Bid Tab
98 KB Posted
- Solicitation number
- 75944
- Issued by
- Norfolk City, Nathalie CDP, Virginia
About this file
This document is a bid tabulation for a Parking Lots and Garage Maintenance contract opportunity in Virginia. The contracting agency is the University of Old Dominion, and the project involves providing maintenance services for parking lots and garages at the ODU main campus and VHS Medical Campus. The bid tabulation outlines various line items for labor, equipment, and materials, including machine work, hand work, concrete sidewalks, milling, curb and gutter work, striping, signage, and other related repairs. The contract will be awarded to the lowest responsive and responsible bidder. The bids were submitted by Branche Industries, Inc. and The Blair Brothers, Inc.
The bid tabulation provides unit prices and total costs for the various line items. Branche Industries, Inc. submitted a total bid of $248,615.00, while The Blair Brothers, Inc. submitted a bid of $611,227.30. The contract will be awarded for a one-year term with options for four additional one-year renewals. Funding for the contract will come from the University's Parking Services Department budget.
Text of this file
Tabulation
| Parking Lots & Garage Maint. | Branche Industries, Inc. | The Blair Brothers, Inc. | |||||
| Item | Description | ||||||
| Labor, Equipment and Materials | Qty. | Unit Price | Total | Unit Price | Total | ||
| 1.A. | Machine: <100 tons | 75 | Ton | 125.00 | 9,375.00 | 171.50 | 12,862.50 |
| B. | Machine: >100 tons | 165 | Ton | 110.00 | 18,150.00 | 132.00 | 21,780.00 |
| C. | Hand: <100 tons | 35 | Ton | 150.00 | 5,250.00 | 337.60 | 11,816.00 |
| D. | Hand: >100 tons | 105 | Ton | 100.00 | 10,500.00 | 182.25 | 19,136.25 |
| 2.A. | Machine: <100 tons | 75 | Ton | 150.00 | 11,250.00 | 172.50 | 12,937.50 |
| B. | Machine: >100 tons | 165 | Ton | 120.00 | 19,800.00 | 133.00 | 21,945.00 |
| C. | Hand: <100 tons | 35 | Ton | 175.00 | 6,125.00 | 338.60 | 11,851.00 |
| D. | Hand: >100 tons | 105 | Ton | 100.00 | 10,500.00 | 183.25 | 19,241.25 |
| 3.A. | Concrete Sidewalk, <500 SF | 450 | SF | 9.00 | 4,050.00 | 30.00 | 13,500.00 |
| B. | >500 SF | 550 | SF | 9.00 | 4,950.00 | 10.25 | 5,637.50 |
| 4.A. | Machine: <100 tons | 75 | Ton | 75.00 | 5,625.00 | 142.50 | 10,687.50 |
| B. | Machine: >100 tons | 165 | Ton | 75.00 | 12,375.00 | 103.00 | 16,995.00 |
| C. | Hand: <100 tons | 35 | Ton | 100.00 | 3,500.00 | 308.60 | 10,801.00 |
| D. | Hand: >100 tons | 105 | Ton | 85.00 | 8,925.00 | 153.25 | 16,091.25 |
| 5 | Excavation & Site Prep | 200 | CY | 80.00 | 16,000.00 | 145.00 | 29,000.00 |
| 6 | Raise/lower, manhole lids, etc. | 4 | Ea. | 200.00 | 800.00 | 2,000.00 | 8,000.00 |
| 7 | Topsoil, Seeding, Fertilizer | 100 | SY | 20.00 | 2,000.00 | 15.00 | 1,500.00 |
| 8.A. | Milling 2” of asphalt <100SY | 75 | SY | 35.00 | 2,625.00 | 95.00 | 7,125.00 |
| B. | >100 SY | 165 | SY | 15.00 | 2,475.00 | 31.67 | 5,225.55 |
| 9 | Undercut | 1000 | CY | 10.00 | 10,000.00 | 145.00 | 145,000.00 |
| 10 | Select fill | 1000 | CY | 35.00 | 35,000.00 | 72.00 | 72,000.00 |
| 11 | Paint Striping (4”) | 1000 | LF | 1.00 | 1,000.00 | 6.83 | 6,830.00 |
| 12 | Thermoplastic Striping (4”) | 1000 | LF | 2.50 | 2,500.00 | 11.50 | 11,500.00 |
| 13 | Paint Characters (12”) | 100 | Ea. | 5.00 | 500.00 | 20.00 | 2,000.00 |
| 14 | Thermoplastic (12”) | 1000 | LF | 10.00 | 10,000.00 | 34.50 | 34,500.00 |
| 15 | Composite Speed Bump | 1 | Ea. | 600.00 | 600.00 | 1,800.00 | 1,800.00 |
| 16.A. | Hot tar to cracks < 1”, <100 LF | 85 | LF | 3.00 | 255.00 | 14.00 | 1,190.00 |
| B. | >100 LF | 135 | LF | 3.00 | 405.00 | 7.00 | 945.00 |
| 17.A. | Seal Coating, <800 SY | 500 | SY | 4.00 | 2,000.00 | 4.25 | 2,125.00 |
| B. | >800 SY | 1600 | SY | 2.00 | 3,200.00 | 2.40 | 3,840.00 |
| 18.A | Remove & Dispose of Existing Wheel Stops | 1 | Ea. | 200.00 | 200.00 | 100.00 | 100.00 |
| B. | Relocate Existing Wheel Stops | 1 | Ea. | 250.00 | 250.00 | 200.00 | 200.00 |
| C. | Provide New Wheel Stops | 1 | Ea. | 150.00 | 150.00 | 50.00 | 50.00 |
| D. | Install New Wheel Stops | 1 | Ea. | 150.00 | 150.00 | 75.00 | 75.00 |
| 19.A. | Remove & Dispose of Existing Signage with Concrete Footing | 1 | Ea. | 200.00 | 200.00 | 350.00 | 350.00 |
| B. | Relocate Existing Signage | 1 | Ea. | 300.00 | 300.00 | 350.00 | 350.00 |
| C. | Provide new Stop Signs | 1 | Ea. | 150.00 | 150.00 | 250.00 | 250.00 |
| D. | Provide new One Way Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 |
| E. | Provide New No Parking Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 |
| F. | Provide Handicapped Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 |
| G. | Provide Motorcycle Parking Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 |
| H. | Install Signs | 1 | Ea. | 150.00 | 150.00 | 150.00 | 150.00 |
| 20.A | Curb & Gutter (10’ Minimum) (VDOT CG-6), Removed & Replaced In Kind | 200 | LF | 50.00 | 10,000.00 | 155.00 | 31,000.00 |
| B. | Concrete Curb (10’ Minimum) (VDOT CG-2), Removed & Replaced In Kind | 200 | LF | 50.00 | 10,000.00 | 135.00 | 27,000.00 |
| 21 | Grading | 1000 | SY | 3.00 | 3,000.00 | 4.00 | 4,000.00 |
| 22.A. | Saw Cutting | 1 | FT | 10.00 | 10.00 | 10.00 | 10.00 |
| 23 | Mobilization | 2 | Ea. | 500.00 | 1,000.00 | 2,000.00 | 4,000.00 |
| 24 | Traffic Control | 1 | Day | 200.00 | 200.00 | 1,800.00 | 1,800.00 |
| Unit Price Based | Qty. | ||||||
| 25.A. | Concrete | 1 | CY | 300.00 | 300.00 | 300.00 | 300.00 |
| B. | Stone, #57 | 1 | TN | 90.00 | 90.00 | 65.00 | 65.00 |
| C. | Concrete Disposal | 1 | CY | 40.00 | 40.00 | 10.00 | 10.00 |
| D. | Asphalt Disposal | 1 | TN | 100.00 | 100.00 | 10.00 | 10.00 |
| 26.A. | Backhoe | 1 | CY | 125.00 | 125.00 | 125.00 | 125.00 |
| B. | Excavator | 1 | TN | 150.00 | 150.00 | 250.00 | 250.00 |
| C. | Dump Truck | 1 | HR | 110.00 | 110.00 | 135.00 | 135.00 |
| D. | Dump Truck w/ Blade for SR | 1 | HR | 300.00 | 300.00 | 250.00 | 250.00 |
| E. | Roller | 1 | HR | 50.00 | 50.00 | 95.00 | 95.00 |
| F. | Grader | 1 | HR | 100.00 | 100.00 | 200.00 | 200.00 |
| G. | Tractor with Box | 1 | HR | 75.00 | 75.00 | 125.00 | 125.00 |
| H. | Skid Steer Loader | 1 | HR | 125.00 | 125.00 | 125.00 | 125.00 |
| I. | Front End Loader | 1 | HR | 150.00 | 150.00 | 200.00 | 200.00 |
| J. | Power Broom | 1 | HR | 75.00 | 75.00 | 95.00 | 95.00 |
| K. | Air Compressor | 1 | HR | 30.00 | 30.00 | 100.00 | 100.00 |
| L. | Jack Hammer | 1 | HR | 25.00 | 25.00 | 50.00 | 50.00 |
| M. | Sand Spreader | 1 | HR | 75.00 | 75.00 | 200.00 | 200.00 |
| N. | Blower | 1 | HR | 25.00 | 25.00 | 50.00 | 50.00 |
| 27.A. | Superintendent | 1 | HR | 75.00 | 75.00 | 95.00 | 95.00 |
| A.1 | Superintendent, Overtime | 1 | HR | 112.50 | 112.50 | 142.50 | 142.50 |
| B. | Equipment Operator | 1 | HR | 70.00 | 70.00 | 75.00 | 75.00 |
| B.1 | Equipment Operator, Overtime | 1 | HR | 105.00 | 105.00 | 112.50 | 112.50 |
| C. | Laborer Skilled | 1 | HR | 50.00 | 50.00 | 75.00 | 75.00 |
| C.1 | Laborer Skilled, Overtime | 1 | HR | 75.00 | 75.00 | 112.50 | 112.50 |
| D. | Labor Unskilled | 1 | HR | 35.00 | 35.00 | 75.00 | 75.00 |
| D.1 | Labor Unskilled, Overtime | 1 | HR | 52.50 | 52.50 | 112.50 | 112.50 |
| E. | Grounds Men for Snow Removal | 1 | HR | 100.00 | 100.00 | 130.00 | 130.00 |
| E.1. | Grounds Men, Overtime | 1 | HR | 150.00 | 150.00 | 195.00 | 195.00 |
| CONTACT | John Branche | Aaron Ketchum | |||||
| PHONE NO. | 757-420-4343 | 757-5381696 | |||||
| DELIVERY DATE: | |||||||
| Eva REGISTERED | YES | YES | E17703 | ||||
| State Corporation Commission | YES | YES | |||||
| SWAM Certification | Yes - S686705 | N/A | |||||
| CONTRACTOR LICENSE | 2705-117364A, H/H | 2701010057 | |||||
| NO. OF COPIES | (1) Original, (1) Copies w/TD | (1) Original, (1) Copies w/TD | |||||
| CONTRACTOR DATA SHEET | Provided | Provided | |||||
| Certificate of Insurance | Provided | Provided | |||||
| ADDENDUM #1, ACKNOWLEDGED | Provided | Provided | |||||
| CONFLICT OF INTEREST: | Signed | Signed | |||||
| BID SIGNED: | Signed | Signed | |||||
| NET TOTAL: | $248,865.00 | $611,227.30 | |||||
| COI Provided |
Page &P of &N
Comparison of FY-'20 - FY-'25
| Parking Lots & Garage Maint. | Branche Industries, Inc. | The Blair Brothers, Inc. | Branche Industries, Inc. - FY-'20 | ||||||
| Item | Description | ||||||||
| Labor, Equipment and Materials | Qty. | Unit Price | Total | Unit Price | Total | Unit Price | Total | ||
| 1.A. | Machine: <100 tons | 75 | Ton | 125.00 | 9,375.00 | 171.50 | 12,862.50 | 95.00 | 7,125.00 |
| B. | Machine: >100 tons | 165 | Ton | 110.00 | 18,150.00 | 132.00 | 21,780.00 | 80.00 | 13,200.00 |
| C. | Hand: <100 tons | 35 | Ton | 150.00 | 5,250.00 | 337.60 | 11,816.00 | 125.00 | 4,375.00 |
| D. | Hand: >100 tons | 105 | Ton | 100.00 | 10,500.00 | 182.25 | 19,136.25 | 90.00 | 9,450.00 |
| 2.A. | Machine: <100 tons | 75 | Ton | 150.00 | 11,250.00 | 172.50 | 12,937.50 | 110.00 | 8,250.00 |
| B. | Machine: >100 tons | 165 | Ton | 120.00 | 19,800.00 | 133.00 | 21,945.00 | 95.00 | 15,675.00 |
| C. | Hand: <100 tons | 35 | Ton | 175.00 | 6,125.00 | 338.60 | 11,851.00 | 150.00 | 5,250.00 |
| D. | Hand: >100 tons | 105 | Ton | 100.00 | 10,500.00 | 183.25 | 19,241.25 | 75.00 | 7,875.00 |
| 3.A. | Concrete Sidewalk, <500 SF | 450 | SF | 9.00 | 4,050.00 | 30.00 | 13,500.00 | 4.00 | 1,800.00 |
| B. | >500 SF | 550 | SF | 9.00 | 4,950.00 | 10.25 | 5,637.50 | 4.00 | 2,200.00 |
| 4.A. | Machine: <100 tons | 75 | Ton | 75.00 | 5,625.00 | 142.50 | 10,687.50 | 35.00 | 2,625.00 |
| B. | Machine: >100 tons | 165 | Ton | 75.00 | 12,375.00 | 103.00 | 16,995.00 | 35.00 | 5,775.00 |
| C. | Hand: <100 tons | 35 | Ton | 100.00 | 3,500.00 | 308.60 | 10,801.00 | 70.00 | 2,450.00 |
| D. | Hand: >100 tons | 105 | Ton | 85.00 | 8,925.00 | 153.25 | 16,091.25 | 30.00 | 3,150.00 |
| 5 | Excavation & Site Prep | 200 | CY | 80.00 | 16,000.00 | 145.00 | 29,000.00 | 40.00 | 8,000.00 |
| 6 | Raise/lower, manhole lids, etc. | 4 | Ea. | 200.00 | 800.00 | 2,000.00 | 8,000.00 | 100.00 | 400.00 |
| 7 | Topsoil, Seeding, Fertilizer | 100 | SY | 20.00 | 2,000.00 | 15.00 | 1,500.00 | 5.00 | 500.00 |
| 8.A. | Milling 2” of asphalt <100SY | 75 | SY | 35.00 | 2,625.00 | 95.00 | 7,125.00 | 10.00 | 750.00 |
| B. | >100 SY | 165 | SY | 15.00 | 2,475.00 | 31.67 | 5,225.55 | 10.00 | 1,650.00 |
| 9 | Undercut | 1000 | CY | 10.00 | 10,000.00 | 145.00 | 145,000.00 | 5.00 | 5,000.00 |
| 10 | Select fill | 1000 | CY | 35.00 | 35,000.00 | 72.00 | 72,000.00 | 15.00 | 15,000.00 |
| 11 | Paint Striping (4”) | 1000 | LF | 1.00 | 1,000.00 | 6.83 | 6,830.00 | 0.75 | 750.00 |
| 12 | Thermoplastic Striping (4”) | 1000 | LF | 2.50 | 2,500.00 | 11.50 | 11,500.00 | 1.50 | 1,500.00 |
| 13 | Paint Characters (12”) | 100 | Ea. | 5.00 | 500.00 | 20.00 | 2,000.00 | 5.00 | 500.00 |
| 14 | Thermoplastic (12”) | 1000 | LF | 10.00 | 10,000.00 | 34.50 | 34,500.00 | 10.00 | 10,000.00 |
| 15 | Composite Speed Bump | 1 | Ea. | 600.00 | 600.00 | 1,800.00 | 1,800.00 | 300.00 | 300.00 |
| 16.A. | Hot tar to cracks < 1”, <100 LF | 85 | LF | 3.00 | 255.00 | 14.00 | 1,190.00 | 2.00 | 170.00 |
| B. | >100 LF | 135 | LF | 3.00 | 405.00 | 7.00 | 945.00 | 2.00 | 270.00 |
| 17.A. | Seal Coating, <800 SY | 500 | SY | 4.00 | 2,000.00 | 4.25 | 2,125.00 | 2.00 | 1,000.00 |
| B. | >800 SY | 1600 | SY | 2.00 | 3,200.00 | 2.40 | 3,840.00 | 1.25 | 2,000.00 |
| 18.A | Remove & Dispose of Existing Wheel Stops | 1 | Ea. | 200.00 | 200.00 | 100.00 | 100.00 | 100.00 | 100.00 |
| B. | Relocate Existing Wheel Stops | 1 | Ea. | 250.00 | 250.00 | 200.00 | 200.00 | 200.00 | 200.00 |
| C. | Provide New Wheel Stops | 1 | Ea. | 150.00 | 150.00 | 50.00 | 50.00 | 100.00 | 100.00 |
| D. | Install New Wheel Stops | 1 | Ea. | 150.00 | 150.00 | 75.00 | 75.00 | 100.00 | 100.00 |
| 19.A. | Remove & Dispose of Existing Signage with Concrete Footing | 1 | Ea. | 200.00 | 200.00 | 350.00 | 350.00 | 200.00 | 200.00 |
| B. | Relocate Existing Signage | 1 | Ea. | 300.00 | 300.00 | 350.00 | 350.00 | 200.00 | 200.00 |
| C. | Provide new Stop Signs | 1 | Ea. | 150.00 | 150.00 | 250.00 | 250.00 | 100.00 | 100.00 |
| D. | Provide new One Way Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 | 100.00 | 100.00 |
| E. | Provide New No Parking Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 | 100.00 | 100.00 |
| F. | Provide Handicapped Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 | 100.00 | 100.00 |
| G. | Provide Motorcycle Parking Signs | 1 | Ea. | 150.00 | 150.00 | 130.00 | 130.00 | 100.00 | 100.00 |
| H. | Install Signs | 1 | Ea. | 150.00 | 150.00 | 150.00 | 150.00 | 100.00 | 100.00 |
| 20.A | Curb & Gutter (10’ Minimum) (VDOT CG-6), Removed & Replaced In Kind | 200 | LF | 50.00 | 10,000.00 | 155.00 | 31,000.00 | 22.00 | 4,400.00 |
| B. | Concrete Curb (10’ Minimum) (VDOT CG-2), Removed & Replaced In Kind | 200 | LF | 50.00 | 10,000.00 | 135.00 | 27,000.00 | 20.00 | 4,000.00 |
| 21 | Grading | 1000 | SY | 3.00 | 3,000.00 | 4.00 | 4,000.00 | 1.00 | 1,000.00 |
| 22.A. | Saw Cutting | 1 | FT | 10.00 | 10.00 | 10.00 | 10.00 | 3.00 | 3.00 |
| 23 | Mobilization | 2 | Ea. | 500.00 | 1,000.00 | 2,000.00 | 4,000.00 | ||
| 24 | Traffic Control | 1 | Day | 200.00 | 200.00 | 1,800.00 | 1,800.00 | ||
| Unit Price Based | Qty. | ||||||||
| 25.A. | Concrete | 1 | CY | 300.00 | 300.00 | 300.00 | 300.00 | 140.00 | 140.00 |
| B. | Stone, #57 | 1 | TN | 90.00 | 90.00 | 65.00 | 65.00 | 40.00 | 40.00 |
| C. | Concrete Disposal | 1 | CY | 40.00 | 40.00 | 10.00 | 10.00 | 10.00 | 10.00 |
| D. | Asphalt Disposal | 1 | TN | 100.00 | 100.00 | 10.00 | 10.00 | 10.00 | 10.00 |
| 26.A. | Backhoe | 1 | CY | 125.00 | 125.00 | 125.00 | 125.00 | 75.00 | 75.00 |
| B. | Excavator | 1 | TN | 150.00 | 150.00 | 250.00 | 250.00 | 95.00 | 95.00 |
| C. | Dump Truck | 1 | HR | 110.00 | 110.00 | 135.00 | 135.00 | 75.00 | 75.00 |
| D. | Dump Truck w/ Blade for SR | 1 | HR | 300.00 | 300.00 | 250.00 | 250.00 | 125.00 | 125.00 |
| E. | Roller | 1 | HR | 50.00 | 50.00 | 95.00 | 95.00 | 30.00 | 30.00 |
| F. | Grader | 1 | HR | 100.00 | 100.00 | 200.00 | 200.00 | 50.00 | 50.00 |
| G. | Tractor with Box | 1 | HR | 75.00 | 75.00 | 125.00 | 125.00 | 50.00 | 50.00 |
| H. | Skid Steer Loader | 1 | HR | 125.00 | 125.00 | 125.00 | 125.00 | 75.00 | 75.00 |
| I. | Front End Loader | 1 | HR | 150.00 | 150.00 | 200.00 | 200.00 | 95.00 | 95.00 |
| J. | Power Broom | 1 | HR | 75.00 | 75.00 | 95.00 | 95.00 | 50.00 | 50.00 |
| K. | Air Compressor | 1 | HR | 30.00 | 30.00 | 100.00 | 100.00 | 20.00 | 20.00 |
| L. | Jack Hammer | 1 | HR | 25.00 | 25.00 | 50.00 | 50.00 | 10.00 | 10.00 |
| M. | Sand Spreader | 1 | HR | 75.00 | 75.00 | 200.00 | 200.00 | 35.00 | 35.00 |
| N. | Blower | 1 | HR | 25.00 | 25.00 | 50.00 | 50.00 | 15.00 | 15.00 |
| 27.A. | Superintendent | 1 | HR | 75.00 | 75.00 | 95.00 | 95.00 | 60.00 | 60.00 |
| A.1 | Superintendent, Overtime | 1 | HR | 112.50 | 112.50 | 142.50 | 142.50 | 90.00 | 90.00 |
| B. | Equipment Operator | 1 | HR | 70.00 | 70.00 | 75.00 | 75.00 | 45.00 | 45.00 |
| B.1 | Equipment Operator, Overtime | 1 | HR | 105.00 | 105.00 | 112.50 | 112.50 | 67.50 | 67.50 |
| C. | Laborer Skilled | 1 | HR | 50.00 | 50.00 | 75.00 | 75.00 | 35.00 | 35.00 |
| C.1 | Laborer Skilled, Overtime | 1 | HR | 75.00 | 75.00 | 112.50 | 112.50 | 52.50 | 52.50 |
| D. | Labor Unskilled | 1 | HR | 35.00 | 35.00 | 75.00 | 75.00 | 25.00 | 25.00 |
| D.1 | Labor Unskilled, Overtime | 1 | HR | 52.50 | 52.50 | 112.50 | 112.50 | 37.50 | 37.50 |
| E. | Grounds Men for Snow Removal | 1 | HR | 100.00 | 100.00 | 130.00 | 130.00 | 50.00 | 50.00 |
| E.1. | Grounds Men, Overtime | 1 | HR | 150.00 | 150.00 | 195.00 | 195.00 | 75.00 | 75.00 |
| CONTACT | John Branche | Aaron Ketchum | John Branche | ||||||
| PHONE NO. | 757-420-4343 | 757-5381696 | 757-420-4343 | ||||||
| DELIVERY DATE: | |||||||||
| Eva REGISTERED | YES | YES | E17703 | YES | |||||
| State Corporation Commission | YES | YES | YES | ||||||
| SWAM Certification | Yes - S686705 | N/A | Yes - S686705 | ||||||
| CONTRACTOR LICENSE | 2705-117364A, H/H | 2701010057 | 2705-117364A, H/H | ||||||
| NO. OF COPIES | (1) Original, (1) Copies w/TD | (1) Original, (1) Copies w/TD | (1) Original, (1) Copies w/TD | ||||||
| CONTRACTOR DATA SHEET | Provided | Provided | Provided | ||||||
| ADDENDUM #1, ACKNOWLEDGED | Provided | Provided | Provided | ||||||
| CONFLICT OF INTEREST: | Signed | Signed | Signed | ||||||
| BID SIGNED: | Signed | Signed | Signed | ||||||
| NET TOTAL: | $248,715.00 | $611,032.30 | $129,105.50 |
Page &P of &N
Contract Pricing Table
| Parking Lots & Garage Maint. | Branche Industries, Inc. | ||||
| Item | Description | ||||
| Labor, Equipment and Materials | Qty. | Unit Price | Total | ||
| 1.A. | Machine: <100 tons | 75 | Ton | 125.00 | 9,375.00 |
| B. | Machine: >100 tons | 165 | Ton | 110.00 | 18,150.00 |
| C. | Hand: <100 tons | 35 | Ton | 150.00 | 5,250.00 |
| D. | Hand: >100 tons | 105 | Ton | 100.00 | 10,500.00 |
| 2.A. | Machine: <100 tons | 75 | Ton | 150.00 | 11,250.00 |
| B. | Machine: >100 tons | 165 | Ton | 120.00 | 19,800.00 |
| C. | Hand: <100 tons | 35 | Ton | 175.00 | 6,125.00 |
| D. | Hand: >100 tons | 105 | Ton | 100.00 | 10,500.00 |
| 3.A. | Concrete Sidewalk, <500 SF | 450 | SF | 9.00 | 4,050.00 |
| B. | >500 SF | 550 | SF | 9.00 | 4,950.00 |
| 4.A. | Machine: <100 tons | 75 | Ton | 75.00 | 5,625.00 |
| B. | Machine: >100 tons | 165 | Ton | 75.00 | 12,375.00 |
| C. | Hand: <100 tons | 35 | Ton | 100.00 | 3,500.00 |
| D. | Hand: >100 tons | 105 | Ton | 85.00 | 8,925.00 |
| 5 | Excavation & Site Prep | 200 | CY | 80.00 | 16,000.00 |
| 6 | Raise/lower, manhole lids, etc. | 4 | Ea. | 200.00 | 800.00 |
| 7 | Topsoil, Seeding, Fertilizer | 100 | SY | 20.00 | 2,000.00 |
| 8.A. | Milling 2” of asphalt <100SY | 75 | SY | 35.00 | 2,625.00 |
| B. | >100 SY | 165 | SY | 15.00 | 2,475.00 |
| 9 | Undercut | 1000 | CY | 10.00 | 10,000.00 |
| 10 | Select fill | 1000 | CY | 35.00 | 35,000.00 |
| 11 | Paint Striping (4”) | 1000 | LF | 1.00 | 1,000.00 |
| 12 | Thermoplastic Striping (4”) | 1000 | LF | 2.50 | 2,500.00 |
| 13 | Paint Characters (12”) | 100 | Ea. | 5.00 | 500.00 |
| 14 | Thermoplastic (12”) | 1000 | LF | 10.00 | 10,000.00 |
| 15 | Composite Speed Bump | 1 | Ea. | 600.00 | 600.00 |
| 16.A. | Hot tar to cracks < 1”, <100 LF | 85 | LF | 3.00 | 255.00 |
| B. | >100 LF | 135 | LF | 3.00 | 405.00 |
| 17.A. | Seal Coating, <800 SY | 500 | SY | 4.00 | 2,000.00 |
| B. | >800 SY | 1600 | SY | 2.00 | 3,200.00 |
| 18.A | Remove & Dispose of Existing Wheel Stops | 1 | Ea. | 200.00 | 200.00 |
| B. | Relocate Existing Wheel Stops | 1 | Ea. | 250.00 | 250.00 |
| C. | Provide New Wheel Stops | 1 | Ea. | 150.00 | 150.00 |
| D. | Install New Wheel Stops | 1 | Ea. | 150.00 | 150.00 |
| 19.A. | Remove & Dispose of Existing Signage with Concrete Footing | 1 | Ea. | 200.00 | 200.00 |
| B. | Relocate Existing Signage | 1 | Ea. | 300.00 | 300.00 |
| C. | Provide new Stop Signs | 1 | Ea. | 150.00 | 150.00 |
| D. | Provide new One Way Signs | 1 | Ea. | 150.00 | 150.00 |
| E. | Provide New No Parking Signs | 1 | Ea. | 150.00 | 150.00 |
| F. | Provide Handicapped Signs | 1 | Ea. | 150.00 | 150.00 |
| G. | Provide Motorcycle Parking Signs | 1 | Ea. | 150.00 | 150.00 |
| H. | Install Signs | 1 | Ea. | 150.00 | 150.00 |
| 20.A | Curb & Gutter (10’ Minimum) (VDOT CG-6), Removed & Replaced In Kind | 200 | LF | 50.00 | 10,000.00 |
| B. | Concrete Curb (10’ Minimum) (VDOT CG-2), Removed & Replaced In Kind | 200 | LF | 50.00 | 10,000.00 |
| 21 | Grading | 1000 | SY | 3.00 | 3,000.00 |
| 22.A. | Saw Cutting | 1 | FT | 10.00 | 10.00 |
| 23 | Mobilization | 2 | Ea. | 500.00 | 1,000.00 |
| 24 | Traffic Control | 1 | Day | 200.00 | 200.00 |
| Unit Price Based | Qty. | ||||
| 25.A. | Concrete | 1 | CY | 300.00 | 300.00 |
| B. | Stone, #57 | 1 | TN | 90.00 | 90.00 |
| C. | Concrete Disposal | 1 | CY | 40.00 | 40.00 |
| D. | Asphalt Disposal | 1 | TN | 100.00 | 100.00 |
| 26.A. | Backhoe | 1 | CY | 125.00 | 125.00 |
| B. | Excavator | 1 | TN | 150.00 | 150.00 |
| C. | Dump Truck | 1 | HR | 110.00 | 110.00 |
| D. | Dump Truck w/ Blade for SR | 1 | HR | 300.00 | 300.00 |
| E. | Roller | 1 | HR | 50.00 | 50.00 |
| F. | Grader | 1 | HR | 100.00 | 100.00 |
| G. | Tractor with Box | 1 | HR | 75.00 | 75.00 |
| H. | Skid Steer Loader | 1 | HR | 125.00 | 125.00 |
| I. | Front End Loader | 1 | HR | 150.00 | 150.00 |
| J. | Power Broom | 1 | HR | 75.00 | 75.00 |
| K. | Air Compressor | 1 | HR | 30.00 | 30.00 |
| L. | Jack Hammer | 1 | HR | 25.00 | 25.00 |
| M. | Sand Spreader | 1 | HR | 75.00 | 75.00 |
| N. | Blower | 1 | HR | 25.00 | 25.00 |
| 27.A. | Superintendent | 1 | HR | 75.00 | 75.00 |
| A.1 | Superintendent, Overtime | 1 | HR | 112.50 | 112.50 |
| B. | Equipment Operator | 1 | HR | 70.00 | 70.00 |
| B.1 | Equipment Operator, Overtime | 1 | HR | 105.00 | 105.00 |
| C. | Laborer Skilled | 1 | HR | 50.00 | 50.00 |
| C.1 | Laborer Skilled, Overtime | 1 | HR | 75.00 | 75.00 |
| D. | Labor Unskilled | 1 | HR | 35.00 | 35.00 |
| D.1 | Labor Unskilled, Overtime | 1 | HR | 52.50 | 52.50 |
| E. | Grounds Men for Snow Removal | 1 | HR | 100.00 | 100.00 |
| E.1. | Grounds Men, Overtime | 1 | HR | 150.00 | 150.00 |
| CONTACT | John Branche | ||||
| PHONE NO. | 757-420-4343 | ||||
| DELIVERY DATE: | |||||
| Eva REGISTERED | YES | ||||
| State Corporation Commission | YES | ||||
| SWAM Certification | Yes - S686705 | ||||
| CONTRACTOR LICENSE | 2705-117364A, H/H | ||||
| NO. OF COPIES | (1) Original, (1) Copies w/TD | ||||
| CONTRACTOR DATA SHEET | Provided | ||||
| ADDENDUM #1, ACKNOWLEDGED | Provided | ||||
| CONFLICT OF INTEREST: | Signed | ||||
| BID SIGNED: | Signed | ||||
| NET TOTAL: | $248,615.00 | ||||
| COI Provided |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .