Bid Tab Sheet (Unofficial)
82 KB Posted
- Solicitation number
- GDC-23-COLW-PD-010
- Issued by
- Georgia
About this file
This is an unofficial bid tab sheet for the Colwell Probation Detention Center Culvert Replacement and Stream Bank Stabilization project, administered by the Georgia State Financing and Investment Commission (GSFIC) on behalf of the Georgia Department of Corrections. The project involves replacement of a 60-inch diameter drainage culvert under the entrance driveway to the detention center gym and annex building, along with erosion control and streambank remediation work downstream of the culvert replacement. The scope of work includes rock excavation (1 cubic yard), slip-lining of the existing 60-inch corrugated metal pipe (200 linear feet), and concrete pavement demolition and replacement (1,058 square feet). The bid opening was held on November 15, 2022, at 2:00 PM, with electronic bid submission conducted through the e-Builder Project Management system.
Two bidders submitted proposals for this project: Wilson Construction Management and Patton Excavating Inc. Wilson Construction Management submitted a base bid total of $565,000.14, while Patton Excavating Inc. submitted a base bid total of $876,451.67. Significant price variance exists between the two bids, particularly for slip-lining work ($1,575.00 per foot versus $1,545.00 per foot) and concrete pavement work ($44.67 per square foot versus $25.00 per square foot). The bid tab indicates that the winning bidder, Wilson Construction Management, satisfied bidder qualification requirements with supporting documentation attached. Contact information for the project manager and bidders is provided on the sheet.
Text of this file
Project:
Bid Open Date:
Description Quantity UoM Unit Cost Total Cost Unit Cost Total Cost
Base Bid - Culvert Replacement & Stream Bank Stabilization 0.00 565,000.14 0.00 876,451.67
565,000.14 876,451.67
1 Rock Excavation 1 CY 250.00 250.00 70.00 70.00
Slip-lining existing 60" corrugated metal pipe shown on Sheet C-105 200 FT 1,575.00 315,000.00 1,545.00 309,000.00
Concrete pavement, demolish and replace shown on Sheet C-104 1058 SF 44.67 47,260.86 25.00 26,450.00
362,510.86 335,520.00
565,000.14 876,451.67
Bidder Qualification Notes yes, see attachment Attached
Bid Summary Base Bid Total
Unit Price
Unit Price Cost Total
Base Bid
Base Bid Cost Total
Wilson Construction Management Patton Excavating Inc.
GDC-23-COLW-PD-010, Colwell Probation Detention Center Culvert Repl. Daniel Miller Mike Patton
11.15.2022 2:00 PM dmiller@wilsoncm.com Pattonexc@gmail.com
GDC-23-COLW-PD-010, Colwell Pro
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Sign-In Sheet | — | |
| e-Builder User Guide | — | |
| Invitation To Bid | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .