Bid tabulation~8.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
ITB - Sanding Rock Delivered to 5 Sites in ODOT DIstrict 4 (Re-bid)
Solicitation number
S-73000-00007160
Issued by
Jackson County, Oregon

About this file

The document provided is a bid tabulation for a re-bid on a state and local contract opportunity issued by the Oregon Department of Transportation (ODOT) to supply and deliver a total of 6,650 tons of sanding rock to five locations within ODOT District 4. The contract covers furnishing and delivering sanding rock to the cities of Rose Lodge, Grand Ronde, Wakefield, Corvallis, and Wren. The bid tabulation shows unit prices and total prices submitted by four bidders: Bishop Services Inc., Green Dream International, North Santiam Paving Co., and 4-R Equipment LLC.

The bid tabulation indicates that Bishop Services Inc. submitted the lowest overall bid of $282,240.50. The other bids came in at $298,352.50, $371,050.00, and no total price was provided for the 4-R Equipment LLC bid. The bid document does not include any information about set-asides, incumbents, funding sources, or contract term and renewal options.

View the file

Other files

File Type Posted
00007160_ITB.docx DOCX document
Request for Proposals 2MG Reservoir Replacement Design Build RFP No W-481.pdf PDF
00007160_Bid Cover Sheet.docx DOCX document
00007160_Sample Contract.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00007160 Sanding Rock Delivered to 5 sites in ODOT District 4 (re-bid)
BID TABULATIONBishop Services Inc. (a Washington corporation)
Green Dream International (an Arkansas corporation)North Santiam Paving Co.4-R Equipment LLC
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Furnish and deliver sanding rock to Rose Lodge1500Ton-$ 44.95$ 67,425.00$ 45.55$ 68,325.00$ 80.30$ 120,450.00
2Furnish and deliver sanding rock to Grand Ronde1500Ton-$ 47.31$ 70,965.00$ 45.55$ 68,325.00$ 70.95$ 106,425.00
3Furnis and deliver sanding rock to Wakefield1500Ton-$ 37.86$ 56,790.00$ 45.55$ 68,325.00$ 43.60$ 65,400.00
4Furnish and deliver sanding rock to Corvallis1300Ton$ 58.00$ 75,400.00$ 43.76$ 56,888.00$ 45.55$ 59,215.00$ 41.50$ 53,950.00
5Furnish and deliver sanding rock to Wren750Ton-$ 40.23$ 30,172.50$ 45.55$ 34,162.50$ 33.10$ 24,825.00
TOTALNOT RESPONSIVE$ 282,240.50$ 298,352.50$ 371,050.00

Sheet2