This is a bidding document for the City of Fort Collins, Colorado, soliciting qualified professionals to provide master planning services for the Water and Wastewater Master Planning Program. The document outlines the City's request for comprehensive proposals addressing water and wastewater infrastructure planning needs. The solicitation establishes a structured evaluation process for selecting qualified firms capable of delivering strategic master planning services that will guide the City's water and wastewater systems for future years. Specific response deadlines, site visit opportunities, pre-bid meetings, and contract award timelines are outlined within the document to ensure orderly proposal submission and evaluation.

The pricing structure, financial requirements, and funding mechanisms for the master planning services are detailed within the bidding document. The document specifies any applicable set-asides, incumbent contractor information, and current operational environment relevant to the water and wastewater planning initiatives. Contract term parameters, renewal options, and specific funding sources allocated for these professional services are established to provide bidders with clear parameters regarding project scope, budget allocation, and contractual obligations for the City of Fort Collins' water and wastewater master planning program.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 1 of 41

REQUEST FOR PROPOSAL

10371 WATER AND WASTEWATER MASTER PLANNING SERVICES

RFP DUE: 3:00 PM MT (Mountain Time), December 15th, 2026

The City of Fort Collins (City) is requesting proposals from qualified Professional(s) to provide master planning services for the Water and Wastewater Master Planning Program.

As part of the City’s commitment to sustainability, proposals must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by RMEPS.

A pre-proposal meeting will be held at 10:00 AM MT on November 16th, 2026. The pre-proposal meeting will be hosted on-line via Microsoft Teams. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to announce your name and mute your microphone:

https://teams.microsoft.com/meet/2533014005087857?p=SpU4yIeKA4rF7

Meeting ID: 253 301 400 508 785 7 Passcode: W6Jr6L4t

All questions should be submitted, in writing via email, to Moutaz "Taz" Badawi, Buyer II at abadawi@fcgov.com, with a copy to Matt Simpson, Project Manager, at masimpson@fcgov.com, no later than 3:00 PM MT on November 23rd, 2026. Please format your e-mail to include: RFP 10371 Water and Wastewater Master Planning Services in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage.

Rocky Mountain E-Purchasing System hosted by BidNet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins.

Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-

4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality.

The City also strictly prohibits unlawful harassment in the workplace, including sexual

Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522

970.221.6775 fortcollins.gov http://www.bidnetdirect.com/colorado/city-of-fort-collins https://teams.microsoft.com/meet/2533014005087857?p=SpU4yIeKA4rF7j2k4g mailto:masimpson@fcgov.com

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 2 of 41 harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding.

The City requires its Professionals to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party Professionals and their subcontractors/subconsultants at every tier.

Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Professionals may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Professionals may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA, trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Professionals hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and pricing of any contract resulting from this request for proposal will be public information.

Professionals Registration: The City requires new Professionals receiving awards from the City to submit IRS form W-9 and requires all Service Professionals to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website under Vendor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit (Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion.

Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited.

Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal.

The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities.

https://www.fortcollins.gov/Business/Bids-and-Contracts

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 3 of 41

Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms.

The selected Professional shall be required to sign the City’s Agreement prior to commencing services (see sample attached to this document).

Sincerely, Jake Rector Purchasing Director

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 4 of 41

I. BACKGROUND & OBJECTIVE / OVERVIEW

A. Objective The City of Fort Collins (City) is requesting proposals from qualified engineering Professionals to provide master planning services for the Water and Wastewater Master Planning Program. The City intends to award to multiple Professionals and enter into separate Master Services Agreement with each. Work Orders may be issued to the selected Professional at the City’s discretion based on the needs of individual assignments. Master planning and modeling efforts are anticipated to begin in spring 2027 and continue into 2028.

B. Background The City of Fort Collins Utilities operates its water and wastewater systems within a One Water organizational framework. The Water and Wastewater Master Planning Program is intended to support near-term and long-range planning for the City’s water distribution and wastewater collection systems and to provide a consistent basis for hydraulic modeling, system evaluation, capital improvement planning, and related planning studies.

Water and wastewater master planning has occurred through a variety of studies and modeling efforts over the years. The most recent combined planning effort was the 2018 Water Distribution & Wastewater Collection Master Plan prepared by Ditesco. The water and wastewater models were last substantially updated as part of this effort, which concluded in 2018, with limited updates or maintenance since then.

The City has selected Aquanuity’s AquaTwin software as its hydraulic modeling platform.

The City’s water distribution and wastewater collection models have recently been converted from InfoWater and InfoSWMM to AquaTwin. The primary objective of the upcoming master planning effort is to review and comprehensively update these models so they can serve as reliable planning tools maintained by City staff. The water model is currently receiving a geometry update.

The master planning effort will evaluate system needs over a 20-year planning horizon and develop a priority projects list. Planning considerations are expected to include redevelopment and densification, aging infrastructure, existing and future capacity constraints, changing operating conditions, regional and adjacent-utility interactions, system resiliency, and emergency scenarios.

The City will provide all available information to support the work, including GIS data, current hydraulic models, water-use/AMI data, current asset-condition and risk-analysis work, development projections, available wastewater flow data, and previous planning studies.

Additional wastewater flow monitoring will be needed to support the wastewater model update and calibration. The City would like to have flow monitoring in place in spring 2027.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 5 of 41

II. SCOPE OF PROPOSAL

A. Project Scope Overview Initial anticipated work includes:

1. Water Distribution Master Planning, including updates to and use of the City’s AquaTwin water-distribution model to evaluate existing and future system needs.

2. Wastewater Collection Master Planning, including updates to and use of the City’s AquaTwin wastewater-collection model to evaluate existing and future system needs.

3. Wastewater Flow Monitoring, anticipated as an early Work Order to support wastewater model development and calibration.

The initial master planning efforts are expected to consider a 20-year planning horizon and develop a Priority Project list (with documentation). The work will generally address hydraulic-model improvement and calibration, existing and future system evaluation, infrastructure condition and risk, alternatives analysis, project prioritization, and development of planning tools that can support ongoing City decision-making.

Although Water and Wastewater work will generally be completed through separate Work Orders and may be performed by different Professionals, the City intends for the resulting master plans and supporting tools to follow a coordinated and generally consistent planning framework. The City is interested in the Professional’s recommendations for achieving this consistency - including appropriate methods, standards, document structure, mapping, dashboards, planning tools, etc.

A key objective of the program is to develop planning tools and processes that City staff can continue to use and update after the master plans are completed. This includes hydraulic models, supporting data, maps, dashboards, asset-risk information, project prioritization tools, and documentation.

The Master Services Agreement(s) may also be used for future model updates, special studies, alternatives analyses, asset-risk and project prioritization, development or system-impact evaluations, operational and resiliency studies, and other related Water Distribution and Wastewater Collection master planning services.

B. Scope of Work The following categories describe the types of professional services that may be authorized under the Master Services Agreement(s). They are intended to define the general breadth of services and do not represent a detailed scope for any individual assignment. Specific scope, responsibilities, deliverables, schedule, staffing, and fees will be established through individual Work Orders.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 6 of 41

Task 1 – Project Management, Coordination, and Staff Engagement Provide project management and coordination appropriate to each Work Order.

Services may include project meetings, schedule and budget management, status reporting, workshops, coordination with City staff and other Professional(s), and other project controls appropriate to the assignment.

Where Water and Wastewater assignments overlap, Professional(s) may be asked to coordinate assumptions, methods, terminology, and deliverables. Public, Council, board, or other external engagement may also be included when specifically authorized.

Task 2 – Data Review, Planning Basis, and Standards Development Review available City information relevant to individual assignments, including previous studies, GIS data, hydraulic models, water-use data (AMI), wastewater flow data, development projections, operational information, maintenance and inspection records, and asset-condition and risk information.

Services may also include identifying data gaps and developing or refining planning and modeling criteria, calibration standards, QA/QC practices, documentation standards, and other repeatable procedures for future City use.

Task 3 – Hydraulic Modeling and Model Management Update, calibrate, evaluate, and document the City's Water Distribution and Wastewater Collection hydraulic models using AquaTwin. Services may include model geometry and data updates, demand and loading development, scenario development, QA/QC, system analysis, and documentation of assumptions and model changes.

Model development shall support long-term use and maintainability by City staff, including appropriate documentation, transfer of supporting data and files, staff training, and knowledge transfer.

Task 4 – Field Data Collection and Wastewater Flow Monitoring Perform or support field investigations needed for hydraulic modeling and system planning. Services may include wastewater flow monitoring, water system pressure monitoring, manhole survey, GIS verification, review of CCTV or other condition information, and other appropriate field investigations.

Wastewater flow monitoring is anticipated as an early Work Order and may include monitoring-plan development, site selection, equipment or subcontractor coordination, installation, data QA/QC, analysis, and use of monitoring results for model calibration.

The City may perform portions of field-data collection using City resources or other contracts.

Task 5 – Water Distribution System Planning

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 7 of 41

Evaluate existing and future Water Distribution system performance and needs.

Services may include analysis of demands, pressure, fire flow, velocity, water age, storage, pumping, pressure zones, interconnections, redundancy, and capacity constraints.

Planning may also address redevelopment and densification, targeted system expansion, regional and adjacent-utility interactions, infrastructure improvements, operational scenarios, and system resiliency, including water emergencies within the FCU system, emergencies affecting adjacent systems or districts, wildfire, outages, source interruptions, interconnect operations, and storage limitations.

Task 6 – Wastewater Collection System Planning Evaluate existing and future Wastewater Collection system performance and needs.

Services may include wastewater loading, dry- and wet-weather flow analysis, inflow and infiltration, trunk and interceptor capacity, regional inflows, operational constraints, system deficiencies, and system expansion.

Planning may also address redevelopment and densification, targeted expansion areas, adjacent-utility interactions, unserved areas, septic areas and opportunities for conversion to municipal wastewater service, and service-area considerations. The City's current 208 Utility Plan update is expected to provide baseline information for future wastewater planning.

Task 7 – Asset Condition, Risk, and Infrastructure Renewal Review and build upon the City's existing asset-condition and risk information, including previous master-planning work, current Linear-Asset Risk Assessments, maintenance and failure history, inspection information, and operational knowledge.

Services may include additional data analysis, refinement of existing methodologies, identification of data gaps, recommendations for additional condition assessment or data collection, and development of improved approaches for evaluating infrastructure risk and renewal.

Task 8 – Alternatives Analysis, Project Prioritization, and CIP Support Identify and evaluate alternatives for addressing system deficiencies and future needs, including infrastructure replacement, operational constraints, resiliency risks, and opportunities associated with redevelopment and system expansion.

Services may include conceptual design as necessary. Wastewater alternatives may include profile development or other vertical evaluation where needed to establish feasibility.

Professionals may also assist the City in developing a repeatable and maintainable process for asset risk, infrastructure renewal, and project prioritization that can be updated and incorporated into ongoing master planning and CIP maintenance.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 8 of 41

Task 9 – Master Plan Documents, Maps, Dashboards, and Planning Tools Develop master-plan documents and technical products as appropriate for each Work Order. Deliverables may include technical memorandums, Water Distribution and Wastewater Collection Master Plans, hydraulic models and documentation, GIS data, maps, dashboards, CIP information, decision-support tools, and supporting technical data.

The City is particularly interested in GIS-based maps, dashboards, and planning tools that City staff can maintain and use as part of the ongoing master planning and CIP program.

Task 10 – Additional Master Planning and Technical Services Additional services may be authorized throughout the term of the Master Services Agreement(s) based on City needs. These may include model updates and maintenance, hydraulic studies, private development evaluations, regional interconnection studies, resiliency and operational analyses, asset-risk refinement, planning-criteria development, alternatives analysis, project prioritization, technical support, training, and other related Water Distribution and Wastewater Collection master-planning services.

C. Milestones The City anticipates executing the Master Services Agreement(s) in early 2027. Initial Water Distribution and Wastewater Collection master planning efforts are expected to begin in spring 2027 and proceed concurrently, with completion targeted for mid-2028.

Wastewater flow monitoring is anticipated as an early Work Order, with monitoring desired to begin in spring 2027. Specific schedules, milestones, and deliverable dates will be established for each Work Order.

D. Minimum Qualifications Professionals shall meet the following minimum qualifications:

1. Have a Professional Engineer registered in the State of Colorado on the proposed project team.

2. Demonstrate experience providing municipal Water Distribution and/or Wastewater Collection master planning services.

3. Demonstrate experience with hydraulic model development, calibration, and system analysis for municipal Water Distribution and/or Wastewater Collection systems.

III. GENERAL INFORMATION

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 9 of 41

A. Anticipated RFP Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time.

• RFP Issuance: November 9th, 2026

• Pre-Proposal Meeting: 10:00 AM MST November 16th, 2026

• Question Deadline: November 23rd, 2026

• Final Addendum Issued: Week of November 30th

• Proposal Due Date: December 15th, 2026

• Interviews (tentative): January 25th – 29th, 2027

• Award of Contract (tentative): Week of February 1st, 2027

B. Interviews In addition to submitting a written proposal, the top-rated Professional(s) may be invited to participate in an interview with the City’s evaluation team. Interviews may include discussion of the Professional’s qualifications, proposed team, approach to the Master Services Agreement(s), anticipated coordination, and responses to questions from the City. The City may use the same general evaluation criteria for both written proposals and interviews.

C. Travel & Expenses Subject to the terms of the applicable Work Order, reasonable expenses may be reimbursable per the current rates found at www.gsa.gov. Professional will be required to provide original receipts to the City for all travel expenses.

D. Subcontractors/Subconsultants Professional(s) will be responsible for identifying any subcontractors and/or subconsultants in their proposal. Please note that the City will contract solely with the awarded Professional; therefore, subcontractors and/or subconsultants will be the responsibility of the Professional.

E. Financial Qualifications (CONFIDENTIAL) Professional(s) selected as finalists may be required to submit a banking reference and the most recent financial statement (audited preferred) including balance sheet and income statement, as well as a statement of cash flows (the “Financial Information”).

F. Current standards All work and/or materials must meet current standards in force by recognized technical http://www.gsa.gov/

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 10 of 41 and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances.

G. Fees, Licenses, Permits The successful Professional (s) shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All vehicles and equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law.

H. Laws and Regulations The Professional (s) agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances to include American Disabilities Act (ADA).

I. Work Orders The awarded Professional (s) will be required to sign the City’s Work Order Type Agreement, a sample of which is attached as Section VII for reference purposes. In the event that the City has agreements with multiple Professional (s) for the Work, the City reserves the right to request proposals for individual Work Order assignments from the awarded Professional (s) or assign Work Orders directly to a Professional (s) at its sole discretion. Selection for individual Work Orders may be based on, but not limited to, availability, approach, prior experience, firm capability, and cost.

Individual Work assignments will be requested and agreed to utilizing the City’s Work Order (included in the Agreement). Each Work Order must include a start and completion date, total cost and a Scope of Work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and personnel details. Fees outlined in the Work Order will conform with those stated in the Agreement.

No Work Order over $7,500 will be considered valid until signed, at a minimum, by the Professional, project manager and Purchasing Department representative. Depending on the cost and nature of the Work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the Agreement) and will not be considered valid until signed, at a minimum, by the Professional, project manager and Purchasing Department representative.

J. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Professional each month following the submittal of a correct invoice by the Professional indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report.

Payments will be made using the prices stated in the Work Order and Agreement. In the event a service is requested which is not stated in the Work Order and/or Agreement, the Professional and the City will negotiate an appropriate unit price for the service prior to the mailto:invoices@fcgov.com

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 11 of 41

Professional initiating such work.

The City pays invoices on Net 30 terms.

For Work Orders over $100,000, 5% retainage will be withheld on all Invoices until Final Completion is accepted by the City.

IV. PROPOSAL SUBMITTAL

Proposals should clearly demonstrate the Professional (s) qualifications, relevant experience, proposed team, understanding of the Water and Wastewater Master Planning Program, and approach to providing services under a Master Services Agreement and individual Work Orders. The City is interested in each Professional (s) recommended approaches, methods, and ideas for accomplishing the objectives described in this RFP.

Proposal Requirements:

• Limit the total length of your proposal to a maximum of thirty (30) 8 ½” x 11” pages (excluding: cover pages, table of contents, dividers, authorization form, and resumes).

• Font shall be a minimum of 10 Arial and margins are limited to no less than 0.5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page and may be used for exhibits only.

• Proposals shall be submitted as digital only using the PDF format.

• Links to websites for demonstration of example products (such as a dashboard or website) or products will be allowed. However, websites shall not be used to extend the length of the proposal. Proposals are expected to demonstrate the firm’s qualifications and experience.

• The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal.

• Proposals that do not conform to these requirements may be rejected.

Professional (s) should organize proposals in the order presented below and clearly address each requested item.

A. Cover Letter / Executive Summary Provide a concise executive summary describing the Professional (s) interest in the Water and Wastewater Master Planning Program, the services and discipline(s) for which the Professional (s) is proposing, the proposed project team, and the key qualifications and strengths the Professional (s) would bring to the City.

The Professional (s) should clearly indicate whether they are proposing primarily for Water Distribution Master Planning, Wastewater Collection Master Planning, or both.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 12 of 41

B. Service Provider’s Information Provide the following information for the proposing Professional (s):

1. Brief description of the firm, including business background and primary areas of practice.

2. Number of years in business.

3. Ownership and organizational structure.

4. Overview of services offered and relevant technical capabilities.

5. Approximate firm size and staffing.

6. Office location(s), including identification of the office(s) expected to primarily support the City.

7. Primary contact information, including name, title, mailing address, phone number, and email address.

C. Understanding and Approach Provide a concise description of the Professional (s) understanding of the City’s Water and Wastewater Master Planning Program and the Professional’s recommended approach to accomplishing the objectives described in this RFP. The City wants to understand the Professional’s proposed methods, technical approach, and ideas at a program level.

At a minimum, address the following:

1. Program Understanding and Master Planning Approach Describe your understanding of the City’s master planning objectives, key challenges, and opportunities. Discuss your overall approach to Water Distribution and/or Wastewater Collection master planning. Include how you would move from data review and model development through system evaluation, alternatives analysis, project prioritization, and CIP support. Explain how your services would support an ongoing master planning program that can be maintained and updated by City staff.

2. Hydraulic Modeling Approach Describe your approach to updating, calibrating, documenting, and using water and wastewater hydraulic models (of any type), including your experience with AquaTwin. Also describe your approach to model QA/QC, scenario development, documentation, and long-term model maintainability by City staff.

3. Planning Criteria and Standards Describe your approach to working with the City to establish or refine consistent modeling criteria, planning assumptions, evaluation standards, documentation practices, and repeatable procedures for future planning and model updates.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 13 of 41

4. Asset Risk and Infrastructure Renewal Describe your approach to reviewing and improving the City’s existing risk analyses, including identifying data gaps, integrating hydraulic results, and developing a repeatable process to support infrastructure renewal and project prioritization.

5. Alternatives and Project Prioritization Describe your approach to identifying and evaluating alternatives and developing a clear, repeatable project-prioritization framework that considers hydraulic performance, asset condition and risk, redevelopment and growth, resiliency, operational needs, project coordination opportunities, and other appropriate considerations.

6. Planning Tools and Deliverables Describe your recommended approach to developing maintainable master-planning tools, including GIS-based maps, dashboards, CIP tools, model documentation, and other products that can be updated and maintained by City staff over time.

7. Innovation, Opportunities, and Risks Describe any innovative ideas the Professional (s) would bring to these master planning efforts. Also identify significant assumptions, risks, opportunities, or recommended approaches the City should consider.

D. Firm Capability, Experience, and Assigned Personnel Provide information demonstrating the Professional’s qualifications and experience relevant to the services described in this RFP. The City is particularly interested in the experience of the specific personnel proposed to support the Water and Wastewater Master Planning Program.

At a minimum, include the following:

1. Proposed Project Team Provide an organization chart identifying key personnel, their roles, and the relationship between the prime Professional (s) and any subconsultants. Clearly identify the proposed Project Manager and key technical leads.

2. Key Personnel Qualifications Provide concise resumes for key personnel expected to perform the work. Resumes should highlight relevant experience in municipal water distribution and/or wastewater collection master planning, hydraulic modeling, asset management, project prioritization/ CIP development, field data collection, and related services.

3. Relevant Project Experience

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 14 of 41

Provide examples of similar projects completed for public utilities or public agencies.

Examples should demonstrate relevant experience with Water Distribution and/or Wastewater Collection master planning, hydraulic modeling, system evaluation, asset risk, alternatives analysis, and project prioritization/ CIP development.

4. Hydraulic Modeling Experience Describe the team’s experience with municipal hydraulic modeling platforms, including AquaTwin, and with model development, calibration, documentation, QA/QC, and long-term model management.

5. Master Planning and Program Experience Describe experience developing master plans and ongoing planning programs intended to be updated and maintained over time rather than completed as one-time studies.

6. Asset Management and Risk Experience Describe relevant experience integrating asset condition, failure history, risk, inspection data, and hydraulic or system-performance information into infrastructure renewal and capital planning decisions.

7. References Provide references for at least three relevant projects. Include the owner, project name, brief project description, key personnel involved and contact information for the reference.

E. Sustainability / Triple Bottom Line Approach In concise terms, describe how the Professional (s) would incorporate environmental, economic, and social considerations into Water and Wastewater master planning and related services under this Agreement. Provide relevant examples from similar utility planning efforts, where appropriate.

Considerations may include:

• Environmental – System resiliency, water quality and resource protection, energy and resource efficiency, climate and wildfire considerations, and long-term environmental impacts.

• Economic – Life-cycle considerations, infrastructure risk, efficient use of public resources, coordination of capital investments, affordability, operational efficiency, and long-term financial sustainability.

• Social – Public health and safety, reliability of utility services, accessibility, community and customer impacts, stakeholder considerations, service equity, RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 15 of 41 and other social factors relevant to utility planning and infrastructure decisions.

Responses should be concise and focused on how these considerations inform the Professional’s technical and planning approach. The response to this section should not exceed one (1) page.

F. Coordination and Master Services Approach Describe the Professional’s approach to working with the City under a Master Services Agreement – Work Order structure, including how the team would develop, manage, and deliver individual assignments over the term of the Agreement.

At a minimum, address the following:

1. Work Order Development and Management Describe your approach to developing individual Work Orders with the City, including definition of scope, assumptions, responsibilities, schedule, staffing, deliverables, and fee.

2. Coordination with the City Describe how the Professional (s) would coordinate with the City project manager, technical staff, Operations, and other internal stakeholders as appropriate to individual assignments.

3. Coordination with Other Service Provider(s) The selected Professional (s) may be assigned different or overlapping Water and Wastewater Work Orders based on City needs, Professional (s) qualifications, availability, and individual assignment requirements.

Describe how your team would coordinate with the other selected Professional where work overlaps, including development of common assumptions, standards, terminology, planning methods, and deliverable formats.

4. Program Continuity and Knowledge Transfer Describe how the Professional (s) would maintain continuity between Work Orders, including continuity of key personnel, and preserve institutional knowledge, technical assumptions, models, data, and planning decisions throughout the Master Services Agreement.

G. Wastewater Flow Monitoring Approach

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 16 of 41

Wastewater flow monitoring is anticipated as an early Work Order. Professional (s) proposing for Wastewater Collection master planning should describe their approach to this work.

At a minimum, address the following:

1. Monitoring Program Development Describe your approach to developing a wastewater flow-monitoring program, including site selection, monitoring duration, seasonal considerations, wet-weather capture, coordination with existing City data, and use of monitoring results for model calibration.

2. Equipment and Field Services Describe the equipment, methods, and staffing you would typically use, including whether monitoring would be self-performed or performed through a subconsultant.

3. Data Management and QA/QC Describe your approach to data review, validation, QA/QC, troubleshooting, documentation, and preparation of monitoring data for hydraulic model development and calibration.

4. Integration with Master Planning Describe how flow-monitoring results would be used in wastewater loading analysis, model calibration, wet-weather evaluation, and subsequent system planning.

H. Cost and Billing Rates Because specific scopes of work will be developed and negotiated through individual Work Orders, the City is not requesting a total fee for the overall services described in this RFP. Cost information submitted with the proposal will be used to evaluate the Professional’s proposed billing rates and general cost structure. This will serve as a basis for negotiating future Work Orders.

Provide the following:

1. Schedule of Billing Rates Provide a schedule of hourly billing rates by employee name and/or labor classification for personnel anticipated to support the Agreement. Identify the role or job title associated with each rate.

2. Subconsultant Rates Provide billing rates or rate schedules for proposed subconsultants, where available.

Identify any anticipated markup applied to subconsultant services.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 17 of 41

3. Other Direct Costs Identify the Professional’s approach to reimbursable direct costs and other expenses not included within hourly labor rates.

4. Rate Adjustments Submitted rates will be effective for one year from the date of the agreement. Rate changes may be mutually agreed upon and amended annually at the time of renewal.

5. Wastewater Flow Monitoring Costs For Professional (s) proposing to support Wastewater Collection master planning, provide representative planning-level cost information to help the City understand the order of magnitude and major cost drivers for a wastewater flow-monitoring project.

This information is for proposal evaluation and planning purposes only and is not intended to establish the final scope or fee for a future Work Order.

I. Sample Agreement Included with this request for proposals is a sample Agreement that the City intends to use for obtaining the services of the Professional (s). The Professional is required to review this Agreement and indicate any objections to the terms of the contract. If revisions to the contractual terms are requested, provide suggested revisions.

J. Acknowledgement The Acknowledgement form is attached as Section VI. Complete the attached form indicating the Professional (s) hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that the Professional has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP.

V. REVIEW AND ASSESSMENT CRITERIA

Proposal Review and Assessment Criteria

Proposals will be evaluated based on the criteria below. The City anticipates selecting two Professional (s) to support the Water and Wastewater Master Planning Program.

The City may invite the highest-rated Professional (s) to participate in interviews. Written proposals and interviews, if conducted, will be evaluated using the same general criteria.

The rating scale shall range from 1 to 10. A rating of 1 indicates that the proposal does not meet minimum requirements, a rating of 5 indicates that the proposal meets minimum requirements, and a rating of 10 indicates that the proposal substantially exceeds minimum requirements.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 18 of 41

Weight Evaluation Category

30% Understanding and Technical Approach & A. Sustainability /Triple Bottom Line Approach

40% Firm Capability, Experience, and Assigned Personnel

15% Master Services, Coordination, and Program Delivery Approach

15% Cost Structure and Billing Rates

1. Understanding and Technical Approach – 30%

Evaluation may consider:

• Understanding of the City’s Water and Wastewater Master Planning Program, objectives, and key challenges.

• Recommended technical and master planning approach, including hydraulic modeling, planning criteria, and AquaTwin.

• Integration of asset condition and risk, alternatives analysis, project prioritization, and CIP support.

• Approach to GIS mapping, dashboards, models, and other planning tools that can be maintained by City staff.

• Identification of relevant opportunities, risks, innovative approaches, and Triple Bottom Line considerations.

• For Wastewater Collection proposals, the proposed approach to wastewater flow monitoring and integration with model calibration and master planning.

• Adherence to Proposal formatting and maximum length requirements.

2. Firm Capability, Experience, and Assigned Personnel – 40%

• Relevant municipal Water Distribution and/or Wastewater Collection master planning experience.

• Qualifications and experience of the proposed Project Manager and key technical personnel.

• Hydraulic modeling experience, including AquaTwin or comparable platforms.

• Experience with asset management, infrastructure risk, system evaluation, and capital planning.

• Experience developing master planning programs and tools intended for continued

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 19 of 41 use by utility staff.

• Relevant experience of proposed subconsultants and quality of project references.

• Demonstrated ability of the proposed team to perform similar work for public utilities or agencies.

3. Master Services, Coordination, and Program Delivery Approach – 15%

• Approach to working under a Master Services Agreement and individual Work Orders.

• Ability to efficiently develop and manage individual assignments.

• Approach to coordination with City staff, internal stakeholders, and other Service Provider(s).

• Approach to coordination between Water and Wastewater planning efforts and development of consistent planning methods and deliverables.

• Continuity of key personnel throughout the Agreement term.

• Approach to knowledge transfer and maintaining continuity between Work Orders.

4. Cost and Billing Rates – 15%

• Reasonableness and competitiveness of proposed billing rates and overall rate structure.

• Subconsultant costs, markups, and reimbursable expenses.

• For Wastewater Collection proposals, reasonableness of representative wastewater flow-monitoring cost information.

• Approach to future rate adjustments.

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 20 of 41

VI. ACKNOWLEDGEMENT

This form may not be redlined and must be submitted with your proposal. Failure to adhere to these requirements may result in your proposal being rejected.

Service Provider/Professional hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP 10371 Water and Wastewater Master Planning Services and sample Agreement except as otherwise noted. Additionally, Service Provider/Professional hereby makes the following representations to City:

a. All of the statements and representations made in this proposal are true to the best of the Service Provider/Professional’s knowledge and belief.

b. Service Provider/Professional commits that it is able to meet the terms provided in this proposal.

c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof.

d. Service Provider/Professional further agrees that the method of award is acceptable.

e. Service Provider/Professional also agrees to complete the proposed Agreement with the City of Fort Collins within 10 days of notice of award. If contract is not completed and signed within 10 days, City reserves the right to cancel and award to the next highest rated firm.

f. Service Provider/Professional acknowledges receipt of addenda.

g. Service Provider/Professional acknowledges no conflict of interest.

h. Service Provider/Professional acknowledges that the City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq.

(“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Professionals may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.”

In this version of the proposal, Professionals may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA, trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Service Providers/Professionals hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and

RFP 10371 WATER AND WASTEWATER MASTER PLANNING SERVICES Page 21 of 41 pricing of any contract resulting from this request for proposal will be public information.

Legal Firm Name:__

Physical Address: __

Remit to Address: __

Phone:__

Name of Authorized Agent of Firm: __

Signature of Authorized Agent: __

Primary Contact for Project: __

Title: __ Email Address: _____

Phone: __ Cell Phone: ________

NOTE: ACKNOWLEDGMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL.

Official Purchasing Document Last updated 4/2025

Master Professional Services Agreement – Work Order Type RFP 10371 Water and Wastewater Master Planning Services

VII. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN )

MASTER PROFESSIONAL SERVICES AGREEMENT

WORK ORDER TYPE

This Master Professional Services Agreement (Agreement) made and entered into the day and year set forth in the Agreement Period section below, by and between the CITY OF FORT COLLINS, COLORADO, a Colorado Municipal Corporation (City) and , a(n) [enter state] [business type] (Professional).

WITNESSETH:

In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows:

1. Scope of Service. The Professional agrees to provide Services in accordance with any project Work Orders for RFP 10371 Water and Wastewater Master Planning Services, issued by the City. Such Work Orders will be incorporated into this Agreement. A blank sample of a Work Order is attached hereto as Exhibit A, consisting of one (1) page and incorporated herein. A general Scope of Services is attached hereto as Exhibit B, consisting of [# of Pages] and incorporated herein. The City reserves the right to independently solicit any project rather than issuing a Work Order to the Professional for the same pursuant to this Agreement. Irrespective of references to certain named third parties within this Agreement or any Work Order, the Professional shall be solely responsible for performance of all duties hereunder. The term Service as used in this Agreement shall include the Services and deliverables contained in any Work Order issued by the City.

The City may, at any time during the term of a particular Work Order and without invalidating the Work Order, make changes to the scope of the particular Service. Changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit C, consisting of one (1) page and incorporated herein.

2. Work Order Schedule. The Services to be performed pursuant to this Agreement shall be performed as specified on each Work Order. Time is of the essence. Any change in schedule must be agreed upon in writing by the parties hereto via a Change Order.

3. Changes. The City may, at any time during the term of the Agreement, make changes to the Agreement. Such changes shall be agreed upon in writing by the parties.

4. Agreement Period. This Agreement shall commence , 20(Year) (the Effective Date) and shall continue in…