About this file
This is a bidding document and specification manual for the construction of Fountain Fire Station #4 by the City of Fountain, Colorado. The project encompasses all labor, materials, general construction, and site work necessary for completion of a new fire station facility. The specifications establish comprehensive requirements for work across multiple divisions including general requirements, concrete work, structural elements, mechanical systems, electrical systems, and fire protection systems. Key project requirements include coordination between multiple trades, adherence to 2021 International Building Code standards and 2023 National Electrical Code requirements, establishment of quality control systems, and compliance with all applicable local codes and utility requirements. The document mandates a preconstruction conference following Notice of Award, regular progress meetings with major subcontractors (mechanical, electrical, utility, earth work, masonry, and steel erection trades), and site mobilization procedures. Special inspections for structural work, welding, concrete testing, and masonry testing are required and paid for by the Owner, with the contractor responsible for other testing related to material substitutions or corrective actions. Record documents must be maintained throughout construction and submitted at project completion.
Pricing, payment, and contract terms are detailed through unit prices for civil work items including imported structural fill, backfill, asphalt paving, concrete walks, curb and gutter, and heavy-duty concrete. The contractor must submit a Quality Control Plan with the Schedule of Values and Construction Progress Schedule, detailing personnel, procedures, and testing protocols. The document includes provisions for alternates, specifically Alternate #01 for adding a third truck bay to the project. A one-year correction period applies after Notice of Acceptance for defects due to faulty materials or workmanship. The contractor must provide comprehensive warranties from both the contractor and all subcontractors, deliver manufacturer warranties, and submit final record documents including as-built drawings showing underground utility locations, equipment locations, and all field changes. Re-inspection fees of $150 per hour apply if the contractor fails to complete punch list items satisfactorily, requiring additional architect inspections.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fountain Fire Station #4 01 1100-1 SUMMARY OF WORK
DIVISION 1 GENERAL REQUIREMENTS
SECTION 01 1100
SUMMARY OF WORK
1.01 CONDITIONS AND REQUIREMENTS
Division 1 - General Requirements shall govern work under all Divisions of the
Specifications.
1.02 SCHEDULE OF DRAWINGS, SPECIFICATIONS AND ADDENDA
A. Drawings: See Index on Drawings.
B. Project Manual: Fountain Fire Station #4
C. Addenda: All Addenda issued prior to bidding.
1.03 EXAMINATION OF SITE AND CONSTRUCTION DOCUMENTS
A. Failure to visit site will in no way relieve Contractor from necessity of furnishing materials or performing work that may be required to complete work in accordance with Drawings and Specifications without additional cost to Owner.
1.04 CONTRACTS
A. All work under this contract will be executed under a single prime contract between the
Owner and the General Contractor.
1.05 CONTRACTOR USE OF PREMISES
A. Limitations: Operations of the General Contractor shall be limited to areas where work is indicated and generally within the areas of construction fence.
B. Coordination with Owner: Schedule all work performed with Owner.
C. Construction Access: Maintain safe access and egress from the construction site.
Provide temporary walkways and protective fencing over excavations and through construction areas even though not specifically indicated on the drawings.
D. Power Outage and Utility Locates: Contractor is responsible to coordinate all power outages and utility locate requests. Contact appropriate utility company.
E. Construction Utilities: All utilities will be metered. Meters shall be supplied and installed by the Contractor.
F. Waste Material: All waste material will be disposed of off-site as coordinated by the
Contractor.
Fountain Fire Station #4 01 1100-2 SUMMARY OF WORK
1.06 PROTECTION OF PROPERTY
A. Contractor shall limit his operations and site access and those of his subcontractors to areas of the site being disturbed by construction and site grading. Other areas shall be left undisturbed. Any damage to such areas will require repair at the Contractor's expense.
1.07 COORDINATION
A. General: Coordinate work of various sections of specifications to assure efficient and orderly sequence of installation of construction elements with provisions for accommodating items installed later.
B. Equipment: Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.
1. Electrical Requirements:
a. Comply with NEC.
b. Provide UL listed and labeled products where applicable.
C. Spaces: Coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically. Follow routing indicated for pipes, ducts and conduits as closely as practicable; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installation, for maintenance and for repairs.
D. Finished Areas: In finished areas concealed pipes, ducts and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements.
END OF SECTION
Fountain Fire Station #4 01 2200-1 UNIT PRICES
SECTION 01 2200
UNIT PRICES
PART 1 - GENERAL
1.01 DESCRIPTION
A. Quantities indicated on the drawing or extra quantities specified shall be included in the
Subcontractor's base bid. For adding or deducting from base bid quantities, the unit prices described in this section will be applied. The Subcontractor will be notified in writing of the quantities applicable to each unit price and the contract price will be adjusted accordingly by change order. The same unit price shall apply to both additions and deductions from required quantities.
B. All unit prices shall include all labor, materials, equipment, services, delivery to the project, overhead, profit, insurance and all other incidental expenses to complete the work specified. All work covered by unit prices shall be performed in accordance with requirements of the applicable sections of the specifications.
1.02 UNIT PRICES
A. Description:
1. Imported Structural Fill, cost per cubic yard: See Civil Drawings & Specifications.
2.
3. Imported Structural Backfill, cost per cubic yard: See Civil Drawings &
Specifications
4. Asphalt Paving (In place), cost per square yard (6” & 6.5” depth):
See Civil Drawings & Specifications
5. Concrete Walks (In place), cost per square foot: See Civil Drawings &
Specifications
6. Concrete Curb and Gutter (In place), cost per linear foot: See Civil Drawings & Specifications.
7. Heavy Duty Concrete, cost per square foot: See Civil Drawings & Specifications
Fountain Fire Station #4 01 23 00-1 ALTERNATES
SECTION 01 23 00
ALTERNATES
1.01 DESCRIPTION OF REQUIREMENTS
A. Definitions and Explanations: "Alternates" are defined as alternate products, materials, equipment, systems, methods, units of work for major elements of construction, which may, at Owner's option be selected for work in lieu of corresponding requirements of Contract Documents.
1. Selections may occur prior to Contract date or may be deferred for possible selection at subsequent date.
2. Alternates may or may not change scope and general character of work substantially.
3. Requirements of this Section may be related to, but must not be confused with, requirements of Contract Documents related to "unit prices", "change orders", "substitutions" and similar terms.
B. Accepted Alternates: Refer to Owner-Contractor Agreement and subsequent modifications thereof (if any) for determination of which Alternates listed have been accepted, and are, therefore, in full force and effect as though originally included in Contract Documents for base bid.
C. Notification: Immediately following award of contract, prepare and distribute to each entity or person to be involved in performance of work, notification of status of each alternate scheduled and including those subsequently added by notification during bidding. Indicate which alternates have been: 1) accepted, 2) rejected, and 3) deferred for consideration at later date as indicated. Include full description of negotiated modifications to alternates, if any.
1.02 GENERAL ALTERNATE REQUIREMENTS
A. General: Description for each alternate is recognized to be incomplete and abbreviated but implies that each change must be completed for scope of work affected. Refer to applicable sections (Divisions 2 through 33) and to applicable Drawings for specific requirements of each alternate. Modify surrounding work as required to integrate with work of each alternate.
1.03 DESCRIPTION
A. Add Alternate #01:
Contractor shall provide a cost to add a third truck bay to the project.
Fountain Fire Station #4 01 3114 - 1
SECTION 01 3114
FACILITY SERVICES COORDINATION
PART 1 GENERAL
1.01 RELATED DOCUMENTS
1.02 WORK INCLUDED
A. Carefully coordinate the interface between Division 21-28 before submitting any equipment for review or commencing installation.
B. Responsibility: Unless otherwise indicated, all motor and controls for Division 22/23 equipment shall be furnished, set in place and wired in accordance with the following schedule:
ITEM FURNISHED
UNDER
DIVISION
INSTALLED
UNDER
DIVISION
POWER
WIRING
UNDER
DIVISION
CONTROL
WIRING
UNDER
DIVISION
Equipment Motor 22/23 22/23 26 23
Starters/Contactors (Separate)
22/23 26 26 23
Starters/Contactors (Factory Mounted and Wired)
22/23 22/23 26 23
Starters/Contactors (In Motor Control Centers)
26 26 26 23/26
Motor Speed Controllers including Variable Frequency Drives
22/23 26 26 23
Disconnect Switches (1) 26 26 26 --
Contactors 26 26 26 --
Thermal Overload Switches (1)
26 26 26 --
Manual Operating Switches (2)
26 26 26 --
Control Relays (2) 23 23 -- 23
Control Transformers (120v to 24v)
22/23 22/23 23/26 23
Plumbing Fixture Sensor Transformers (120v to24v) 22 26 26 26
Control Circuit Outlets 26 26 26 --
Fountain Fire Station #4 01 3114 - 2
Thermostat (2) 23 23 -- 23
Push Button Stations, Pilot Lights
26 26 26 23
Thermostat and Controls (2): Integral with Equipment or Directly Attached to Ducts, Pipes, etc.
23 23 26 23
Equipment in Temperature Control Panels
23 23 23/26*** 23
Standalone Control Panels
23 23 23/26*** 23
Valve Motors, Damper Motors, Solenoid Valves, etc
23 23 26 23
EP Valves or Switches, P.E. Switches, etc.
23 23 -- 23
Fire Alarm System 28 28 26 28
Fire Sprinkler Alarm 21 21 26 28
Firestats 23 23 26 23
Smoke Duct Detectors Including Relays for Fan Control
28 23 26 23**, 28*
Smoke Space Detectors Including Relays for Elevator Shaft Damper (3)
28 28 26 23**, 28*
Smoke Space Detectors Including Relays for Duct Fire/Smoke Damper Control (3)
28 28 26 23**, 28*
Smoke Duct Detectors Including Relays for Duct Fire/Smoke Damper Control (3)
28 23 26 23**, 28*
Fire/Smoke Dampers (120 volt) (3)
23 23 26 28*
Fire/Smoke Damper (24 volt) (3)
23 23 23 28*
Local Annunciation Light for Fire/Smoke Dampers
28 28 26 28
Fountain Fire Station #4 01 3114 - 3
Control Air Compressor 23 23 26 23
Refrigerated Air Dryer 23 23 26 23
Equipment Interlocks 22/23 22/23 26 23
Boiler, Chiller, and Water Heater Emergency Power Off (EPO) Switches
23 23 26 26
C. Table Notes:
1. Note (1) If furnished as part of factory wired equipment that is furnished and set in place under Division 22/23, wiring and connections are under Division 26, plus if shown external to equipment on electrical drawings, provide and wire under Division 26.
2. Note (2) If float switches, line thermostats, P.E. switches, time switches, or other controls carry the FULL LOAD CURRENT to any motor, they shall be furnished under Division 23, but they shall be set in place and connected under Division 26, except that where such items are an integral part of the mechanical equipment, or directly attached to ducts, piping, or other mechanical equipment, they shall be set in place under Division 23 and connected under Division 26. If they do not carry the FULL LOAD CURRENT to any motor, they shall be furnished, set in place and wired under Division 23
3. Note (3) Fire/smoke dampers shall be installed in accordance with applicable codes.
4. Note (*) Division 28 - Responsibility includes wiring for fire alarm system.
5. Note (**) Division 23 - Responsibility includes control wiring for fan and/or damper control.
6. Note (***) Division 23 - Responsibility includes line voltage power wiring to control panels, control transformers, control devices and control wiring to all devices. Division 26 provides spare circuits and circuit breakers onto which Division 23 connects.
7. Control Wiring:
a. Consists of wiring in pilot circuits of contactors, starters, sensors, controllers, and relays, and wiring for valve and damper operators.
8. Connections:
a. Connections to all controls directly attached to ducts, piping and mechanical equipment shall be made with flexible connections.
9. Starters:
a. Provide combination starters for all three phase motors and motors that are not EC motors which require automatic control complete with:
1) Control transformers.
2) 120V holding coils.
Fountain Fire Station #4 01 3114 - 4
3) Integral hand-off-auto switch.
4) Auxiliary contacts required for system operation plus two (2) spares.
5) Undervoltage, loss of phase, and phase reversal relays.
10. Remote Switches and Push Button Stations:
a. Provide all remote switches and/or push button stations required for manually operated equipment (if no automatic controls have been provided) complete with pilot lights of an approved type lighted by current from load side of starter.
11. Special Requirements:
a. Motors, starters and other electrical equipment installed in moist areas or areas of special conditions, such as explosion proof, shall be designed and approved for installation in such areas with appropriate enclosure.
b. Provide equipment so that disconnect switches do not exceed maximum code mounting height even when equipment is mounted on a raised base. Modify equipment as required.
12. Identification:
a. Provide identification of purpose for each switch and/or push button station furnished.
Identification may be either engraved plastic sign or permanent mounting to wall below switch, or stamping on switch cover proper. All such identification signs and/or switch covers in finished areas shall match other hardware in the immediate area.
13. Control Voltage:
a. Maximum allowable control voltage 120V. Fully protect control circuit conductors in accordance with National Electrical Code.
b. Fully coordinate the requirements of each division with regard to supplying a complete DDC Control System. J-boxes, and control transformer connections shall be provided under Division 23. The transformers shall be furnished and set in place under Division 23.
PART 2 PRODUCTS
2.01 MOTOR HORSEPOWER
A. In general, all motors 3/4 HP and above shall be three phase, all motors 1/2 HP and less single phase. Coordinate with Division 26 prior to ordering equipment.
B. Voltage and phase of motors as scheduled on the electrical drawings shall take precedence in the case of a conflict between the mechanical and electrical drawings or general condition 2.01 A, above.
C. Work under Division 22/23 includes coordinating the electrical requirements of all mechanical equipment with the requirements of the work under Division 26, before ordering the equipment.
Fountain Fire Station #4 01 3114 - 5
1. If motor horsepower’s are changed under the work of Division 22/23, without a change in duty of the motor's driven device, coordination of additional electrical work (if any) and additional payment for that work (if any) shall be provided under the section of Division 22/23 initiating the change. Increases or decreases in motor horsepower from that specified shall not be made without written approval from the Architect.
2.02 ACCESS PANELS
A. Access panels shall be furnished by the Division that is listed in the “Furnished Under” column as stated in the Mechanical and Electrical Coordination Schedule and installed by the contractor responsible for the surface.
PART 3 EXECUTION - NOT USED
Fountain Fire Station #4 01 31 19 - 1 PROJECT MEETINGS
SECTION 01 31 19
PROJECT MEETINGS
1.01 PRECONSTRUCTION CONFERENCE
A. Preconstruction and Contract Accomplishment Conference: Meeting will be scheduled by Architect after Notice of Award.
B. Contractor will submit executed bonds and insurance certificates and will sign Contract at this meeting.
C. Administrative requirements such as products lists, schedule of values, payment applications, and progress charts, change order procedures and project closeout will be reviewed in detail.
D. Tax exempt status procedures will also be discussed.
E. Site Mobilization Conference: A meeting will be scheduled by the Architect at the site immediately prior to contractor move-in. Representatives of the Contractor, Mechanical and Electrical subcontractors, Owner, Architect and Architect's Consultants will be present. Job site procedures to include the following items will be discussed:
F. Procedures for maintaining record documents
G. Owner's requirements
H. Construction facilities and controls
I. Temporary utilities
J. Security and housekeeping procedures
K. Materials testing
L. Requirements of start-up trades
M. Building layout
N. Communications with Architect's Consultants
O. Access to and use of site in relation to continued use of existing facilities.
1.02 PROGRESS MEETING
A. Meetings: Contractor will schedule regular periodic meetings at Contractor's job site field office.
Major subcontractors for the Fountain Fire Station #4 shall be required to attend all construction field meetings. Major subcontractors shall include: Mechanical, Electrical, Utility, Earth Work, Masons, Steel Erectors. All other subcontractors shall attend meetings when required by the Architect. Architect shall determine when the subcontractors shall attend and the number of meetings required. Representatives of the Owner and Architect will be invited to attend. Also invited as appropriate to items under discussion, will be selected subcontractors and suppliers and the Architect's Consultants. Following items will be discussed:
B. Review of work progress since previous meetings
C. Field observations, problems, and conflicts
D. Problems which impede construction schedule
E. Review of off-site fabrication, delivery schedule
F. Corrective measures and procedures to regain projected schedule
G. Revisions to construction schedule
H. Plan progress, schedule during succeeding work period
I. Coordination of schedules
J. Maintenance of quality standards
K. Review submittal schedules; expedite as required
Fountain Fire Station #4 01 31 19 - 2 PROJECT MEETINGS
L. Review proposed changes for effect on other trades, construction schedule and completion date
M. Coordination of separate contracts
N. Other business as required
O. Agenda and Minutes: Contractor shall establish agenda, subject to Owner and Architect review, and keep and distribute minutes of progress meetings and lists of those present and others as directed.
P. Contractor: Notify Architect at least 24 hours in advance of meeting regarding items added to agenda.
Q. Persons Representing Contractor at Meetings: Have authority to commit Contractor to solutions agreed upon in meetings. To maximum extent possible, assign same person or persons to represent Contractor at meetings throughout progress of work.
R. Coordination Meetings: Progress meetings shall in no way be considered substitute for Contractor/ subcontractor coordination meetings.
Fountain Fire Station #4 01 33 29 – 1 SUSTAINABLE DESIGN
REPORTING
01 35 16 – 1 ALTERATION PROJECT
PROCEDURES
SECTION 01 35 16
ALTERATION PROJECT PROCEDURES
PART 1 - GENERAL
1.01 REQUIREMENTS INCLUDED
A. Coordinate work of trades and schedule elements of alterations and renovation work by procedures and methods to expedite completion of the work.
B. In addition to demolition specified in Section 02 41 00 and that specifically shown, cut, move and remove items as necessary to provide access or to allow alterations and new work to proceed. Include such items as:
1. Repair or removal of hazardous or unsanitary conditions.
2. Removal of abandoned items and items serving no useful purpose, such as abandoned piping, conduit and wiring.
3. Removal of unsuitable or extraneous materials not marked for salvage, such as abandoned furnishings and equipment, and debris such as rotted wood, rusted metals and deteriorated concrete.
4. Cleaning of surfaces, and removal of surface finishes, as needed to install new work and finishes.
C. Patch, repair and refinish existing items to remain, to the specified conditions for each material, with a workmanlike transition to adjacent new items of construction.
D. Coordinate power outages and major interruptions of progress of construction work with Owner.
1.02 RELATED REQUIREMENTS
A. Materials for Renovation Work: Specifications in Divisions 2 through 23.
B. Use of Existing Utilities: Section 01 50 00 Construction Facilities and Temporary Controls.
C. Cleaning During Construction: Section 01 50 00 Construction Facilities and Temporary Controls.
D. Cutting and Patching of New or Existing Work During Construction: Section 01 73 29 Cutting and Patching.
E. Demolition: Section 02 41 00.
1.03 ALTERATIONS, CUTTING AND PROTECTION
A. Assign the work of moving, removal, cutting and patching to trades qualified to perform the work in a manner to cause least damage to each type of work and provide means of returning surfaces to appearance of new work.
1. Perform cutting and removal work to remove minimum necessary and in a manner to avoid damage to adjacent work.
2. Cut finish surfaces such as masonry, tile, stone flooring, plaster or metals by methods to terminate surfaces in a straight line at a natural point of division.
B. Protect existing finishes, equipment and adjacent work which is scheduled to remain from damage.
1. Protect existing and new work from weather and extremes of temperature.
a. Maintain existing interior work above 60 degrees Fahrenheit.
b. Provide weather protection, waterproofing, heat and humidity control as needed to prevent damage to remaining existing work and to new work.
C. Temporary Enclosures:
1. Provide temporary, dustproof enclosures to separate work areas from existing building and from areas occupied by Owner.
2. Provide weatherproof partitions at portions of existing building which are exposed during construction of addition.
Fountain Fire Station #4
01 35 16 – 2 ALTERATION PROJECT
1.04 COORDINATION WITH OWNER'S USE OF THE FACILITY
A. General: Coordinate construction phasing with operation of Owner's existing facility. The Owner intends to occupy portions of the existing building throughout construction.
1. Establish effective communications with the Owner regarding his operation and moving schedule. Give as much advance notice as possible, in addition to the minimums specified, for construction activities which will affect Owner's operations.
2. Coordinate with Owner scheduling for asbestos removal to provide Owner's consultant with minimum 3 weeks advanced notice.
B. Utility Interruptions: Coordinate and Schedule with Owner interruptions of building utilities for hours when building is closed to normal operations, i.e. weekends, evenings, etc. Notify Owner 48 hours in advance of all utility interruptions, including those scheduled for off hours.
Obtain Owner’s permission before any scheduled utility service interruption at any time.
PART 2 - PRODUCTS
2.01 PRODUCTS FOR PATCHING, EXTENDING AND MATCHING
A. General Requirements that Work be Complete:
1. Provide same products or types of construction as that in existing structure, as needed to patch, extend or match existing work.
a. General Contract Documents will not define products or standards of workmanship present in existing construction; Contractor shall determine products by inspection and any necessary testing, and workmanship by use of the existing as a sample of comparison.
2. Presence of a product, finish, or type of construction, requires that patching, extending or matching shall be performed as necessary to make Work complete and consistent.
PART 3 - EXECUTION
3.01 LAYING OUT WORK
A. Verify dimensions and elevations indicated in layout of existing work. Refer discrepancies between Drawings, Specifications and existing conditions to Architect for adjustment before work affected is performed. Failure to make such notification shall place responsibility upon Contractor to carry out work in satisfactory, workmanlike manner. In addition verify existence of any materials containing asbestos per AHERA plan and notify Architect and Owner immediately.
B. The Contractor shall be held responsible for the location and elevation of the construction contemplated by the Construction Documents.
C. Prior to commencing work, carefully compare and check Architectural, Structural, Mechanical and Electrical Drawings, each with the other that in any way affects the location or elevation of the work to be executed, and should any discrepancy be found, immediately report the same to the Architect for verification and adjustment.
3.02 LOCATION OF EQUIPMENT AND PIPING
A. Drawings showing location of equipment, piping, ductwork, etc. are diagrammatic and job conditions shall not always duplicate conditions shown. When this situation occurs, it shall be brought to the Architect's attention immediately and the relocation determined in a joint conference. Work shall not proceed until the Contractor receives approval from Architect in writing.
B. The Contractor shall be responsible for the relocating of any items without first obtaining the Architect's approval. He shall remove and relocate such items at his own expense if so directed by the Architect.
3.03 PATCHING EXISTING FACILITIES
A. Existing structures, facilities, etc. that are damaged or removed due to required construction work, shall be patched, repaired or replaced, and be left in their original state of repair by the Contractor, to satisfaction of the Architect.
01 35 16 – 3 ALTERATION PROJECT
3.04 INTEGRATING EXISTING WORK
A. Protect existing improvements from damage.
B. Contractor's operations shall be confined to the immediate vicinity of the new work and shall not in any way interfere with or obstruct the ingress or egress to and from adjacent facilities.
C. Where new work is to be connected to existing work, special care shall be exercised not to disturb or damage the existing work more than necessary. All damaged work shall be replaced, repaired and restored to its original condition at no cost to the Owner.
3.05 ADJUSTMENTS
3.06 WHERE PARTITIONS ARE REMOVED, PATCH FLOORS, WALLS AND CEILINGS WITH
FINISH MATERIALS TO MATCH EXISTING.
A. Where removal of partitions results in adjacent spaces becoming one, rework floors and ceilings to provide smooth planes without breaks, steps or bulkheads, unless shown on Drawings to have breaks, steps or bulkheads.
B. Where extreme change of plane of two inches or more occurs, request instructions from Architect as to method of making transition.
C. Trim and refinish existing doors as necessary to clear new floors. Maintain labeled assembly where required.
3.07 DAMAGED SURFACES
A. Patch and replace any portion of an existing finished surface which is found to be damaged, lifted, discolored, or shows other imperfections, with matching material.
1. Provide adequate support of substrate prior to patching the finish.
2. Refinish patched portions of painted or coated surfaces in a manner to produce uniform color and texture over entire surface.
3. When existing surface finish cannot be matched, refinish entire surface to nearest intersections.
3.08 TRANSITION FROM EXISTING TO NEW WORK
A. When new work abuts or finishes flush with existing work, make a smooth and workmanlike transition. Patch work shall match existing adjacent work in texture and appearance so that the patch or transition is invisible at a distance of five feet.
1. When finished surfaces are cut in such a way that a smooth transition with new work is not possible, terminate existing surface in a neat manner along a straight line at a natural line of division, and provide trim appropriate to finished surface. Provide bulkheads or soffits when required by Drawings.
3.09 DUST CONTROL
A. Precaution shall be exercised at all times to control dust created as a result of any operations during the construction period. If serious problems arise due to air borne dust, and when directed by Architect, operations causing such problems shall be temporarily discontinued and necessary steps taken to control the dust.
3.10 FIRE PROTECTION
A. Maintain good housekeeping practices to reduce the risk of fire damage and injury to workmen.
All scrap materials, rubbish and trash shall be removed daily from in and about the work area and shall not be permitted to be scattered to adjacent areas. Contractor shall provide a trash dumpster to be used by all trades for trash.
B. Suitable storage space shall be provided outside the immediate building area for storing flammable materials and paints; no storage will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal container and removed from the building during unused periods.
C. A fire extinguisher shall be available at each location where cutting or welding is being performed. Where electric or gas welding or cutting work is done, interposed shields of
01 35 16 – 4 ALTERATION PROJECT
incombustible material shall be used to protect against fire damaged due to sparks and hot metal. When temporary heating devises are used, a watchman shall be present to cover periods when other workmen are not on the premises.
D. Provide fire extinguishers in accordance with the recommendations of NFPA Bulletins Nos. 10 and 241. However, in all cases a minimum of four fire extinguishers shall be available for each building.
3.11 CLEANING
A. Perform periodic and final cleaning as specified in Section 01 80 00, 01 50 00 and as follows:
1. Clean Owner-occupied areas where construction or remodeling is occurring, daily.
2. Clean areas of heavy dust production daily.
3. Clean spillage and overspray immediately.
B. At completion of work of each trade, clean area and make surfaces ready for work of successive trades.
C. At completion of work in each area, provide final cleaning and return space to a condition suitable for use by Owner.
Fountain Fire Station #4 01 40 00 – 1 QUALITY CONTROL AND
SPECIAL INSPECTIONS
SECTION 01 40 00
QUALITY CONTROL AND SPECIAL INSPECTIONS
1.01 RELATED REQUIREMENTS
A. Cost of Testing: General Conditions
1.02 TESTING - GENERAL
A. Contractor: Provide equipment and facilities as required, subject to Architect's review, for conducting field tests and for collecting and forwarding samples.
1. Do not use materials or equipment represented by samples until tests, if required, have been made and the materials or equipment found to be acceptable.
2. Do not incorporate any product into work which becomes unfit for use after acceptance thereof.
B. Testing: Materials or equipment proposed to be used may be tested at any time during their preparation or use. Furnish required samples without charge and give sufficient notice of the placing of orders to permit testing. Products may be sampled either prior to shipment or after received at site of work.
C. Tests: Made by accredited testing laboratory selected by Owner. Except as otherwise provided, sampling and testing of materials and laboratory methods and testing equipment shall be in accordance with the latest standards and tentative methods of ASTM and the 2015 IBC.
1. Specific information concerning testing methods, sample sizes, etc., is included under the applicable sections of Specifications.
2. Any modification of, or elaboration on, these test procedures included for specific materials under their respective sections in the Specifications shall take precedence over these procedures.
1.03 TESTS PAID FOR BY OWNER
A. Control Tests of Fill and Backfill: At such times and in such numbers as specified in Section 31 00 00 Earthwork.
B. Control Tests of Concrete Work: At such times and in such numbers as specified in Section 03 20 00 Concrete Reinforcing and Section 03 30 00 Cast-In-Place Concrete.
C. Control Tests of Masonry Prisms, Mortar and Grout: At such times and in such numbers as specified in Section 04 05 11 Mortar and Masonry Grout and Section 04 20 00 Unit Masonry.
D. Control Tests of Welding: At such times and in such numbers as specified in Section 05 12 00 Structural Steel Framing. Also following Sections:
1. Section 05 31 00: Steel Decking.
2. Section 05 40 00: Cold Formed Metal Framing.
1.04 OTHER TESTING
A. Following Testing: Performed at expense of Contractor:
1. Other Tests: Any other tests required by Contract Documents not listed in article above.
2. Any additional tests required because of any tests that fail subject to following conditions:
a. Quantity and Nature of Tests: Determined by Architect.
b. Tests: Taken in presence of Architect.
c. Proof of Noncompliance: Contractor liable for corrective action which Architect feels is required including complete removal and replacement of defective material.
3. Material Substitution: Any tests of material or equipment offered as substitute for specified item on which test may be required in order to prove its compliance with Specifications.
4. Epoxy anchor bolts, threaded rod & dowel procedures: Due to missing, miss-located, & rejected anchor bolts, threaded rod & rebar in concrete footings, foundations, drilled piers, masonry walls, slabs, and any other locations not listed but indicated in the contract documents.
Fountain Fire Station #4 01 40 00 - 2 QUALITY CONTROL AND
a. General Contractor shall contact Architect/Structural Engineer and obtain written direction and/or drawing for corrective measures needed.
b. Epoxy rebar installation shall be observed and documented by Special Inspector full time.
c. Any epoxy rebar dowel installed without the procedures listed above shall be removed promptly and reinstalled under specified procedures.
d. All Special Inspection observations & testing shall be paid for by the General Contractor.
B. Contractor: May have tests performed on material and equipment for his own information and job control so long as Owner does not assume responsibility for costs or for giving them consideration when appraising quality of materials.
1.05 TEST REPORTS
A. Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as follows:
B. 1 Copy - Contractor
C. 1 Copy - Applicable Supplier or Subcontractor
D. 1 Copy - Owner
E. 1 Copy - Applicable Engineer
F. 1 Copy - Architect
G. Other Copies - As Directed
1.06 GENERAL CONTRACTOR'S QUALITY CONTROL SYSTEM
A. Quality Control: Establish system to perform sufficient inspection and tests of all items of work, including that of subcontractors, to ensure conformance to the Contract Documents for materials, workmanship, construction, finish, functional performance and identification.
1. Control System: Establish for all construction except where Contract Documents provide for specific compliance tests by testing laboratories or engineers employed by the Owner.
B. Quality Control System: Means by which Contractor assures himself that construction complies with the requirements of the Contract Documents.
1. Controls: Adequate to cover all construction operations and keyed to proposed construction schedule.
C. Records: Maintain correct records on appropriate form for all inspections and tests performed, instructions received from architect and actions taken as a result of those instructions.
D. Records: Include evidence that required inspections or tests have been performed (including type and number of inspections or tests, nature of defects, causes for rejection, etc.) proposed or directed remedial action, and corrective action taken.
E. Document inspections and tests as required by each section of Specifications.
F. Quality Control Plan: Submit with proposed Schedule of Values and Construction Progress Schedule. Plan shall include:
1. Personnel, procedures, instructions, and records to be used.
2. List of control tests which Contractor understands he or his subcontractors are to perform.
3. Procedures for reviewing and approving all Shop Drawings, Product Data, Samples or other submittals before submission to Architect. Include procedures for obtaining field measurements.
4. Method of documenting quality control operation, inspection and testing including samples of proposed forms.
1.07 REQUIRED SPECIAL INSPECTIONS (PAID FOR BY OWNER UNLESS NOTED)
A. Refer to Structural Drawings for information regarding all required special inspections.
Fountain Fire Station #4 01 40 00 - 3 QUALITY CONTROL AND
B. Special inspectors shall provide documentation of inspections to the Owner, Architect, and the Structural Engineer in a timely manner and notify the Contractor immediately of any discrepancies that are noted in the construction.
C. The General Contractor is responsible for notifying the special inspectors when work requiring special inspection is being performed so that proper documentation of construction is made.
The General Contractor is also responsible for notifying the Structural Engineer in a timely manner so that his required observations can be made. The engineer will be doing periodic observations of the construction to monitor that construction is in general conformance with the intent of the contract documents, but will NOT observe all conditions and will NOT function as a code specified special inspector. The General Contractor shall also verify that the above stated meets the requirements of the authority having jurisdiction.
Fountain Fire Station #4 01 41 00 - 1 REGULATORY REQUIREMENTS
SECTION 01 41 00
REGULATORY REQUIREMENTS
1.01 PERMITS AND FEES
A. See General and Supplementary Conditions.
1.02 CODES AND ORDINANCES
A. Compliance: All Contractors shall comply with all applicable codes, ordinances and regulations in effect at the time of bid opening including but not necessarily limited to the following:
B. Applicable local codes and ordinances.
C. International Building Code, 2021 Edition.
D. International Mechanical Code, 2021 Edition.
E. International Plumbing Code, 2021 Edition.
F. National Electrical Code, 2023 Edition.
G. Governing Fire Department Requirements and Codes.
H. Utility Company Requirements.
I. State Department of Labor Requirements.
J. State Department of Health Requirements.
K. National Fire Protection Association Standards.
L. State and Federal Safety and Health Laws.
M. Discrepancies: If discrepancies occur between Contract Documents, local codes, local utility requirements, etc., the most stringent requirements shall apply.
Fountain Fire Station #4 01 42 13 - 1 ABBREVIATIONS AND
SYMBOLS
SECTION 01 42 13
ABBREVIATIONS AND SYMBOLS
A. Drawings and Symbols
1. Drawings
B. Drawing or Schedule Abbreviations:
1. Drawings or Schedules
1.02 SPECIFICATION LANGUAGE EXPLANATION
A. These Specifications are of abbreviated, simplified or streamlined type and include incomplete sentences.
B. Omissions of words or phrases such as "the contractor shall", "in conformity therewith", "shall be", "as noted on the drawings", "a", "the", are intentional.
C. Supply omitted words or phrases by inference in same manner as they are when "NOTE" occurs on drawings.
D. Supply words "shall be" or "shall" by inference when colon is used within sentences or phrases.
E. Supply words "on the drawings" by inference when "as indicated" is used with sentences or phrases.
F. "Provide" shall mean furnish and install.
1.03 ABBREVIATIONS
A. Reference in Contract Documents to trade associations, technical societies, recognized authorities and other institutions include following organizations which are sometimes referred to only by corresponding abbreviations.
AA Aluminum Association
AAMA Architectural Aluminum Manufacturer's Association
ACI American Concrete Institute
ADA Americans With Disabilities Act
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
AITC American Institute of Timber Construction
ANSI American National Standards Institute
APA American Plywood Association
ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers
ASTM American Society for Testing and Materials
AWI Architectural Woodwork Institute
AWPA American Wood Preservers Association
AWS American Welding Society
BIA Brick Institute of America
CDA Copper Development Association, Inc.
CRA California Redwood Association
CRSI Concrete Reinforcing Steel Institute
CS Commercial Standard (U.S. Department of Commerce)
DFPA Douglas Fir Plywood Association
Fountain Fire Station #4 01 42 13 - 2 ABBREVIATIONS AND
SYMBOLS
FGMA Flat Glass Marketing Association
FM Factory Mutual Engineering Division
FS Federal Specification
GA Gypsum Association
MIA Marble Institute of America
MIL Military Specification
MLMA Metal Lath Manufacturer's Association
NAAMM The National Association of Architectural Metal Manufacturers
NBS National Bureau of Standards
NCMA National Concrete Masonry Association
NEC National Electrical Code (of NFPA)
NEMA National Electrical Manufacturer's Association
NFPA National Fire Protection Association
NOMA National Oak Flooring Manufacturer's Association
NPVLMA National Paint, Varnish and Lacquer Manufacturer's Association
NTMA The National Terrazzo and Mosaic Association
NWMA National Woodwork Manufacturer's Association
OSHA Occupational Safety and Health Administration
PCA Portland Cement Association
PCI Pre-stressed Concrete Institute
PEI Porcelain Enamel Institute
PS Product Standard (U.S. Department of Commerce)
SDI Steel Deck Institute
SJI Steel Joist Institute
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SPA Southern Pine Association
SPI The Society of the Plastics Industry, Inc.
SPR Simplified Practice Recommendation (U.S. Department of Commerce)
SSPC Steel Structures Painting Council
SWI Steel Window Institute
TCA Tile Council of America
TIMA Thermal Insulation Manufacturers Association
UL Underwriters' Laboratories, Inc.
WCLA West Cost Lumbermen's Association
WRI Wire Reinforcement Institute
WWPA Western Wood Products Association
Fountain Fire Station #4 01 42 19 - 1 REFERENCE STANDARDS
SECTION 01 42 19
REFERENCE STANDARDS
1.01 QUALITY ASSURANCE
A. Reference Standards: For products or workmanship specified by association, trade or Federal Standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.
1. No provision of any referenced standard specification, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change duties and responsibilities of Owner, Contractor or Architect or any of their consultants, agents or employees from those set forth in Contract Documents, nor shall it be effective to assign to Architect or any of Architect's consultants, agents or employees any duty or authority to supervise or direct furnishing or performance of Work or any duty or authority to undertake responsibilities contrary to provisions of General and Supplementary Conditions.
B. Effective Date: Date of standard is that in effect as of documents date except when specific date is specified or when standard is part of applicable code which includes edition date.
C. Copies: When required by individual sections, obtain copy of standard. Maintain copy at job site during work.
01 50 00 - 1 TEMPORARY FACILITIES AND
CONTROLS
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary utilities.
B. Temporary telecommunications services.
C. Temporary sanitary facilities.
D. Temporary Controls: Barriers, enclosures, and fencing.
E. Security requirements.
F. Vehicular access and parking.
G. Waste removal facilities and services.
H. Project identification sign.
I. Field offices.
1.02 RELATED REQUIREMENTS
A. Section 01 51 00 - Temporary Utilities.
1.03 REFERENCE STANDARDS
A. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2015a.
B. ASTM E90 - Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements; 2009.
1.04 TEMPORARY UTILITIES - SEE SECTION 01 51 00
1.05 TELECOMMUNICATIONS SERVICES
A. Provide, maintain, and pay for telecommunications services to field office at time of project mobilization.
1.06 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
B. Maintain daily in clean and sanitary condition.
1.07 BARRIERS
A. The General Contractor shall provide and maintain the following protective devices and facilities which are for the protection of the public and the general protection of all workmen on the project:
B. Danger signs warning against hazards created by such features of construction as protruding nails, hoists and falling materials.
C. Fire Protection Equipment: The General Contractor shall provide and maintain fire extinguishers and active fire hydrants where indicated, maintain fire lanes to hydrants and other equipment as necessary for proper fire protection during construction. Such equipment is to be used for fire protection only.
D. The General Contractor and each subcontractor shall provide temporary walks, roadways, trench covers, barricades, bulkheads, railings, danger lights and signals, etc., required for his work by Federal, State and Municipal safety laws and building codes.
E. All temporary protective facilities shall be maintained in good condition throughout the term of the work and at completion of the work they shall be removed and all work damaged thereby shall be repaired and replaced in good condition.
G. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect
01 50 00 - 2 TEMPORARY FACILITIES AND
existing facilities and adjacent properties from damage from construction operations and demolition.
H. Provide barricades and covered walkways required by governing authorities for public rights-of-way and for public access to existing building.
I. Provide protection for plants designated to remain. Replace damaged plants.
J. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.08 SCAFFOLDING AND RUNWAYS
A. All scaffolding shall be the responsibility of the Contractor requiring the same who shall include its cost in his bid and shall be responsible for its maintenance.
B. The General Contractor shall furnish, erect, and maintain for the safe performance as required, all runways, guard rails, platforms and similar temporary construction, as he may deem necessary for the performance of the contract. Such facilities shall be of type and arrangement as required for their specific use; shall be substantially constructed throughout, strongly supported, and well secured, and shall comply with all applicable rules and regulations or applicable state and local codes.
1.09 FENCING
A. Construction: Commercial grade chain link fence.
B. Provide 6 foot high fence around construction site; equip with vehicular and pedestrian gates with locks.
1.11 INTERIOR ENCLOSURES
A. Construction: Framing and reinforced polyethylene sheet materials with closed joints and sealed edges at intersections with existing surfaces:
1.12 PROTECTION FOR WORK IN PLACE
A. Work in place that is subject to injury because of operations being carried on adjacent shall be covered, boarded up, or substantially enclosed with adequate protection. Permanent openings used as thoroughfares for the introduction of work and materials to the structure shall have heads, jambs, and sills well blocked and boarded. All forms of protection shall be constructed in a manner such that, upon completion, the entire work will be delivered to the Owner in undamaged condition.
1.14 VEHICULAR ACCESS AND PARKING
A. Comply with regulations relating to use of streets and sidewalks, access to emergency facilities, and access for emergency vehicles.
B. Coordinate access and haul routes with governing authorities and Owner.
C. Provide and maintain access to fire hydrants, free of obstructions.
D. Provide means of removing mud from vehicle wheels before entering streets.
E. Provide temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking.
1.15 TEMPORARY CONTROLS
A. General: Comply with local codes, ordinances and regulations.
B. Noise: Minimize noise near occupied spaces. Properly muffle equipment. Do not operate noisy equipment during business hours.
C. Dust Control: When construction procedures result in dust which becomes nuisance to Owner, private property or traffic, control said dust.
D. Water Control: Provide such means as is necessary to control flow of water at site to prevent damage to Owner's private and public facilities.
E. Debris Control: Continually police work to prevent collection and scattering of debris uncovered, loosened, or caused by prosecution of work.
01 50 00 - 3 TEMPORARY FACILITIES AND
F. Pollution Control: Take extreme caution to prevent spilling and littering of water polluting substances. Do not dump any foreign materials into sewer and storm sewer collection systems. Provide such labor, equipment, and materials as is necessary to remedy such pollution. No burning of debris nor any other air polluting methods or equipment shall be allowed.
G. Erosion Control: Provide such facilities as might be necessary to prevent erosive damage to Owner's property or to adjacent properties.
1.16 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
B. Provide containers with lids. Remove trash from site periodically.
C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.
D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.
1.17 PROJECT IDENTIFICATION
A. Provide project identification sign of design and construction indicated on Drawings.
B. Erect on site at location indicated.
C. No other signs are allowed without Owner permission except those required by law.
1.18 FIELD OFFICES
A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.
B. Provide space for Project meetings, with table and chairs to accommodate 6 persons.
C. Locate offices a minimum distance of 30 feet from existing and new structures.
1.19 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Date of Substantial Completion inspection.
B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated.
C. Clean and repair damage caused by installation or use of temporary work.
1.20 CLEAN UP DURING CONSTRUCTION
A. Clean Up During Construction: Each Contractor shall keep the building and premises free from all surplus material, waste material, dirt and rubbish caused by his employees or work, and at the completion of his work he shall remove all such surplus material, waste material, dirt and rubbish, as well as all his tools, equipment and scaffolding and shall leave his work clean.
Each Contractor shall perform his clean up daily and shall transport his rubbish to an on site location designated by the General Contractor who shall arrange for its removal.
PART 2 PRODUCTS - NOT USED
Fountain Fire Station #4 01 51 00 - 1 TEMPORARY UTILITIES
SECTION 01 51 00
TEMPORARY UTILITIES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary Utilities: Provision of electricity, lighting, heat, ventilation, and water.
1.02 RELATED REQUIREMENTS
A. Section 01 50 00 - Temporary Facilities and Controls:
1. Temporary telecommunications services for administrative purposes.
2. Temporary sanitary facilities required by law.
1.03 TEMPORARY ELECTRICITY
A. Service and Distribution: The…