RFP-26-32-FM: Generator and Transfer Switch Upgrade/Replacements
This is a Request for Proposal (RFP) issued by the City of Lafayette, Colorado, for the complete replacement of an emergency generator and automatic transfer switch (ATS) at Fire Station #1, located at 401 N 111th Street, Lafayette, Colorado 80026. The project requires removal of the existing Cummins/Onan generator (model 35GGFB, approximately 35 kW standby) and associated transfer switch, followed by furnishing, installation, startup, testing, and commissioning of a new emergency power system sized to feed the entire building load and accommodate proposed future additions. The RFP was issued October 2, 2026, with a mandatory pre-bid walk scheduled for October 9, 2026, at 9:00 AM MT. Written inquiries must be submitted by October 20, 2026, at 5:00 PM MT, with the City's response posted by October 23, 2026. Proposals are due October 30, 2026, by 5:00 PM MT and must be uploaded to the Rocky Mountain E-Purchasing System (Bidnet) at bidnetdirect.com/Colorado/CityofLafayette. Oral presentations and interviews may be conducted at the City's discretion during the week of November 2, 2026. The anticipated contract start date is November 9, 2026, with the initial term subject to City discretion for option or extension periods. The work must maintain Fire Station #1 operational status throughout the project, requiring careful coordination with City staff and fire personnel.
The proposal evaluation will be conducted by an Evaluation Committee using criteria scored on a 100-point scale: Technical Approach, Proposed Equipment, and System Sizing (35 points); Cost Proposal (30 points); Demonstrated Experience, Key Personnel, and References (20 points); and Operational Continuity, Temporary Power Plan, and Project Schedule (15 points). Contractors must provide a signed Non-Collusion Certificate and submit mandatory documentation including licenses, certifications, insurance information, a bid bond equal to 5 percent of the bid amount, completed W-9, three reference contacts, and a customer support/staffing plan. Insurance requirements include Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Professional Liability ($1,000,000 per claim/$2,000,000 aggregate if applicable), Workers' Compensation per Colorado statutory limits, and Comprehensive Automotive Liability ($500,000 combined single limit). Performance and Payment Bonds at 100 percent of the contract price are required upon award. The cost proposal must be firm for the contract term and include all labor, materials, equipment, permits, demolition, disposal, delivery, installation, startup, testing, commissioning, and training. Pricing should be formatted as a Base Bid for complete generator and ATS replacement and separate pricing for temporary power solutions, with clear identification of existing equipment disposition assumptions and any exclusions or contingencies. City permits for this municipal project are provided at no fee.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
RFP-26-32-FM
Generator and Transfer Switch Upgrade/ Replacements – City of Lafayette Fire Department:
Station #1
Proposals must be uploaded to the Rocky Mountain E- Purchasing System, Bidnet®, at: https:// www.bidnetdirect.com/Colorado/CityofLafayette
RFP Release Date: October 2, 2026 Proposal Due Date: October 30, 2026 | 5:00PM MT City of Lafayette 1290 South Public Road Lafayette, Colorado 80026
Page of Rev. 20251 25 https://www.bidnetdirect.com/Colorado/CityofLafayette
Contents
REQUEST FOR PROPOSAL COVER SHEET & SIGNATURE PAGE 4
NON-COLLUSION CERTIFICATE 6
1. SECTION 1 – GENERAL INFORMATION 7
1.1. BACKGROUND, OVERVIEW, AND GOALS 7
Statement of Vision 7
Statement of Values 7
PURPOSE 7
1.2. SCHEDULE OF ACTIVITIES 8
1.3. ADMINISTRATIVE INFORMATION 8
1.3.I.Official Means of CommunicaQon 8
1.3.II.ModificaQon or Withdrawal of Proposals 9
1.3.III.Proposal Submission 9
1.3.IV.Addendum or Supplement to Request for Proposal 9
1.3.V.Oral PresentaQons/Site Visits 9
1.3.VI.Incurring Costs 9
1.3.VII.ConfidenQality 9
1.3.VIII.Acceptance of RFP terms 10
1.3.IX.Independent Price DeterminaQon 10
1.3.X.Conflicts of Interest/Ethics 11
1.3.XI.Protested SolicitaQons and Awards 11
1.3.XII.Accessibility 11
1.4. CONTRACT AND TERM 12
2. SECTION 2 – REQUIREMENTS AND SCOPE OF WORK 12
2.1. INSURANCE REQUIREMENTS 12
2.2. BONDS 13
2.3. MANDATORY SUBMISSION REQUIREMENTS 13
2.4. SCOPE OF WORK 14
2.5. REQUESTED PROPOSAL FORMAT 16
I. DEMONSTRATED EXPERIENCE AND CAPABILITIES 16
II. MANDATORY REQUIREMENTS 16
III. TECHNICAL AND BUSINESS PROPOSAL 17
IV. Cost Proposal 17
Page of Rev. 20252 25
3. SECTION 3 – EVALUATION METHODOLOGY & AWARD 17
3.1. EVALUATION PROCESS 17
3.2. EVALUATION COMMITTEE 18
3.3. PROPOSAL EVALUATION CRITERIA 18
3.4. DEMONSTRATIONS AND DISCUSSIONS 21
3.5. SINGLE PROPOSAL 21
3.6. AWARD 21
APPENDIX A – SAMPLE CONTRACT 23
APPENDIX B – EXISTING UNIT PICTURES 24
Page of Rev. 20253 25
REQUEST FOR PROPOSAL COVER SHEET & SIGNATURE PAGE
Generator and Transfer Switch Upgrade/Replacements – City of Lafayette Fire Department: Station #1
The Request for Proposal Coversheet and Non-Collusion Certificate must be signed by the Offeror or an officer of the Offeror legally authorized to bind the Offeror to the proposal.
Verifiable digital signatures are accepted.
RFP-26-32-FM
Proposal Submission Deadline:
October 30, 2026 | 5:00PM MT
Submit Sealed Proposals to:
bidnetdirect.com/Colorado/CityofLafayette
Project Manager:
Steve Teeters
Steve.Teeters@lafayetteco.gov
Pete Bradshaw
Pete.Bradshaw@lafayetteco.gov
Procurement Manager:
Elizabeth Messner
Elizabeth.Messner@lafayetteco.gov
Legal Company Name (Offeror):
Authorized Signature:
Typed/Printed Name:
Title:
F.E.I.N.
Company Address:
City: State: Zip:
Contact for clarifications:
Title:
Email Address:
Page of Rev. 20254 25 https://www.bidnetdirect.com/colorado/cityoflafayette mailto:Steve.Teeters@lafayetteco.gov mailto:Pete.Bradshaw@lafayetteco.gov mailto:Elizabeth.Messner@lafayetteco.gov
By signing this Request for Proposal Coversheet, the authorized agent acknowledges acceptance of all terms and conditions of this solicitation.
ONLINE PROPOSAL SUBMISSION: Offerors must be registered with the Rocky Mountain E- Purchasing System at https://www.bidnetdirect.com prior to the due date and time so that the proposal and other required information may be uploaded. Proposals sent by other methods will not be accepted.
Please be advised that telegraphic or electronic responses (Email, Fax, Drop Box, Etc.)
CANNOT BE ACCEPTED as a sealed proposal. Vendors are urged to read these documents thoroughly before submitting a response.
Phone Number:
Page of Rev. 20255 25
NON-COLLUSION CERTIFICATE
The undersigned, being duly sworn, deposes and says that the person, firm, association, co-partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in the preparation and submission of a proposal to the City of Lafayette for consideration in the award of a Contract for Generator and Transfer Switch Upgrade/ Replacements – City of Lafayette Fire Department: Station #1
(Offeror Name)
By: _______________________________________________
(Authorized Signature)
Title: _______________________________________________
1. SECTION 1 – GENERAL INFORMATION
1.1. BACKGROUND, OVERVIEW, AND GOALS
Statement of Vision
Lafayette’s panoramic view of the Rocky Mountains inspires our view into the future. We value our heritage, our unique neighborhoods, a vibrant economy, and active lifestyles.
We envision a future that mixes small town livability with balanced growth and superior city services.
Statement of Values
We foresee a strong economy that is diverse and sustainable, attracts innovators, encourages a balance of big and small businesses, and meets the community’s needs.
We intend to shape the future through strengthening our voice on environmental stewardship and social issues, taking an active role in sustainability and strategic planning development, and facilitating leadership development and fresh thinking.
We strive to be a connected community that encourages cooperative relationships and inclusivity, expects accessibility and communication, nurtures resiliency, appreciates multiculturalism, and humanizes physical and social interactions within the City.
We support placemaking endeavors that stimulate historic preservation and the arts, encourage open space stewardship and networking of neighborhoods, and promote comprehensive planning and livability.
PURPOSE
The City of Lafayette, CO is seeking proposals from qualified contractors to replace the existing emergency generator and automatic transfer switch (ATS) at Fire Station #1, 401 N 111th Street, Lafayette, CO 80026. The project is a complete, turnkey replacement. It includes removal of the existing equipment and the furnishing, installation, startup, testing, and commissioning of a new emergency power system
1.2. SCHEDULE OF ACTIVITIES
1.3. ADMINISTRATIVE INFORMATION
1.3.I.Official Means of Communication
The RFP is published on the Rocky Mountain E-Purchasing System (Bidnet), so that proposals may be uploaded electronically to that system. The uploaded proposals are sealed by the system and can’t be viewed by the Procurement department or the evaluators until the due date and time have passed. This meets the Colorado procurement code requirement of “sealed proposals”.
The Procurement Manager will post notices that will include, but are not limited to, modifications to administrative or performance requirements, answers to inquiries received, clarifications to requirements, and the announcement of the apparent winning vendor.
No inquiries will be accepted after the date and time indicated in Section 1.2., Schedule of Activities. Where appropriate, inquiries should include references to any relevant Section/paragraph of the solicitation.
The only official response to an Offeror's inquiries are those responses that are published as a modification in Bidnet. Offerors should not rely on any other statements, whether written or verbal, that alter any specification or other term or condition of this RFP.
It is incumbent upon Offerors to monitor Bidnet carefully and regularly for any such postings prior to the proposal submission deadline, as this is the primary means for
Activity Date and Time
RFP Issued via Rocky Mountain E- Purchasing System/Bidnet October 2, 2026
Pre-Bid Walk - Mandatory
October 9, 2026 | 9:00AM MT
401 N 111th Street, Lafayette, CO 80026
Meet at front door
Prospective Vendors Written Inquiry Deadline (No questions will be accepted after this date and time.)
October 20, 2026 | 5:00PM MT
City’s Response to Written Inquiry October 23, 2026
Proposal Submission Deadline October 30, 2026 | 5:00PM MT
Interviews/Oral Presentations At City’s discretion; week of November 2, 2026 communicating any clarifications or changes to solicitation content, timeline and/or requirements.
1.3.II.Modification or Withdrawal of Proposals
Proposals may be modified or withdrawn by an Offeror up to twenty-four (24) hours prior to the established due date and time. Withdrawal of an Offeror’s proposal after award is prohibited.
1.3.III.Proposal Submission
Proposals must be uploaded to Bidnet at https://www.bidnetdirect.com/Colorado/ CityofLafayette on or before the date and time indicated in the Schedule of Activities. Late proposals will not be accepted. It is the responsibility of the Offeror to ensure that the proposal is uploaded on or before the closing date and time.
The Request for Proposal Cover Page and the Non-Collusion Certificate must both be signed in ink or with a verifiable digital signature by the Offeror or an officer of the Offeror legally authorized to bind the Offeror to the proposal. The signed Cover Page and Certificate may be scanned and included with the uploaded proposal.
Documents signed with DocuSign are acceptable.
1.3.IV.Addendum or Supplement to Request for Proposal
In the event that it becomes necessary to revise any part of all of this RFP, an addendum notice will be published on Bidnet.
1.3.V.Oral Presentations/Site Visits
The City may, it its sole discretion, request that Offerors make an oral presentation.
1.3.VI.Incurring Costs
Offerors are solely responsible for all costs incurred as a result of responding to this solicitation, which may include, but is not limited to, proposal development and materials, meetings, presentations, or negotiations.
1.3.VII. Confidentiality
Following the proposal submission deadline, individuals/entities may request from the City a list of the names of the responding Offerors. All other information related to the solicitation process will remain confidential until award.
Following the Notice of Intent to Award, all Offeror proposals will be open to public inspection with exception of information determined to be a trade secret or confidential or proprietary, per §24-72-200.1 et seq., C.R.S., as amended, Colorado Open Records Act.
An Offeror may submit, as a part of its proposal, a written request for classification of certain portions of the proposal as a trade secret or other confidential or proprietary information. Material for which the Offeror is requesting confidentiality shall be readily identifiable and separated from other portions of the proposal to facilitate public inspection of the non-confidential portion of the proposal.
Commingling of confidential information and non-confidential information is not acceptable. Neither price information nor any information that will be included in a resulting Contract will be considered confidential.
The Offeror must include the rationale for any request to classify portions as a trade secret or confidential or proprietary, including references to the authority that allows for such treatment.
In no event shall an entire proposal be classified as confidential.
Any additional Offeror information, which many be a part of evaluation/negotiation process and for which an Offeror claims confidentiality, is subject to the same requirements and processes identified above.
1.3.VIII.Acceptance of RFP terms
A proposal submitted in response to this RFP shall constitute a binding offer. The autographic signature of the Offeror or an officer of the Offeror legally authorized to execute contractual obligations shall include acknowledgement of this condition.
The proposal, including pricing, shall allow for a minimum of 180 calendar days for acceptance by the City, unless otherwise specified in this solicitation.
A submission in response to this RFP acknowledges acceptance by the Offeror of all terms and conditions as set forth herein. An Offeror shall identify clearly and thoroughly any variations between its proposal and this RFP. Failure to do so shall be deemed a waiver of any rights to subsequently modify the terms of performance, except as outlined or specified in the RFP.
The contents of the proposal of the awarded Offeror will become contractual obligations under the awarded Contract. Failure of the awarded Offeror to accept these obligations may result in cancelation of the award to that Offeror.
1.3.IX.Independent Price Determination
By its signature on the Cover Page and Certificate of Non-Collusion the Offeror certifies that the prices and other terms in the proposal have been arrived at independently without any consultation, communication, agreement with, or knowledge of the contents of the proposal by any other competing Offerors. For purposes of this paragraph, "consultation, communication, agreement with, or knowledge" does not include knowledge of prices or terms gained through availability of established price lists or catalogues made available to the public by the competing Offerors. No attempt has been made or will be made by the Offeror to induce any other person or firm to submit or not to submit a proposal for restricting competition per §6-4-101, C.R.S., et seq., (Colorado Antitrust Act of 1992) as amended.
1.3.X.Conflicts of Interest/Ethics
The Offeror must disclose in its proposal any potential or actual conflict of interest in connection with a response to this solicitation. A conflict of interest may include, but is not limited to, access to any non-public information by the Offeror regarding the solicitation or its subject matter.
The Offeror acknowledges that even the appearance of a conflict of interest may be harmful to the City’s interests. The Offeror shall disclose in its proposal whether there currently is, or potentially could be, the appearance of a conflict of interest regarding this solicitation, its staff, any proposal subcontractors or partners, or any related business with the City.
Requirements set forth in this Section are continuing requirements throughout the solicitation process and, for the awarded Offeror, the Contract term, including any extensions.
1.3.XI.Protested Solicitations and Awards
Any actual or prospective vendor or contractor who is aggrieved in connection with the solicitation or award of a contract may protest to the City’s Finance Department.
The protest shall be submitted in writing to the Procurement contact listed above within seven (7) working days after such aggrieved person knows, or should have known, of the facts giving rise thereto (emphasis added).
With regard to the emphasized language above, it is important for Offerors to note that a challenge to the solicitation's requirements or specifications should be made within seven (7) working days of when the protestable item is known. In other words, if you believe that the solicitation contains a requirement you want to protest, the protest should be submitted within the seven (7) working day time period, even if that means it is filed during the time the solicitation is still open.
Announcement of the apparent winning vendor will be made via a posting on Bidnet. The requirement for timely submission of any protest (seven (7) working days) will begin no later than the first working day following posting of the award notice on Bidnet.
1.3.XII. Accessibility
On June 30, 2021, Colorado HB21-1110 strengthened the Colorado law for protection against discrimination against persons with disabilities; specifically, it requires the accessibility of all digital government information technology. To comply, all digital experiences including websites, applications, digital assets, and digital interfaces provided by the Offeror must meet all applicable Level A and AA success criteria of the Web Content Accessibility Guidelines (WCAG) version 2.1.
In order to comply with Colorado law, the proposed product or deliverable must meet these WCAG guidelines. To assess the current status of compliance, the City may request a functional accessibility evaluation such as providing an accessibility compliance report utilizing the current ITIC Voluntary Product Accessibility Template (VPAT 2.5 WCAG) or manual testing reports. If the product or deliverable does not or cannot meet these compliance standards or you cannot provide these evaluations, the City may engage in dialogue to understand the status of the product and how to bring the product into compliance. This may include your organization either performing or procuring manual testing of the product, providing reports for the current accessibility compliance status and providing a roadmap for when issues can be remediated.
1.4. CONTRACT AND TERM
The City’s Sample GENERAL CONTRACT- LONG FORM (“Contract”) is included as Appendix A of this RFP. Any exceptions to the Contract documentation will be taken into consideration when evaluating proposals submitted. Offerors should submit any requested modifications in a redlined copy of the City’s Contract when submitting their proposal.
The City reserves the right to reject any or all proposed modifications.
The initial term of the awarded Contract is anticipated to begin on or around November 9, 2026.
The City may, within its sole discretion, choose not to exercise any option or extension term in the Contract for any reason. If the City chooses not to exercise any option or extension term, it may re-procure the goods and/or services in its sole discretion.
2. SECTION 2 – REQUIREMENTS AND SCOPE OF WORK
2.1. INSURANCE REQUIREMENTS
Offeror shall, at its own expense, keep in full force and effect during the term of any Contract resulting from this solicitation, and during the term of any extension or amendment to that Contract, insurance as stated below:
• Commercial General Liability Insurance with minimum combined single limits of One Million Dollars and No Cents ($1,000,000.00) for each occurrence and Two Million Dollars and No Cents ($2,000,000.00) aggregate
• If professional services are provided, Professional Liability Insurance with limits of One Million Dollars and No Cents ($1,000,000.00) per claim and Two Million Dollars and No Cents ($2,000,000.00) aggregate.
• Workers’ Compensation Insurance to cover all obligations imposed by applicable laws for all of the Offeror’s employees engaged in the performance of work under any Contract resulting from this solicitation, based on statutory limits prescribed by and in accordance with Colorado law. In the event any services are performed by a subcontractor, the Offeror shall require such subcontractor to provide workers’ compensation insurance for its employees.
• Comprehensive Automotive Liability Insurance for the duration of any Contract resulting from this solicitation, covering all owned, non-owned, and hired vehicles used in connection with the work performed by or on behalf of the Offeror under that Contract, in an amount not less than Five Hundred Thousand Dollars and No Cents ($500,000.00) combined single limit per occurrence for bodily injury and property damage.
2.2. BONDS
Each bid shall be accompanied by a bid guarantee bond, or certified cashier's check made payable City of Lafayette in an amount not less than five (5) percent of the amount of the bid as a guarantee that the bidder will execute the Contract, if awarded. The bond shall be forfeited to the City if a bid is accepted and the bidder fails to sign a contract within fifteen (15) days of acceptance
The bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and Payment Bond acceptable to the City of Lafayette for 100% of the Contract Price for each bond, in accordance with the requirements of the Contract Documents.
2.3. MANDATORY SUBMISSION REQUIREMENTS
• Signed Request for Proposal Cover Sheet and Non-Collusion Certificate/Cover Letter
• Proposal - Provide a written narrative that defines the methods and means by which the proposing firm will perform the Scope of Work outlined in this RFP. An enhancement to the Scope of Work may be submitted on a separate sheet.
• Licenses – List all licenses, certifications and bonding of personnel employed by Contractor.
• Insurance Information
• Bid Bond, if required
• Completed W-9
• At least three (3) reference contacts for similar projects, including names and contact information for individuals who can speak to the team’s qualifications.
• A Customer Support/Staffing Plan detailing all personnel and subconsultants proposed for assignment to the Project team. Identify the names and experience of staff dedicated to addressing issues that may arise during the term of a contract with the City.
o All key personnel identified in the Staffing Plan shall remain on the team for the duration of the procurement process and execution of the project. If circumstances require a change in the Staffing Plan, it must be submitted in writing to the City, who shall have sole discretion to determine whether to authorize the change, recognizing that certain circumstances may occur that are beyond control. Unauthorized changes to the Staffing Plan during the procurement process may result in disqualification of a proposal or termination of the contract.
• Proposals will be considered only from firms or individuals that are well established in an appropriate field, who are financially responsible, and who have the resources and ability to provide services in a professional and timely manner. The City may request additional information as deemed necessary. The City reserves the right to obtain financial data or other supplemental information concerning the firm and/or its subcontractors. Failure to provide such information may result in the proposal being considered non-responsive.
o Company information, including answers to the below:
▪ How long has the company been in business in this name and any previous names that the company has operated under?
▪ What are the standard services that the company provides?
▪ Has the company been involved in any litigation or lawsuits in the last five (5) years? If yes, please describe.
▪ Has the company been involved in a bankruptcy or reorganization proceeding? If yes, please describe.
▪ Has the company been refused any surety, bond, or liability insurance in the past ten (10) years? If yes, please describe.
▪ Has the company, or any officer or partner, even failed to complete a contract? If yes, please describe.
o Please provide a Recent Loss Run/History Report and 300A OSHA Report
2.4. SCOPE OF WORK
• Scope of Work o Project: Generator and Transfer Switch Upgrade/Replacements – City of Lafayette Fire Department Station #1 o Location: 401 N 111th Street, Lafayette, CO 80026 o Prepared for: City of Lafayette
Project Overview
The City of Lafayette is soliciting proposals for the complete replacement of the existing emergency generator and automatic transfer switch (ATS) serving Fire Station #1, located at 401 N 111th Street, Lafayette, Colorado 80026. The existing equipment includes an older Cummins/Onan generator, model 35GGFB, rated approximately 35 kW standby at 120/208V, 3-phase, together with an associated Cummins Onan transfer switch utilizing PowerSentry controls feeding one EM panel. Offerors shall field verify all existing conditions, ratings, controls, fuel type, compatibility requirements, access conditions, and site constraints prior to finalizing equipment selection and pricing. The new generator and transfer switch shall feed the entire load supplied by the MDC serving the whole building and the current proposed additions.
Because Fire Station #1 is an active first responder facility, the station must remain operational throughout the work. The Contractor shall plan and coordinate the project in a manner that minimizes disruption to emergency operations and response readiness.
All applicable permitting shall requested by the contractor including City permits. City permits for City projects are free of fees.
General Requirements
The Contractor shall furnish all labor, supervision, materials, equipment, rigging, permits, demolition, disposal, installation, startup, testing, commissioning, and incidental work necessary to provide a complete and operational emergency power system. The Contractor shall field verify all existing conditions, including dimensions, utility connections, fuel connections, exhaust routing, conductor sizes, distribution interface, clearances, pad conditions, access limitations, and applicable code requirements before ordering equipment or commencing installation.
All work shall comply with applicable federal, state, and local codes, regulations, safety requirements, and manufacturer recommendations. The Contractor shall coordinate closely with City staff and Fire personnel throughout the work and shall include all temporary measures necessary to maintain continuity of operations during demolition, changeover, and startup.
Adjacent structures, paving, utilities, and finishes shall be protected, and any damage caused by the work shall be repaired by the Contractor.
Generator Replacement
The Contractor shall remove the existing generator and furnish and install a new outdoor emergency generator sized for the station and proposed addition. The installation shall include all related accessories, fittings, connections, supports, pad modifications, anchorage, vibration isolation, weather protection, controls, annunciation, batteries, charger, block heater, remote monitoring interfaces, exhaust components, fuel system sizing and connections, and all other incidental components required for a complete and code-compliant installation.
The Contractor shall clearly state the basis used to size the proposed generator and transfer switch.
ATS Replacement
The Contractor shall remove the existing automatic transfer switch and furnish and install a new ATS of appropriate size, rating, and configuration for the proposed generator and the facility load. The work shall include all associated demolition, reconnection, controls integration, labeling, startup, testing, and commissioning required for a complete and operational installation.
Offerors shall identify the proposed ATS rating, controller type, enclosure type, and any modifications required to accommodate the replacement equipment.
Testing, Startup, and Commissioning
The Contractor shall provide factory-authorized startup and commissioning of the generator and ATS and shall perform all testing required to verify reliable operation of the complete system. This shall include generator testing, ATS testing, controls and alarm verification, monitoring verification, and load testing and/or load bank testing as required. All outage windows shall be coordinated in advance with the City, and successful automatic and manual transfer operation shall be demonstrated prior to final acceptance.
Scheduling and Deliverables
The Contractor shall provide a project schedule showing submittals, procurement, demolition, installation, outage coordination, startup, testing, and completion, and shall clearly identify long-lead equipment items.
Required deliverables shall include equipment submittals and product data for the proposed generator and ATS, a written basis-of-design narrative describing sizing. Startup and commissioning documentation, operations and maintenance manuals, warranty documentation, training for City staff, record drawings/as-builts, and a final acceptance walkthrough.
2.5. REQUESTED PROPOSAL FORMAT
Proposals should be organized in the following format and should address each item with sufficient detail to allow the City to evaluate the Offeror’s qualifications, technical approach, and pricing.
I. DEMONSTRATED EXPERIENCE AND CAPABILITIES
The proposal shall describe the Offeror’s experience performing generator and ATS replacement projects at occupied public safety, municipal, or other mission-critical facilities.
The Offeror shall identify key personnel assigned to the project and summarize their qualifications, licenses, certifications, and responsibilities. The proposal shall also identify the generator and ATS manufacturers the Offeror proposes to support and shall provide at least three references for similar projects.
II. MANDATORY REQUIREMENTS
The proposal shall confirm that the Offeror will provide complete replacement of both the existing generator and the existing ATS. It shall confirm the Offeror’s ability to provide a complete turnkey installation, including demolition, removal, replacement, startup, testing, and commissioning, while maintaining safe and uninterrupted fire station operations to the greatest extent possible.
The proposal shall also confirm that the replacement system has been considered for future station expansion and future system scalability, and that the Offeror will inspect and evaluate the existing generator and ATS and provide written recommendations regarding salvage, relocation, reuse, disposal, and mitigation. Any assumptions, exclusions, or clarifications to the Scope of Work shall be clearly stated.
III. TECHNICAL AND BUSINESS PROPOSAL
The technical proposal shall describe the Offeror’s approach to replacing the existing generator and ATS, including field verification, demolition, installation, coordination, startup, and commissioning. It shall identify the proposed generator by manufacturer, model, rating, voltage, phase, fuel type, enclosure, controls, lead time, and warranty. It shall likewise identify the proposed ATS by manufacturer, rating, controller type, enclosure type, and compatibility with the proposed generator and facility load.
The Offeror shall explain the basis used to size the replacement system for current station need and proposed addition.
The Offeror shall provide its evaluation of the existing generator and ATS and shall include recommendations regarding salvage, resale, trade-in, relocation, reuse, or disposal.
Any anticipated repairs, upgrades, code issues, transport considerations, or logistical limitations associated with relocating the existing generator to another City site shall be identified. The proposal shall also describe recommended temporary power measures, outage coordination, and mitigation strategies during demolition and replacement. Finally, the Offeror shall provide a project schedule from notice of award through final completion and identify any proposed subcontractors.
IV. Cost Proposal
The cost proposal shall remain firm during the term of the Contract and shall include all labor, materials, equipment, permits, demolition, disposal, delivery, freight, installation, startup, testing, commissioning, training, warranty, and all incidental costs required for a complete project.
Pricing shall be provided in the following format:
1. Base Bid: Remove and replace the existing generator and existing ATS, including complete installation, startup, testing, and commissioning.
2. Separate Pricing: Any recommended temporary power solution, if not already highlighted as its own line item included in the Base Bid.
The Offeror shall clearly identify the assumptions included regarding disposition of the existing generator and shall clearly identify any exclusions, contingencies, owner-responsibility items, lead-time assumptions, or pricing contingencies tied to equipment availability.
3. SECTION 3 – EVALUATION METHODOLOGY & AWARD
3.1. EVALUATION PROCESS
A comprehensive, thorough, complete, and impartial evaluation of each proposal received will be conducted. The award shall be made to the responsible Offeror whose proposal is determined to be the most advantageous to the City, taking into consideration the price and evaluation factors set forth in this Request for Proposal.
3.2. EVALUATION COMMITTEE
An Evaluation Committee will be established utilizing measures to ensure the integrity of the evaluation process. These measures include the following:
• Selecting committee members who do not have a conflict of interest regarding this solicitation.
• Facilitating the independent review of proposals.
• Requiring the evaluation of the proposals to be based strictly on the content of the proposals.
• Ensuring the fair and impartial treatment of all Offerors.
The objective of the Evaluation Committee is to conduct reviews of the proposals that have been submitted, to hold frank and detailed discussions among themselves, and to recommend an Offeror for award.
3.3. PROPOSAL EVALUATION CRITERIA
• The City will evaluate proposals to determine if each Offeror meets all mandatory qualification requirements; provided, however, that the City has the authority to waive non-material mandatory requirements in certain circumstances. The mandatory qualification requirements are scored on a Met/Not Met basis and only those proposals found to meet all mandatory requirements, other than non-material mandatory requirements waived by the City, can be considered for a Contract resulting from this solicitation.
• Proposals will be evaluated by the Evaluation Committee using the evaluation criteria listed below. The evaluators will consider whether the Scope of Work requirements in the solicitation have been addressed, and they will review the capabilities of the Offeror, as well as the quality of the approach proposed, the price, and any other aspect determined relevant to the evaluation criteria.
• The evaluation criteria to be used in evaluating the proposals are as follows (and are listed in no particular order):
Criteria Maximum Score
1. Technical Approach, Proposed Equipment, and System Sizing Evaluates the completeness and soundness of the Offeror's technical solution for a turnkey replacement of the generator and automatic transfer switch at Fire Station #1. Consideration will be given to the following:
• Field verification approach. How well the Offeror plans to verify the existing generator, automatic transfer switch, fuel service, gas meter and regulator sizing, main distribution center configuration, pad, exhaust routing, clearances, and site access.
• Generator specification. Whether the proposed generator is fully identified by manufacturer, model, kW rating, voltage, phase, fuel type, sound-attenuated weather-protective enclosure, digital controller, remote annunciation and monitoring, lead time, and warranty.
• Automatic transfer switch specification. Whether the proposed switch is fully identified by manufacturer, rating, number of poles, controller type, transition type, enclosure type, and any required service-entrance rating, and whether it is compatible with the generator and the full building load.
• Sizing basis. The quality of the basis-of-design, including load calculations or metered demand data, motor starting and step-load analysis, and allowances for the proposed station additions and future growth.
• Code compliance and commissioning. The Offeror's plan for compliance with the National Electrical Code, NFPA 110, the International Fire Code, and authority having jurisdiction requirements, and its approach to factory-authorized startup, load bank or building load testing, and transfer demonstration.
• Existing equipment disposition. The quality of the Offeror's evaluation and recommendations for salvage, trade-in, relocation and reuse at another City site, or disposal.
• Mandatory confirmations. Whether the Offeror clearly confirms each mandatory requirement and clearly states all assumptions, exclusions, and clarifications.
35 points
2. Cost Proposal Evaluates the total cost and the transparency of pricing to City.
Consideration will be given to the following:
• Base Bid. Whether the Base Bid is reasonable and complete for removal and replacement of the generator and automatic transfer switch, including installation, startup, testing, commissioning, training, and warranty.
• Temporary power pricing. The reasonableness of separate pricing for the recommended temporary power solution.
• Pricing clarity. Whether the Offeror clearly identifies existing equipment disposition assumptions, any trade-in or salvage credits, exclusions, contingencies, owner-responsibility items, and lead-time or equipment availability pricing contingencies.
• Firm pricing. Whether the proposal confirms firm pricing for the term of the contract.
• Proposals that minimize unpriced exclusions and the risk of change orders will be scored more favorably.
30 points
3. Demonstrated Experience, Key Personnel, and References Evaluates the Offeror's capability to deliver this project successfully.
Consideration will be given to the following:
• Comparable experience. The Offeror's experience replacing generators and automatic transfer switches at occupied fire stations, public safety, municipal, or other mission-critical facilities, particularly where systems were upsized from partial emergency loads to whole-building service.
• Key personnel. The qualifications, Colorado electrical licenses, manufacturer certifications, and defined responsibilities of the assigned staff.
• Manufacturer support. The Offeror's factory-authorized relationships with the proposed manufacturers.
• Subcontractors. The qualifications of any proposed subcontractors.
• References. The relevance and strength of at least three references for similar projects
20 points
3.4. DEMONSTRATIONS AND DISCUSSIONS
The Evaluation Committee may, if it deems necessary, request clarifications, conduct discussions or oral presentations, or request best and final offers. Discussions may be held with responsible offerors whose proposals are determined to be reasonably susceptible to be selected for award to:
a. Promote understanding of the City’s requirements and the Offerors’ proposals; and
b. Facilitate a Contract that will be most advantageous to the City taking into consideration price and the other evaluation factors set forth in the request for proposals.
The Evaluation Committee may adjust its scoring based on the results of such activities.
However, proposals may be reviewed and determinations made without such activities.
Offerors should be aware that the opportunity for further explanation might not exist;
therefore, Offerors should ensure that their submission is complete, and are encouraged to submit their best possible proposal, including pricing.
3.5. SINGLE PROPOSAL
If only one bid or proposal is received in response to a solicitation, an award may be made to the single bidder or Offeror if the procurement official finds that the price submitted is fair and reasonable and that other prospective bidders or Offerors had reasonable opportunity to respond.
3.6. AWARD
A Notice of Intent to Award will be published on Bidnet.
4. Operational Continuity, Temporary Power Plan, and Project Schedule Evaluates the Offeror's ability to keep Fire Station #1 operational and response-ready throughout the work. Consideration will be given to the following:
• Temporary power. The adequacy of the recommended temporary generator capacity, connection method, and fuel supply.
• Outage sequencing. How well the work is sequenced to limit the number and duration of outages.
• Coordination. The Offeror's plan for advance notice and coordination of outage windows with City personnel, including protection of apparatus bays, driveways, and egress routes.
• Contingency measures. The measures proposed in case work extends beyond a scheduled outage window.
• Project schedule. Whether the schedule is realistic from notice of award through final acceptance, and whether it clearly identifies submittals, long-lead equipment, permitting, utility and gas service coordination, outage windows, commissioning, and training.
15 points
TOTAL POSSIBLE SCORE 100 points
The award determination is ultimately a business decision that will reflect an integrated assessment of the relative merits of the proposals received, using the factors set forth in Section 3.3. The City intends to award Contract(s) to the Offeror(s) whose proposal(s), conforming to the solicitation, will be most advantageous to the City, price and other factors considered.
The City reserves the right to award to multiple offerors if is determined to be in the best interest of the City.
APPENDIX A – SAMPLE CONTRACT
APPENDIX B – EXISTING UNIT PICTURES
| REQUEST FOR PROPOSAL COVER SHEET & SIGNATURE PAGE |
| NON-COLLUSION CERTIFICATE |
| SECTION 1 – GENERAL INFORMATION |
| BACKGROUND, OVERVIEW, AND GOALS |
| Statement of Vision |
| Statement of Values |
| PURPOSE |
| SCHEDULE OF ACTIVITIES |
| ADMINISTRATIVE INFORMATION |
| Official Means of Communication |
| Modification or Withdrawal of Proposals |
| Proposal Submission |
| Addendum or Supplement to Request for Proposal |
| Oral Presentations/Site Visits |
| Incurring Costs |
| Confidentiality |
| Acceptance of RFP terms |
| Independent Price Determination |
| Conflicts of Interest/Ethics |
| Protested Solicitations and Awards |
| Accessibility |
CONTRACT AND TERM
| SECTION 2 – REQUIREMENTS AND SCOPE OF WORK |
| INSURANCE REQUIREMENTS |
| BONDS |
| MANDATORY SUBMISSION REQUIREMENTS |
| SCOPE OF WORK |
| REQUESTED PROPOSAL FORMAT |
| DEMONSTRATED EXPERIENCE AND CAPABILITIES |
| MANDATORY REQUIREMENTS |
| TECHNICAL AND BUSINESS PROPOSAL |
| Cost Proposal |
| SECTION 3 – EVALUATION METHODOLOGY & AWARD |
| EVALUATION PROCESS |
| EVALUATION COMMITTEE |
| PROPOSAL EVALUATION CRITERIA |
| DEMONSTRATIONS AND DISCUSSIONS |
| SINGLE PROPOSAL |
| AWARD |
| APPENDIX A – SAMPLE CONTRACT |
| APPENDIX B – EXISTING UNIT PICTURES |
File details come from the government source that posted it. Updated .