This document is a Bidder Q&A Template for Request for Proposal (RFP) #250000002704 issued by the Michigan Department of Natural Resources (DNR) for Tree and Shrub Control at 8 State Parks. The solicitation covers invasive species management across multiple recreation areas including Waterloo, Island Lake, Algonac, Highland, and Watkins Lake State Parks, with specific treatment zones targeting non-native invasive woody species. The project involves various treatment techniques such as foliar herbicide applications, cut stump treatments, and potential forestry mowing, with work expected to be completed between September 30, 2025, and September 15, 2026. Bidders are required to specify their preferred treatment seasons, techniques, and potential price variations.
The document provides detailed guidance on treatment methodologies, including herbicide selection, application techniques, and zone-specific considerations. Partial payments will be available for significant, quantifiable work completed by September 30, 2025, or during the winter season. The DNR allows flexibility in treatment approaches, with preferences for foliar spraying in most zones and specific restrictions in areas with high native plant diversity (no-slop zones). Bidders are encouraged to propose comprehensive strategies that minimize collateral damage to native vegetation and can include different treatment sequences and timing, with pricing options for various approaches. The solicitation emphasizes the importance of targeting specific invasive species while protecting native plant and tree populations.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bidder Q&A Template 250000002704.docx | DOCX document | |
| RFP 250000002704_V2 Park tree and shrub specs Updated 7.1.25.docx | DOCX document | |
| RFP 25000000270_V2 response form Updated 7.1.25.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
BIDDER QUESTIONS & ANSWERS
RFP#250000002704
Tree and Shrub Control at 8 State Parks Bidders who have questions for the above Solicitation must fill the sections below and attach the document in an email to the Solicitation Manager, as described in the Instruction to Bidders.
Addendum
All Parks Section C
2. Techniques Pgs. 7-9 If contractor would like to include forestry mowing of a zone (or multiple zones) as part of their treatment in conjunction with foliar herbicide treatments and thus span multiple seasons, please provide this intent and proposed timeline in your proposal and it will be considered. Please note that foliar treatment before mowing is preferred in most cases. Including prices for different sequences of treatments is acceptable. Mowing and herbicide treatments should be separated for proper bid comparisons.
All Parks Section C
5. Results Pgs. 12-17 The deadline for work completion in any one treatment area is separate from and need not be the same as the other zones in the same bid line item (treatment zone groups).
All Parks Section C
3. Herbicides 3.d. For all black locust stems that are treated Pg. 10 Section 3.d. Garlon 4 Ultra is specified as the herbicide to be used when performing foliar treatments on black locust. In most zones, milestone should be added or substituted. Venders should put their preferred chemical mix in their proposal.
Section C
1. Park/Species /Treatment Waterloo Recreation Area Pg. 6 Treatment Zone A (site 52) All non-native invasive woody species are added as target species. In addition to those listed in the work statement Siberian elm and upright juniper are known to occur at the site. The boundary of this zone was modified to end at the tree line on the southwest edge. The polygon has been updated on the Web map. The new acreage is 14.25.
Treatment Zone 24-2 All non-native invasive woody species are added as target species. The most common species in this zone are black locust, juniper and autumn olive.
Section C
1. Park/Species /Treatment Island Lake Recreation Area
Pg. 5 All poplar and cherry trees under 20 feet were added as target species in treatment zones F, 8, 10, 14, 15, and 16.
All Parks (Q/A 1-3)
| Q # |
| Document and Section |
| Page # |
| Bidder Question |
| Answer (to be completed by the State) |
| 1 |
| Section 5 |
Results
| 12 |
| How do we know if a zone must be completed by September 30, 2025 or September 15, 2026? |
| A1: Bidder should make note on the bid response form in the Willing/Preferred Treatment Season column when they are willing and when they prefer to do the work each bid line item (i.e. by Sept 30; winter work; growing season 2026). Bidders should note in the discounts section if there is a price difference between the seasons they list. Further details can be written in the minimum/maximum section of their bid response form how many zones and/or what specific zones they are willing/able to complete by September 30, 2025 and what zones they and what zones they prefer to complete by September 15, 2026. Price discounts for doing work the following year (dormant season, growing season or some combination of the two) should be noted. |
A2: It was explained at each prebid meeting that DNR expects to award some work to be completed by September 30, 2025. Our preferred zones/park were noted at each prebid meeting. It was also noted that DNR has flexibility of season with most parks and zones. Cut stump, frill, basil bark zones were noted at each location and can be done during dormant season. Island Lake numbered zones (follow up to land clearing) were noted as preferred to be treated in the current growing season. Likewise, all locust treatments at Waterloo were also noted that 2025 foliar treatments were preferred.
| 2 |
| N/A |
| N/A |
| Will partial payments be made for work completed in 2025? |
| Yes, if significant and quantifiable work is completed by September 30 or during the winter but a bid line item is not 100% complete until growing season 2026 partial payments can be made. |
All Parks (Continue Q/A 1-3)
| Q# |
| Document and Section |
| Page # |
| Bidder Question |
| Answer (to be completed by the State) |
| 3 |
| Section 5 |
Results
| 12 |
| Q. Completion dates - we assume zones can be completed when DNR think phenology will be best for kill rates, but did notice a general statement for completing certain zones "For some zones all treatments must be completed by September 30, 2025. For some zones treatments must be completed by March 1, 2026. Other zones may have the option to complete by September 15, 2026. Deadlines will be discussed at the respective prebid meetings." Vendor A didn't hear specific dates today, so if there are specific deadlines for sites in southeast MI, please let us know |
DNR-PRD would like as much of the foliar work completed by sept 30, 2025, particularly at Waterloo and Island Lake so the next phase of work can be done over the winter. Bidders should submit their preferred strategy and seasonality of work in their bid. If there are cost differences between options you propose due to timing or strategies, they should be made clear in your bid response.
Questions regarding zone boundaries were asked and answered during each meeting.
Algonac State Park Q/A 1-3
Q #
| Document and Section |
| Page # |
| Bidder Question |
Answer (to be completed by the State)
Section 11
Creating brush piles versus scattering brush shall be as determined in section 3.iii.
Do we have to remove buckthorn biomass from the zones?
No, for foliar sprayed trees will be left standing dead. For cut stump treatments trees will either be left scattered on the ground or piled. See section 11 of the work statement for details on creating brush piles.
Section C
PARK / SPECIES / TREATMENT
Section 2 Techniques
7-9
Is foliar spray preferred for most treatment zones?
Yes. Zones 7 and 31 are most suitable for winter basal bark treatment.
Section 2 Techniques
v. Hand swiping
vi. Foliar Spray
Section 4 Adjuvants
Section 7
7-9
12-13
What are no slop areas?
No slop zones indicate areas of high native plant diversity where collateral damage is not acceptable. In these areas plants should be treated by hand swiping or cone nozzles on handheld/backpack sprayers. Areas within no slop areas that are monocultures of non- native species can be sprayed. Outside of no slop areas collateral damage should be kept to a minimum when most of the vegetation is native (see section 7 of the work statement).
Highland Recreation Area Q/A 1-5
Q #
| Document and Section |
| Page # |
| Bidder Question |
Answer (to be completed by the State)
Section C 3.Herbicides
| Is it acceptable to use milestone within the dripline of an oak? |
| Yes |
| 2 |
| Section C |
1.
Park/Species/Treatment
Can zones 8 and 9 be forestry mowed?
Yes but oak, hickory and fragrant sumac need to be avoided.
| 3 |
| Section C |
1.
Park/Species/Treatment
| Is it expected that every stem of target species are found and treated in areas of dense native prairie plants (question asked in reference to bittersweet)? |
| No. Patches of target species should be found and treated but it is not expected for every individual stem. |
| 4 |
| Section C |
1.
Park/Species/Treatment
What other species are expected in this zones?
Black locust and bittersweet are the two most common target species. Autumn olive, multiflora rose, honey suckle, and Siberian elm are also likely to occur.
| 5 |
| Section C |
1.
Park/Species/Treatment
| Are all woody invasive species treatment targets in zone 9? |
| Yes |
Island Lake Recreation Area Q/A 1-3
Q #
| Document and Section |
| Page # |
| Bidder Question |
Answer (to be completed by the State)
Section D. Description of treatment area DNR PRD Woody Contract hyper link
| 18 |
| Why is zone G yellow on the map? |
Zone G is a no-slop area. No-slop zones indicate areas of high native plant diversity where collateral damage is not acceptable. In these areas plants should be treated by hand swiping or cone nozzles on handheld/backpack sprayers. Areas within no slop areas that are monocultures of non- native species can be sprayed. Outside of no slop areas collateral damage should be kept to a minimum when most of the vegetation is native.
| 2 |
| Section C. |
2.Techniques
| 7-9 |
| How should the locust in zone G be treated? |
Due to the high density of native plants, much of the zone locust trees where this occurs may be cut stump treated as needed.
Can we use UTV’s within any/all zones?
UTV’s are allowed on designated trails for access and moving equipment/personal to and from zones. Additionally, if doing broad herbicide treatments UTV’s may be used within most zones (i.e. land clearing zones. UTV’s are not allowed in zones G, H or D.
Waterloo Recreation Area Q/A 1-4
Q #
| Document and Section |
| Page # |
| Bidder Question |
Answer (to be completed by the State)
Section C.
2.Techniques
Can drone spraying be used in zones with dense stands of locust even in tree planted zones?
Yes, drone spraying will be allowed in most zones. In zones where native trees have been planted hand spraying will be required where young trees are identified.
Are lingering black locust trees treatment targets?
Yes, any black locust trees that are lingering (showing any signs of resprouting and/or re-growth) need to be treated as well as resprouts.
| Is there ATV access to the zones at the mine site? |
| Yes. ATVs will be allowed within the site to access most zones. Entrance points and routes will be decided by DNR project manager. No ATVs are allowed on slopes. |
| Are there any tree species that are desired at the mine site? |
| Yes, young native trees have been planted and need to be protected from drift. Poplar stands should also be avoided. |
Watkins Lake State Park Q/A 1
Q #
| Document and Section |
| Page # |
| Bidder Question |
Answer (to be completed by the State)
| Can brush hogging be used in place of cut stump treatment in Watkins Lake zone K? |
| No, due to the sensitive nature of the habitat work should be preformed by cut stumping. |