About this file
This is a Statement of Qualifications (SOQ) document issued by the City of Aurora, Colorado, for the Picadilly Storm Sewer Improvements – Water Quality Pond project (SOQ-26-6175A). The City is soliciting pre-qualification applications from general contractors interested in bidding on this storm water quality pond construction project along Picadilly Road from Smith Road north to First Creek. The project scope includes clearing and grubbing, tree removal, excavation and embankment, erosion control, storm pipe installation (24"-48" diameter), soil ripric, concrete pavement, outlet structure, concrete forebay, seeding, traffic control, and miscellaneous items. The estimated probable cost for the work is $1,300,000. SOQs must be submitted electronically through the Rocky Mountain E-Purchasing System (BidNet) no later than 2:00 p.m. MST on December 3, 2026. The tentative project schedule includes questions due by November 18, 2026; contractor notification of pre-qualification approval in late December 2026; issuance of the Invitation to Bid in February 2027; and bid opening in March 2027.
Prospective general contractors must demonstrate a minimum of three years of construction experience and submit information for at least three similar projects completed within the last five years that included minimum 2,000 cubic yards of excavation and berm embankment, large diameter storm sewer installation, erosion control best management practices, concrete pavement, cast-in-place concrete, and traffic control. Evaluation criteria include technical competence of the project manager (30 points), general contractor experience (25 points), similar project experience (25 points), technical competence of the superintendent (10 points), and organization and completeness of the SOQ submission (10 points). The City reserves the right to use the prequalified contractor list for other projects of similar scope. Pursuant to Colorado Revised Statutes 8-17-101, 102, and 103, a minimum of eighty percent (80%) Colorado labor is mandated for all public works construction. Pre-qualification is valid for one year from notification, and inclusion on the pre-qualified list does not guarantee contract award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Picadilly Storm Sewer Improvements - Water Quality Pond SOQ-26-6175A
STATEMENT OF QUALIFICATIONS: SOQ-26-6175A
TITLE: Picadilly Storm Sewer Improvements – Water Quality Pond
CLASS/ITEM: 91244, 91339, 91340, 91345, 91356,
91360, 91377, 91378, 91381, 91392 95939 DATE ADVERTISED: November 10, 2026
PRE-INVITATION NOTICE/STATEMENT OF QUALIFICATIONS
SOLICITATION FOR A PRE-INVITATION TO BID,
AND SUBMISSION OF A STATEMENT OF QUALIFICATION.
Picadilly Storm Sewer Improvements
Water Quality Pond
Statements of Qualifications (SOQs) shall be submitted electronically through the Rocky Mountain E-Purchasing System (aka BidNet) no later than 2:00 p.m., MST, December 3, 2026. File size limit is 2GB. Please be advised that SOQs MUST be submitted through BidNet to be considered responsive. The SOQs shall be retained by the City and cannot be returned. If you need assistance with the registration or proposal upload process, you may call BidNet’s vendor support at 1-800-835-4603 or e-mail support@bidnet.com.
THE CITY DOES NOT INTEND TO AWARD A CONTRACT ON THE BASIS OF THIS
SOLICITATION, OR TO OTHERWISE PAY FOR THE INFORMATION SOLICITED HEREIN.
THIS SOLICITATION IS ISSUED FOR THE PURPOSE OF selecting qualified general contractors to bid on the Picadilly Road Storm Sewer Improvements – Water Quality Pond project for the City of Aurora Water Department.
Prequalification is valid for one year from notification of prequalification. The City reserves the right to use the prequalified list of contractors resulting from this solicitation for other projects of same or similar scope of work.
Note: Contractors intending on serving as subcontractors, or material suppliers should not submit a Statement of Qualifications for this Pre-invitation/Statement of Qualification process. This process is designed to pre-qualify General Contractors only. When the bids for these construction projects are solicited, only those pre-qualified General Contractors selected from this process will be solicited or allowed to participate.
However, any potential subcontractors and material suppliers shall be given full opportunity at that time to review, and/or purchase the project manuals as they deem appropriate.
The City of Aurora reserves the right to amend, by addendum or addenda to this SOQ, at any time and/or a multiple number of times prior to the date set for receipt of the submission of proposals. Addenda or addendums will only be posted and updated on the Rocky Mountain E- Purchasing System located at www.bidnetdirect.com/colorado. It shall be the responsibility of General Contractors to obtain all addenda from the Rocky Mountain E-Purchasing System.
Parties obtaining bid information from other sources do so understanding that their information mailto:support@bidnet.com http://www.bidnetdirect.com/colorado may be incomplete, inaccurate, or out of date and therefore wholly unreliable from a commercial perspective. Those registered for the paid bidding notification service shall be notified either by fax or email depending on the service that they have subscribed to. It shall be the responsibility of those General Contractors registered for the no-charge service or the no notification service on the Rocky Mountain E-Purchasing System to monitor the Rocky Mountain E-Purchasing System for any addenda or addendums. Failure to do so may lead to reliance on incomplete, inaccurate, or out-of-date information when submitting a SOQ subjecting such SOQ to automatic disqualification from consideration. If revisions are of such a magnitude to warrant, in the City of Aurora’s opinion, the postponement of the date for receipt of SOQ’s, an addendum will be issued announcing the new date.
PROJECT SYNOPSIS:
This SOQ solicitation is being issued for the Picadilly Storm Sewer Improvements – Water Quality Pond project.
The City of Aurora (“City”) is planning to construct a storm water quality pond, including clearing and grubbing, tree removal, excavation/embankment, erosion control, storm pipe (24”-48”), soil riprap, concrete pavement, outlet structure, concrete forebay, seeding, traffic control, and miscellaneous items. The project provides for water quality of storm runoff along Picadilly Road from Smith Road north to First Creek.
The opinion of probable cost for the Work is estimated to be: $1,300,000
TENTATIVE SCHEDULE
Pre-Qualification Posted on Bidnet November 10, 2026 Questions Due November 18, 2026; 2:00 p.m.
Pre-Qualification Submittal December 3, 2026; 2:00 p.m.
Approved Contractors Notified Late December, 2026 Issue Invitation to Bid for Approved Contractors February 2027 Bid Opening March 2027
All questions shall be submitted in writing to Nathan Jones, Procurement Supervisor, at njones@auroragov.org. All questions and answers will be posted on BidNet via an addendum.
STATEMENT OF QUALIFICATION (SOQ) REQUIREMENTS:
General Contractors interested in qualifying for the referenced SOQ must submit their SOQ electronically as previously defined in the SOQ Submittal Deadline section.
mailto:njones@auroragov.org
SECTION I: PROJECT SPECIFIC QUALIFICATIONS
1. At a minimum, the General Contractor shall provide information for three (3) similar projects that have been completed within the last five (5) years.
- The City defines similar projects for the Picadilly Storm Sewer Improvements – Water Quality Pond project as those projects which included a minimum of 2000 CY of excavation and berm embankment, installation of large diameter storm sewer, erosion control BMP’s, concrete pavement, cast in place concrete, and traffic control. For each of the projects listed, please complete the information requested in Attachment A (you may reproduce the form as necessary). Additional projects that are considered similar may also be submitted in addition to the minimum requirements, but do not include dissimilar projects.
Names and references must be current and verifiable for each project reference, include the following information at a minimum:
• Project Name
• Location
• Owner (list owner, contact and current phone number)
• Engineer (list firm, contact and current phone number)
• Contractor’s Project Manager
• Contractor’s Project Superintendent
• Original Bid Amount
• Final Contract Amount (Bid plus Change Orders)
• Original Scheduled Completion Date
• Actual Date of Completion
• Bid tab quantities
• Description of Project, Scope of Work Performed
2. Submit resumes/experience statements for locally based construction and key management staff with similar project construction experience. A minimum of three (3) years’ construction experience specific to the General Contractor submitting on this SOQ is required.
The City reserves the right to contact any or all parties given as references and to ask questions which will include but are not necessarily limited to the following:
1. Were the projects completed on time?
2. Was the Construction in accordance with the Contract Documents?
3. Were there any Change Orders related to the projects? If so, what were the number of changes, scope of each change, what were the costs, and why did they occur?
4. Was the contractor responsive, cooperative, and timely in dealing with contract changes?
5. Was the as-built documentation provided in a satisfactory manner?
The City of Aurora reserves the right to contact any or all parties given as references to verify the information provided.
SECTION II: GENERAL CONTRACTOR QUALIFICATIONS
1. How many years has your organization been in business as a General Contractor?
2. How long has your organization been in business under its present business name?
3. Under what other or former names has your organization operated?
4. If a corporation, please answer the following:
• Date of incorporation
• State of incorporation
• President’s Name
• Vice-President’s Name
• Secretary’s Name
• Treasurer’s Name
5. If an Individual or partnership please answer the following:
• Date of organization
• Name and Address of all partners (state if general or limited partnership)
6. Have you ever failed to complete any work awarded to you?
• If so, note when, where and why.
7. Is your Organization currently a debtor in a bankruptcy case?
8. Was your Organization in bankruptcy at any time during the last five years?
9. Has your Organization or any of its owners, officers, partners or members ever been found liable in a civil suit or found guilty in a criminal action for making any false claim or material misrepresentation to any public agency or entity? If yes, provide on a separate sheet the following information: the individual involved, the name of the public agency, the date of the investigation and the grounds for the finding.
10. Has your Organization or any of its owners, officers, partners or members ever been convicted of a crime involving any federal, state, or local law related to construction? If yes, provide on a separate sheet the following information: the individual involved, the name of the public agency, the date of the investigation and the grounds for conviction.
11. At any time during the past five years has your firm been assessed and paid liquidated damages under a construction contract with either a public or private owner? If yes, provide on a separate sheet the following information: the project, the project owner, owner’s address, the date of completion of project, amount of liquidated damages assessed, and all other information necessary to fully explain the assessment of liquidated damages.
12. In the past five years has your Organization been denied an award of a public works contract based on a finding by a public agency that your Organization was not a responsible bidder? If yes, provide on a separate sheet with the following information:
the year of the occurrence, the owner, the project and the basis for the finding by the public agency.
13. Provide name of bonding Company and name and address and phone number of agent.
14. Provide your insurance comp rating.
EVALUATION CRITERIA:
To be pre-qualified, a General Contractor must submit all information as requested herein.
Omission of any of the required information may be grounds to reject the General Contractor for further consideration. The following criteria shall be used to determine which General Contractors shall be pre-qualified to bid on the referenced projects.
Criteria Points 1 Technical competences of the project Manager. 30 2 Experience of the General Contractor 25 3 Similar Project Experience. 25 4 Technical competences of the superintendent. 10 5 Organization and completeness of SOQ. 10 Total 100
APPROVAL PROCESS AND BIDDER NOTIFICATION:
A City Selection Committee comprised of personnel with the appropriate technical expertise shall review the above Statements of Qualifications. The Committee, at its discretion, may contact any or all of the General Contractors, references and conduct interviews and/or discussions to obtain sufficient information to render their determinations. When the Committee has completed its review and selected those General Contractors that will be approved to bid on future referenced projects, they will submit the list of General Contractors to Purchasing Services. Purchasing Services will then notify all pre-qualified General Contractors who have been pre-qualified to bid.
When the design for the project is complete and ready for solicitation, only those approved General Contractors will be solicited and allowed to bid. Further, any General Contractors, regardless of their qualifications, which have not been pre-approved in this solicitation, will be precluded from bidding on the referenced project. A General Contractor’s inclusion on the list of pre-qualified General Contractors does not guarantee a General Contractor the award of any work with the City. This pre-qualification is only for the project listed with this SOQ.
Finally, this process does not preclude the City from rejecting a pre-approved General Contractor as non-responsive after bid opening and prior to award if the basis is information subsequently discovered that would have originally disqualified a General Contractor.
CONFIDENTIALITY
SOQs submitted to the City for consideration shall be subject to the Colorado Open Records Law, Section 24-72-201, et seq., C.R.S. Any confidential information in the General Contractor’s SOQ shall be identified as such. If any information is considered to be confidential, the General Contractor shall agree to indemnify the City of Aurora for any and all attorney fees that the City may incur in defending the withholding of such information by signing and returning the letter found at Attachment B to this Statement of Qualifications. Should the City receive a request for the release of any information in the General Contractor’s SOQ in accordance with the open records law, the City will release only that information which has not been identified as confidential so long as Attachment B has been signed and returned by the General Contractor along with the SOQ. Should the General Contractor choose not to sign and return Attachment B, all information in the General Contractor’s SOQ shall be considered releasable by the City.
The General Contractors will not be notified of any open records requests prior to the release of such information. If, in the opinion of City’s legal counsel, the City is nonetheless compelled to disclose any portion of such information to anyone or else stand liable for contempt or suffer censure or penalty, the City may disclose such information without liability.
MISCELLANEOUS
Pursuant to Colorado Revised Statute 8-17-101, 102, & 103, a minimum of eighty percent (80%) Colorado labor is mandated for all public works construction. "Colorado labor" is defined as any person who is a resident of the state of Colorado at the time of employment without discrimination as to race, color, creed, sex, age, or religion except when sex or age is a bona fide occupational qualification.
PROJECT INFORMATION & INQUIRIES:
Since this solicitation is not an Invitation to bid and is designed only to identify and pre-qualify General Contractors who will be approved to bid, further details about the project will not be provided.
SOQ ACKNOWLEDGEMENT FORM
In submitting this Statement of Qualifications (SOQ), it is understood that the right is reserved by the City of Aurora to reject any and all SOQ’s as deemed to be in the City’s best interest.
The undersigned further states that under penalty of perjury their submitted SOQ to the best of their knowledge is true and contains current accurate information as of the date identified below.
OFFICIAL ADDRESS:
(ORIGANIZATION NAME)
(TYPE/PRINT PRINCIPAL'S NAME)
(SIGNATURE OF PRINCIPAL)
(TITLE)
PHONE:
(DATE)
(TELEPHONE NUMBER)
(EMAIL ADDRESS)
Attachment A Project Name Architect/ Engineer Architect/ Engineer Contact Name Current Telephone Number
General Contractor Name Project Manager Construction Manager Superintendent Foreman
Description of project, scope of work performed, equipment requirements, number of change orders and amounts, and contract duration (refer to Section I for specific details to include):
Total value of construction (including change orders):
Original scheduled completion date:
Time extensions granted (number of days):
Actual date of completion:
ATTACHMENT B
City of Aurora Purchasing Services, Suite 5700 15151 E. Alameda Parkway Aurora, Colorado 80012 www.auroragov.org
Re: Request under the Colorado Open Records Act
Request for Statement of Qualifications SOQ-26-6175A
Qualifications submitted in response to this SOQ are subject to disclosure pursuant to the Colorado Open Records Act (“CORA”), C.R.S. 24-72-201, et seq. The City is the custodian of records and will make all determinations regarding the disclosure of records in accordance with CORA. Submission of an SOQ constitutes the proposer’s acknowledgment that the City may be required to disclose all or part of the SOQ in response to a CORA request or other legal obligation. If a contractor believes any portion of its SOQ contains trade secrets or other information exempt from disclosure under CORA (including confidential commercial, financial, geological, or geophysical data), contractors must clearly identify such portions at the time of submission by marking the specific information as confidential. The City will consider any properly asserted claim of exemption but makes no representation and provides no guarantee that any information will be withheld from disclosure. Contractors shall indemnify, defend, and hold harmless the City, its officers, and employees from and against any claims, damages, liabilities, and costs (including reasonable attorney fees) arising out of or related to the City’s reliance on the contractor’s designation of information as exempt from disclosure. If the City believes it is required by law, court order, or otherwise to disclose any portion of an SOQ, the City may do so without liability to the contractor.
By having an authorized officer of the company sign below, General Contractor agrees to indemnify the City of Aurora for any and all attorney fees that the City may incur in defending the withholding of such information.
GENERAL CONTRACTOR
By:
Signature
Name (Type or Print)
Title
Date
| STATEMENT OF QUALIFICATIONS: SOQ-26-6175A |