This Request for Proposal (RFP) is issued by the City of Rifle, Colorado, seeking qualified consultants to provide Construction Management and Quality Assurance services for the CDOT Park and Ride project, a federally funded initiative under the Westward Three BUILD grant award. The scope of work encompasses construction management and quality assurance oversight for a new Park and Ride facility and adjacent infrastructure improvements, including road extensions of West Avenue, Park Avenue, and Park Loop; water main looping; sewer extensions; storm drain infrastructure; and associated site improvements totaling approximately 11,000 cubic yards of imported fill, 1,070 linear feet of water main, 3,300 tons of hot mix asphalt, 23,600 square feet of concrete flatwork, and various ancillary improvements. The mandatory pre-bid meeting is scheduled for October 21, 2026, at 10 a.m. at Rifle City Hall. The proposal submission deadline is November 3, 2026, at 2 p.m. via the Rocky Mountain e-purchasing system (BidNet Direct). The question deadline is October 28, 2026, at 12 p.m. The notice of award is anticipated for November 18, 2026, with an anticipated construction start date of Summer 2027. The construction management phase is scheduled to run from February 24, 2027, through November 1, 2027, with project closeout extending through December 1, 2027.
Qualifying firms must be licensed as Professional Engineers in Colorado with a minimum of five years of experience on CDOT or Local Agency construction projects and demonstrated experience in CDOT/Local Agency project administration. Proposals shall not exceed ten single-sided pages or five double-sided pages, excluding resumes and attachments, and must include a detailed fee schedule with staff names, hourly rates, and fees for each task and subtask. The project is funded through the FHWA BUILD Grant and City of Rifle funds. Evaluation criteria include technical expertise (0-20 points), previous experience on similar projects (0-30 points), completeness and accuracy of proposal (0-15 points), project approach (0-20 points), and proposal cost reflecting value and cost-effectiveness (0-15 points). The City reserves the right to reject any or all proposals, waive informalities, and negotiate with the highest-ranked firm to adjust scope and fee before City Council award. The contract will be substantially in the form of the EJDC E500 2020 version and must comply with all federal and state requirements, including CDOT Form 250 Materials Documentation Records, Title VI Plan requirements, Federal Wage Decisions, DBE/OJT provisions, and Buy America documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Management and Quality
Assurance for CDOT Park n Ride
Request for Proposal
October 6, 2026
City of Rifle
202 Railroad Avenue
Rifle, Colorado 81650
Proposal Due Date: November 3, 2026, at 2 p.m.
Prebid Meeting: October 21, 2026, at 10 a.m.
Question Deadline: October 28, 2026, 12 p.m.
Notice of Award: (tentative) November 18, 2026
Anticipated Start Date: December 2026
Project Directory
Public Works Director
Craig Spaulding
202 Railroad Ave
Rifle, CO 81650
970.665.6556 cspaulding@rifleco.org
Construction Project Manager
Ryan Peskuski
202 Railroad Ave
Rifle, CO 81650
970.665.6554 rpeskuski@rifleco.org
Construction Inspector
Jenna Lucas
202 Railroad Ave
Rifle, CO 81650
970.665.6554 jlucas@rifleco.org
Procurement and Grant Reporting Manger
Iris Trevisano
202 Railroad Ave
Rifle, CO 81650
970-665-6412
Itrevisano@rifleco.org
Table of Contents
Project Directory
REQUEST FOR PROPOSAL
1. Overview
2. Scope of Work
3. Schedule
4. Submittal
5. Pre-Proposal Meeting
6. Questions
7. Delivery of Proposal
8. Schedule
9. Evaluation
10. Award
11. Draft Contract
12. Accessibility
REQUEST FOR PROPOSAL
For
Construction Management and Quality Assurance for CDOT
Park n Ride
The City of Rifle is requesting proposals from interested and qualified consultants for Construction Management and Quality Assurance for CDOT
Park n Ride . Proposals must be submitted via the Rocky Mountain e-purchasing system- bidnet direct website www.bidnetdirect.com/colorado/cityofrifle by
November 3, 2026, at 2 p.m. Proposals received after the closing date and time will not be considered.
There will be a mandatory pre-big meeting October 21, 2026, at 10 a.m. Rifle
City Hall Mamm Peak Conference Room
Questions concerning this proposal shall be addressed to Iris Trevisano, Procurement and Grant Reporting Manager at itrevisano@rifleco.org. The final deadline for questions is October 28, 2026, 12 p.m.
Notice of Award (tentative) November 18, 2026
The City of Rifle values full inclusion and access for all of our facilities, programs, activities and services. We are pleased to provide meaningful accommodations to comply with the Americans with Disabilities Act (ADA) and reasonably provide translation, interpretation, modifications, accommodations, alternative formats, auxiliary aids, and services.
To request special assistance for Solicitations only, call Procurement and
Grant Reporting Manager Iris Trevisano at 970-665-6412 or email
Itrevisano@rifleco.org . Please allow 48 hours for your requests to be met.
This Advertisement for Bid is subject to all applicable provisions of the City of
Rifle Municipal Code, including Article III- Purchasing regarding procurement procedures. In case of any inconsistency between this advertisement and the
City Code, the provisions of the City Code shall take precedence.
1. Overview
As a part of the Westward Three BUILD grant award, The City of Rifle is constructing a new Park and Ride along with the adjacent infrastructure.
This is federally funded and will have all of the project requirements associated with a Federally funded project. It will be the responsibility of the selected construction management contractor to ensure the federal and state requirements are met and documented.
2. Scope of Work
Agreement will be EJDC E500 2020 version
Article 1 of the Agreement, Services of Engineer, is supplemented to include the following provisions:
Baseline Information: Owner has furnished the following Project information to Engineer as of the Effective Date. Engineer’s scope of services has been developed based on this information. As the Project moves forward, some of the information may change or be refined, and additional information will become known, resulting in the possible need to change, refine, or supplement the scope of services.
Water Line and Adjacent
Facilities:
Type and Size of Facility: 11,000 CY of imported fill
151 LF of sewer lines and services
1070 LF of water main
783 LF of storm drain piping
350 LF of Bored 30” Steel Pipe beneath Union Pacific
3,300 tons of HMA
11,500 tons of imported subbase
23,600 sf concrete flatwork
4,173 lf of curb and gutter
Conduit and Street Light bases
1,742 sf of retaining wall (less than 4’)
Description of Improvements: This project includes building the road extensions of
West Ave, Park Ave, and Park Loop. A water main will be looped through the project and sewer extensions to provide service to commercial lots. Storm drain infrastructure collects onsite water and conveys upstream flows to the Colorado River. Signage, striping, lighting, retaining walls, and pedestrian improvements are included.
Traffic control will be the responsibility of the contractor. Traffic control plans will be required for submittal and approval. The contractor will be required to submit a phasing plan and work with the
City and the Project Engineer to determine a plan with the least impact to businesses in the downtown area. Access to businesses shall remain open for the duration of the project. Public Notification will be handled by the City of Rifle, but the awarded contractor should expect to be present in meetings with business owners to communicate the phasing plan prior to beginning work.
Expected Construction Start: Summer 2027
Prior Studies, Reports, Plans: See attached
Facility Location(s): Centennial Parkway
Current Project Budget: Unposted
Funding Sources: FHWA BUILD Grant, City Funds
Known Design Standards: City of Rifle Public Works Manual, CDOT M&S, PROWAG, AWWA, CDPHE, AREMA
Known Project Limitations: See attached
Project Assumptions: TBD
Other Pertinent Information: Final Plans and Specifications
Project Geotechnical Report
Union Pacific Permit
Geotechnical Report for Jack and Bore
CDOT 1214
Engineer shall provide Basic and Additional Services as set forth below.
Preconstruction:
• Review project documentation and have QA/QC and documentation plans prepared to present at pre-bid meeting
CDOT 1214:
• Conduct and document pre-construction meeting in conformance with
CDOT agenda
• Prepare/submit Title VI Plan and Incorporate Title VI Assurances
• Ensure the correct Federal Wage Decision, all required Disadvantaged
Business Enterprise/On-the-Job Training special provisions and FHWA
Form 1273 are included in the Contract (CDOT Resident Engineer)
• Conduct and document pre-survey meeting in conformance with CDOT agenda
• Conduct and document pre-pour meeting in conformance with CDOT agenda
• Conduct and document pre-paving meeting in conformance with CDOT agenda
• Act as “in responsible charge”
• Ongoing oversight of DBE participation
• Buy America documentation
• Complete CDOT Form 250 - Materials Documentation Record o Generate form, which includes determining the minimum number of required tests and applicable material submittals for all materials placed on the project o Update the form as work progresses o Complete and distribute form after work is completed
• Perform Project Acceptance Samples and Tests
• Perform Laboratory Acceptance Tests
• Approve mix designs o Concrete o Hot mix asphalt
• Check Final Materials Documentation
• Complete and Distribute Final Materials Documentation
• Fulfill Project Bulletin Board and Pre-Construction Packet Requirements
• Process CDOT Form 205 - Sublet Permit Application and CDOT Form 1425
– Supplier Application Approval Request. Review & sign completed forms, or review/approve in compliance software system, as applicable, & submit to Region Civil Rights Office.
• Conduct Equal Employment Opportunity and Labor Compliance
Verification Employee Interviews. Complete CDOT Form 280
• Monitor Disadvantaged Business Enterprise Participation to Ensure
Compliance with the “Commercially Useful Function” Requirements
• Conduct Interviews When Project Utilizes On-the-Job Trainees.
o Complete CDOT Form 1337 – Contractor Commitment to Meet OJT
Requirements.
o Complete CDOT Form 838 – OJT Trainee / Apprentice Record.
o Complete CDOT Form 200 - OJT Training Questionnaire
• Check Certified Payrolls (Contact the Region Civil Rights Office for training reqmts.)
• Submit FHWA Form 1391 - Highway Construction Contractor’s Annual
EEO Report
• Prepare EEO Certification and Collect EEO Forms
• Check Material Documentation and Accept Final Material Certification
(See Chapter 9)
• Submit CDOT Professional Services Closeout Report Form
Union Pacific
• Coordinate track monitoring and contingency plan
3. Schedule
Task Start End Cal. Days
Penwell Design
CM Bid Award 10/6/2026 11/18/2026 43
Contract Execution 11/18/2026 12/2/2026 14
Construction Bid Document Review 12/2/2026 12/16/2026 14
Construction Bid 12/16/2026 1/13/2027 28
Construction Award 1/13/2027 2/24/2027 42
Construction Management 2/24/2027 11/1/2027 250
Closeout 11/1/2027 12/1/2027 30
4. Submittal
Please submit your proposal in a single part, with a maximum length of 10 pages (single-sided) or 5 pages (double-sided). This limit excludes resumes, project descriptions, and required attachments. A basic corporate resume of qualifications is sufficient.
Elements to be included along with the proposal in the general order listed:
a. Cover Letter: Include a cover letter that introduces your proposal and provides a price quote for the project based on the scope of work outlined.
b. Qualifications Statement: Provide a statement of your firm’s qualifications, along with the qualifications of the team members assigned to the project. Clearly identify the key personnel who will be responsible for the work. Resumes for each team member should be included in the appendix.
c. Approach and Plan: Address key project issues the consultant envisions focusing on a rate structure that is sustainable for both consumers and infrastructure maintenance and replacement.
i. Describe how you will approach the project and complete the services outlined in the Scope of Work. Be sure to address how your plan will meet the specific needs of the City.
d. Proposed Timeline: Provide a proposed timeline or schedule for the project, outlining key milestones and deadlines.
e. Special Services: Indicate if any part of the work will be handled by sub-consultants or external resources and describe these services.
f. Fee Schedule: Include a detailed fee schedule for the services outlined in your proposal. With a breakdown of staff names, hours, hourly rate, and fee for each proposed task, subtask, and sub-consultants. If any expenses (e.g., travel, materials) will be billed separately from professional fees, provide an estimate.
g. References and Past Work: Provide examples of similar projects you have completed, along with at references from clients who can speak to your experience with similar services.
5. Pre-Proposal Meeting
a. Attendance at the pre-proposal meeting is mandatory.
i. Wednesday, October 21, 2026, at 10 a.m.
ii. City Hall- 202 Railroad Ave. Rifle, CO 81650
b. City staff will discuss the scope of work and respond to questions from attendees. All questions raised and answers given outside of the pre-proposal meeting, if any, will be documented and issued as an addendum to the RFP.
6. Questions
Potential bidders may direct questions to Iris Trevisano at itrevisano@rifleco.org Question deadline: Wednesday, October 28, 2026, 12 p.m.
7. Delivery of Proposal
Proposals must be submitted via the Rocky Mountain e-purchasing system- bidnet direct www.bidnetdirect.com/colorado/cityofrifle
The electronic submission must be compiled into a single pdf or Word document. The deadline for submitting responses to this RFP is
November 3, 2026, at 2 p.m.
Documents uploaded to bidnet will be sealed until the due date and time indicated in the solicitation. It is the sole responsibility of the respondent that the response is submitted and received before the due date and time as specified in this document. The City of Rifle is not responsible for delays in transmittal or delays caused by any other occurrence. Please allow sufficient time to complete the response and upload documents.
8. Schedule
•Proposal Due Date: November 3, 2026, at 2 p.m.
•Mandatory Prebid Meeting: October 21, 2026, at 10 a.m.
•Question Deadline: October 28, 2026, 12 p.m.
•Notice of Award (tentative):November 18, 2026
This RFP does not commit the City of Rifle to award or contract, nor to pay any costs incurred in the preparation and submission of proposals in anticipation of a contract. The City of Rifle reserves the right to reject all, or any, submitted as a result of this request, to negotiate with all qualified sources, or to cancel all or part of the RFP. The City Council reserves the right to not hire any of the candidates provided. Additionally, the City Council reserves the right to hire a candidate not recommended.
9. Evaluation
The selection committee will review and evaluate submittals based upon the firm’s demonstrated ability to meet the purpose and requirements of the
Request for Proposal.
Specific evaluation criteria include but are not limited to:
a. Qualifying Firms are required to have:
i. Licensure as a Professional Engineer in the State of Colorado
ii. Experience in administration of CDOT/Local Agency projects
iii. Minimum of 5 years of experience on CDOT/Local Agency construction projects
b. Bid acceptance and bid evaluation.
i. Bids shall be unconditionally accepted without alteration or correction, except as authorized in this Code. Bids shall be evaluated based on the requirements set forth in the invitation for bids, which may include criteria to determine acceptability such as inspection, testing, quality, workmanship, delivery and suitability for a particular purpose. Those criteria that will affect the bid price and be considered in evaluation for award shall be objectively measurable, such as discounts, transportation costs, and total or life cycle costs.
ii. The invitation for bids shall set forth the evaluation criteria to be used. In addition to the evaluation criteria set forth in the invitation to bid, the following criteria may be considered, in addition to price:
• Technical Expertise (0-20)
• Previous experience on similar projects in Scope (0-30)
• Completeness and Accuracy of Proposal (0-15)
• Project Approach (0-20)
• Proposal Cost – The proposal includes a detailed fee schedule that reflects the scope of work and services to be provided. Overall costs will be evaluated in relation to value, with consideration for clarity, completeness, and cost-effectiveness. (0-15)
10. Award
By the City using the criteria above, negotiations will be conducted with the highest ranked firm to adjust scope and fee to add preferences/omissions and remove unwanted aspects of the proposal. Once an agreement is reached on the final scope, schedule and budget, the selection (with adjusted fee and scope) will be sent to City Council for award. The City reserves the right to reject any or all bids, to waive any informalities or technical defects in bids, and unless otherwise specified by the City or by the bidder, to accept any items or group of items in the bid, as may be in the best interest of the City. No verbal explanations, clarifications, additions or instructions will be binding to either the City or the bidders, except those confirmed in writing. A signed purchase order/bid furnished to the successful bidder results in a binding bid without further action by either party. Notice of Award estimated: November 18, 2026
11. Draft Contract
The contract between a selected Respondent(s) and the City will be substantially in the form of the draft contract contained in Attachment A.
Respondents must review the draft contract and identify any proposed changes as “Proposed Changes to the Contract” in the Proposal. The City may consider any proposed changes in selecting a Respondent and awarding the contract but may reject the Proposals and condition the award of the contract on acceptance of a contract without the proposed changes.
12. Accessibility
Accessibility Requirements All work performed as a result of this solicitation must comply with all applicable provisions of §§24-85-101, C.R.S., et seq., and the Accessibility Standards for Individuals with a Disability, as established by the Office Of Information Technology pursuant to §24-85-103 (2.5), C.R.S. and
3) all State of Colorado technology standards related to technology accessibility and with Level AA of the most current version of the Web Content
Accessibility Guidelines (WCAG), incorporated in the State of Colorado technology standards.