BID2023-104 Bid Tabs.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
ESB - Juntura Tree Removal and Planting Project Phase II
Solicitation number
S-73000-00009074
Issued by
Harney County, Oregon

About this file

BID2023-104 Curb Ramp at Naef Rd and Harold Ave - Bid Tabs Summary

This document is a bid tabulation sheet for BID2023-104, a curb ramp construction project located at Naef Road and Harold Avenue. The project encompasses site preparation, traffic control, excavation, grading, asphalt paving, concrete work including curbs and walks, accessibility improvements such as curb ramps and truncated domes, and landscaping. The work includes 25 active line items with quantities ranging from 2 curb ramps to 650 cubic yards of topsoil. Ten contractors submitted bids: Colton Construction, Duke Construction and Excavation, Turney Excavation, Freedom Builders, D&D Concrete & Utilities, Don Burke Excavation, Angelo Underground, KNL Industries, Lee Contractors, and Brown Contracting. The lowest responsive bid total is $61,235.00 submitted by Angelo Underground, while the highest is $127,825.00 from Lee Contractors. The average bid across all contractors is $93,448.93.

Pricing analysis reveals significant variation among bidders, particularly on labor-intensive items such as flagging at $240 to $24,000 for 240 hours, temporary work zone fencing from $570 to $4,940 for 95 feet, and concrete work ranging considerably by contractor. Several line items (39-74) containing water quality seeding and additional topsoil work contain formula errors and zero pricing across most bids, indicating potential scope clarification issues. The flagging rate shows base plus fringe at $48.19 per hour. Two bid totals were submitted separately at $113,820.00 and $58,335.00, suggesting possible bid corrections or alternative pricing scenarios. No set-asides, incumbent information, or specific award dates are indicated in this tabulation document.

View the file

Other files

File Type Posted
ESB_fnl_RFCQ_279B_Services.docx DOCX document
ESB_fnl_RFCQ_Attachments_279B_Services.docx DOCX document
35891 Intent To Award.xlsx XLSX spreadsheet
Exhibit 1 (Technical Specifications)~4.docx DOCX document
35891 Preliminary Results.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Tabs BID 2023-104 Curb Ramp at Naef Rd and Harold Ave

Contractor #1 - Colton ConstructionContractor #2 - Duke Construction and ExcavationContractor #3 - Turney ExcavationContractor #4 - Freedom BuildersContractor #5 - D&D Concrete & UtilitiesContractor #6 - Don Burke ExcavationContractor #7 - Angelo UndergroundContractor #8 - KNL IndustriesContractor #9 - Lee ContractorsContractor #10 - Brown Contracting
Bid ItemUnitQuantityUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalLowHighAverage Unit PriceAverage Total
1WORKPLACE HARASSMENT PREVENTION PLANLS1$1,000.00$1,000.00$463.22$463.22$250.00$250.00$1,500.00$1,500.00$1,000.00$1,000.00$500.00$500.00$200.00$200.00$1,000.00$1,000.00$200.00$200.00$500.00$500.00$200.00$1,000.00$580.00$580.00
2EXTRA WORK AS AUTHORIZEDFA1$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00
3MOBILIZATIONLS1$5,000.00$5,000.00$4,554.64$4,554.64$2,850.00$2,850.00$5,000.00$5,000.00$8,000.00$8,000.00$4,500.00$4,500.00$4,000.00$4,000.00$5,000.00$5,000.00$12,000.00$12,000.00$9,000.00$9,000.00$4,000.00$12,000.00$7,000.00$7,000.00
4TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETELS1$1,000.00$1,000.00$2,605.56$2,605.56$1,300.00$1,300.00$5,000.00$5,000.00$6,000.00$6,000.00$4,400.00$4,400.00$1,800.00$1,800.00$10,000.00$10,000.00$5,000.00$5,000.00$3,300.00$3,300.00$1,000.00$10,000.00$4,220.00$4,220.00
5FLAGGERSHR240$70.00$16,800.00$73.82$17,716.80$86.00$20,640.00$80.00$19,200.00$63.00$15,120.00$95.00$22,800.00$59.00$14,160.00$100.00$24,000.00$45.00$10,800.00$1.00$240.00$240.00$24,000.00$55.00$13,200.00
6TEMPORARY WORK ZONE FENCING INCLUDING POSTSFT95$10.00$950.00$12.19$1,158.05$6.00$570.00$30.00$2,850.00$20.00$1,900.00$6.00$570.00$10.00$950.00$52.00$4,940.00$40.00$3,800.00$15.00$1,425.00$950.00$4,940.00$25.40$2,413.00
7EROSION CONTROLLS1$1,000.00$1,000.00$1,017.99$1,017.99$1,150.00$1,150.00$1,500.00$1,500.00$2,000.00$2,000.00$1,780.00$1,780.00$500.00$500.00$1,500.00$1,500.00$2,000.00$2,000.00$350.00$350.00$350.00$2,000.00$1,070.00$1,070.00
8SEDIMENT BARRIER, TYPE 8FT95$6.00$570.00$7.14$678.30$4.00$380.00$10.00$950.00$8.00$760.00$3.20$304.00$10.00$950.00$7.50$712.50$5.00$475.00$5.00$475.00$475.00$950.00$6.70$636.50
9POLLUTION CONTROL PLANLS1$1,000.00$1,000.00$463.22$463.22$250.00$250.00$1,500.00$1,500.00$500.00$500.00$500.00$500.00$200.00$200.00$1,000.00$1,000.00$100.00$100.00$250.00$250.00$100.00$1,000.00$510.00$510.00
10CONSTRUCTION SURVEY WORKLS1$1,000.00$1,000.00$2,895.06$2,895.06$4,650.00$4,650.00$5,000.00$5,000.00$2,500.00$2,500.00$1,500.00$1,500.00$2,700.00$2,700.00$4,000.00$4,000.00$2,000.00$2,000.00$6,000.00$6,000.00$1,000.00$6,000.00$3,140.00$3,140.00
11REMOVAL OF STRUCTURES AND OBSTRUCTIONSLS1$3,000.00$3,000.00$5,176.96$5,176.96$4,100.00$4,100.00$7,500.00$7,500.00$3,000.00$3,000.00$8,216.00$8,216.00$2,000.00$2,000.00$4,000.00$4,000.00$15,000.00$15,000.00$2,000.00$2,000.00$2,000.00$15,000.00$5,200.00$5,200.00
12CLEARING AND GRUBBINGLS1$6,000.00$6,000.00$2,298.99$2,298.99$800.00$800.00$2,500.00$2,500.00$3,000.00$3,000.00$4,930.00$4,930.00$2,000.00$2,000.00$4,500.00$4,500.00$1,000.00$1,000.00$1,600.00$1,600.00$1,000.00$6,000.00$3,020.00$3,020.00
13GENERAL EXCAVATIONLS1$3,000.00$3,000.00$3,431.08$3,431.08$4,200.00$4,200.00$2,500.00$2,500.00$2,000.00$2,000.00$9,540.00$9,540.00$2,000.00$2,000.00$4,000.00$4,000.00$3,000.00$3,000.00$9,500.00$9,500.00$2,000.00$9,500.00$4,300.00$4,300.00
14SUBGRADE GEOTEXTILESY85$5.00$425.00$4.09$347.65$3.75$318.75$10.00$850.00$1.00$85.00$5.00$425.00$10.00$850.00$10.00$850.00$10.00$850.00$4.00$340.00$340.00$850.00$7.80$663.00
15AGGREGATE BASE AND SHOULDERSTON80$40.00$3,200.00$26.06$2,084.80$58.00$4,640.00$75.00$6,000.00$100.00$8,000.00$59.30$4,744.00$30.00$2,400.00$50.00$4,000.00$250.00$20,000.00$124.00$9,920.00$2,400.00$20,000.00$98.80$7,904.00
16LEVEL 3, 1/2 INCH DENSE ACP MIXTURETON35$200.00$7,000.00$410.35$14,362.25$360.00$12,600.00$250.00$8,750.00$400.00$14,000.00$343.00$12,005.00$125.00$4,375.00$250.00$8,750.00$400.00$14,000.00$265.00$9,275.00$4,375.00$14,000.00$248.00$8,680.00
17EXTRA FOR THICKENED EDGE SIDEWALKFT35$80.00$2,800.00$96.73$3,385.55$55.00$1,925.00$70.00$2,450.00$40.00$1,400.00$86.00$3,010.00$20.00$700.00$50.00$1,750.00$40.00$1,400.00$120.00$4,200.00$700.00$4,200.00$62.00$2,170.00
18CONCRETE CURBS, CURB AND GUTTERFT90$140.00$12,600.00$99.53$8,957.70$80.00$7,200.00$40.00$3,600.00$60.00$5,400.00$75.00$6,750.00$20.00$1,800.00$80.00$7,200.00$100.00$9,000.00$69.00$6,210.00$1,800.00$12,600.00$81.80$7,362.00
19CONCRETE WALKSSF550$35.00$19,250.00$31.72$17,446.00$14.50$7,975.00$15.00$8,250.00$16.00$8,800.00$11.50$6,325.00$13.00$7,150.00$35.00$19,250.00$25.00$13,750.00$31.00$17,050.00$7,150.00$19,250.00$27.80$15,290.00
20EXTRA FOR NEW CURB RAMPSEACH2$2,000.00$4,000.00$881.24$1,762.48$2,500.00$5,000.00$800.00$1,600.00$2,000.00$4,000.00$3,162.50$6,325.00$2,500.00$5,000.00$1,500.00$3,000.00$1,500.00$3,000.00$1,300.00$2,600.00$2,600.00$5,000.00$1,760.00$3,520.00
21TRUNCATED DOMES ON NEW SURFACESSF60$30.00$1,800.00$2.90$174.00$17.00$1,020.00$30.00$1,800.00$50.00$3,000.00$0.00$0.00$40.00$2,400.00$50.00$3,000.00$50.00$3,000.00$45.00$2,700.00$1,800.00$3,000.00$43.00$2,580.00
22PAVEMENT BAR, TYPE STOP BARSF15$70.00$1,050.00$115.80$1,737.00$100.00$1,500.00$40.00$600.00$30.00$450.00$33.40$501.00$100.00$1,500.00$66.50$997.50$30.00$450.00$150.00$2,250.00$450.00$2,250.00$83.30$1,249.50
23REMOVE AND REINSTALL EXISTING SIGNSLS1$500.00$500.00$579.01$579.01$770.00$770.00$300.00$300.00$600.00$600.00$500.00$500.00$100.00$100.00$1,000.00$1,000.00$2,000.00$2,000.00$500.00$500.00$100.00$2,000.00$820.00$820.00
24TOPSOILCY5$100.00$500.00$210.99$1,054.95$150.00$750.00$150.00$750.00$100.00$500.00$138.00$690.00$50.00$250.00$150.00$750.00$200.00$1,000.00$169.00$845.00$250.00$1,000.00$133.80$669.00
25BARK MULCHCY5$100.00$500.00$210.99$1,054.95$150.00$750.00$100.00$500.00$100.00$500.00$138.00$690.00$50.00$250.00$150.00$750.00$200.00$1,000.00$170.00$850.00$250.00$1,000.00$134.00$670.00
39WATER QUALITY SEEDING, LOW GROW SEED MIXACRE0.08$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
40TOPSOILCY650$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
41$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
42$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
43$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
44$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
45$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
46$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
47$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
48$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
49$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
50$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
51$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
52$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
53$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
54$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
55$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
56$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
57$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
58$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
59$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
60$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
61$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
62$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
63$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
64$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
65$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
66$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
67$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
68$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
69$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
70$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
71$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
72$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
73$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
74$0.00$0.00$0.00$0.00$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00ERROR:#REF!$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#REF!
$96,945.00$98,406.21$88,588.75$93,450.00$95,515.00$104,505.00$61,235.00$118,950.00$127,825.00$94,380.00$61,235.00$127,825.00
Submitted bid total $113,820.00Submitted bid total $58,335.00
Base+Fringe for flagger is $48.19