This document is a bid tabulation for a Parking Lots and Garage Maintenance contract opportunity in Virginia. The contracting agency is the University of Old Dominion, and the project involves providing maintenance services for parking lots and garages at the ODU main campus and VHS Medical Campus. The bid tabulation outlines various line items for labor, equipment, and materials, including machine work, hand work, concrete sidewalks, milling, curb and gutter work, striping, signage, and other related repairs. The contract will be awarded to the lowest responsive and responsible bidder. The bids were submitted by Branche Industries, Inc. and The Blair Brothers, Inc.

The bid tabulation provides unit prices and total costs for the various line items. Branche Industries, Inc. submitted a total bid of $248,615.00, while The Blair Brothers, Inc. submitted a bid of $611,227.30. The contract will be awarded for a one-year term with options for four additional one-year renewals. Funding for the contract will come from the University's Parking Services Department budget.

Text of this file

Tabulation

Parking Lots & Garage Maint.Branche Industries, Inc.The Blair Brothers, Inc.
ItemDescription
Labor, Equipment and MaterialsQty.Unit PriceTotalUnit PriceTotal
1.A.Machine: <100 tons75Ton125.009,375.00171.5012,862.50
B.Machine: >100 tons165Ton110.0018,150.00132.0021,780.00
C.Hand: <100 tons35Ton150.005,250.00337.6011,816.00
D.Hand: >100 tons105Ton100.0010,500.00182.2519,136.25
2.A.Machine: <100 tons75Ton150.0011,250.00172.5012,937.50
B.Machine: >100 tons165Ton120.0019,800.00133.0021,945.00
C.Hand: <100 tons35Ton175.006,125.00338.6011,851.00
D.Hand: >100 tons105Ton100.0010,500.00183.2519,241.25
3.A.Concrete Sidewalk, <500 SF450SF9.004,050.0030.0013,500.00
B.>500 SF550SF9.004,950.0010.255,637.50
4.A.Machine: <100 tons75Ton75.005,625.00142.5010,687.50
B.Machine: >100 tons165Ton75.0012,375.00103.0016,995.00
C.Hand: <100 tons35Ton100.003,500.00308.6010,801.00
D.Hand: >100 tons105Ton85.008,925.00153.2516,091.25
5Excavation & Site Prep200CY80.0016,000.00145.0029,000.00
6Raise/lower, manhole lids, etc.4Ea.200.00800.002,000.008,000.00
7Topsoil, Seeding, Fertilizer100SY20.002,000.0015.001,500.00
8.A.Milling 2” of asphalt <100SY75SY35.002,625.0095.007,125.00
B.>100 SY165SY15.002,475.0031.675,225.55
9Undercut1000CY10.0010,000.00145.00145,000.00
10Select fill1000CY35.0035,000.0072.0072,000.00
11Paint Striping (4”)1000LF1.001,000.006.836,830.00
12Thermoplastic Striping (4”)1000LF2.502,500.0011.5011,500.00
13Paint Characters (12”)100Ea.5.00500.0020.002,000.00
14Thermoplastic (12”)1000LF10.0010,000.0034.5034,500.00
15Composite Speed Bump1Ea.600.00600.001,800.001,800.00
16.A.Hot tar to cracks < 1”, <100 LF85LF3.00255.0014.001,190.00
B.>100 LF135LF3.00405.007.00945.00
17.A.Seal Coating, <800 SY500SY4.002,000.004.252,125.00
B.>800 SY1600SY2.003,200.002.403,840.00
18.ARemove & Dispose of Existing Wheel Stops1Ea.200.00200.00100.00100.00
B.Relocate Existing Wheel Stops1Ea.250.00250.00200.00200.00
C.Provide New Wheel Stops1Ea.150.00150.0050.0050.00
D.Install New Wheel Stops1Ea.150.00150.0075.0075.00
19.A.Remove & Dispose of Existing Signage with Concrete Footing1Ea.200.00200.00350.00350.00
B.Relocate Existing Signage1Ea.300.00300.00350.00350.00
C.Provide new Stop Signs1Ea.150.00150.00250.00250.00
D.Provide new One Way Signs1Ea.150.00150.00130.00130.00
E.Provide New No Parking Signs1Ea.150.00150.00130.00130.00
F.Provide Handicapped Signs1Ea.150.00150.00130.00130.00
G.Provide Motorcycle Parking Signs1Ea.150.00150.00130.00130.00
H.Install Signs1Ea.150.00150.00150.00150.00
20.ACurb & Gutter (10’ Minimum) (VDOT CG-6), Removed & Replaced In Kind200LF50.0010,000.00155.0031,000.00
B.Concrete Curb (10’ Minimum) (VDOT CG-2), Removed & Replaced In Kind200LF50.0010,000.00135.0027,000.00
21Grading1000SY3.003,000.004.004,000.00
22.A.Saw Cutting1FT10.0010.0010.0010.00
23Mobilization2Ea.500.001,000.002,000.004,000.00
24Traffic Control1Day200.00200.001,800.001,800.00
Unit Price BasedQty.
25.A.Concrete1CY300.00300.00300.00300.00
B.Stone, #571TN90.0090.0065.0065.00
C.Concrete Disposal1CY40.0040.0010.0010.00
D.Asphalt Disposal1TN100.00100.0010.0010.00
26.A.Backhoe1CY125.00125.00125.00125.00
B.Excavator1TN150.00150.00250.00250.00
C.Dump Truck1HR110.00110.00135.00135.00
D.Dump Truck w/ Blade for SR1HR300.00300.00250.00250.00
E.Roller1HR50.0050.0095.0095.00
F.Grader1HR100.00100.00200.00200.00
G.Tractor with Box1HR75.0075.00125.00125.00
H.Skid Steer Loader1HR125.00125.00125.00125.00
I.Front End Loader1HR150.00150.00200.00200.00
J.Power Broom1HR75.0075.0095.0095.00
K.Air Compressor1HR30.0030.00100.00100.00
L.Jack Hammer1HR25.0025.0050.0050.00
M.Sand Spreader1HR75.0075.00200.00200.00
N.Blower1HR25.0025.0050.0050.00
27.A.Superintendent1HR75.0075.0095.0095.00
A.1Superintendent, Overtime1HR112.50112.50142.50142.50
B.Equipment Operator1HR70.0070.0075.0075.00
B.1Equipment Operator, Overtime1HR105.00105.00112.50112.50
C.Laborer Skilled1HR50.0050.0075.0075.00
C.1Laborer Skilled, Overtime1HR75.0075.00112.50112.50
D.Labor Unskilled1HR35.0035.0075.0075.00
D.1Labor Unskilled, Overtime1HR52.5052.50112.50112.50
E.Grounds Men for Snow Removal1HR100.00100.00130.00130.00
E.1.Grounds Men, Overtime1HR150.00150.00195.00195.00
CONTACTJohn BrancheAaron Ketchum
PHONE NO.757-420-4343757-5381696
DELIVERY DATE:
Eva REGISTEREDYESYESE17703
State Corporation CommissionYESYES
SWAM CertificationYes - S686705N/A
CONTRACTOR LICENSE2705-117364A, H/H2701010057
NO. OF COPIES(1) Original, (1) Copies w/TD(1) Original, (1) Copies w/TD
CONTRACTOR DATA SHEETProvidedProvided
Certificate of InsuranceProvidedProvided
ADDENDUM #1, ACKNOWLEDGEDProvidedProvided
CONFLICT OF INTEREST:SignedSigned
BID SIGNED:SignedSigned
NET TOTAL:$248,865.00$611,227.30
COI Provided

Page &P of &N

Comparison of FY-'20 - FY-'25

Parking Lots & Garage Maint.Branche Industries, Inc.The Blair Brothers, Inc.Branche Industries, Inc. - FY-'20
ItemDescription
Labor, Equipment and MaterialsQty.Unit PriceTotalUnit PriceTotalUnit PriceTotal
1.A.Machine: <100 tons75Ton125.009,375.00171.5012,862.5095.007,125.00
B.Machine: >100 tons165Ton110.0018,150.00132.0021,780.0080.0013,200.00
C.Hand: <100 tons35Ton150.005,250.00337.6011,816.00125.004,375.00
D.Hand: >100 tons105Ton100.0010,500.00182.2519,136.2590.009,450.00
2.A.Machine: <100 tons75Ton150.0011,250.00172.5012,937.50110.008,250.00
B.Machine: >100 tons165Ton120.0019,800.00133.0021,945.0095.0015,675.00
C.Hand: <100 tons35Ton175.006,125.00338.6011,851.00150.005,250.00
D.Hand: >100 tons105Ton100.0010,500.00183.2519,241.2575.007,875.00
3.A.Concrete Sidewalk, <500 SF450SF9.004,050.0030.0013,500.004.001,800.00
B.>500 SF550SF9.004,950.0010.255,637.504.002,200.00
4.A.Machine: <100 tons75Ton75.005,625.00142.5010,687.5035.002,625.00
B.Machine: >100 tons165Ton75.0012,375.00103.0016,995.0035.005,775.00
C.Hand: <100 tons35Ton100.003,500.00308.6010,801.0070.002,450.00
D.Hand: >100 tons105Ton85.008,925.00153.2516,091.2530.003,150.00
5Excavation & Site Prep200CY80.0016,000.00145.0029,000.0040.008,000.00
6Raise/lower, manhole lids, etc.4Ea.200.00800.002,000.008,000.00100.00400.00
7Topsoil, Seeding, Fertilizer100SY20.002,000.0015.001,500.005.00500.00
8.A.Milling 2” of asphalt <100SY75SY35.002,625.0095.007,125.0010.00750.00
B.>100 SY165SY15.002,475.0031.675,225.5510.001,650.00
9Undercut1000CY10.0010,000.00145.00145,000.005.005,000.00
10Select fill1000CY35.0035,000.0072.0072,000.0015.0015,000.00
11Paint Striping (4”)1000LF1.001,000.006.836,830.000.75750.00
12Thermoplastic Striping (4”)1000LF2.502,500.0011.5011,500.001.501,500.00
13Paint Characters (12”)100Ea.5.00500.0020.002,000.005.00500.00
14Thermoplastic (12”)1000LF10.0010,000.0034.5034,500.0010.0010,000.00
15Composite Speed Bump1Ea.600.00600.001,800.001,800.00300.00300.00
16.A.Hot tar to cracks < 1”, <100 LF85LF3.00255.0014.001,190.002.00170.00
B.>100 LF135LF3.00405.007.00945.002.00270.00
17.A.Seal Coating, <800 SY500SY4.002,000.004.252,125.002.001,000.00
B.>800 SY1600SY2.003,200.002.403,840.001.252,000.00
18.ARemove & Dispose of Existing Wheel Stops1Ea.200.00200.00100.00100.00100.00100.00
B.Relocate Existing Wheel Stops1Ea.250.00250.00200.00200.00200.00200.00
C.Provide New Wheel Stops1Ea.150.00150.0050.0050.00100.00100.00
D.Install New Wheel Stops1Ea.150.00150.0075.0075.00100.00100.00
19.A.Remove & Dispose of Existing Signage with Concrete Footing1Ea.200.00200.00350.00350.00200.00200.00
B.Relocate Existing Signage1Ea.300.00300.00350.00350.00200.00200.00
C.Provide new Stop Signs1Ea.150.00150.00250.00250.00100.00100.00
D.Provide new One Way Signs1Ea.150.00150.00130.00130.00100.00100.00
E.Provide New No Parking Signs1Ea.150.00150.00130.00130.00100.00100.00
F.Provide Handicapped Signs1Ea.150.00150.00130.00130.00100.00100.00
G.Provide Motorcycle Parking Signs1Ea.150.00150.00130.00130.00100.00100.00
H.Install Signs1Ea.150.00150.00150.00150.00100.00100.00
20.ACurb & Gutter (10’ Minimum) (VDOT CG-6), Removed & Replaced In Kind200LF50.0010,000.00155.0031,000.0022.004,400.00
B.Concrete Curb (10’ Minimum) (VDOT CG-2), Removed & Replaced In Kind200LF50.0010,000.00135.0027,000.0020.004,000.00
21Grading1000SY3.003,000.004.004,000.001.001,000.00
22.A.Saw Cutting1FT10.0010.0010.0010.003.003.00
23Mobilization2Ea.500.001,000.002,000.004,000.00
24Traffic Control1Day200.00200.001,800.001,800.00
Unit Price BasedQty.
25.A.Concrete1CY300.00300.00300.00300.00140.00140.00
B.Stone, #571TN90.0090.0065.0065.0040.0040.00
C.Concrete Disposal1CY40.0040.0010.0010.0010.0010.00
D.Asphalt Disposal1TN100.00100.0010.0010.0010.0010.00
26.A.Backhoe1CY125.00125.00125.00125.0075.0075.00
B.Excavator1TN150.00150.00250.00250.0095.0095.00
C.Dump Truck1HR110.00110.00135.00135.0075.0075.00
D.Dump Truck w/ Blade for SR1HR300.00300.00250.00250.00125.00125.00
E.Roller1HR50.0050.0095.0095.0030.0030.00
F.Grader1HR100.00100.00200.00200.0050.0050.00
G.Tractor with Box1HR75.0075.00125.00125.0050.0050.00
H.Skid Steer Loader1HR125.00125.00125.00125.0075.0075.00
I.Front End Loader1HR150.00150.00200.00200.0095.0095.00
J.Power Broom1HR75.0075.0095.0095.0050.0050.00
K.Air Compressor1HR30.0030.00100.00100.0020.0020.00
L.Jack Hammer1HR25.0025.0050.0050.0010.0010.00
M.Sand Spreader1HR75.0075.00200.00200.0035.0035.00
N.Blower1HR25.0025.0050.0050.0015.0015.00
27.A.Superintendent1HR75.0075.0095.0095.0060.0060.00
A.1Superintendent, Overtime1HR112.50112.50142.50142.5090.0090.00
B.Equipment Operator1HR70.0070.0075.0075.0045.0045.00
B.1Equipment Operator, Overtime1HR105.00105.00112.50112.5067.5067.50
C.Laborer Skilled1HR50.0050.0075.0075.0035.0035.00
C.1Laborer Skilled, Overtime1HR75.0075.00112.50112.5052.5052.50
D.Labor Unskilled1HR35.0035.0075.0075.0025.0025.00
D.1Labor Unskilled, Overtime1HR52.5052.50112.50112.5037.5037.50
E.Grounds Men for Snow Removal1HR100.00100.00130.00130.0050.0050.00
E.1.Grounds Men, Overtime1HR150.00150.00195.00195.0075.0075.00
CONTACTJohn BrancheAaron KetchumJohn Branche
PHONE NO.757-420-4343757-5381696757-420-4343
DELIVERY DATE:
Eva REGISTEREDYESYESE17703YES
State Corporation CommissionYESYESYES
SWAM CertificationYes - S686705N/AYes - S686705
CONTRACTOR LICENSE2705-117364A, H/H27010100572705-117364A, H/H
NO. OF COPIES(1) Original, (1) Copies w/TD(1) Original, (1) Copies w/TD(1) Original, (1) Copies w/TD
CONTRACTOR DATA SHEETProvidedProvidedProvided
ADDENDUM #1, ACKNOWLEDGEDProvidedProvidedProvided
CONFLICT OF INTEREST:SignedSignedSigned
BID SIGNED:SignedSignedSigned
NET TOTAL:$248,715.00$611,032.30$129,105.50

Page &P of &N

Contract Pricing Table

Parking Lots & Garage Maint.Branche Industries, Inc.
ItemDescription
Labor, Equipment and MaterialsQty.Unit PriceTotal
1.A.Machine: <100 tons75Ton125.009,375.00
B.Machine: >100 tons165Ton110.0018,150.00
C.Hand: <100 tons35Ton150.005,250.00
D.Hand: >100 tons105Ton100.0010,500.00
2.A.Machine: <100 tons75Ton150.0011,250.00
B.Machine: >100 tons165Ton120.0019,800.00
C.Hand: <100 tons35Ton175.006,125.00
D.Hand: >100 tons105Ton100.0010,500.00
3.A.Concrete Sidewalk, <500 SF450SF9.004,050.00
B.>500 SF550SF9.004,950.00
4.A.Machine: <100 tons75Ton75.005,625.00
B.Machine: >100 tons165Ton75.0012,375.00
C.Hand: <100 tons35Ton100.003,500.00
D.Hand: >100 tons105Ton85.008,925.00
5Excavation & Site Prep200CY80.0016,000.00
6Raise/lower, manhole lids, etc.4Ea.200.00800.00
7Topsoil, Seeding, Fertilizer100SY20.002,000.00
8.A.Milling 2” of asphalt <100SY75SY35.002,625.00
B.>100 SY165SY15.002,475.00
9Undercut1000CY10.0010,000.00
10Select fill1000CY35.0035,000.00
11Paint Striping (4”)1000LF1.001,000.00
12Thermoplastic Striping (4”)1000LF2.502,500.00
13Paint Characters (12”)100Ea.5.00500.00
14Thermoplastic (12”)1000LF10.0010,000.00
15Composite Speed Bump1Ea.600.00600.00
16.A.Hot tar to cracks < 1”, <100 LF85LF3.00255.00
B.>100 LF135LF3.00405.00
17.A.Seal Coating, <800 SY500SY4.002,000.00
B.>800 SY1600SY2.003,200.00
18.ARemove & Dispose of Existing Wheel Stops1Ea.200.00200.00
B.Relocate Existing Wheel Stops1Ea.250.00250.00
C.Provide New Wheel Stops1Ea.150.00150.00
D.Install New Wheel Stops1Ea.150.00150.00
19.A.Remove & Dispose of Existing Signage with Concrete Footing1Ea.200.00200.00
B.Relocate Existing Signage1Ea.300.00300.00
C.Provide new Stop Signs1Ea.150.00150.00
D.Provide new One Way Signs1Ea.150.00150.00
E.Provide New No Parking Signs1Ea.150.00150.00
F.Provide Handicapped Signs1Ea.150.00150.00
G.Provide Motorcycle Parking Signs1Ea.150.00150.00
H.Install Signs1Ea.150.00150.00
20.ACurb & Gutter (10’ Minimum) (VDOT CG-6), Removed & Replaced In Kind200LF50.0010,000.00
B.Concrete Curb (10’ Minimum) (VDOT CG-2), Removed & Replaced In Kind200LF50.0010,000.00
21Grading1000SY3.003,000.00
22.A.Saw Cutting1FT10.0010.00
23Mobilization2Ea.500.001,000.00
24Traffic Control1Day200.00200.00
Unit Price BasedQty.
25.A.Concrete1CY300.00300.00
B.Stone, #571TN90.0090.00
C.Concrete Disposal1CY40.0040.00
D.Asphalt Disposal1TN100.00100.00
26.A.Backhoe1CY125.00125.00
B.Excavator1TN150.00150.00
C.Dump Truck1HR110.00110.00
D.Dump Truck w/ Blade for SR1HR300.00300.00
E.Roller1HR50.0050.00
F.Grader1HR100.00100.00
G.Tractor with Box1HR75.0075.00
H.Skid Steer Loader1HR125.00125.00
I.Front End Loader1HR150.00150.00
J.Power Broom1HR75.0075.00
K.Air Compressor1HR30.0030.00
L.Jack Hammer1HR25.0025.00
M.Sand Spreader1HR75.0075.00
N.Blower1HR25.0025.00
27.A.Superintendent1HR75.0075.00
A.1Superintendent, Overtime1HR112.50112.50
B.Equipment Operator1HR70.0070.00
B.1Equipment Operator, Overtime1HR105.00105.00
C.Laborer Skilled1HR50.0050.00
C.1Laborer Skilled, Overtime1HR75.0075.00
D.Labor Unskilled1HR35.0035.00
D.1Labor Unskilled, Overtime1HR52.5052.50
E.Grounds Men for Snow Removal1HR100.00100.00
E.1.Grounds Men, Overtime1HR150.00150.00
CONTACTJohn Branche
PHONE NO.757-420-4343
DELIVERY DATE:
Eva REGISTEREDYES
State Corporation CommissionYES
SWAM CertificationYes - S686705
CONTRACTOR LICENSE2705-117364A, H/H
NO. OF COPIES(1) Original, (1) Copies w/TD
CONTRACTOR DATA SHEETProvided
ADDENDUM #1, ACKNOWLEDGEDProvided
CONFLICT OF INTEREST:Signed
BID SIGNED:Signed
NET TOTAL:$248,615.00
COI Provided

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .