):
in the state of:
Bidder's federal tax identification number (TIN):
General character of work performed by your organization and brief history of operations:
Does your firm have any officer, director, or agent who is also an officer or employee of the
Town of Estes Park?
Are there any Town of Estes Park agents or employees who own, directly or indirectly an interest in the bidder’s firm or any of its branches?
Bonding Limit: $
Bonding Company: Phone #
Address:
The Town has a right to request financial statement(s) and other relevant information. Are you willing to submit such information at the Town’s request?
Submitted by: Date:
(Person submitting bid)
ITB Museum Gallery Renovation 32
Qualifications
1. How many years have you been in business under your present firm or trade name?
a. Under other names?
2. Have you or your organization, or any office or partner thereof, failed to complete a contract?
a. ___Yes ___No
3. Within the last five years, has your organization been assessed liquidated damages for failing to complete a contract within the time specified?
a. ___Yes ___No
4. Has your organization been assessed any penalties for non-compliance violations of the Federal or State Labor laws and/or regulations within the last five years?
a. ___Yes ___No
5. Does your organization have any outstanding judgments, demands, or liens resulting from violating State Labor laws, Colorado Revised Statutes, Civil or Criminal decisions?
a. ___Yes ___No
6. Have there been any suits, liens, or surety claims against you or your organization over the past five years for non-payment of sums due subcontractors or suppliers for work completed?
a. ___Yes ___No
7. Has your organization been cited for violations of OSHA standards and requirements within the past five years?
a. ___Yes ___No
8. Is either the Bidder or its principals presently debarred, suspended, proposed for disbarment, declared ineligible, or voluntarily excluded from participation in this transaction by any department or agency?
a. ___Yes ___No
ITB Museum Gallery Renovation 33
9. Have you ever been debarred or suspended by a government from consideration for the award of contracts?
a. ___Yes ___No
Please explain all questions answered “yes” in the section above on a separate sheet of paper. Include where and why, if applicable. Note that your answers do not necessarily disqualify your bid. For example, it is not uncommon for contractors of large projects to be charged liquidated damages in certain cases.
Firm Background and Experience
❖ Total number of employees:
❖ Total number of licensed professionals:
❖ Proposed Superintendent:
Relevant degrees and/or certifications:
❖ Principals
List directors, officers, owners, managerial employees, or partners, and identify the ownership interest of each:
ITB Museum Gallery Renovation 34
❖ Experience
List the experience of the principal members of your organization. If preferred, resumes may be submitted in lieu of form entry.
Name: Title:
Background/ Years’ Experience:
Name: Title:
Background/ Years’ Experience:
❖ Similar Projects
List three projects of similar scope and budget to this project that your organization has performed work on:
Project Name:
Cost: Location:
Reference Name: Phone:
Project Name:
ITB Museum Gallery Renovation 35
❖ Contract(s) on Hand
List projects your organization is undertaking that will be concurrent with the Town’s bid schedule. Include the anticipated completion date.
Schedule:
Subcontractor or Prime: Completion Date:
Schedule:
Subcontractor or Prime: Completion Date:
ITB Museum Gallery Renovation 36
5. SUBCONTRACTORS AND RELATED DATA
For each Subcontractor to be utilized, please provide the following information (use additional sheets as necessary). Please indicate what percentage of the Work to be assigned.
Firm Name: Town Business License #
Address:
Proposed work and percentage of total work to be assigned:
Percentage %
ITB Museum Gallery Renovation 37
6. BID PROPOSAL
PROJECT: Museum Gallery Renovation
1. In compliance with the Invitation to Bid, and subject to all conditions thereof, the undersigned: [Select one] a corporation incorporated in the State of
-OR-
a partnership or limited partnership, registered in the State of , whose general partner(s) is/are:
-OR-
a sole proprietor, whose trade name is _______________________________________________ based in the City/Town of , State of _____, offers this Bid Proposal for the construction of all items listed at the prices shown on the following bid schedule.
(The attached bid schedule lists the various divisions of construction contemplated in the Plans and Specifications, together with an estimate of the units of each. With these units as the basis, extend each item, using the cost inserted in the unit column.
This is the start of the file's text. The full file is on GovTribe.