BID 10373 Traffic Control Services

This is a competitive sealed bid solicitation issued by the City of Fort Collins, Colorado for traffic control services to support various city departments. The City requests comprehensive traffic control services including supervisory personnel, flaggers, barricades, signs, cones, and specialized equipment for ongoing use at the City's discretion. Specific services outlined include Traffic Control Supervisors at hourly rates, flag persons with paddles, various barricade types, traffic control devices, and specialized signage. Schedule B addresses dedicated Open Streets Event services occurring Sundays from 6:00 AM to 6:00 PM, requiring Type III barricades, flag persons, Type I barricades, Jersey barriers, message boards, no-parking signs, and cones. The question deadline is 3:00 PM Mountain Time on November 12, 2026. Bids are due at 3:00 PM Mountain Time on November 20, 2026, submitted electronically through the Rocky Mountain E-Purchasing System. The bid opening will occur via videoconference immediately following the deadline. Award is anticipated for the week of November 23, 2026. The initial agreement term is one year, with the City holding the option to extend for up to four additional one-year periods through mutual written agreement with pricing negotiations occurring at least thirty days prior to expiration.

Bid pricing must remain firm for ninety days following the opening. The City reserves the right to award to multiple contractors and split the bid in percentages most advantageous to its operations. Awards will be based primarily on lowest bid price and service availability. The awarded contractor must maintain $1,000,000 combined single limit general liability insurance and comply with all City traffic control standards, including current versions of the City of Fort Collins Traffic Control Handbook and the Manual on Uniform Traffic Control Devices. The contractor must employ certified Traffic Control Supervisors possessing American Traffic Safety Services Association or Colorado Contractors Association certification and certified flaggers through the Colorado Department of Highways. The City does not set a minimum quantity requirement and reserves the right to rent devices only, hire its own personnel for setup, or issue work orders for specific projects. Contractors must respond to service calls within two hours for minor requests and thirty minutes for emergencies, with availability required twenty-four hours per day, seven days per week including holidays. The City will assess liquidated damages at $200 per hour for downtime caused by contractor negligence and $10 per day per barricade for failure to remove devices after notification, with total liquidated damages capped at $5,000 annually. The City may terminate the agreement upon fifteen days written notice.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID 10373 Traffic Control Services Page 1 of 43

INVITATION TO BID

10373 TRAFFIC CONTROL SERVICES

BID OPENING: 3:00 PM MT (our clock), November 20, 2026

The City of Fort Collins is requesting bids from qualified Contractors for traffic control services for various City departments to be used at the City departments’ discretion.

As part of the City’s commitment to Sustainable Purchasing, electronic bid submission is preferred. Bids shall be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Please note:

submitting bids through RMEPS may need additional time for completion. Bids not submitted by the designated Opening Date and Time will not be accepted by the system.

The City encourages all disadvantaged business enterprises to submit bid in response to all invitations to bid. No individual or business will be discriminated against on the grounds of race, color, sex, or national origin. It is the City’s policy to create a level playing field on which DBEs can compete fairly and to ensure nondiscrimination in the award and administration of all contracts.

Public Bid Opening: Bid opening will be conducted shortly after 3:00 PM MT on November 20, 2026. Bid openings will be conducted by videoconference. At said place and time, and promptly thereafter, all Bids that have been duly received will publicly opened and read aloud. To access the Bid opening, please follow the link:

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2336463259915799?p=0pHlFvglt66KecZ0fk Meeting ID: 233 646 325 991 579 9 Passcode: f8XS2Y8r

Dial in by phone +1 970-628-0892,,821660412# United States, Grand Junction Find a local number Phone conference ID: 821 660 412#

Any additional questions should be submitted, preferably in writing via email, to Adam Hill, Senior Buyer, at adhill@fcgov.com with a copy to Project Manager, Steve Varnellat svarnell@fcgov.com, no later than 3:00 PM MT (our clock) on November 12, 2026.

Please format your e-mail to include: Bid 10373 Traffic Control Services in the subject line.

Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage.

Rocky Mountain E-Purchasing System hosted by BidNet:

A copy of the Bid may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins.

Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522

970.221.6775 fcgov.com/purchasing http://www.bidnetdirect.com/colorado/city-of-fort-collins https://teams.microsoft.com/meet/2336463259915799?p=0pHlFvglt66KecZ0fk tel:+19706280892,,821660412 https://dialin.teams.cloud.microsoft/b731d730-657a-4b1b-8b3d-1cc5c0704511?id=821660412

BID 10373 Traffic Control Services Page 2 of 43

This BID has been posted utilizing the following Commodity Code(s):

Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-

4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality.

The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding.

The City requires its Contractor to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party Contractor and their subcontractors/subconsultants at every tier.

Colorado Open Records Act: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any bid submitted hereunder is subject to public disclosure by the City pursuant to CORA and City ordinances. All submitted bids, Bid Forms, and the awarded contract will be considered public records subject to disclosure under CORA. By responding to this Bid, Contractor hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA.

Special Instructions:

BID 10373 Traffic Control Services Page 3 of 43

All bids must be properly signed by an authorized representative of the company with the legal capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set for closing. Once bids have been accepted by the City and closing has occurred, failure to enter into contract or honor the purchase order will be cause for removal of supplier's name from the City of Fort Collins' bidders list for a period of twelve months from the date of the opening.

The City may also pursue any remedies available at law or in equity. Bid prices must be held firm for a period of ninety (90) days after bid openings.

Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained in the City's specifications initially provided to the Contractor. Any proposed modification must be accepted in writing by the City prior to award of the bid.

Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly identified by the bid number and bid name contained in the bid proposal.

No bid will be accepted from, or any purchase order awarded, to any person, firm or corporation in default on any obligation to the City.

Bids must be furnished exclusive of any federal excise tax, wherever applicable.

Contractors must be properly licensed and secure necessary permits wherever applicable.

The City may elect where applicable, to award bids on an individual item/group basis or on a total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities.

Sales Prohibited/ Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity, favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited.

Freight Terms: Unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight charges must be included in prices submitted on proposal.

Collusive or Sham Bids: Any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is not a collusive or sham bid.

Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms.

Contractor Registration: The City requires a new Contractor receiving awards from the City to submit IRS form W-9 and requires all Contractors to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Contractor Direct Deposit Authorization Form can be found on the City’s Purchasing website at https://www.fortcollins.gov/Department- Directory/Purchasing under Contractor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit https://www.fortcollins.gov/Department-Directory/Purchasing https://www.fortcollins.gov/Department-Directory/Purchasing

BID 10373 Traffic Control Services Page 4 of 43

(Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion.

Bid results are posted online at http://www.bidnetdirect.com/colorado/city-of-fort-collins.

Jake Rector Purchasing Director

BID 10373 Traffic Control Services Page 5 of 43

CITY OF FORT COLLINS

GENERAL INFORMATION

The City of Fort Collins is requesting bids from qualified Contractors for traffic control services for various City departments to be used at the City departments’ discretion.

Schedule The following represents the City’s target schedule for the bid. The City reserves the right to amend the target schedule at any time.

• Bid issuance: October 29, 2026

• Question deadline: 3:00 PM MT on November 12, 2026

• Final Addendum Issuance November 13, 2026

• Bid Opening Date: 3:00 MT (our clock) on November 20, 2026

• Award of Contract (tentative): Week of November 23, 2026

Method of Award The City reserves the right to award multiple Contractors and split the bid award in whatever percentages are most advantageous to the City.

Award(s) from this bid will be based primarily on lowest bid price and availability of services.

Future orders may be authorized, at the option of the City, from this bid for a period of five years after bid closing date. Satisfactory pricing and delivery are required for future orders based on this bid.

Agreement The awarded Contractor will receive a Purchase Order from the City authorizing work under this Agreement. Contractor should not begin any Work prior to receipt of the Purchase Order.

The awarded Contractor is also expected to sign the City’s standard Services Agreement, a sample of which is attached. The Agreement will be effective for a period of one year. At the option of the City, the Agreement may be extended for up to an additional four (4) one-year periods. Renewals and pricing changes shall only be negotiated and agreed to by both parties at least thirty (30) days prior to Agreement expiration. Written notice of renewal shall be provided to the Contractor and mailed no later than thirty (30) days prior to the Agreement expiration date.

The awarded Contractor is also expected to sign the City’s standard work order type services agreement, a sample of which is attached as Section VI for reference purposes. In the event that the City has agreements with multiple Contractors for the Work, the City reserves the right to choose which Contractor to contact regarding the project, unless order of preference has been established during the contracting process.

Individual work assignments will be requested and agreed to utilizing the City’s standard Work Order (included in the agreement). Each work order form must include a start and completion date, total cost and a general summary of work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and personnel details. Fees outlined in the work order will conform with those submitted in the BID response and subsequently included in the contract.

BID 10373 Traffic Control Services Page 6 of 43

No work order will be considered valid until signed, at a minimum, by the Contractor, project manager and Purchasing Department representative. Depending on the cost and nature of the work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the agreement) and will not be considered valid until signed, at a minimum, by the Contractor, project manager and Purchasing Department representative.

Invoices & Payments Invoices should be emailed monthly or after a shipment to invoices@fcgov.com with a copy to the Project Manager. The cost of the item(s) delivered shall be paid to the Contractor each month following the submittal of a correct invoice. Contractor should include Purchase Order Number and a detailed description of item(s) on each invoice submitted. The City pays invoices on Net 30 terms.

Fees, Licenses, Permits The successful Contractor shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law.

Laws and Regulations All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories.

The Contractor agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances to include American Disabilities Act (ADA). The Contractor further agrees to comply fully with the Occupational Safety and Health Act, all regulations issued there under, and all state laws and regulations enacted and adopted pursuant thereto.

Insurance Contractor is responsible for providing the City with insurance as required in the attached Agreement.

BID 10373 Traffic Control Services Page 7 of 43

CITY OF FORT COLLINS

BID SUBMITTAL INSTRUCTIONS

The following items must be provided in the bid submittal package:

1) Completed Bid Submittal Form, consisting of ( ) pages, including:

• Bid Schedule A & B

• Experience & References List, providing documentation of at least three (3) reference projects.

• List of Subcontractors to be used on project (if applicable)

• Acknowledgement.

• Additional documents may be submitted in Word or PDF.

Failure to submit any of the above may result in your bid being considered non-responsive.

10373 Traffic Control Services

BID SUBMITTAL FORM

BID 10373 Traffic Control Services Page 8 of 43

CONTRACTOR NAME:

SUBMITTAL DATE:

A. BID SCHEDULE

BID SCHEDULE A (Contractor to provide all service, delivery, set-up, manpower & equipment)

Description Quantity Unit Price Total Quantity

Available On Hand

Traffic Control Supervisor (at job site full time) 1 per hour $

Traffic Control Supervisor (at job site full time) (Overtime/Holiday/Afterhours) 1 per hour $

Flag Person with Paddle 1 per hour $

Flag Person with Paddle (Overtime/Holiday/Afterhours) 1 per hour $

Vertical Panel without Light 1 per unit/ per day $

Type I Barricade without light 1 per unit/

Type III Barricade without lights 1 per unit/

Light - Steady Burn 1 per unit/

Light - Flashing 1 per unit/

Barrels 1 per unit/

Size A Sign with stand 1 per unit/

Size A Sign without stand 1 per unit/

Size B Sign with stand 1 per unit/

No Parking Sign with stand 1 per unit/

Specialty Size Size A - Cost of Manufacture 1 per sign $

BID 10373 Traffic Control Services Page 9 of 43

28" Cone with reflective strip 1 per cone/ per day

36" Cone with reflective strip 1 per cone/ per day

Safety Fence 1 per roll/

Arrow Board 1 per unit/

Message Board 1 per unit/

Type IV Barrier - Jersey Barrier 1 per unit/

SUB-TOTAL SCHEDULE A $

BID SCHEDULE B (Open Streets Event – Sundays From 6:00AM – 6:00PM)

Description Quantity Unit Price Total

Type III Barricade 30 Per unit/

Flag Person w/ Paddle 6 Per day $

Type I Barricade 6 Per day $

Type IV Jersey Barrier (concrete of H2O fillable) 20 Per day $

Message Board 4 Per day $

“No Parking” Sign with Stand 30 Per day $

Cones 100 Per day $

SUB-TOTAL SCHEDULE B

TOTAL BASE BID SCHEDULES A & B $

IN WORDS:

SUBMITTED BY

PRINTED

COMPANY

ADDRESS

CITY, STATE ZIP

BID 10373 Traffic Control Services Page 10 of 43

PHONE

EMAIL

Define “Afterhours” hours of service: ____________________________________________

BID 10373 Traffic Control Services Page 11 of 43

B. EXPERIENCE & REFERENCES LIST

PROJECT #1

Project Name:

Project Type:

Location:

Contract Amount: $

Client:

Contact Name: Title:

Phone: Email:

Start Date: Completion Date:

Was the Project completed on time? Yes No

If no, please describe:

Was the Project completed within the original budget? Yes No

Additional information:

BID 10373 Traffic Control Services Page 12 of 43

PROJECT #2

Project Name:

Project Type:

BID 10373 Traffic Control Services Page 13 of 43

PROJECT #3

Project Name:

Project Type:

PLEASE NOTE: THE CITY RESERVES THE RIGHT TO REQUEST AND CONTACT ADDITIONAL

REFERENCES.

BID 10373 Traffic Control Services Page 14 of 43

C. SCHEDULE OF SUBCONTRACTORS

Please list all subcontractors and their corresponding Work items in the space below. If not applicable, please note “N/A”.

ITEM SUBCONTRACTOR

BID 10373 Traffic Control Services Page 15 of 43

D. ACKNOWLEDGEMENT

This form may not be redlined and must be submitted with your bid.

Contractor hereby acknowledges receipt of the City of Fort Collins Bid and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in 10373 Traffic Control Services except as otherwise noted. Additionally, Contractor hereby makes the following representations to City:

a. All of the statements and representations made in this proposal are true to the best of the

Contractor’s knowledge and belief.

b. Contractor commits that it is able to meet the terms provided in this proposal.

c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof.

d. Contractor further agrees that the method of award is acceptable.

e. Contractor also agrees to complete the proposed Notice of Award (NOA) with the City of

Fort Collins within 10 days of notice of award. If NOA is not completed and signed within 10 days, City reserves the right to cancel and award to the next highest rated firm.

f. Contractor acknowledges receipt of addenda.

g. Contractor acknowledges no conflict of interest.

h. Contractor acknowledges that the City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any bid submitted hereunder is subject to public disclosure by the City pursuant to CORA and City ordinances. All submitted bids, Bid Forms, and the awarded contract will be considered public records subject to disclosure under CORA. By responding to this Bid, Contractor hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA.

Legal Firm Name:

Physical Address:

Remit to Address:

Phone:

Name of Authorized Agent of Firm:

Signature of Authorized Agent:

Primary Contact for Project:

Title: Email Address:

Phone: Cell Phone:

NOTE: ALL BID SUBMITTAL FORM PAGES MUST BE COMPLETED, SIGNED WHERE

REQUIRED & RETURNED WITH YOUR BID PROPOSAL PACKAGE.

Master Services Agreement – Work Order Type ITB 10373 Traffic Control Services Page 16 of 43

Official Purchasing Document Last updated 4/2025

SCOPE OF WORK

The Scope of Work covers the requirements for providing Traffic Services for the City of Fort Collins at each City Departments’ discretion on an annual basis reference Bid Schedules A & B.

All of these requirements and provisions shall be incorporated in the signed Work Order Services Agreement when the bid is awarded.

The City requires traffic control services for special events, for example Open Streets events.

Open Streets events involve closing a 1-2 mile street route to cars to allow a safe, car-free space for participants. Open Streets event road closures typically last one day from approximately 6:00 a.m. to 6:00 p.m., usually twice annually. The awarded Contractor will be responsible for the following:

1. Producing a Traffic Control Plan at least forty-five (45) days prior to the event dates, which will be determined in Q1 of each year.

2. Submitting the Traffic Control Plan to the Open Streets Coordinator for inclusion in the Special Event Permit.

3. Modify the Traffic Control Plan at the direction of the City Traffic Engineer or designated representative, including the Open Streets Coordinator, within one week of written notice to modify the Plan.

4. Implement the Plan on the day of Open Streets events with complete set up by 7:00 a.m.

on that day.

5. Remove all traffic control devices by 6:00 p.m. the day of Open Streets events. Removal of traffic control devices will be done in a manner that prevents thru traffic from inadvertently entering the event route prior to full restoration of service. In other words, the event route “vacuum” should be maintained and removed in a systematic way from one end to the other.

6. May provide certified flaggers to manage specific, typically high-volume intersections along the event route.

Open Streets Traffic Control Plans typically vary from event to event. The awarded Contractor will demonstrate resourcefulness to adapt Traffic Control Plans to meet the needs demanded by nuances and complexities of each event route. A typical Open Streets footprint could involve the following:

1. Multiple arterial or collector intersections that remain open to thru traffic while ensuring clear closures on either side.

2. Full closures of collector and local streets intersecting with the event route.

3. Occasional need to create and manage two-way lanes from a single traffic lane to maintain access to businesses or residences.

4. Occasional need to create and manage cross-route traffic flow to allow for access to businesses or residences when other off-route access is not available.

The City’s Special Event Permit requires that all possible vehicle access points be barricaded in a clear, robust manner so that a vehicle driver will clearly determine the event route is inaccessible. Furthermore, the Special Event Permit requires that any clusters of activity or areas along the route where pedestrians are anticipated to gather must be barricaded in a way that prevents the unauthorized and potentially malicious entry of a vehicle into crowded spaces. These needs must be balanced with the one-day, quick deployment nature of Open Streets events. A typical Open Streets event route requires the following traffic control device needs, plus or minus depending on the route, not intended to be all inclusive of possible needs:

ITB 10373 Traffic Control Services Page 17 of 43

Official Purchasing Document Last updated 4/2025

• Type 3 barricades: 30

• Flag person with paddle: 6

• Type 1 barricades: 6

• Type 4 jersey barrier (concrete or water fillable): 20

• Message board: 4

• No parking sign with stand: 30

• Cones: 100

Also, as part of the City’s Open Streets events – Schedule B must be complete with the appropriate costs and required equipment that would be needed per a developed Traffic Control Plan (TCP).

A. Certificates and Traffic Control Supervisor (TCS) Duties All work area traffic control placed within City of Fort Collins right of way, under the terms of this Agreement, shall be under the direct supervision of a Traffic Control Supervisor (TCS). The TCS shall possess a current American Traffic Safety Services Association certification or a C.C.A.

Colorado Contractors Association certification as a work site traffic control supervisor this certification shall be on file with the City. Valid certification card shall be presented to the City Traffic Control Manager for each person employed to perform as a TCS. When new TCS's are hired their certification card must be presented and the new TCS briefed by the City Traffic Control Manager prior to putting that person on the job. A TCS must be on site when traffic control devices are placed, modified and removed. The hourly and daily rate charged for TCS personnel shall include a properly equipped vehicle and a cellular telephone.

The TCS's duties shall include, but not be limited to:

1. Coordination of all traffic control related operations, including those of Subcontractors and Suppliers.

2. Preparing and revising Traffic Control Plans as required.

3. Direct supervision of project flaggers.

4. Supervise the notification of businesses, Schools, and residents prior to construction as directed. (The notification of businesses and residents may be accomplished by a representative of the TCS.)

5. Maintaining a daily traffic control log which shall become part of the City's project records.

6. Inspecting traffic control devices on every calendar day for the duration of the project.

7. Insuring that traffic control devices are functioning as required.

8. Overseeing all requirements covered by the plans and specifications which contribute to the convenience, safety and orderly movement of traffic.

9. Flagging.

10. Setting up traffic control devices.

For all street closures, the Contractor shall be responsible for the notification of businesses and residents. The notification shall consist of distributing letters indicating the nature of the work to be completed, any special instructions (i.e. limits on lawn watering during concrete pouring, etc.), ITB 10373 Traffic Control Services Page 18 of 43

Official Purchasing Document Last updated 4/2025 the dates and times of the work, and the parking and access restrictions that will apply. Sample letters will be provided by City personnel. Letters shall be submitted with the Traffic Control Plans for City approval. After approval, the letters shall be distributed a minimum of 24 hours prior or as required by City of Ft. Collins Traffic Operations to the commencement of each phase of the work. (Note: The time frame criterion for distributing letters is the same as for posting "NO PARKING" signs.) The cost for preparing and distributing the letters shall be included in the cost for TCS hour or day rate. Please refer to City Work Area Traffic Control Handbook.

Time spent maintaining signs on the weekends, holidays, bad weather days, and other days shall be included in the unit prices for the equipment.

All traffic control devices shall be placed under the supervision of a Traffic Control Supervisor.

Failure to have a TCS during placement, changes or removal or failure to have a certified Flagger shall remove all liability from the City for any adverse consequences and the City will not pay the cost of any non-certified personnel.

Flag people must be certified through the Colorado Department of Highways Flagger Certification Program or other City approved certification programs. The Contractor must certify their employees as required by this contract without expense to the City. All flag people must carry proof of certification and present it when requested by a City representative. If the onsite TCS performs flagging duties the City will pay for flagging price only.

B. Conformity All traffic control devices placed in the City right of way under the terms of the Agreement must meet or exceed the minimum standards set forth in the most current issue of the City of Fort Collins Handbook for Traffic Control. Additionally, any sign blank with signs faces on both sides must have the back sign face completely covered when in use to avoid confusion to motorists traveling in the opposite direction. Company identification must not be placed on the front of traffic control devices and all identification must comply with current Manual on Uniform Traffic Control Devices (MUTCD) regulations.

C. Service Call Requirements Delivery and set-up of the traffic control devices shall occur per date and time agreed upon by Contractor and City Representative for day to day type activities between the hours as requested by City of Ft. Collins, if a TCP has previously been approved. Delivery and set-up of traffic control devices shall occur within 2 hours for minor set-ups as requested by City of Ft. Collins. Delivery and set-up of the traffic control devices shall occur within 30 minutes in an emergency.

Emergency requests must be responded to immediately with personnel and equipment on site within 30 minutes of notification. City personnel shall give the Contractor as much notice as practical for work requiring traffic control, except in the event of an emergency. City personnel shall endeavor to give reasonable advance notice, even for day to day requests on minor set-ups.

Contractor cannot refuse delivery and set-up of traffic control devices and or traffic control personnel as requested by City of Ft. Collins various departments.

D. Traffic Control Plan Preparation and Approval If same TCP or a slightly modified TCP is used more than once for same set-up per job, the TCP is paid for only once.

The awarded Contractor will be required to prepare a TCP for all projects, except emergencies lasting less than 24 hours. The TCPs must be prepared by a certified TCS, and presented to the City's Traffic Control Manager for approval, prior to set-up of devices at job site. In the case of

ITB 10373 Traffic Control Services Page 19 of 43

Official Purchasing Document Last updated 4/2025 an emergency lasting longer than 24 hours, a TCP will be submitted within 12 hours of the initial emergency. Approval by the City Traffic Control Manager will be completed within 24 hours after plan is presented. A copy of the signed, approved plan must be maintained by traffic control personnel at the job site and presented to the City representatives during set-up.

If, upon arrival at a job site, a City representative determines an approved traffic plan set-up is not being used, the job will be immediately stopped until the correct set-up is in place. This action will result in non-payment to the Contractor for any illegal devices, delivery, set-up, modification or removal charges as further defined in the City of Fort Collins Handbook for Traffic Control associated with the job. Additionally, at the discretion of the City, the Contractor can be back-charged liquidated damages incurred by City for downtime or loss of services during the stoppage of work, at a rate of $200/hour.

The Traffic Control Plan shall include, as a minimum, the following:

1. A detailed diagram which shows the location of all sign placements, including advance construction signs (if not previously approved) and speed limit signs; method, length, and time duration for lane closures; and location of flag persons.

2. A tabulation of all traffic control devices shown on the detailed diagram including, but not limited to: construction signs; vertical panel; vertical panel with light; Type I, Type II, and Type III barricades; cones; drum channelizing devices; and advance warning flashing or sequencing arrow panel. Certain traffic control devices may be used for more than one operation or phase. However, all devices required for any particular phase must be detailed and tabulated for each phase.

3. Number of flaggers to be used.

4. Parking Restrictions to be in effect.

E. Setup, Rental and Removal In no case will the responsibility for setup and modification of traffic control devices be divided between the Contractor and City Crews. Either the Contractor sets up all the traffic control devices or the City Crews will setup the traffic control devices. City personnel shall specify who will do the traffic control setup and modification when making the request for traffic control devices.

The City shall have the option of renting devices from the Contractor at the unit prices bid, and handling the traffic control internally, to include all staffing required. In such cases the City shall be responsible for the TCP, and any required TCS's. Bid Schedule “B” is for rental of devices and flaggers only.

Removal of traffic control devices from TRAVELED ROADWAY shall occur within 30 minutes after request is made, and no rental rates may be assessed after that point. Traffic control devices shall be placed and/or stored when not in use in City right of way in such a manner that minimizes the hazards to pedestrians, bicyclists and vehicles. Material shall be removed from City right-of-way within 12 hours.

F. Availability and Service Checks The Contractor must be available for requests 24 hours per day, 7 days a week, including holidays. The person answering the phone must be capable of receiving messages and must notify the TCS on duty immediately. Contractor must return call to City personnel within 10 minutes of receipt of request of service.

Response times must conform to Section C requirements.

ITB 10373 Traffic Control Services Page 20 of 43

Official Purchasing Document Last updated 4/2025

While the traffic control devices are being used by the City, a TCS will perform service checks as determined by the requesting department as many times as requested, at least four times a day, twice between the hours of 7:00 A.M. and 5:00 P.M., and twice between the hours of 5:00 P.M.

and 7:00 A.M., on residential, collector and arterial streets to insure that all traffic control devices are working properly and are positioned correctly, 7 days a week including holidays. During inclement weather, ie. wind, rain, snow, etc., it shall be the Contractor's responsibility to perform inspection more frequently to assure that all devises are visible and working properly or as requested by City of Ft. Collins.

A log of each service check, noting location, times and any problems encountered, must be maintained by the Contractor and a copy given to the City Department Representative monthly, or to any City Representative upon request. Random checks by City representatives will be made to verify compliance to this section.

The cost of providing service checks shall be included in unit prices. If all service checks are not performed in accordance with these specifications equipment rental for equipment not serviced will not be paid for.

G. Specifications for Devices The traffic control devices provided by the Contractor shall meet the current City of Ft. Collins Traffic Control Handbook and current federal specifications for such traffic control devices as set forth in the manual on Uniform Traffic Control Devices (official, with revisions), as compiled by the Federal Highway Administration. All traffic control devices shall be clean and in good operating condition when delivered and shall be maintained in that manner on a daily basis.

• Size A Signs - 0.01 to 9.00 Square Feet

• Size B Signs - 9.01 to 16.00 Square Feet

• Type III Barricades must be min 8' wide and 5' high.

• Safety fencing shall be 48" high in 50' rolls, rigid orange 2" plastic mesh. The fence shall be secured with posts or barricades with sand bags or anchorage approved by City personnel.

28" cones with collars must be used on residential, collector and arterial streets. 36" cones with collars must be used on any street with a posted speed limit of 40 MPH or greater.

H. Loss or Damage The City will not be responsible for any damage to, or loss of traffic control devices. Traffic control devices shall remain the property of the Contractor and must be clearly marked as to ownership, within the regulations set forth by the Federal Highway Administration. Upon notification by the City of any need for replacement or repair, the Contractor must make such replacement or repair as needed within 30 minutes of notification.

City crews shall not move the traffic control devices from one location to another unless an emergency situation exists, or unless the City is renting only the devices and is handling the TCP/staffing internally. In the event of an emergency the City shall notify the Contractor within 24 hours after such relocation.

I. Quantity The City is not obligated to take delivery of any minimum quantity of traffic control devices.

ITB 10373 Traffic Control Services Page 21 of 43

Official Purchasing Document

J. Log and Billing Forms A permanent log for each request shall be maintained in a legible manner and will contain the following information:

a. Date and time of request for placement.

b. Date and time traffic control devices to be placed.

c. Name of person and department making the request for placement.

d. Project name and location of traffic control devices.

e. Quantity of each type and identification per MUTCD designation or designate as a specialty.

f. Date and time traffic control devices were placed.

g. Clearly printed name and signature of City personnel responsible for accepting devices at job site. If City personnel are not at the job site, a signature of responsible City person shall be obtained within 24 hours. In no case will traffic control invoices be paid for unsigned or altered logs.

h. All modifications made, to include moving devices, adding additional devices, taking devices away. The City personnel requesting each modification shall also be identified.

I. Date and time of request for removal.

j. Date and time traffic control devices are to be removed.

k. Name and department making request for removal.

l. Date and time traffic control devices are removed.

m. Name of person making log entries.

n. TCS and flagger hours

o. A tabulation/spreadsheet showing daily quantities may be required by some Project Managers for projects longer than 2 calendar day duration. This sheet shall be signed by the TCS and City Representative and shall be writing.

A permanent log for each weekend and after-hour service call will be maintained and submitted with monthly billings. The service call log shall contain the following information:

a. Date and time of service call

b. Location

c. Name of person performing the call

d. Services performed (i.e., barricade lights checked, light changed, cones replaced, cones straightened, etc.)

e. TCS and flagger hours

Invoices shall contain information items c, d, e, f, g, h, I, j, and o from the log sheets in legible form. Separate invoices by project shall be provided. All invoices and log sheets shall be sent by the Contractor, in duplicate, to invoices@fcgov.com with a copy to the applicable City mailto:invoices@fcgov.com

ITB 10373 Traffic Control Services Page 22 of 43

Official Purchasing Document Last updated 4/2025

Department. Invoices not containing all required information will be returned to the Contractor and not paid until completed.

Questions regarding invoices shall be answered promptly and professionally. The Contractor shall respond to individual replies as required. Departments which request additional information on their invoice forms. All billing problems will be brought to the attention of the accounting staff immediately upon discovery.

All bills shall be submitted within 15 days after notification to pick up traffic control devices. For projects lasting longer than 30 days, bills will be submitted every 30 days and within 15 days of the end of the 30 day period. Bills not submitted within 15 days will incur a penalty of 15% of the invoice total unless the Project Manager, in his discretion, determines that the delay was caused by circumstances beyond the control of the Contractor. Bills not submitted within 30 days will incur a penalty of 30% of the invoice total unless the Project Manager, in his discretion, determines that the delay was caused by circumstances beyond the control of the Contractor. Payment will be made within 30 days after verification of billing charges.

K. Contractor Responsibility for Work The Contractor shall be responsible for all damages, loss or injuries that occur as a result of the fault or negligence of said Contractor or his employees in connection with the performance of this work. The Contractor is to place all traffic control devices to meet or exceed the standards set forth in the most current City of Fort Collins Work Area Traffic Control Handbook. The Contractor shall not be expected to compromise this responsibility. The Contractor should contact the City Traffic Control Manager if such an occasion should occur.

The Contractor shall furnish sufficient Traffic Control Supervisors, flag people and working personnel capable of promptly accomplishing all service requests according to the terms of this Agreement. The Contractor's employees shall conduct themselves in a proper and efficient manner while performing services for the City of Fort Collins. The City reserves the right to reject personnel for cause, and the Contractor shall replace these individuals promptly at the City's request.

L. Monthly Report:

Upon request the Contractor shall provide monthly written reports of the total number of calls received per day, as well as the general nature of the calls, i.e., number of barricades placed, location and when removed.

M. Insurance Coverage During the term of this Agreement, insurance coverage in the amount of $1,000,000 combined single limit, bodily injury and property damage shall be maintained by the Contractor, see Exhibit B. A certificate of insurance providing such coverage shall be presented to the City at the time the Services Agreement is signed by the Contractor.

N. Termination This Contract and all associated purchase orders may be terminated by the City, upon fifteen (15) days written notice.

The City shall have the ability to bid traffic control for any selected projects separately, if it is in the City's best interest.

O. Pricing Structure

ITB 10373 Traffic Control Services Page 23 of 43

Official Purchasing Document Last updated 4/2025

The cost for setting up equipment, modifying equipment, and maintaining equipment during authorized days shall be included in the Agreement Unit Price for Traffic Control Supervisor per day and per hour.

The cost for Traffic Control Devices, shall include delivery, rental, and pickup. The cost for setting up equipment, modifying equipment, and maintaining equipment will be paid for under the Agreement Unit Price for TCS as described above.

If a TCS(s) is used for an authorized day (a day is 10 hours), but not for the entire day, the TCS(s) shall be paid at the Agreement Unit Price for "Traffic Control Supervisor" at the per hour rate.

The quantity to be measured for flagging will be the total number of hours that flagging is actually used as authorized. Hours of flagging, in excess of those authorized, shall be at the Contractor's expense. Flagger breaks shall be included in the Agreement Unit Price for Flagging. The method for covering flagger breaks shall be approved by the City Representative.

Flagging outside of the construction work hours will not be paid for under the terms of this Agreement unless authorized. Flagger stand-by time will not be paid.

In locations where traffic control is set up and the work is not performed due to Traffic Control Contractor caused delays, the traffic control shall not be paid for under the terms of this contract.

The costs for advance warning "NO PARKING" signs for periods in excess of 24 hours prior to the advancement of work, including those instances when said signs have been changed or otherwise updated to reflect current schedules, will not be paid for under the terms of this contract unless authorized by the City in writing. In addition, the Owner shall deduct from compensation due the Contractor $10.00 for each traffic control device per day, including "NO PARKING" signs, for said conditions.

Payment shall be full compensation for furnishing, erecting, maintaining, moving, removing and disposing of construction traffic control devices necessary to complete the work. All construction traffic control devices which are not permanently incorporated into the project will remain the property of the Contractor.

Payment shall be made for the maximum number of each type of traffic control device being used at one given time per day. The accepted quantities will be paid for at the contract unit price for each of the pay items listed in the Bid Schedules.

The initial manufacturing will be paid for Specialty Signs per unit and the actual use paid for under the appropriate unit cost for Size A or Size B sign. This item shall apply to new signs only. Once manufactured, they may be used throughout the project. Upon completion of the work, the Specialty Signs shall be returned to the Contractor.

Flagger hand signs will not be measured and paid for separately, but shall be included in the work.

The flaggers shall be provided with electronic communication devices when required. These devices will not be measured and paid for separately, but shall be included in the work.

The cost of batteries, electricity and/or fuel for all lighting or warning devices will not be paid for separately but will be considered subsidiary to the item. Sand bags will not be measured and paid for separately, but shall be included in the work.

ITB 10373 Traffic Control Services Page 24 of 43

Official Purchasing Document Last updated 4/2025

The Contractor may provide larger construction traffic signs than those typically used in accordance with the MUTCD, if approved; however, payment will be made for the typical panel size.

The City shall not be responsible for any losses or damage due to theft or vandalism.

P. Liquidated Damages Liquidated damages at an hourly rate of $200/hour, may be assessed and back billed to the Contractor as stated in Section D for downtime incurred due to negligence of the Contractor in placement of traffic control devices resulting in shut-down of job sites.

Material shall be removed from City right-of-way within 24 hours. City dispatch logs will be used to confirm proper removal and pick-up time frames are met; failure to conform can result in back charging of daily rental rates per day for each device remaining after notification.

It shall be recognized by and between the parties hereto that the City will suffer certain unspecified damages in the event service is not provided in accordance with the terms of the proposal, and the signed Services Agreement. In recognition of the difficulty of ascertaining the actual damages to be sustained by the City, the parties shall agree that the assessment of liquidated damages shall be appropriate. In the event the project is not completed within the specified time, there shall be assessed against the Contractor, and the Contractor shall authorize the City to retain from monies due the Contractor, based on the following schedule:

1. If the Contractor fails to respond to service requests within two (2) hours for all locations, the City may deduct $200.00 per offense from payment as liquidated damages or have the authority to call in another Contractor. Emergency response time shall be 30 minutes, if response time is not met the City will have the authority to call in another contractor.

2. The City reserves the right to assess liquidated damages in the amount of $10.00 per day for each day per each barricade when barricades are not removed after notification as set forth in Section C of Exhibit A. In no event shall liquidated damages exceed the sum of Five Thousand Dollars ($5,000.00) during the term of this Agreement.

ITB 10373 Traffic Control Services Page 25 of 43

Official Purchasing Document Last updated 4/2025

ATTACHMENT A

SAMPLE SERVICES AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN)

MASTER SERVICES AGREEMENT

WORK ORDER TYPE

This Master Services Agreement (Agreement) made and entered into the day and year set forth in the Agreement Period section below, by and between THE CITY OF FORT COLLINS, COLORADO, a Colorado Municipal Corporation (City) and , a(n) (ENTER STATE) [business type], (Contractor).

WITNESSETH:

In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows:

1. Scope of Service. The Contractor agrees to provide Services in accordance with any project Work Orders for 10373 Traffic Control Services, issued by the City. Such Work Orders will be incorporated into this Agreement. A blank sample of a Work Order is attached hereto as Exhibit A, consisting of [# of Pages] and incorporated herein. A general Scope of Services is attached hereto as Exhibit B, consisting of [# of Pages] and incorporated herein. The City reserves the right to independently solicit any project rather than issuing a Work Order to the Contractor for the same pursuant to this Agreement. Irrespective of references to certain named third parties within this Agreement or any Work Order, the Contractor shall be solely responsible for performance of all duties hereunder. The term Service as used in this Agreement shall include the Services and deliverables contained in any Work Order issued by the City.

The City may, at any time during the term of a particular Work Order and without invalidating the Work Order, make changes to the scope of the particular Service. Changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit C, consisting of [# of Pages] and incorporated herein.

2. Work Order Schedule. The Services to be performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time is of the essence. Any change in schedule must be agreed upon in writing by the parties via a Change Order.

3. Changes. The City may, at any time during the term of the Agreement, make changes to the Agreement. Such changes shall be agreed upon in writing by the parties.

4. Agreement Period. This Agreement shall commence , 20(Year) (the Effective Date) and shall continue in full force and effect until , 20(Year), unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one (1) year periods not to exceed four (4) additional one-year period(s).

Renewals and pricing changes shall be negotiated by and…