Bid_Specs_Heavy_Equip_with_Op.pdf

PDF 203 KB Posted

Attached to
BID-PW- Rental of Heavy Equipment WITH Operator
Solicitation number
0000004350
Issued by
Hennepin County, Minnesota

About this file

Summary of Bid Specifications

This document is a specifications sheet for the City of Minneapolis soliciting bids for the rental of heavy equipment with operators (Event No. 4350). The City intends to award multiple contracts to the lowest responsive and responsible bidders to serve various City departments and the Minneapolis Park and Recreation Board on an as-needed basis. The equipment categories include dump trucks, tandans, tractors, cranes, log loaders, skidders, chippers, haulers, and other equipment as needed. The initial contract term is one year, commencing on or around March 2027, with the option for the City to renew and extend the contract for four additional 12-month periods if agreeable to both parties. Contractors must respond to equipment requests with average notice of two working days, though shorter notice may occur. Equipment operators must provide current business telephone, cell phone, and email contact information for timely coordination. All on-road vehicles must meet 2010 or newer emission standards, and all off-road equipment must meet Tier 3 or newer emission standards.

Pricing for equipment rental is on an hourly basis and must include equipment, operating personnel, fuel, supplies, and related incidentals, with no minimum charges allowed. Bid prices remain firm for the initial contract year; after the initial period, price escalation may be permitted based on demonstrable industry-wide, regional, or operational cost increases, capped at the higher of the Consumer Price Index or five percent. All equipment operators must be properly licensed, wear City-approved safety equipment and work attire, and comply with federal drug and alcohol testing requirements for commercial drivers. Contractors are classified as independent contractors and must maintain their own worker's compensation insurance. Equipment mobilization charges for specific items such as cranes will be paid by using departments, while contractors bear all other mobilization costs. Invoices must include the PO number, dispatcher name, and department name, and payment is rendered within thirty days of receipt and acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e 1 | 5

SPECIFICATIONS

RENTAL OF HEAVY EQUIPMENT WITH OPERATOR

EVENT NO.: 4350

SCOPE OF WORK:

The City of Minneapolis is accepting bids for the rental of heavy equipment with operator for various City of Minneapolis departments (“City”) and boards (“Park Board”) projects on an as needed basis. The various needs include dump trucks, tandems, tractors, cranes, etc. and other equipment such as log loaders, skidders, chippers and haulers as needed all in accordance with the specifications as follows.

CONTRACT TERM:

It is the intent of the City to award multiple contracts. The successful Contractor(s) will be awarded an initial one (1) year contract starting on or around March 2027. Bid prices shall remain firm for the initial contract term. This contract may be renewed at the expiration of the initial term at the request of the City. The City reserves the right to extend these contracts for four (4) additional 12-month periods if agreeable to both parties.

The bid will be awarded to the lowest responsive and responsible bidders based on the Bid Forms submitted. The City reserves the right to award multiple bidders to serve the best interest of the City. This contract could be used by any City Department but most likely will be Fleet or Park Board.

NON-EXCLUSIVE:

Any contract(s) resulting from this Request for Bid will not be an exclusive contract and the City reserves the right to hire other contractors and seek bids from other vendors.

PRICE ESCALATION:

Prices shall be firm for the first year of the contract. After the initial contract period, an escalation may be allowed for any extensions based upon a demonstrable industry-wide, regional, or operational increases in the contractor’s costs. For documentary evidence to be considered, it must be submitted to the City of Minneapolis Purchasing Department sixty (60) days prior to the end of the current contract year. The exact amount of escalation, if any, will be governed by the validity of the documentary evidence submitted. No price increase will be effective until approved by the City of Minneapolis Purchasing Department. With the exception of extraordinary circumstances, the amount of any increase shall not exceed the Consumer Price Index (CPI) or five (5) percent, whichever is higher.

RIGHTS OF THE CITY:

The City reserves the right to reject all or any part of any bid, waive informalities, and award the contract to the lowest responsive and responsible bidder(s) to best serve the interest of the City. Informality shall mean a minor defect or variation of a bid from the exact requirements of the Call for Bid which does not affect the price, quality, quantity, or delivery schedule for the goods, services or construction being procured.

QUANTITIES:

The quantities specified in this Contract are estimates only. They may not indicate the actual quantity which will be ordered, since such volume will depend upon requirements which develop during the Contract period.

Quantities shown shall not be construed to represent any amount which the City shall be obligated to purchase under the Contract or relieve the Contractor of its obligation to fill all orders placed by the City.

REQUESTS FOR EQUIPMENT:

City personnel will call the supplier to request type of equipment needed. The average notice is two (2) working days prior to the start of work, but shorter notice may sometimes occur. The request will be made for a specific piece of equipment and substitutions will not be allowed unless prior authorization is given in writing (email is satisfactory). The City personnel have determined the size and type of equipment

P a g e 2 | 5 needed. If other equipment is to be considered, a prior on-site meeting with City personnel will be necessary.

The City may require equipment that is not specifically called for on this bid. Each bidder is encouraged to list and bid all equipment they can provide in addition to what is requested. Any additional equipment bid will be covered under this contract with the same terms and conditions.

The City will normally contact the lowest bid item first, the second lowest bid item next and so forth depending on availability. Notwithstanding this, the City may contact a higher bid item if in the opinion of the City the machine and/or operator provided by an alternative Contractor is better suited for the project. A lower priced Contractor, working for the City will not be allowed to bump a higher priced Contractor, also working for the City, in the middle of a project.

Specific information regarding the job location, work hours, possible special conditions, and other job information will be provided at the time of request.

Period of usage shall be given at the time of request to the best of the City’s estimation.

Equipment may be scheduled anytime. When a need is determined, and the Contractor is contacted, Contractors are expected to respond in a timely manner. If an effort is made to contact a Contractor and the Contractor does not respond or cannot respond within the time allotted by a department, the department may contact another Contractor on the contract list for their rental equipment and operator needs.

Bidders must provide a telephone number that is active during normal working hours. Many City and/or Park Board needs arise that are of urgent nature. The Contractor shall provide his/her current business telephone number, cell phone number and e-mail address for contact. The City will make a reasonable attempt to contact the Contractor to initiate a contract. A lack of response from the Contractor or an inability to contact the Contractor in a 30-minute period may constitute a rejection on the part of the Contractor to accept the contract. If a Contractor cannot be contacted, the City and/or Park Board will make alternative arrangements for which neither the City nor the Park Board will be financially liable. If in a calendar year, a Contractor has not accepted a contract after six (6) attempts by the City, the Contractor's bid may be considered invalid for future contracts.

All equipment provided must be available for inspection at any time by the City or Park Board Personnel. In order to help meet the City’s goals of reducing Greenhouse Gasses, all on road vehicles must meet 2010 or newer emission standards, and all off road equipment must meet Tier 3 or newer emission standards.

PERSONNEL REQUIREMENTS:

Equipment shall be rented on an hourly basis, price bid to include equipment, required operating personnel, fuel, supplies and related incidentals. Contractor must furnish equipment bid or a substitute approved by the Dispatcher's Office.

All equipment operators will wear City approved hard hats, safety vests and Safety Shoes or Boots.

Operator must also wear appropriate work attire such as full-length pants and regulation T-Shirts. No wearing of shorts or “muscle” shirts. Failure to do so will result in suspension from working for the City until corrected and approved by the City Dispatcher's Office.

Contractors who have employees will be required to submit payroll records with their invoices.

Contractors must haul material designated by the Foreman and deliver to site designated by the Foreman.

Failure to accept an assignment based on miles required or type of material hauled, or failure to notify dispatch of absence one (1) hour prior to start of shift, will result in suspension up to and including further City work during current contract.

PERFORMANCE EXPECTATIONS:

P a g e 3 | 5

One written complaint on performance from field supervisor or designee in charge of site will prompt a request for a competent operator. If none are available, the machine will be cut until a competent operator can be found. Two written complaints and the City has the option to cut that machine for the designated project.

IDENTIFICATION OF OPERATOR:

All City time sheets for work performed shall include operator's name, equipment model number, serial number or license plate number, year of manufacture and company name. Operator will be required to provide a driver’s license for identification.

HOURLY RATE:

ALL hours worked will be invoiced at the hourly rate bid. There will be no additional rate for overtime, weekend and holiday work.

SUB-CONTRACTING:

The lessor shall not be permitted to sub-contract with equipment operators for their services.

CONTRACTOR IS INDEPENDENT CONTRACTOR:

It is agreed that nothing herein contained is intended or should be construed in any manner as creating or establishing the relationship of co-partner between the parties hereto or as constituting the Contractor as the agent, representative or employee of the City or the Park Board for any purpose or in any manner whatsoever. Contractor is to be and shall remain an independent contractor with respect to all services performed under this contract. Any and all Lessor of Contractor, while engaged in the performance of any work or services required by Lessor under this contract, shall not be considered employees of the City or the Park Board, and any and all claims that may arise under the Worker's Compensation Act of the State of Minnesota or any other State or any other employment related claim brought by employees, shall in no way be the responsibility of the City or the Park Board. Contractor shall defend, indemnify and hold the City and the Park Board, its elected officials, officers, agents and employees harmless from any and all such claims. Such persons shall not require nor be entitled to any compensation, rights or benefits of any kind whatsoever from the City or the Park Board.

PARTNERSHIPS:

For the purpose of this bid, a partner can be listed on only one bid. A partner shown on one bid cannot change partnerships. Only partners not shown on any bids can be added to a partnership. All additions to partnerships MUST be accompanied by a Certificate of Assumed Name on file at the Office of the Secretary of State showing new partner's names at the time of bid opening showing all partners listed on the bid form.

Bidders may not change the status of your bid (owner operator, partnership, corporation) once the bid has closed.

EQUIPMENT OPERATIONS:

Persons who operate the rental equipment shall include the equipment owner-contractor or employee of the owner-contractor and no others.

The operator furnished with any rented equipment must be competent and any operator who does not satisfactorily carry out the instructions of the engineer or foreman in charge of the work shall be replaced by a satisfactory operator promptly upon written request by the lessee.

PREVAILING WAGE:

Any person other than the owner-contractor who operates the rented equipment shall be deemed an employee of the owner-contractor and shall be paid in accordance with the Prevailing Wage Provision of these specifications. If the owner-contractor is a corporation in which more than 50% of the stock is owned by a single individual, such individuals and no other may be deemed an owner-contractor for this

P a g e 4 | 5 paragraph. If the owner-contractor of the rented equipment is a partnership, any general partner thereof may be deemed an owner-operator so long as the leased equipment is titled in the partnership name or is identified as the property of the partnership in the partnership agreement. Corporate bidders or partnerships must complete the "Acknowledgement" included and return it with the bid. Corporations shall provide the year and state of their incorporation with their bids. Partnerships shall provide a notarized list of all general and limited partners designating whether the partner is general or limited and identifying any partner who will function as an operator of the rented equipment. This information as to corporations and partnerships shall be provided by bidders on a separate sheet of paper attached to the bid form. The City or Park Board may request certification of any foregoing information.

Lunch/Coffee Breaks: The foreman in charge may declare lunch and coffee breaks for his staff. If in the foreman's opinion the contractor must also cease to work during this period, the Contractor will not be paid for such time and shall not include the time in his/her invoices.

EQUIPMENT MOVES:

Equipment rented must be moved to first job location and moved from last job location by the Contractor at his/her own cost. Mobilization charges for specific equipment such as cranes as designated by Fleet Division or Park and Recreation Board will be paid by the using departments. Bidder shall submit mobilization charge formula with bid. All other moves, other than rubber-tired equipment will be made by the City or Park and Recreation Board. If equipment is to be substituted for equipment that is bid, it must have prior approval from Field Coordination Office. The Contractor shall bear and pay the cost of all inexperience, lack of skill, or negligence of the operator or operators thereof. No equipment will be allowed to park on City property without first obtaining permission from Field Coordination Office. The Field Coordination Office phone number for the City is (612) 673-5730 and for the Park and Recreation Board the number is (612) 370-4900.

All equipment with operator will be rented on an hourly basis and must be in excellent operating condition and be complete with proper licenses, insurance, fuel and necessary operating supplies.

Controlled Substances and Alcohol Use and Testing Compliance Information

1) Applicability: New Federal regulations require certain drug and alcohol testing for drivers who are required to have a commercial driver's license (CDL). The regulations become effective for the City of Minneapolis on January 1, 1995. The driver of a Contractor is included in the definition of a "driver" as defined in the regulations:

"Driver means any person who operates a commercial motor vehicle. This includes, but is not limited to:

full time, regularly employed drivers; casual; intermittent or occasional drivers; leased drivers and independent, owner-operator contractors who are either directly employed by or under lease to an employer or who operates a commercial motor vehicle at the direction of or with the consent of the employer. For the purpose of pre-employment/pre-duty testing only, the term driver includes a person applying to an employer to drive a commercial motor vehicle." 49 C.F.R. Section 382.107.

2) Contractor Obligations: The Contractor shall, at its own expense, be responsible for compliance with the regulation in all respects including, but not limited to:

a. Pre-employment testing required by Section 382.201.

b. Post-accident testing required by Section 382.303.

c. Random testing required by Section 382.305 if Lessor is a member of a consortium testing pool.

d. Return to duty testing required by Section 382.309.

e. Follow up testing required by Section 382.311.

f. The maintenance of such training and records as the rules may require the Contractor to maintain.

P a g e 5 | 5

The time and/or expense incurred by the Contractor in complying with the regulation shall not be reimbursable by the City or the Park Board.

3) City Obligation: The City shall, at the Contractor's expense, be responsible for and have the right to ensure compliance with the regulations insofar as Lessor's drivers are subject to:

a. Random testing as required by Section 382.305 for those drivers not included in a consortium testing pool.

b. Reasonable suspicion testing as required by Section 382.307.

c. Reservation of Rights: The City reserves the right to amend the obligation of the Lessor and of the City as it reasonably deems the rules to require.

A completed release and information form required by FHWADOT Regulations for Controlled Substance and Alcohol Testing must be filled out completely and submitted to the City of Minneapolis and/or the Minneapolis Park and Recreation Board before starting work.

Letter of Enrollment in a program must be submitted to the City of Minneapolis Field Coordination Office at 1200 Currie Avenue North, Minneapolis, MN 55403 and/or Park and Recreation Board Dispatch Office, 3800 Bryant Avenue South, Minneapolis, MN 55409. Letter must show all operators names.

INVOICING REQUIREMENTS:

Vendors shall submit an itemized invoice that contains billing for actual rental time; no minimum charges are allowed.

To ensure accurate and timely processing, each invoice must include:

1. PO Number assigned at the time equipment is rented.

2. Dispatcher’s Name given to the vendor when the rental is arranged.

3. Department Name: Fleet or Park Board Fleet

All work requested under this Contract shall be placed on a City issued Purchase Order. Bidder shall make all reasonable efforts to submit invoices and documentation in an electronic format, such as PDF or other format compatible with City software capabilities, in lieu of paper invoices and documentation, when so requested by City. Upon delivery and acceptance of the materials, the Bidder shall submit an invoice detailing the appropriate charges.

Invoices shall be submitted to:

City of Minneapolis – Accounts Payable 505 Fourth Ave. S, Room 310 Minneapolis, MN 55415 Email: submitinvoices@minneapolismn.gov

Upon receipt of invoice and final inspection and acceptance of the materials, the City will render payment within thirty (30) days unless any items thereon are questioned, in which event payment will be withheld pending verification of the amount claimed and the validity of the claim. The Supplier shall provide complete cooperation during any such investigation.

mailto:submitinvoices@minneapolismn.gov

SPECIFICATIONS